Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.100 Luke Short Ct.0029.2019.ARBK
DATE:2/2o/19 MASTER PERMIT: PERMIT NUMBER:0029.2019.ARBK • COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION% THEc,7YOFASPEN PROPERTY INFORMATION , ADDRESS 100 Luke Short UNIT# PARCEL ID# 273707427703 LOT 3A BLOCK TRACT Centennial Subdivision OR SUBDIVISION OWNER NAME Centennial Aspen II LP CELL 970-925-1876 EMAIL centmgt@rof.net BEST CONTACT Kim Keilin CELL 970-925-1876 EMAIL centmgt©rof.net NAME PROJECT DETAILS , DESCRIPTION OF WORK IN DETAIL Siding Repair/Replacement PROJECT $90,00o Use of Building Class of Work Fixture Counts Equipment Checklist VALUATION SO FT OF ❑ CommericalToilets,Bidets bO ❑ New Forced Air/Gravity Systems W RKAREA 18,560 ❑■ Multi-Family 0 Addition Bathtub Wall,Suspended,or Unit Heaters ❑ Single Family 0Alteration Lavatory(Wash Basin) Gas Log 0 Mixed-Use Shower UNITSQFT ❑ ❑■ Repair Kitchen Sink(+Disposal) Gas Appliancew LOT SIZE ❑ 0 IFFR Dishwasher Appliance Vents (SQ FT) ❑ Tenant Finish Laundry Bar,Utility Sink Heat,Refrig,Cooling,or DISTURBED Will there be ❑ Demolition Clothes Washer Absorption Unit EXTERIOR AREA any roof/wall ❑ Change Order Floor Sink Boilers(includes vent) penetrations? ❑ Floor Drain Air Handling Unit NEW SQ FT ❑ Yes Water Heater(Pan Req) _Cooling Systems #Gas Outlets 5Q FT OF ROOMS 0 No _Water Treatment Ventilation Fans WITH UTILITY WORK Other Range Hood #of Gas System Outlets ZONE DISTRICT R/MFA Snowmelt System Sq Ft N Project Valuation:Cost of project as defined in Valuation Affadavit. NOTICE: This permit becomes null and Z Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. is not commenced within 180 days,or ~ Lot Size:Total surveyed square footage of property. if construction or work is suspended or Y q g p p Y abandoned for a period of 180 days at Z Disturbed Exterior Area:Square footage of lot affected by permit application. any time after work is commenced. u_ New Sq Ft:Total added square footage for additions to net livable or net leasble space. p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re- FOR CITY USE ONLY APPROVALS viewer SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Department Needse SOff Ap- proved 1791 .56 Permit Fee 2756.25 Impact0 PC x jb 3/11/19 Plan Check Parks Zoning x JRB 3/19/19 Engineering Zoning(50%) 162.50 School Ded. 0 HPC Building x BM 3/22/19 Zoning(50%) 162.50 CMP(50%) 992.96 TDM Impact 0 Fire Engineering Energy Code REMP Ped.Amenity 0 CMP x Water CMP(50%) 992.96 Plan Check Housing Cash in Lieu 0(Hourly) Storm Water Zoning Sanitation Parks Review 556.80 (Hourly) Stormwater Env. Health Utility Review Engineering City Use Tax Parks x Dr 3/25/19 (Hourly) Landscape GIS County Use Tax 225 Efficiency Approved ii) �► Lot Area Deed Restricted To Issue RECEIVE Census Code # of Dwellings Plans Location Issuance ( CITY OF ASPEN December2017 130 S. GALENA ST I ASPEN, CO�81611 ADDRESS: 100 Luke Short Building "H" PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT l BUILDING PERMIT CONTACT SHEET CI FOR PLAN REVIEW QUESTIONS Name Steve Wilson Phone 970-948-7627 E-mail saw.desicin@outlook.com FOR INSPECTION QUESTIONS Name Marc Tergeoglou Phone 970-618-8003 E-mail marc@athenbuildersaspen.com OWNER Name Centennial Aspen II LP Phone 970-925-1876 Cell Phone 970-925-1876 Address 100 Luke Short Ct. city Aspen State CO ZIP 81611 Address centmgt@rof.net OWNER'S AUTHORIZED AGENT Name Kim Kellen Phone 970-925-1876 Cell Phone 970-925-1876 Adds lregs 100 Luke Short Ct. City Aspen State CO ZIP 81611 Address centmgt@rof.net APPLICATION BEST CONTACT Name Phone Cell Phone Mailing Address City State ZIP E-mail Address ARCHITECT OR DESIGNER OF RECORD Name Steve Wilson Phone 9*70-948-7627 Cell Phone 970-948-7627 Mailing Address PO Box 1328 City Basalt State CO ZIP 81621 E-mail Address saw.design@outlook.com CIVIL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address GENERAL CONTRACTOR Name Athen Builders Phone 970-618-8003 Cell Phone 970-618-8003 Address PO Box 4404 city Aspen State CO ZIP 81612 Address marc@athenbuildersaspen.com INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is b It in compliance with all applicable codes. Contractor Signature Date 1 10 2019 P fj� l' El Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner inlding a avit. (CITY USE ONLY) Owner builder approved by: Date: Affida2t/ Oly2019 CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, C9,83,611 (WING UI_-AH I MEN I 600 610 Brandon Bldgs R and S ADDRESS: 9 PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT SCOPE OF WORK CHECKLIST THECnorASPL, LAND USE QUESTIONS If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your permit application. Does your permit involve any of the following? ElPart of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District ❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high non-unit space water mark ❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure Work involves exterior of structure Changes to elevator or stair configuration ElChanging the number of residential units Changes to the use of existing structure or space ❑ Changes to number or location of onsite parking ADDITIONAL SCOPE OF WORK QUESTIONS Does your permit involve any of the following? ❑ Exterior lighting added or changed ❑ Work involves exterior wall penetrations ElWork involves roof penetrations El Work involves digging or excavation ❑ Work adds, removes, or changes ❑ Work involves restaurant or food service plumbing fixtures ElDisturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys 12 months ❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines ❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries dripline of a tree • RECEIVEI 2( CITY OF ASPEN _August130 S. GALENA ST I ASPEN, CO/81611j -L. y BUILDING DEPARTMENT PERMIT NUMBER: 0029.2019.ARBK COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC THECnorASPEN BUILDING CODE INFORMATION ❑ 2015 IRC ❑■ 2015 IBC 0 2015 IEBC 0 Other (Please Explain) Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted and Amended) Fire Sprinkler System I Existing? M°No I Required? M°No I Type 0 NFPA 13 ❑ NFPA 13 R ❑ NFPA 13 D Type Of Construction ❑■ VA 0 VB❑ IV 0 IIIA ❑ IIIB ❑ IIA ❑ IIB 0 IA 0 IB Fire Alarms Installed ■❑ Yes No Required Special Inspections ❑ High-Strength Bolting ❑ Epoxy Anchors ❑ Structual Steel Welding ❑ Permanent Micropiles 0 Sprayed Fire-Resistants ❑ Other Energy Code Compliance ❑ Prescriptive Table ❑ Other ❑ RESCheck UA Alternative ❑ COMCheck UA Alternative Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool (Existing + New) Building Type/ I ❑ A ❑ B ❑ F_ ❑ E DR I ❑ One Family ❑ Two Family Occupancy Group g ❑ B (A<50) ❑ H_ ❑M ❑ S_ R C ❑ I ❑ U C ❑ Townhouse UNIT DESCRIPTION AS PROPOSED Gross Area of Building: Gross Area of Unit: ADU BUILDING DESCRIPTION Occupant Load: Is there an ADU? 0 Yes ❑ No # Stories Above Grade # Stories Below Grade # Living Rooms Attached Garage Detached Garage Carport # Kitchens Parking Spaces Parking Spaces Parking Spaces # Full Baths # Bedrooms # Full Baths Deck Area # 3/4 Baths # 3/4 Baths # 1/2 Baths # Be2 Baths # Bedrooms # Kitchens #Wood Fireplaces #Other Rooms (List) # Gas Appliances # Gas Logs BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement Letter of Completion Main Level 2nd Floor 3rd Floor Additional RFCEIVEC Reviewed By: Bonnie Muhigirwa Date: 3/22/19 2/20/201 ( CITY OF ASPEN January2018 130 S. GALENA ST I ASPEN, CO 81611j BUILDING DEPARTMENT Permit No. COMMUNITY DEVELOPMENT DEPARTMENT Homeowner Association Compliance Policy All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or Attorney representing the property owner. The following certification shall accompany the application for a permit. Subject Property: 100 Luke Short Building "H" Northeast, Northwest Elevations, and Southeast Elevation I, the property owner, certify as follows: (pick one) I This property is not subject to a homeowners association or other form of private covenant. n This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. n This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner signature: 1 date: ( 1 //' 7 ewAsa.._. Owner printed name: Kim Keilin or, Attorney signature: date: Attorney printed name: 11, 0 November,2014 City of Aspen 1130 S.Galena St. I (970)920-5090 � 19 ASPEN BUILDING DEPARTMENT January 10, 2019 City of Aspen Building Department Attn: Denis Murray 517 East Hopkins Avenue Aspen, CO 81611 970-920-5090 Re: Permit Application Dear Denis, This letter should serve as your"Letter of Approval"to verify the property owner, contractor hired for the work, etc. Centennial-Aspen II Limited Partnership hereby does approve that Athen Builders Inc./Marc Tergeoglou will perform the siding replacement work at 100 Luke Short Building"H" Athen Builders estimate that the work designated for H Building will be a total of$90,000. Please call if you have further questions or concerns. Sincerel , et/(A/Yt K' ilin, Property Manager Centennial Community Management, Inc. 100 Luke Short Court Aspen, CO 81611 970-925-1876 office centmgt@rof.net RECEIVED 2/20/2019 ASPEN BUILDING DEPARTMENT ADDRESS: 100 Luke Short Building "H" PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST THECr(YOFASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days, weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future,long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ❑x Yes❑No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? 0 Yes 0 No Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. Agent ner Kim Keilin Phone # 970-925-1876 vvv i ici Applicant (print name) Marc Tergeoglou Phone # 970-618-8003 Applicant Signature Date 1 10 2019 I ri Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you a e,q �gL' about asbestos, interpreting your test results, or other matters. 2/20/2019 CITY OF ASPENNAugust2017 130 S. GALENA ST I ASPEN, CQi$4611J BUILDING DEPARTMENT HealthSa f eEGT10N5 HealthSafe Inspections Inc 390 Apple Drive Basalt CO 81621 970-920-2100 Jim Baker CDPHE Asbestos Building Inspector,Asbestos Air Monitoring Specialist (AMS) & Project Designer Certification #13437 CDPHE Lead-Based Paint Inspector & Lead Hazard Assessor Certification #23607 ASBESTOS REPORT DATE 01/16/2019 CLIENT Centennial Condominiums HOA — 100 Luke Short Court PROPERTY ADDRESS 100 Luke Short Court,Aspen, Colorado 81611 1 00 LUKE SRO__RT 4C1. 1 RECEIVFL 1 2/20/2019 ASPEN BUILDING DEPARTMENT CLIENT BACKGROUND & CONCERNS The Client,Athen Builders, Inc., hired HealthSafe Inspections, Inc. (hereinafter, HealthSafe) to perform a limited exterior asbestos inspection for the removal of exterior cladding materials (wood siding, non-taped gypsum wallboard, insulation). The inspection included bulk sampling, PLM analysis of those bulk samples by a certified laboratory and this report for the requirements of exterior building materials removal and disposal. Interior building materials of personal storage closets and the interior of the dwelling units are exempt from this report. VISUAL INSPECTION & LABORATORY FINDINGS An inspection was conducted by Jim Baker of HealthSafe on Friday, January 11, 2019. All exterior siding/cladding suspect asbestos containing materials (ACM) or suspect asbestos containing building materials (ACBM) were identified by their respective homogenous materials reflecting the same in consistency, appearance and application/installation date(s) and sampled randomly respective to the scope of those materials slated for disturbance-demolition-disposal (DDD). Those materials collected and analyzed by EPA 600 Method PLM analysis are the following: 1. Exterior Non-Taped Gypsum Wallboard, a homogeneous miscellaneous material requiring a minimum of at least two samples [samples 1-2: GYP-1,2], collected from underneath the exterior wood siding underneath two separate north entry stairwells. The PLM analytical estimated results: NONE DETECTED. A total of 2 suspect homogeneous ACM/ACBM bulk samples were collected and 2 samples were analyzed. The bulk samples were analyzed by EPA 600 PLM analytical methods by a NVLAP accredited laboratory in accordance with Colorado State Regulation 8 for the presence of asbestos mineral fibers. There is NO asbestos in all 2 samples. See supporting Hayes Microbial Consulting, Inc. data report#19001568. HEALTHSAFE CONCLUSIONS • There is NO asbestos in any of the exterior gypsum wallboard, a suspect building material slated for DDD. NO asbestos abatement will be required for any of these specific and limited building materials.All the exterior walls'building waste and debris can be disposed of in any landfill which accepts normal, non-hazardous building waste. RECEIVED 2 2/20/2019 ASPEN BUILDING DEPARTMENT Sincerely Submitted, Jim Baker COLORADO & FEDERAL ASBESTOS REGULATIONS SUMMARY Regulation No. 8 Part B—Asbestos of the Colorado Department of Public Health and Environment(CDPHE),Air Quality Control Commission requires a State-certified Asbestos Building Inspector to inspect and collect bulk samples of all suspect asbestos containing materials (ACM) or suspect asbestos containing building materials (ACBM) prior to their disturbance, removal or demolition and disposal. The suspect materials shall be analyzed by a NVLAP accredited laboratory by polarized light microscopy(PLM) using EPA 600 analytical method.A material which is estimated to contain more than 1% asbestos is classified as ACM/ACBM and regulated by the State and Federal governments.Any friable (able to crush or reduce to powder by finger pressure) asbestos with trace amounts of asbestos fibers or less than 1%must be point-counted using EPA 400 analytical method to prove that it is indeed less than 1%; if not, it must be classified as ACM/ACBM and shall be treated as a State and Federal regulated material.Any friable asbestos containing material (greater than 1% asbestos concentration) or ACM/ACBM that could be rendered friable during its removal or demolition and disposal shall require an asbestos abatement by a certified asbestos abatement contractor to remove and dispose of the material(s). A Colorado State (CDPHE) issued asbestos abatement permit is required for the following trigger levels of ACM/ACBM: 1. Residential buildings of four or fewer units--if more than 32 square feet of any surface coverage (e.g., gypsum wallboard or drywall and associated applied surfacing materials/textures, acoustic sprays,joint compounds,plaster, etc.), 50 feet of asbestos covered or asbestos insulated pipe or any material which would fill a 55-gallon drum is going to be disturbed, removed or disposed of, an asbestos abatement permit is required. 2. Residential complexes with more than four residential units, public access areas to a residential building, commercial and retail buildings,public and civic buildings, industrial buildings--if more than 160 square feet of surfacing materials, 260 linear feet or more than 35 cubic feet (NESHAP) or 55-gallon drum(CDPHE) of suspect RECEIVED 3 2/20/2019 ASPEN BUILDING DEPARTMENT ACM/ACBM is going to be disturbed, removed or disposed of, an asbestos abatement permit is required under NESHAP and by the CDPHE. See note below on OSHA. The regulations require an absolute minimum of 3 samples (EPA suggests 9)per homogenous suspect surfacing and TSI materials and an absolute minimum of 2 samples of homogenous miscellaneous materials or any number of"samples sufficient to determine whether a material is ACM" (Reg8.IV.D.3). More samples are required based on surface area or volume. These are minimums; the asbestos building inspector has the field responsibility to determine homogenous materials and the number of samples to collect per material; more than the minimum number of samples may be necessary at the discretion of the inspector.An assessment of friability and functional space conditions of the materials are also the inspector's field responsibilities. OSHA compliance is required for all employers and employees no matter the quantity of asbestos present with strict regulations regarding 10 sf or more of TSI or friable surfacing materials, and therefore it does not matter what the quantity or State trigger levels are: all suspect ACM/ACBM shall be inspected and tested for asbestos prior to their disturbance, removal and disposal for worker protection and safety. See EPA 40 CFR 763.121 Worker Protection Rule, OSHA 29 CFR 1910.134 Respirator Protection Standard, OSHA 29 CFR 1910.1001 General Industry Standard and OSHA 29 CFR 1926.1101 Construction Standard regulations when dealing with asbestos hazards. Note: County or City regulations may be more stringent. RECEIVED 4 2/20/2019 ASPEN BUILDING DEPARTMENT HMC #19001568 HAYES MICROBIAL CONSULTING 3005 East Boundary Terrace,#F Midlothian,VA 23112, USA 804.562.3435 Fax: 804.447.5562 contact@hayesmicrobial.com http://hayesmicrobial.com/ Analysis Report prepared for HealthSafe Inspections 390 Apple Drive Basalt, CO. 81621 Phone: 970-920-2100 Job Name: C-O Athen Builders 100 Luke Short Ct Aspen, CO 81611 Date Sampled: 01-11-2019 Date Analyzed: 01-16-2019 Report Date: 01-16-2019 EPA Laboratory ID#VA01419 `n9rpnnectirur Ne ® TEXAS DPH Department Jo Health S Services Connecticut Department of Public Health RECEIVED NVLAP Lab Code: 500096-0 Asbestos License: 300435 License:#PH-0198 2/2 0/2 01 9 ASPEisii of 4 BUILDING DEPARTMENT 4111D HAYES MICROBIAL CONSULTING 3005 East Boundary Terrace,#F Midlothian,VA 23112, USA HMC #19001568 804.562.3435 Fax:804.447.5562 HealthSafe Inspections 390 Apple Drive Basalt, CO 81621 January 16, 2019 Client Job Number: Client Job Name: C-O Athen Builders 100 Luke Short Ct Aspen, CO 81611 Dear HealthSafe Inspections, We would like to thank you for trusting Hayes Microbial for your analytical needs. On January 14, 2019 we received 2 samples by FedEx for the job referenced above. 2 samples were received in good condition. The results in this analysis pertain only to this job, collected on the stated date and should not be used in the interpretation of any other job. This report may not be duplicated, except in full, without the written consent of Hayes Microbial Consulting, LLC. This laboratory bears no responsibility for sample collection activities, analytical method limitations, or your use of the test results. Interpretation and use of test results are your responsibility. Any reference to health effects or interpretation of mold levels is strictly the opinion of Hayes Microbial Consulting. In no event, shall Hayes Microbial Consulting or any of its employees be liable for lost profits or any special, incidental or consequential damages arising out of your use of the test results. 411141 *64---. Steve Hayes, BSMT(ASCP) Laboratory Director Hayes Microbial Consulting, LLC RECEIVED 2/20/2019 ASPEA2 of 4 BUILDING DEPARTMENT HA Y E S HealthSafe Inspections EPA 600/R-93, M-4/82-020 (PLM) (1111D MICROBIAL CONSULTING 390 Apple Drive 3005 East Boundary Terrace,#F Basalt, CO 81621 Midlothian,VA 23112, USA Phone: 970-920-2100 HMC #19001568 804.562.3435 Fax:804.447.5562 Job Number: Job Name: C-O Athen Builders Date Collected: 01/11/2019 Collected by: Jim Baker 100 Luke Short Ct Date Received: 01/14/2019 Email: healthsafeinspections@gmail.com Aspen, CO 81611 Date Reported: 01/16/2019 # Sample Name Description Asbestos Fibers Other Fibers Non-Fibers 12 % Cellulose fibers 1 1 GYP-1 Drywall/White/Brown (None Detected) 2 % Fiberglass 86% 12 % Cellulose fibers 2 2 GYP-2 Drywall/White/Brown (None Detected) 2 % Fiberglass 86 0,0 RECEIVED / Signature: Date: 01/16/2019 Reviewed by: �� �j ' Date: 01/216/201209/2019 ASPahi3 of 4 ! U LDING DEPARTMENT 4111DHA Y E S HealthSafe Inspections Asbestos - Additional Information MICROBIAL CONSULTING 390 Apple Drive 3005 East Boundary Terrace,#F Basalt, CO 81621 Midlothian,VA 23112, USA Phone: 970-920-2100 HMC #19001568 804.562.3435 Fax:804.447.5562 All samples were received in acceptable condition unless otherwise noted on the report. This report must not be used by the client to claim product certification, approval, or endorsement by AIHA, NIST, NVLAP, NY ELAP, or any agency. The results relate only to the items tested. Hayes Microbial Consulting reserves the right to dispose of all samples after a period of 60 days in compliance with state and federal guidelines. All Polarized Light Microscopy (PLM) results include an inherent uncertainty of measurement associated with estimating percentages by PLM. Measurement uncertainty data can be provided when requested. 'None Detected'-Below the detected reporting limit of 1% unless point counting is performed,then the detected reporting limit is .25%. Per NY ELAP198.6(NOB), TEM is the only reliable method to declare an NOB material as Non-Asbestos Containing. Any NY ELAP samples that are subcontracted to another laboratory will display the name and ELAP Lab Identification number in the report page heading of those samples. The original report provided to Hayes Microbial Consulting is available upon request. RECEIVED Signature: Date: 01/16/2019 Reviewed by: _J2�� ' Date: 01/16/2019 2/20/2019 ASPE014 of 4 BUILDING DEPARTMENT 1•1•�•t••./•. .••1•t•;••••/•. \�� .••t•1•���•/••� ••1•�•t�/•.•. •.•�•�����•• t/ •i�•����•j�• ,•.i....../• `i: ••1•��;�•/•�• ••1•1�;••/•/• V .•1•�•;••�i •ii••••I�4.;.•. y.�1j1.1.1••11•A. ..;1:11.11••/001,'•. �.p,t�/I,4II/.p.. ..4.4,*111•�••....i..ivg4/1/1// •P• :�1111�/4/�/.00 v►111/�fs.,...40. th,o,444If,0,0. .iv,,,�.t.c•i .•..p 11/1;0;„.�q\111•N/111/11 1 0 1;•,.t.o tt40.4111111 .•'Ak40•••1.4.0V/i/e�.\\\I1.440l/j 00i'..�.\00.S...400,00,-^.�\\11111//11.111044`7.'voso, 0,,,,,,, ;•\\\%;41,./11•,ori4��,A0.,,1c�:�•�. ....��v.,•0r,0g,,,J11111•j1�,I,1e,jAJ111111.1/0•00,,e4 �\\11111//..,•,,fele J\1111 t...1 ,,,,,,/'As,00.4.0.:,,,,A• ,, 1111•woo,if/,;// J�\�11j111111odq':#414\�111�1/111j/11r/40,ii! r rfIir4'-'.:lirp �1 . zE.. �.. ••-�== " _ � ��` "'t�J'R•11 '1h`11U11 �1�•(�UJGUIlt�J1,IU�Ji�U�ifU'11���IhG11(N1�JhU�h��U�i(�L � %:e_- • *,., .k • 11CI1 ��/.u�V1V'V.V.V..y�•��/1. / i ., .�.��_= lam. � � �i _ _ _ J\_, -l' l ... - _. _. _. - � _ .. � �IVVV V v"i/Yi/\/.YC' �_�••. ,2-::5f.:5.:._ssssrzl., )j vic- —fefj .== ;' Colorado Department t - =:=%%,.-:. c i= = _---- ' of Public Health (( =%=• :: j) and Environment ((c; -_=:.::.:;. % :' ?ij �� A' ::�«, _) ASBESTOS • `��' ";'=:•. ' ';: j', CERTIFICATION* cic:: %s== N,,.-_ - This certifies that t« ' ems:; ;.Z.= ?)) cc Jim Baker •-4.5z-,&-- ( o.• %_ ;:.-e.........,i_ _ Certification No.: 13437 c :; -.�: ..' has met the requirements of 25-7-507, C.R.S. and Air Quality Control ,,,�s Commission Regulation No• 8 Part B, and is herebycertified b the 4 state of Colorado in the following discipline: ..--sic.E.,..-z.c....• K`` i•C.='';' i Building Inspector* , - » c, - Issued: March 28, 2018 ( . = )) c _- :' ':;•c s Expires: April 22, 2019 c „�'N = <cc<(:; ((c ,, ,ii • a'i ii,l, ;Z:;S:.tit4.. y;?-s :' ? , *This certificate is valid onlywith thepossession ofa ���•• » (ice .... current Division-approved training course certification ((( )0>>� .�� 4•i• ) in the discipline specified above. [C .��..���� ?j) A prized APCD Representative - :2 :- ':::*,- �) SEAL ___ _ 41 :•: llnl-'"'"f•tll�llf^�lhf�l�ltlilf•114a lilif�liff '1 f�1frihnl111n a irti1��unt��l �b�„�hGf�W4l �l mil.,lhf�t(1moitl�l1•,ilmtguttl ez • ‘ - 1 v...����.�\•\�/%I/ wf:'.',..:•?:: -••.• , ,42 ,.4 :j.' .:•1\�\\ i%r/ ��,'. \1\�\\�%/r%r! '' \11�\\ "�%r� 1�\11►1\�%%il�Ntit•\N�\�%S%// ' \N�►�-'%Ir/ ':i;•\\ ��� .�`�\�////�rd��1'yy1}���\�/I//�,iii1'.ji`y\��\�/%//,f.'J�ihi4��►►\�////�'ri�iti�i•�l►�\�////� •�.�.,1�►►\ / /l�p r�1�.�.��\.►\�//// •.j�:\► • �:` .��;:fli\�V//l9p•111f.►pa!\\V//�� d:::::1.y 111V/l,:i,'.`:;*: ,;����//��/ip'r�11141�i�, \�V//1,�4A.;Q1:iNr�;l�\yV/f/,,�p .1114 ��\r/j/cy�;;;3.).�r�y!y� 2 2 9 :•: .7i1i1i1�yw �j1i/t1111�yh��r %f11111�1111111+1'I��w���lll14+:11 41'41�./ /11111.1111111��1Ay���t',1111�1.11111111�1�1\����! l11�I0 111111 1 1'4\��i%llllr 11.11/1�4�1\�\�Y, G 2 O G O 1 7 1i•.1N�1111\►. •;//j111/1/1 1�11U •i%/%1%1�111111►1►► •i%/IIIIIIN1111111,\..(�//III1111f11111►. •./////II11111111\►. •%//I/I1/11�111,►\•�•(j//I/I�//1111t11\►\v . ��t�.:�1��101. ,00,t1..14•11•. \ d�'/<t••§ilitl: A;�rt�t,1.till,A g,•'1/.1,1•i 1. 11(tt.•NII�►PIr '.fj/il•�11�4:!!• ii�jlttt<t1`de •'I4••„ ... Ir..: L BUILDING DEPARTMENT � --_ �f ►i\' • . � i ; ♦ �►, - ................ ... ...'I.. -,. .00 41,l . ` •.,ifitfriii%'• >'; •Ob{1�f►�!!i4S /� �'� ''a�A\! ll�'., 0..,ift4rri•1 : .' ,01, \!li��•:%• •f',+ . {{p .� , } , . ••,• ►►;r•• • //0%;•''''b .5.rrrv•,'0 0' .•a ',g►1.r•./ .%/%,$i ' .4gC1:r •v •/41V•"- b� 0 r ., .°44l. 41kiti Y•v,• ./% ',f6, 4\ZS0 ,.„/ Ci4i-'�?. ov ••gi i/ / / • •r.� ,.,.t1r"•. / �•• r.e.q\;\;..17d•3. ': ♦ , ;_:ydrrI,1•, / ••• \;; . /ry / /�•• r • ;e•1rl'v / •Q• , ;,yraN/1,,p. i, . S,if I ' tf ,1 1 l `s ( tf , ,, i � ' d"i' L i � am _ -..;:;2:::14:: V.240ir.,:;•."i',• ',i;!It' cic - i Y 1= - p.,,) --':.'._'„.,:,'E,,'tt..)o• .AP•,rfi.-k•1 , - c •r.e0.4.,.1 _,oM$o-••I1 s, ▪ 1 ..fir U ,N F•▪ : ( . , .:c t.iir2:';',.,1'-„,,,1,, 01 ci Sr !\,1- :.-4, r-,::::::,-a.-1..1... - 1 cJ N. L� �.., _ ▪ rMwm4 N .. d ci 4- EN" O Una 'l.I �•{ O Y1/((((((�I•�! ��y\\- . /1.0 (i.) O Z y�_i •• ce, Z i •••o�C: �'I' '•• . I �+.1-%,; :") op r-1 ��• •1 `T//!1 �jOr' rl �+ _�►i�••• • '▪ ,iv '•j _ w0 i 1 ilp� * p [ U �•i IL N O F�� ._r O 4..+ cd .cc vv. +�{ a ,Q by a :El.) Z Oap • a �, C • G4Cr 00 "CI o z • � = W -0 3 .-. O s-+ 00 VI • / bUA y„• O ,r—' a2 CNI .4"-t•- ::::.:;?t E.,-.. Cd C"-- ^ ..-- IIVei,%;:=":ZIA 7 +- U �" cs ' ' :d lcA (f.f.fe'.'.i.::',;::, ...., 1: ,, E ';..: :,i,:.::.....o.. .. -y,1 a"L--- i� • 0 ice. ••/•ry • ..-• / i '{ i ' 3 p� 61 a.� � il 11 : • / l • '•"lfl . . . ts` //,;,•414.i...,,..t , � •o ,i11. • ,,,, a t. e,.0mi k. ] . ,,.•Ii, ! _ .11. , ,, . il q.,. � i •> , / \ ` 1 / ' J ./i.1.I• .401)\.• t. . . /�11 \���{. . i ,••.:� /. \�:{\'• ," / /•//i4.4 �•{{ +: 4 /! ► .\� `� ✓ +� / I�l1•i\a�1�{► ��_y. / •1 �. 1,1i•A . i.� � • s�!1 •� `�:% • 1..0 • 1,...1 __ '� . 1 .BUILDING DEPARTMENT ADDRESS: 100 Luke Short Building "H" PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT — VALUATION AFFADAVIT THE GncfASPEN AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I n rstan that this document is a p blic d cument. \\ Owner Signature: Date: (� 1 O(joN Owner Printed Name: Centeniall II LP or, Authorized Agent Signature: Date: 01-10-2019 Authorized Agent Printed Name: Kim Keilin RECEWE CITY OF ASPENAugustzal7 130 S. GALENA ST ASPEN, C04Vesag19 ASPEN BUILDING DEPARTMENT ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY THE Cif Y OF ASPEN Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed jr ea qr 9�, -rat Additional roof plans showing location of measurements may be necessary. f I �„II" CITY OF ASPEN August2ow 130 S. GALENA ST ASPEN CO�81611 l PERMIT NUMBER: ADDRESS: 100 Luke Short Building "H" COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY THE CrrYOFASPEN 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) Marc Tergeoglou understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: - Date: 1-10-2019 RECEIVEb /,0/poi$ CITY OF ASPENAugust.o17 130 S. GALENA ST I ASPEN, Cap$16111 tfUILUIN(Utt'AH I MtN I January 10, 2019 City of Aspen Building Department Aspen, Colorado 81611 Re: Centennial Siding/Insulation replacement 2018—100 Luke Short Building"H" To Whom It May Concern, "Where the owner certifies in writing to the City of Aspen and the City of Aspen agrees in writing that the planned work and the final structures or topographical changes will not result in, or contribute to, soil erosion or sediment discharges to any waterway or irrigation ditch and will not interfere with any existing drainage course or waterway in such a manner as to cause damage to any adjacent property, or result in the deposition of debris or sediment on any public right-of-way,will not present any hazard to any persons or property, and will have no detrimental influence upon the public welfare, or upon other properties in the watershed." As the Agent for the Owners/Partners of Centennial-Aspen II, I agree to the above. All work performed will comply and not interfere with soil, irrigation, adjacent property or create hazard or detrimental influence. Ki Keilin Centennial-Aspen II 100 Luke Short Court Aspen, CO 81611 970/925-1876 centmgt@rof.net RECEIVED 2/20/2019 ASPEN BUILDING DEPARTMENT