Loading...
HomeMy WebLinkAboutFile Documents.535 E Cooper Ave.0004.2019 (20).ACBK RECEIVED l COMcheck Software Version 4.1.1.0 Interior Lighting Compliance Certificate BUILDIN DE TM NT Project Information Fill out the Energy Code: 2015 IECC owner/agent section of Project Title: Stein Bldg the lighting comcheck. Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 529-535 E Cooper AVE BGbuildingworks Aspen, CO 81611 PO Box 9650 Avon, CO 81620 970.949.6108 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Unit#1 101 (Retail:Sales Area) 875 1.59 1391 2-Unit#2 102(Retail:Sales Area) 239 1.59 380 3-Unit#3 103(Retail:Sales Area) 466 1.59 741 4-Unit#4 104(Retail:Sales Area) 720 1.59 1145 5-Unit#5 105(Retail:Sales Area) 1156 1.59 1838 6-Unit#6 106(Retail:Sales Area) 927 1.59 1474 7-Common Corridor 111 (Common Space Types:Corridor/Transition<8 ft wide) 395 0.66 261 8-Unit#4 RR(Common Space Types:Restrooms) 58 0.98 57 9-Unit#5 RR(Common Space Types:Restrooms) 52 0.98 51 10-Unit#6 RR(Common Space Types:Restrooms) 34 0.98 33 11-Common Bath 112(Common Space Types:Restrooms) 52 0.98 51 12-Trash 110(Common Space Types:Storage>=50-<=1000 sq.ft.) 185 0.63 117 Total Allowed Watts= 7538 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Unit#1 101 ( Retail:Sales Area 875 sq.ft.) LED 1: R1:Other: 1 9 16 144 Track lighting 1:T2:Track Lighting: Wattage based on current limiting device capacity 0 0 480 480 Unit#2 102 ( Retail:Sales Area 239 sq.ft.) LED 4: R1:Other: 1 10 16 160 Unit#3 103( Retail:Sales Area 466 sq.ft.) LED 2: R1:Other: 1 9 16 144 LED 3:C1:Other: 1 2 192 384 Unit#4 104( Retail:Sales Area 720 sq.ft.) LED 5: R1:Other: 1 1 16 16 Track lighting 2:T2: Wattage based on current limiting device capacity 0 0 720 720 Project Title: Stein Bldg Report date: 12/07/18 Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 1 of 6 RECEIVED 1/7/2019 A B C D E fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. ASPEN BUILDIWi AR5 € tail:Sales Area 1156 sq.ft.) Track lighting 3:Ti: Wattage based on current limiting device capacity 0 0 720 720 Track lighting 4:T2: Wattage based on current limiting device capacity 0 0 840 840 Unit#6 106( Retail:Sales Area 927 sq.ft.) LED 8: R1:Other: 1 1 16 16 LED 14:Other: 3 9 50 446 Common Corridor 111 (Common Space Types:Corridor/Transition<8 ft wide 395 sq.ft.) LED 11:R2:Other: 1 10 11 110 Unit#4 RR(Common Space Types:Restrooms 58 sq.ft.) LED 6:V1:Other: 1 1 18 18 Unit#5 RR(Common Space Types:Restrooms 52 sq.ft.) LED 7:V1:Other: 1 1 18 18 Unit#6 RR(Common Space Types:Restrooms 34 sq.ft.) LED 9:V1:Other: 1 1 18 18 Common Bath 112 (Common Space Types:Restrooms 52 sq.ft.) LED 10:V1:Other: 1 1 18 18 Trash 110(Common Space Types:Storage>=50-<=1000 sq.ft. 185 sq.ft.) LED 12:S1:Other: 1 3 25 75 Total Proposed Watts= 4326 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Brent Schumacher, EIT- Electrical Engineer 12/10/2018 Name-Title Signature Date Project Title: Stein Bldg Report date: 12/07/18 Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 2 of 6 RECEIVED 1/7 COMcheck Software Version 4.1.1.0 Inspection Checklist BUILDIN DE TM NTEnergy Code: 2015 IECC Requirements: 94.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR4]1 calculations provide all information Does Not with which compliance can be Location on plans/spec: E0.2, E3.1 determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Stein Bldg Report date: 12/07/18 Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 3 of 6 RECEIVED i is? V,9Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID Asp. .iti ;Lighting controls installed to uniformly ❑Complies Requirement will be met. BUILDIC ARTIITe the lighting load by at least ❑Does Not ° ❑Not Observable Location on plans/spec: E3.1 ' ❑Not Applicable C405.2.1 i Occupancy sensors installed in ❑Complies Requirement will be met. [EL18]1 I required spaces. ❑Does Not ❑Not Observable Location on plans/spec: E3.1 ❑Not Applicable C405.2.1, Independent lighting controls installed ❑Complies Requirement will be met. C405.2.2. per approved lighting plans and all ❑Does Not 3 manual controls readily accessible and ❑Not Observable Location on plans/spec: E3.1 [EL23]2 visible to occupants. ENot Applicable C405.2.2. Automatic controls to shut off all ❑Complies Exception: Lighting controlled by occupancy sensors. 1 building lighting installed in all ❑Does Not [EL22]2 buildings. ❑Not Observable Location on plans/spec: E3.1 ❑Not Applicable 01 .3 Daylight zones provided with ;❑Complies Exception: Requirement does not apply. individual controls that control the ❑Does Not lights independent of general area lighting. ❑Not Observable ❑Not Applicable C405.2.3, Primary sidelighted areas are Complies Exception: Requirement does not apply. C405.2.3. equipped with required lighting ❑Does Not 1, controls. C405.2.3. ❑Not Observable, 2 ❑Not Applicable [EL20]1 1 C405.2.3, Enclosed spaces with daylight area ;❑Complies Exception: Requirement does not apply. C405.2.3. under skylights and rooftop monitors ❑Does Not 1, are equipped with required lighting C405.2.3. controls. ❑Not Observable 3 ❑Not Applicable [EL21]1 C405.2.4 Separate lighting control devices for EComplies Requirement will be met. [EL4]1 specific uses installed per approved Does Not lighting plans. Location on plans/spec: E3.1 ❑Not Observable ❑Not Applicable C405.2.4 Additional interior lighting power ❑Complies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is ❑Not Observable Location on plans/spec: E3.1 automatically controlled and separated from general lighting. ❑Not Applicable 1 C405.3 Exit signs do not exceed 5 watts per ❑Complies Requirement will be met. [EL6]1 face. ❑Does Not ❑Not Observable Location on plans/spec: E0.2 ❑Not Applicable Additional Comments/Assumptions: High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) ' Project Title: Stein Bldg Report date: 12/07/18 Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 4 of 6 RECEIVED 1/ 7 Vv 19 Final Inspection Complies? Comments/Assumptions & Req.ID N Furnished O&M instructions for ❑Complies BUILDII RT V s and equipment to the ❑Does Not . ng owner or designated [F117]3 representative. ❑Not Observable ❑Not Applicable C405.4.1 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [F118]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts ❑Not Observable are less than or equal to allowed ❑Not Applicable watts. C408.2.5. :Furnished as-built drawings for ❑Complies 1 :electric power systems within 90 days ❑Does Not [F116]3 of system acceptance. ❑Not Observable ❑Not Applicable C408.3 1 Lighting systems have been tested to ❑Complies [F133]1 ensure proper calibration, adjustment, ❑Does Not programming, and operation. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Stein Bldg Report date: 12/07/18 Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 5 of 6 RECEIVED 1/7/2019 ASPEN BUILDING DEPARTMENT Project Title: Stein Bldg Report date: 12/07/18 Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 6 of 6