HomeMy WebLinkAboutFile Documents.535 E Cooper Ave.0004.2019 (21).ACBK RECEIVED
1/7 COMcheck Software Version 4.1.1.0
ft
Mechanical Compliance Certificate
BUILDIN DE TM NT
Project Information
Energy Code: 2015 IECC
Project Title: Stein Bldg
Location: Aspen, Colorado
Climate Zone: 7
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
529-535 E Cooper AVE William Larson
Aspen, CO 81611 BGbuildingworks
PO Box 9650
Complete the Avon, CO 81620
970.949.6108
owner/agent on the bplarson@bgbuildingworks.com
plarson@bgbuildingworks.com
mechanical comcheck
Mechanical Systems List
Quantity System Type&Description
1 FC-1 (Single Zone):
Heating: 1 each-Hydronic or Steam Coil, Hot Water,Capacity=37 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each-Hydronic Coil,Capacity=24 kBtu/h, No Economizer, Economizer exception:None
No minimum efficiency requirement applies
Fan System: FC-1 I Unit 1 --Compliance(Motor nameplate HP method): Passes
Fans:
FAN 1 Supply,Single-Zone VAV, 1500 CFM, 1.0 motor nameplate hp,0.0 fan efficiency grade
1 FC-2(Single Zone):
Heating: 1 each-Hydronic or Steam Coil(Cooling equipment),Hot Water,Capacity= 14 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each-Hydronic Coil,Capacity=10 kBtu/h, No Economizer, Economizer exception:None
No minimum efficiency requirement applies
Fan System: FC-2 I Unit 2--Compliance(Motor nameplate HP method): Passes
Fans:
FAN 2 Supply,Single-Zone VAV,600 CFM,0.8 motor nameplate hp,0.0 fan efficiency grade
1 FC-3(Single Zone):
Heating: 1 each-Hydronic or Steam Coil, Hot Water,Capacity=24 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each-Hydronic Coil,Capacity=14 kBtu/h, No Economizer, Economizer exception:None
No minimum efficiency requirement applies
Fan System: FC-3 I Unit 3--Compliance(Motor nameplate HP method): Passes
Fans:
FAN 3 Supply,Single-Zone VAV, 1000 CFM,0.8 motor nameplate hp,0.0 fan efficiency grade
1 fc-4(Single Zone):
Heating: 1 each-Hydronic or Steam Coil, Hot Water,Capacity=21 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each-Hydronic Coil,Capacity=14 kBtu/h, No Economizer, Economizer exception:None
No minimum efficiency requirement applies
Fan System: FC-4 I Unit 4--Compliance(Motor nameplate HP method): Passes
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 1 of 17
RECEIVED
1Qwintr bf stem Type&Description
// // Fans:
ASPEN FAN 4 Supply,Single-Zone VAV, 1000 CFM,0.8 motor nameplate hp,0.0 fan efficiency grade
BUILDING DEPARTMENT Zone):
Heating: 1 each-Hydronic or Steam Coil, Hot Water,Capacity=51 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each-Hydronic Coil,Capacity=26 kBtu/h, No Economizer, Economizer exception:None
No minimum efficiency requirement applies
Fan System: FC-5 I Unit 5--Compliance(Motor nameplate HP method): Passes
Fans:
FAN 5 Supply,Single-Zone VAV, 1650 CFM, 1.5 motor nameplate hp,0.0 fan efficiency grade
1 fc-6(Single Zone):
Heating: 1 each-Hydronic or Steam Coil, Hot Water,Capacity=33 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each-Hydronic Coil,Capacity=34 kBtu/h, No Economizer, Economizer exception:None
No minimum efficiency requirement applies
Fan System: FC-6 I Unit 6--Compliance(Motor nameplate HP method): Passes
Fans:
FAN 6 Supply,Single-Zone VAV, 1950 CFM, 1.5 motor nameplate hp,0.0 fan efficiency grade
1 CUH-1 (Single Zone):
Heating:3 each-Unit Heater, Electric,Capacity=5 kBtu/h
No minimum efficiency requirement applies
Fan System: CUH I Basement and entry doors--Compliance(Motor nameplate HP method): Passes
Fans:
FAN 7 Supply,Constant Volume,70 CFM,0.1 motor nameplate hp,0.0 fan efficiency grade
2 Boiler Plant:
Heating: Hot Water Boiler,Capacity 465 kBtu/h,Gas
Proposed Efficiency:97.00%Et,Required Efficiency:80.00%Et
4 Chiller:
Cooling:Condensing Unit,Capacity 5 kBtu/h,Condenser Air-Cooled
No minimum efficiency requirement applies
1 Water Heater 1:
Gas Storage Water Heater,Capacity: 119 gallons, Input Rating: 199 kBtu/h w/Circulation Pump
Proposed Efficiency:97.00%Et,Required Efficiency:80.00%Et
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit pplication.The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Versi 4. .1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
William Larson, PE a/tA/L -. 12/10/2018
Name-Title S' Date
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 2 of 17
RECEIVED
1/7 COMcheck Software Version 4.1.1.0
Inspection Checklist
BUILDIN DE TM NTEnergy Code: 2015 IECC
Requirements: 97.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans, specifications, and/or ❑Complies Requirement will be met.
[PR2]1 calculations provide all information Does Not
with which compliance can be Location on plans/spec: ALL PLANS
determined for the mechanical ❑Not Observable
systems and equipment and ❑Not Applicable
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
C103.2 Plans, specifications, and/or ❑Complies Requirement will be met.
[PR3]1 calculations provide all information Does Not
with which compliance can be
determined for the service water ❑Not Observable
heating systems and equipment and ❑Not Applicable
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 3 of 17
RECEIVED
1/ f V,Sooting/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
Asp.E.p4 Snow/ice melting system sensors for ❑Complies Exception: Requirement does not apply.
BUILDII pRT�connectionionsystems to
have controls.automatic Freeze ❑Does Not
ct
6 ;controls installed. ❑Not Observable
[FO9]3 ❑Not Applicable
Additional Comments/Assumptions:
'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 4 of 17
RECEIVED
1f#�V,9Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
9FPEN Heated water supply piping conforms ❑Complies Exception: Requirement does not apply.
BUILDII �t T I•° }pe length ❑Does Not
rements. Referand tovolume section details. Location on plans/spec: M2.1
[PL6]3 [Not Observable
❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies Requirement will be met.
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details. Location on plans/spec: M2.0, M2.1
[PL6]3 ['Not Observable
❑Not Applicable
C404.5, Heated water supply piping conforms ;❑Complies Requirement will be met.
C404.5.1, to pipe length and volume InDoes Not
C404.5.2 requirements. Refer to section details. ENot Observable Location on plans/spec: M2.0, M2.1
[PL6]
❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies Requirement will be met.
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details. ['Not Observable Location on plans/spec: M2.0, M2.1
[PL6]3 ❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies Requirement will be met.
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details. Location on plans/spec: M2.0, M2.1
[PL6]3 ❑Not Observable
I❑Not Applicable
C404.5, Heated water supply piping conforms Requirement will be met.
C404.5.1, Ito pipe length and volume ❑Does Not
C404.5.2 ;requirements. Refer to section details. ❑Not Observable Location on plans/spec: M2.0, M2.1, M3.2
[PL6]3 ❑Not Applicable
C404.5, :Heated water supply piping conforms ❑Complies Requirement will be met.
C404.5.1, Ito pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details. Location on plans/spec: M2.0, M2.1, M3.2
[PL6]3 ['Not Observable
❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies Requirement will be met.
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details. Location on plans/spec: M2.0, M2.1
[PL6]3 [Not Observable
❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply.
C404.5.1, to pipe length and volume ID Does Not
C404.5.2 requirements. Refer to section details. ['Not Observable
[PL6]3
❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies Requirement will be met.
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details. Location on plans/spec: M2.0, M2.1
[PL6]3 ['Not Observable
❑Not Applicable
C404.6.1, Automatic time switches installed to ❑Complies Requirement will be met.
C404.6.2 automatically switch off the ❑Does Not
[PL3]1 recirculating hot-water system or heat [Not Observable Location on plans/spec: MO.2 PUMP SCHEDULE
trace.
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 5 of 17
RECEIVED
i is? V 19Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
ASPEN Pumps that circulate water between a ❑Complies Exception: Requirement does not apply.
BUILDIWtPART Tr and storage tank have controls ❑Does Not
limit operation from startup to
'<= 5 minutes after end of heating [Not Observable
cycle. ❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
cycle. ❑Not Applicable
C404.6 Pumps that circulate water between a I❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls ;❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ['Not Observable
cycle. ❑Not Applicable
_
C404.6.3 Pumps that circulate water between a ;❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls '❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
cycle. ❑Not Applicable
C404.6.3 'Pumps that circulate water between a ❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to Location on plans/spec: M3.2
<= 5 minutes after end of heating ❑Not Observable
cycle. i❑Not Applicable
C404.6.3 'Pumps that circulate water between a ❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ENot Observable
;cycle. ❑Not Applicable
C404.6 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls '❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable'
cycle. j❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to ['Not Observable Location on plans/spec: M3.2
<= 5 minutes after end of heating
cycle. ❑Not Applicable
C404.6.3 'Pumps that circulate water between a ❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
,cycle. ❑Not Applicable
C404.6.3 'Pumps that circulate water between a ;❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
cycle. ;❑Not Applicable
C404.7 Water distribution system that pumps ❑Complies Exception: Requirement does not apply.
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ['Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water ;
entering the cold-water piping to
104°F.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 6 of 17
RECEIVED
1/ 7 k2 V,9Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
PORN Water distribution system that pumps ❑Complies Exception: Requirement does not apply.
DI I I fltsti tPARTIIg, from a heated-water supply ❑Does Not
d back to the heated-water source
;through a cold-water supply pipe is a ['Not Observable
:demand recirculation water system. ❑Not Applicable
Pumps within this system have
110 controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
:entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ❑Complies Exception: Requirement does not apply.
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ['Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ❑Complies Exception: Requirement does not apply.
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ['Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
:entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ElComplies Exception: Requirement does not apply.
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ['Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
C404.7 :Water distribution system that pumps ❑Complies Exception: Requirement does not apply.
[PL8]3 :water from a heated-water supply ❑Does Not
0 pipe back to the heated-water source
through a cold-water supply pipe is a [Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 7 of 17
RECEIVED
1/ 2 V,9Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
PORN Water distribution system that pumps ❑Complies Exception: Requirement does not apply.
DI I I fltsti tPARTI I, from a heated-water supply ❑Does Not
d back to the heated-water source
;through a cold-water supply pipe is a ['Not Observable
:demand recirculation water system. ENot Applicable
Pumps within this system have
110 controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
:entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ❑Complies Requirement will be met.
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source ['Not Observable Location on plans/spec: M3.2
through a cold-water supply pipe is a
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ❑Complies Exception: Requirement does not apply.
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ['Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
:entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ElComplies Requirement will be met.
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source ❑Not Observable Location on plans/spec: M3.2 SEQUENCE OF CONTROL
through a cold-water supply pipe is a
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 8 of 17
RECEIVED
1/ fm 1 Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
p K.
N 'Thermally ineffective panel surfaces of ❑Complies Exception: Requirement does not apply.
BUILDMART le heating panels have ❑Does Not
it Ihtion >= R-3.5.
❑Not Observable,
❑Not Applicable
C403.2.13;Unenclosed spaces that are heated ❑Complies Exception: Requirement does not apply.
[ME71]2 use only radiant heat. ❑Does Not
❑Not Observable
❑Not Applicable
C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values.
[ME55]2 ❑Does Not
❑Not Observable
ENot Applicable
C403.2.5. Hot water boilers supplying heat via ❑Complies Requirement will be met.
1 one-or two-pipe systems include ❑Does Not
[ME114]2 outdoor setback control.
[Not Observable
ENot Applicable
C403.2.6. Demand control ventilation provided ❑Complies Exception: Requirement does not apply.
1 for spaces >500 ft2 and >25 ❑Does Not
[ME59]1 people/1000 ft2 occupant density and
served by systems with air side ['Not Observable
economizer, auto modulating outside ❑Not Applicable
air damper control, or design airflow
>3,000 cfm.
i
C403.2.6. 'Enclosed parking garage ventilation ❑Complies Exception: Requirement does not apply.
2 ,has automatic contaminant detection ❑Does Not
[ME115]3 and capacity to stage or modulate
fans to 50%or less of design capacity. ENot Observable
;❑Not Applicable
C403.2.7 Exhaust air energy recovery on !❑Complies Requirement will be met.
[ME57]1 systems meeting Table C403.2.7(1) ❑Does Not
and C403.2.7(2).
'ENot Observable
ENot Applicable
C403.2.8 Kitchen exhaust systems comply with EComplies Exception: Requirement does not apply.
[ME116]3 replacement air and conditioned ❑Does Not
logsupply air limitations, and satisfy hood
rating requirements and maximum ENot Observable
exhaust rate criteria. ENot Applicable
i
IC403.2.9 1 HVAC ducts and plenums insulated. ❑Complies Requirement will be met.
[ME60]2 Where ducts or plenums are installed ❑Does Not
in or under a slab,verification may ['Not Observable Location on plans/spec: MO.1 42 D
need to occur during Foundation
sii
Inspection. ❑Not Applicable
i i
C403.2.9 Ducts and plenums sealed based on ❑Complies Requirement will be met.
[ME10]2 static pressure and location. '❑Does Not
❑Not Observable Location on plans/spec: MO.1 42.E
❑Not Applicable
C403.2.9. :Ductwork operating >3 in. water ❑Complies Requirement will be met.
1.3 column requires air leakage testing. ❑Does Not
[ME11]3 Location on plans/spec: MO.1
[Not Observable
j ❑Not Applicable
C403.2.9. Ductwork operating >3 in. water ❑Complies Requirement will be met.
1.3 column requires air leakage testing. ❑Does Not
[ME11]3 Location on plans/spec: MO.2
[Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 9 of 17
RECEIVED
1f#2 V 1 Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
1RE.N Ductwork operating >3 in. water ❑Complies Requirement will be met.
BUILD: n PART16f trn requires air leakage testing. ❑Does Not
E'l�] Location on plans/spec: MO.2
[Not Observable
❑Not Applicable
C403.2.9. :Ductwork operating >3 in. water ❑Complies Requirement will be met.
1.3 :column requires air leakage testing. ❑Does Not
[ME11]3 Location on plans/spec: MO.2
[Not Observable
❑Not Applicable
C403.2.9. :Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply.
1.3 :column requires air leakage testing. ❑Does Not
[ME11]3 Location on plans/spec: MO.2
[Not Observable
❑Not Applicable
C403.2.9. :Ductwork operating >3 in. water ❑Complies Requirement will be met.
1.3 :column requires air leakage testing. ❑Does Not
[ME11]3 Location on plans/spec: MO.2
[Not Observable
❑Not Applicable
C403.2.9. :Ductwork operating >3 in. water ❑Complies Requirement will be met.
1.3 :column requires air leakage testing. ❑Does Not
[ME11]3 Location on plans/spec: MO.2
[Not Observable
❑Not Applicable
C403.4.2. Three-pipe hydronic systems using a ❑Complies Requirement will be met.
1 common return for hot and chilled ❑Does Not
[ME50]2 water are not used.
❑Not Observable
❑Not Applicable
C403.4.2. Three-pipe hydronic systems using a ❑Complies Requirement will be met.
1 common return for hot and chilled Does Not
[ME50]2 water are not used.
[Not Observable
❑Not Applicable
C403.4.2. Three-pipe hydronic systems using a ❑Complies Requirement will be met.
1 common return for hot and chilled ❑Does Not
[ME50]2 water are not used.
[Not Observable
❑Not Applicable
C403.4.2. Three-pipe hydronic systems using a ❑Complies Requirement will be met.
1 common return for hot and chilled ❑Does Not
[ME50]2 water are not used.
[Not Observable
❑Not Applicable
C403.4.2. Three-pipe hydronic systems using a ❑Complies Requirement will be met.
1 'common return for hot and chilled ❑Does Not
[ME50]2 water are not used.
[Not Observable I
❑Not Applicable
C403.4.2. Three-pipe hydronic systems using a ❑Complies Requirement will be met.
1 common return for hot and chilled ❑Does Not
[ME50]2 water are not used.
[Not Observable
❑Not Applicable
C4 .4.2 Two-pipe hydronic systems using a ❑Complies Requirement will be met.
2 common distribution system have Does Not
[M controls to allow a deadband >=15°F,
allow operation in one mode for at ['Not Observable
least 4 hrs before changeover, and ENot Applicable
have rest controls to limit heating and
cooling supply temperature to <=30
°F.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 10 of 17
RECEIVED
1/ vV,-mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
1PE.114 Chilled water plants with multiple ❑Complies Requirement will be met.
BUILDII �
�RT s have capability to reduce flow ❑Does Not
atically through the chiller plant ❑Not Observable Location on plans/spec: M3.2
:when a chiller is shut down. Boiler
plants with multiple boilers have the ❑Not Applicable
capability to reduce flow automatically
;through the boiler plant when a boiler
:is shut down.
C403.4.2. 'Chilled water plants with multiple ❑Complies Requirement will be met.
6 chillers have capability to reduce flow ❑Does Not
[ME26]3 automatically through the chiller plant
when a chiller is shut down. Boiler ❑Not Observable
plants with multiple boilers have the ❑Not Applicable
capability to reduce flow automatically
:through the boiler plant when a boiler
is shut down.
C403.4.2. Chilled water plants with multiple ❑Complies Requirement will be met.
6 :chillers have capability to reduce flow ❑Does Not
[ME26]3 ;automatically through the chiller plant ❑Not Observable Location on plans/spec: M3.2
when a chiller is shut down. Boiler
plants with multiple boilers have themoi
❑Not Applicable
capability to reduce flow automatically
through the boiler plant when a boiler
'is shut down.
C403.4.2. :Chilled water plants with multiple I❑Complies 'Requirement will be met.
6 :chillers have capability to reduce flow ❑Does Not
[ME26]3 'automatically through the chiller plant ❑Not Observable Location on plans/spec: M3.2
when a chiller is shut down. Boiler
plants with multiple boilers have the ❑Not Applicable
capability to reduce flow automatically
through the boiler plant when a boiler
is shut down.
C403.4.2. ;Chilled water plants with multiple I❑Complies Requirement will be met.
6 chillers have capability to reduce flow ❑Does Not
[ME26]3 ;automatically through the chiller plant ❑Not Observable Location on plans/spec: M3.2
when a chiller is shut down. Boiler
Elplants with multiple boilers have the ❑Not Applicable
capability to reduce flow automatically
through the boiler plant when a boiler
is shut down.
C403.4.2. ;Chilled water plants with multiple ❑Complies Requirement will be met.
6 chillers have capability to reduce flow ❑Does Not
[ME26]3 ;automatically through the chiller plant ❑Not Observable Location on plans/spec: MO.1, M3.2
when a chiller is shut down. Boiler
0 plants with multiple boilers have the ❑Not Applicable
capability to reduce flow automatically
through the boiler plant when a boiler
is shut down.
i 1
C403.4.4. :Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply.
6 :of individual zone boxes have static ❑Does Not
[ME110]3 ;pressure setpoint reset controls. ❑Not Observable See the Mechanical Systems list for values.
❑Not Applicable
C403.4.4. :Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply.
6 :of individual zone boxes have static ❑Does Not
[ME110]3 :pressure setpoint reset controls. LiNot Observable See the Mechanical Systems list for values.
❑Not Applicable
C403.4.4. Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply.
6 of individual zone boxes have static ❑Does Not
[ME110]3 pressure setpoint reset controls. ❑Not Observable See the Mechanical Systems list for values.
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 11 of 17
RECEIVED
1/ ft V,Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
9261P.E.1s4 Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply.
BUILDIIa E1P4,RTme'ividual zone boxes have static ❑Does Not
ure setpoint reset controls. See the Mechanical Systems list for values.
[Not Observable,
❑Not Applicable
C403.4.4. ;Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply.
6 of individual zone boxes have static ❑Does Not
[ME110]3 pressure setpoint reset controls. [Not Observable See the Mechanical Systems list for values.
ENot Applicable
C403.4.4. Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply.
6 of individual zone boxes have static ❑Does Not
[M pressure setpoint reset controls. [Not Observable See the Mechanical Systems list for values.
ENot Applicable
C403.4.4. Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply.
6 of individual zone boxes have static ❑Does Not
[ME110]3 pressure setpoint reset controls. See the Mechanical Systems list for values.
[Not Observable
ENot Applicable
C403.4.5 Condenser heat recovery system that ❑Complies Exception:Total installed heat capacity of water cooled
[ME31]3 can heat water to 85°F or provide ❑Does Not systems = 6 MMBtu/h of heat rejection.
60%of peak heat rejection is installed [Not Observable
,for preheating of service hot water. Location on plans/spec: MO.1
ENot Applicable
C403.4.5 Condenser heat recovery system that ❑Complies I Exception:Total installed heat capacity of water cooled
[ME31]3 can heat water to 85°F or provide ❑Does Not systems = 6 MMBtu/h of heat rejection.
60%of peak heat rejection is installed
for preheating of service hot water. ❑Not Observable
ENot Applicable
C403.4 Condenser heat recovery system that ❑Complies Exception:Total installed heat capacity of water cooled
[ME31 can heat water to 85°F or provide ❑Does Not systems = 6 MMBtu/h of heat rejection.
60%of peak heat rejection is installed [Not Observable
for preheating of service hot water. Location on plans/spec: MO.1
❑Not Applicable
C403.4.5 :Condenser heat recovery system that ❑Complies Exception:Total installed heat capacity of water cooled
[ME31]3 :can heat water to 85°F or provide ❑Does Not systems = 6 MMBtu/h of heat rejection.
;60%of peak heat rejection is installed [Not Observable
;for preheating of service hot water. Location on plans/spec: PROVIDE WITH 7-DAY
ENot Applicable PROGRAMABLE T-STAT IN COMPLIANCE WITH 2015 IECC AND
CARRIER STAGED AIR VOLUME (SAV)CONTROL(SINGLE ZONE
VAV)
C403.4.5 ,Condenser heat recovery system that ❑Complies Exception: Design SWH load = 1 MMBtu/h.
[ME31]3 can heat water to 85°F or provide ❑Does Not
:60%of peak heat rejection is installed ['Not Observable Location on plans/spec: MO.1
;for preheating of service hot water.
ENot Applicable
C403.4.5 Condenser heat recovery system that ❑Complies Exception:Total installed heat capacity of water cooled
[ME31]3 can heat water to 85°F or provide ❑Does Not systems = 6 MMBtu/h of heat rejection.
60%of peak heat rejection is installed
,for preheating of service hot water. ['Not Observable Location on plans/spec: MO.1
, ENot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 12 of 17
RECEIVED
1/ fz,9lechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
,r'pq
p..E.N Gas-fired water-heating equipment ❑Complies Exception: Requirement does not apply.
RI�ILnI��A 'RTOstalled in new buildings: where a ❑Does Not
ngular piece of water-heating
equipment >= 1,000 kBtu/h serves ['Not Observable
the entire building,thermal efficiency ENot Applicable
>= 90 Et. Where multiple pieces of
water-heating equipment serve the
building with combined rating >=
1,000 kBtu/h,the combined input-
capacity-weighted-average thermal
efficiency >= 90 Et. Exclude input
rating of equipment in individual
dwelling units and equipment <= 100
ikBtu/h.
C408.2.2. Air outlets and zone terminal devices ❑Complies Requirement will be met.
1 have means for air balancing. ❑Does Not
[ME53]3 Location on plans/spec: M3.0 N
['Not Observable
' ❑Not Applicable
C408.2.2. HVAC hydronic heating and cooling ❑Complies Requirement will be met.
2 coils have means to balance and have ❑Does Not
[ME54]3 pressure test connections. [Not Observable Location on plans/spec: M3.1
❑Not Applicable
C408.2.2. HVAC hydronic heating and cooling ❑Complies Exception: Pumps with pump motors of 5 hp (3.7 kW)or less.
2 coils have means to balance and have ❑Does Not
[ME54]3 ,pressure test connections. ❑Not Observable Location on plans/spec: MO.1
❑Not Applicable
C408.2.2. HVAC hydronic heating and cooling ❑Complies Exception: Pumps with pump motors of 5 hp (3.7 kW)or less.
2 coils have means to balance and have ❑Does Not
[ME54] pressure test connections. ['Not Observable Location on plans/spec: MO.1
,❑Not Applicable '
C408.2.2. HVAC hydronic heating and cooling '❑Complies Exception: Pumps with pump motors of 5 hp (3.7 kW)or less.
2 coils have means to balance and have ❑Does Not
[ME54]3 pressure test connections. ❑Not Observable Location on plans/spec: MO.1
❑Not Applicable I
C408.2.2. HVAC hydronic heating and cooling ❑Complies Exception: Pumps with pump motors of 5 hp (3.7 kW) or less.
2 coils have means to balance and have ❑Does Not
[M pressure test connections. ❑Not Observable Location on plans/spec: MO.1
I ❑Not Applicable
1
C408.2.2. HVAC hydronic heating and cooling ❑Complies Exception: Pumps with pump motors of 5 hp (3.7 kW) or less.
2 coils have means to balance and have ❑Does Not
[ME54]3 pressure test connections. [Not Observable Location on plans/spec: MO.1
❑Not Applicable
C403.5, Refrigerated display cases, walk-in ❑Complies Exception: Requirement does not apply.
C403.5.1, coolers or walk-in freezers served by ❑Does Not
C403.5.2 remote compressors and remote
[ME123]3 condensers not located in a ❑Not Observable
condensing unit, have fan-powered ❑Not Applicable
condensers that comply with Sections
C403.5.1 and refrigeration compressor',
systems that comply with C403.5.2..
Additional Comments/Assumptions:
High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 13 of 17
RECEIVED
1/ 7 Vv 19 Final Inspection Complies? Comments/Assumptions
& Req.ID
RE,N Furnished O&M manuals for HVAC ❑Complies Requirement will be met.
BUILDII RTMas withinnce. 90 days of system ❑Does Not
3 ta ❑Not Observable
[F18] ❑Not Applicable
C403.2.2 'HVAC systems and equipment ❑Complies Requirement will be met.
[F127]3 capacity does not exceed calculated ❑Does Not
loads. Location on plans/spec: MO.1
❑Not Observable
❑Not Applicable
C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met.
1 controlled by a thermostat control. EDoes Not
[F147]3 Minimum one humidity control device ❑Not Observable Location on plans/spec: M2.1
per installed
humidification/dehumidification ❑Not Applicable
system.
C403.2.4. j Heating and cooling to each zone is ,❑Complies Requirement will be met.
1 controlled by a thermostat control. '❑Does Not
[F147]3 Minimum one humidity control device ❑Not Observable Location on plans/spec: M3.1
,per installed
humidification/dehumidification '❑Not Applicable
system.
C403.2.4. :Heating and cooling to each zone is ❑Complies Requirement will be met.
1 :controlled by a thermostat control. Does Not
[F147]3 Minimum one humidity control device ❑Not Observable Location on plans/spec: M2.1
:per installed
humidification/dehumidification ❑Not Applicable
;system. ,
C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met.
1 controlled by a thermostat control. ❑Does Not
[F147]3 Minimum one humidity control device ['Not Observable Location on plans/spec: M2.3
per installed
humidification/dehumidification Not Applicable
system.
C403.2.4. Heating and cooling to each zone is EComplies Requirement will be met.
1 controlled by a thermostat control. Does Not
[F147]3 Minimum one humidity control device ['Not Observable Location on plans/spec: M2.1
per installed
humidification/dehumidification ❑Not Applicable
system.
C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met.
1 'controlled by a thermostat control. ❑Does Not
[F147]3 'Minimum one humidity control device ❑Not Observable Location on plans/spec: M2.1
per installed
humidification/dehumidification ❑Not Applicable
system.
C403.2.4. Heating and cooling to each zone is ;❑Complies Requirement will be met.
1 controlled by a thermostat control. '❑Does Not
[F147]3 Minimum one humidity control device ❑Not Observable Location on plans/spec: M2.1
;per installed
humidification/dehumidification ❑Not Applicable
system.
C403.2.4. ;Thermostatic controls have a 5 °F ,❑Complies Requirement will be met.
1.2 :deadband. '❑Does Not
[F138]3 ' Location on plans/spec: MO.1
❑Not Observable
❑Not Applicable
C403.2.4. Temperature controls have setpoint ❑Complies Requirement will be met.
1.3 overlap restrictions. ❑Does Not
[F120]3 Location on plans/spec: MO.1
❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 14 of 17
RECEIVED
i/ 7vv l 9 Final Inspection Complies? Comments/Assumptions
& Req.ID
p.E.N 'Each zone equipped with setback ❑Complies Requirement will be met.
BUILDIgpAPAR' controls using automatic time clock or ❑Does Not
programmable control system. Location on plans/spec: MO.1
[Not Observable
❑Not Applicable
C403.2.4. !Automatic Controls: Setback to 55°F ❑Complies Requirement will be met.
2.1, (heat) and 85°F (cool); 7-day clock, 2- ❑Does Not
C403.2.4. :hour occupant override, 10-hour [Not Observable Location on plans/spec: MO.1
2.2 !backup
[F140]3 ❑Not Applicable
C403.2.4. Systems include optimum start ❑Complies Requirement will be met.
2.3 controls. ❑Does Not
[F141]3 ['Not Observable Location on plans/spec: MO.2 FAN COIL UNIT SCHEDULE
❑Not Applicable i
C403.2.4. Systems include optimum start ❑Complies Requirement will be met.
2.3 controls. ❑Does Not
[F141]3 Location on plans/spec: MO.1
['Not Observable
❑Not Applicable
C403.2.4. Systems include optimum start ❑Complies Requirement will be met.
2.3 controls. ❑Does Not
[F141]3 Location on plans/spec: M3.2
['Not Observable
❑Not Applicable
C403.2.4. Systems include optimum start EComplies Requirement will be met.
2.3 controls. ❑Does Not
[F141]3 Location on plans/spec: M3.2
[Not Observable
1 11=INot Applicable
C403.2.4. 1 Systems include optimum start I❑Complies Requirement will be met.
2.3 1controls. :❑Does Not
[F141]3 i Location on plans/spec: M3.2
❑Not Observable
❑Not Applicable
C403.2.4. :Systems include optimum start ❑Comp iesl Requirement will be met.
2.3 'controls. ❑Does Not
[F141]3 1 Location on plans/spec: M3.2
❑Not Observable
1 ❑Not Applicable
C403.2.4. ;Systems include optimum start ❑Complies Requirement will be met.
2.3 controls. ❑Does Not
[F141]3 Location on plans/spec: M3.2
['Not Observable
❑Not Applicable
C404.3 ]Heat traps installed on supply and —❑Complies Requirement will be met.
[F111]3 discharge piping of non-circulating ❑Does Not
systems. Location on plans/spec: M3.2 - E
[Not Observable
❑Not Applicable
C404.4 All piping insulated in accordance with ❑Complies Requirement will be met.
[F125]2 section details and Table C403.2.10. ❑Does Not
❑Not Observable Location on plans/spec: MO.1 - 65
❑Not Applicable i
C404.6.1 ;Controls are installed that limit the ❑Complies Requirement will be met.
[F112]3 :operation of a recirculation pump ❑Does Not
installed to maintain temperature of a Location on plans/spec: MO.2 PUMP SCHEDULE
storage tank. System return pipe is a ❑Not Observable
.11
dedicated return pipe or a cold water ❑Not Applicable
;supply pipe.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 15 of 17
RECEIVED
1ntt v19 Final Inspection Complies? Comments/Assumptions
& Req.ID
N :Commissioning plan developed by ❑Complies 'Requirement will be met.
BUILDMART ` ered design professional or ❑Does Not
-:: •ved agency. Location on plans/spec: MO.1
[Not Observable,
❑Not Applicable
C408.2.3. HVAC equipment has been tested to ❑Complies Exception: Unitary or packaged HVAC eqiupment without
1 ensure proper operation. ❑Does Not supply air economizers.
[F131]1
❑Not Observable Location on plans/spec: MO.1
❑Not Applicable ,
C408.2.3. 1 HVAC control systems have been ❑Complies Requirement will be met.
2 tested to ensure proper operation, ❑Does Not
[F110]1 calibration and adjustment of controls. [Not Observable Location on plans/spec: MO.1
❑Not Applicable
C408.2.4 Preliminary commissioning report ❑Complies Requirement will be met.
[F129]1 completed and certified by registered ❑Does Not
design professional or approved [Not Observable Location on plans/spec: MO.1
agency. ❑Not Applicable
C408.2.5. Furnished HVAC as-built drawings ❑Complies Requirement will be met.
1 submitted within 90 days of system ❑Does Not
[F17]3 acceptance.
[Not Observable
❑Not Applicable
C408.2.5. An air and/or hydronic system ❑Complies Requirement will be met.
3 balancing report is provided for HVAC ❑Does Not
[F143]1 systems. ❑Not Observable Location on plans/spec: MO.1 -41
❑Not Applicable
C408.2.5. Final commissioning report due to ❑Complies Requirement will be met.
4 building owner within 90 days of ❑Does Not
[F130]1 receipt of certificate of occupancy. [Not Observable Location on plans/spec: MO.1
j❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 16 of 17
RECEIVED
1/7/2019
ASPEN
BUILDING DEPARTMENT
Project Title: Stein Bldg Report date: 12/10/18
Data filename: S:\BGProjects\10014.00 Stein Building\Engineering\Energy\Calcs\Stein COMcheck.cck Page 17 of 17