Loading...
HomeMy WebLinkAboutFile Documents.221 E Main St.0112.2018 (6).ACBK ASPEN RE-ROOFING APPLICATION CHECKLIST [41 2015 IBC/IRC For Building and Permit Information,please refer to our website at: THE CITY OF ASPEN http://www.aspenpitkin.com/depts/41/main building.cfm NOTE: This is a general list of required information.More information may be required as each project is individually evaluated. If the proposed structure requires City Land Use Review,all final approvals must be obtained PRIOR to submission of a building permit application. Contact a city planner at 970/920-509�07to determine if a Land Use Review is needed. JOB ADDRESS 2` I F l'1Qi l S+ • PARCEL I.D.NUMBER Z} 3� 6-4 3L $OOZ OWNER 15 q 3 t �,C, DATE: 1 0/ l h J I g All reroofing projects require a roof nj'permit* *Roof work involving changes to height,slope,footprint,structural framing,or cavity insulation requires a Building Permit. *Patching less than 1 square(10'x10')does not require a permit. Plea e submit the following: 5' Permit Application form completely filled out with accompanying 0 Contact Sheet UK-MA Certification form signed by the owner of the property E 'YES/❑ NO -Is the site listed on the"Inventory of Historic Sites and Structures"or in the Historic District? � If yes,HPC Approval required. Contact the Historic Preservation Officer at 429-2758 E Site Plan(2 copies)showing the roof and including the following(may be hand drawn): ❑ Extent of proposed work ❑ Impervious Areas Show and label all hardscape vs. landscaping ❑ Downspout& Gutter locations draw and label each one and show if they drain to hardscape or landscaping ❑ Snowguards/stops required on all roofs that shed onto neighboring properties or potentially occupied areas such as a walkway, stairway,alley,deck,pedestrian and vehicular exit from buildings or areas where there is potential for personal injury or property damage and areas directly above or in front of gas utility or electric utility meters. ' (Ordinance 40,2016) Car/Photographs(2 copies),one clearly showing the structure involved and one showing a close-up of the existing roof ❑ Construction Management Plan(CMP) (2 copies)which includes a Right-of-Way permit required for work in the public ROW and an Encroachment License required for occupancy of a public ROW. ❑ Asbestos Checklist(1 copy)regarding material removed. If you answered YES to the Asbestos Checklist,answer these questions: ❑YES/0 NO-Are all the roofing materials to be removed asphaltic,tar impregnated and non-friable(will not crumble by hand pressure when dry)? ❑YES/0 NO-Will you be removing the roofing materials by hand(no circular saws)? ❑YES/0 NO-Will you dispose asphaltic roof shingles and NOT recycle them? If you answer YES to all of the above,an asbestos test will not be required. re--Assembly: ❑ Proposed Roof assembly drawing label each component,including product and manufacturer name and existing to remain components and number of layers. Show flashing and ice barrier. Roof Class: ❑Provide a listed roof assembly specific to your roofing product and installation(provide the UL or ESR report) 0 Class A(minimum required for all roofs per Ordinance 40,2016) � ❑Existing roofing and number of layers: 1., BYES/❑ )1O-Is the roof vented? ❑ YES/0-Are you removing,replacing,or adding roof deck insulation(including tapered)? If YES,describe: 0 Letter of Structural Integrity(1 copy)required if adding insulation due to potential increase in snow load. ❑ YES/ENO—Are you replacing damaged roof deck?Approximate square feet: If YES,the roof must comply with the energy code which may require insulation. Additional requirements from Ordiannce 40,2016: Ice barrier consisting of either self-adhering polymer modified bitumen sheet or two layers of underlayment cemented together required to extend from the roof eave edge at least 6 feet inside the exterior wall line as measured along the roof surface, 18 inches from the centerline of the valley and 24 inches on the vertical wall at a roof and wall juncture. Ventilation openings,including ridge vents,must protect against rain and snow.Individual vents may not exceed 144 sq inc es;V. s be covered with noncombustible corrosion-resistant mesh or screen with openings no smaller than 1/16"and no larg$1`tli n ED Wood shakes and shingles require a minimum'/4"vented airspace separating the shingles from the roofing underlayment above the structural sheathing. Updated 2/22/2017 11/15/2 018 ASPEN BUILDING DEPARTMENT DATE: MASTER PERMIT: PERMIT NUMBER: 0112 . 2018 .ACBK ` COMMUNITY DEVELOPMENT DEPARTMENT 141161 BUILDING PERMIT APPLICATION THE C11Y0EASPEN PROPERTY INFORMATION ADDRESS 77 I telQan 6.4-, UNIT# PARCEL ID# 2373 1"O'43 ZOp (DOZ LOT BLOCK TRACT OR SUBDIVISION OWNER NAME 15€43 , r\L LC CELL EMAIL eh oej ) p i G.+n+Crestvgkworl--• BEST CONTACT A�Q�(IA ���-� CELL EMAIL(`lr'tGC1�' �U6I;CinVrc4r�GkWadk•NAME PROJECT DETAILS DESCRIPTION OF WORK IN DETAIL PROJECT AI t I� gZBuilding Class ofWorkFixtureCounts 5,0o Use of Equipment ment Checklist VALUATION SQQFTOF El Commerical El New Toilets,Bidets Forced Air/Gravity Systems S%FTOF EA yZ 00 ❑ Multi-Family 0 Addition Bathtub ❑ Single Family 0 Alteration __Lavatory(Wash Basin) Wall,Suspended,or Unit Heaters UNIT SQ FT I Mixed-Use Shower -Gas Log ❑ Repair _Kitchen Sink(+Disposal) -Gas Appliancew LOT SIZE ❑ El IFFR Dishwasher -Appliance Vents (SQ FT) ❑ Tenant Finish _Laundry Bar,Utility Sink Heat,Refrig,Cooling,or DISTURBED Will there be El Demolition _Clothes Washer Absorption Unit EXTERIOR AREA any roof/wall ❑ Change Order Floor Sink Boilers(includes vent) penetrations? ❑ -Floor Drain _Air Handling Unit NEW SQ FT 0 Yes _Water Heater(Pan Req) _Cooling Systems _#Gas Outlets SQ FT OF ROOMS ❑ No Water Treatment Ventilation Fans WITH UTILITY WORK Other Range Hood #of Gas System Outlets ZONE DISTRICT MU -Snowmelt System Sq Ft N Project Valuation:Cost of project as defined in Valuation Affadavit. NOTICE: This permit becomes null and Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. is not commenced within 180 days,or ~ Lot Size:Total surveyed square footage of property. if construction or work is suspended or abandoned for a period of 180 days at Z Disturbed Exterior Area:Square footage of lot affected by permit application. any time after work is commenced. " New Sq Ft:Total added square footage for additions to net livable or net leasble space. pSq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re- FOR CITY USE ONLY APPROVALS viewer SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Department Reviewing ReviewN SOff Ap- proved Plan Check Permit Fee Parks Impact PC SV 1111 .1155 Zoning X SS 11/2t)/'ftd Zoning(50%) HPC X Engineering School Ded. Building X SV 11 . 15 Zoning(50%) CMP(50%) TDM Impact Fire X SV 11 .15 Engineering Energy Code REMP Ped.Amenity CMP X t k 11 . 2 0 Plan Check Water CMP(50%) (Hourly) Housing Cash in Lieu Stormwater Zoning Sanitation Parks Review Stormwater (Hourly) Env. Health Engineering Parks X Dr 11/15/18 Utility Review City Use Tax (Hourly) Landscape GIS County Use Tax Efficiency Approved DAM 1 1/20/IF Lot Area Deed Restricted To Issue ` t"'�r � Census Code #of Dwellings Plans Location Issuance 'Y,, - ` CITY OF ASPEN December2017 130 S. GALENA ST I ASPEN, CO614t8 ASPEN BUILDING DEPARTMENT ADDRESS: 27 I E. Mari ,5S PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET THE CI'IYOFASPEN FOR PLAN REVIEW QUESTIONS 1 Name fk rX C C_S Phone TV. 19- 0 E-mail 171 ,MOMLa. ; •Ceh FOR INSPECTION QUESTIONS Name 1 Mallra. • a, Phone • _) Ctq E-mail C a. r i'.CaM OWNER Name is )4 LLC Phone Cell Phone Mddress ailing VQ T CC S'! • L-Liao City State CO ZIP g b Z OZ A Address 011 ,Cin4& 4+ne:t IJOik.. !}/ OWNER'S AUTHORIZED AGENT Name kC.Cl Acura'CY1 Phone Cell Phone q�i-1 t7),30(0 -378'4 Mailing Address City State ZIP Address kC` eNC �ic5 rb'Nr r CS •Cor APPLICATION BEST CONTACT P. � n_ t� Name *VIfX. r- P S Phone 'I 3 l"tn" !C•� PhoneC0 11 Phon/e� Add ess P. 0• C ' CQ City r elel t'' State ZIP /K'DZA E-mail O(1 �� ' (� Addressl�. txlrh j'�['1 ��..1 �I.�--(DCY1 ARCHITECT OR DESIGNER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address CIVIL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address GENERAL CONTRACTOR Name tbCSr31--1 InC Phone Cell Phone L • - r Address , .etQKLI$' City CQ(6xndQ iC State C d ZIP RI wZ3 M AE-mail ss Q I i7kr ll \`✓ S C 1 I • C9Ir-1 ddre INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project' uilt• compliance ' h all appli a codes. Contractor Signature / ,' Date 40"to11g' ❑ Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/buitiiinOffiiiav (CITY USE ONLY)Owner builder approved by: Date: Affidavit on'file CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, Co 11 8 ASPEN BUILDING DEPARTMENT ADDRESS: Z7 I F . !e1Qin 5f . PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST THE CI CY OF ASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact,in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called"Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S.manufacturing,importation, processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ❑Yes pNo Residential:Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑Yes 131 o Commercial:Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above,you will need an asbestos test before you can receive a building and/ or demolition permit.You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required.A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app.This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. Owner Phone# Applicant (print name),4L )c Cerifenf e5 Phone# ci 3.L 31G'I(IO9 Applicant Signature Date id l(e) I lI Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you have El e fio si 1\ r r; about asbestos, interpreting your test results, or other matters. ( CITY OF ASPEN August z017 130 S. GALENA ST I ASPEN, CO1C .I#8 ASPEN BUILDING DEPARTMENT ADDRESS: 221 E Main St PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT . VALUATION AFFADAVIT THE CITY OF ASPEN AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I,the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No.40,Series of 2016 adopts the 2015 International Residential Code(IRC) and International Building Code(IBC)with certain amendments.These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued,such as electrical,gas, mechanical, plumbing equipment,and other permanent systems, including materials and labor. 109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor,for which the permit is being issued,such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official,the valuation is underestimated on the application,the permit shall be denied,unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas,fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint,floor coverings,tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting,tap fees, development mitigation fees,trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that this document is a public document. Owner Signature: Date: Owner Printed Name: or, Authorized Agent Signatur . , Date: (;) Authorized Agent Printed lime: 14ri,t) � ) G���,►o'� I CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 81611 . rry. /c018 ASPEN BUILDING DEPARTMENT PERMIT NUMBER: ADDRESS: 2 ,I "F .friC,n 61-• COMMUNITY DEVELOPMENT DEPARTMENT rt 0 k ZONING COMPLIANCE VERIFICATION POLICY THE CITY OF ASPEN 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report:The Zoning Officer shall review the report(s)and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name)<r�� 'j Qj 'n I AC understand this policy. I agree that this project will comply with the zoning lim lions affect' this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning li itations. Contractor Signature: � � � � � / Date: I O l I (,I I s' ,,i, r i; `'1 i t CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO38' ii/18 ASPEN BUILDING DEPARTMENT ADDRESS: 7_7 I E. Mci:e) S-f. PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY THE CITY OF ASPEN Applicability:All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report:A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed measurement. Additional roof plans showing location of measurements may be necessary. CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CQ 6/. 4L8 ASPEN BUILDING DEPARTMENT