Loading...
HomeMy WebLinkAboutagenda.hpc.202103241 AGENDA ASPEN HISTORIC PRESERVATION COMMISSION Amended 3/19/2021 11:18 AM March 24, 2021 4:30 PM, WEBEX www.webex.com Enter Meeting Number 182 337 8395 Password provided 81611 Click "Join Meeting" OR Join by phone Call: 1-408-418-9388 Meeting number (access code): 182 337 8395# I.SITE VISIT II.ROLL CALL III.MINUTES III.A.Minutes 3/10/2021 minutes.hpc.20210310.pdf IV.PUBLIC COMMENTS V.COMMISSIONER MEMBER COMMENTS VI.DISCLOSURE OF CONFLICT OF INTEREST VII.PROJECT MONITORING VIII.STAFF COMMENTS IX.CERTIFICATE OF NO NEGATIVE EFFECT ISSUED X.CALL UP REPORTS XI.SUBMIT PUBLIC NOTICE FOR AGENDA ITEMS 1 2 XII.OLD BUSINESS XIII.NEW BUSINESS XIII.A.121 W. Bleeker Street - Conceptual Major Development, Relocation, Dimensional Variations and a Floor Area Bonus, PUBLIC HEARING Memo.121WBleeker.20210324.pdf Resolution.121WBleeker.20210324.pdf ExhibitA.1 HPGuidelinesCriteria.121WBleeker.pdf ExhibitA.2 RelocationCriteria.pdf ExhibitA.3 DimensionalVariationCriteria.pdf ExhibitA.4 FloorAreaBonus.pdf ExhibitB Referral Comments.121 W Bleeker.2021.03.24.pdf ExhibitC Application.121 W Bleeker.20210324.pdf EXECUTIVE SESSION Upon the affirmative vote of two-thirds of the Commissioners, the Historic Preservation Commission will adjourn to executive session pursuant to Colo. Rev. Stat. section 24-6-402(4)(b) to confer with an attorney for the purposes of receiving legal advice on specific legal questions related to the appeal of HPC’s denial of the application of 1020 E. Cooper LLC for redevelopment of property located at 1020 E. Cooper Ave., Aspen, Colorado. XIV.ADJOURN XV.NEXT RESOLUTION NUMBER Typical Proceeding Format for All Public Hearings 1)Conflicts of Interest (handled at beginning of agenda) 2) Provide proof of legal notice (affidavit of notice for PH) 3) Staff presentation 4) Board questions and clarifications of staff 5) Applicant presentation 6) Board questions and clarifications of applicant 7) Public comments 8)Board questions and clarifications relating to public comments 9) Close public comment portion of bearing 10) Staff rebuttal/clarification of evidence presented by applicant and public comment 11) Applicant rebuttal/clarification End of fact finding. Deliberation by the commission commences. No further interaction between commission and staff, applicant or public 12) Chairperson identified the issues to be discussed among commissioners. 2 3 13) Discussion between commissioners* 14) Motion* *Make sure the discussion and motion includes what criteria are met or not met. Revised April 2, 2014 3 REGULAR MEETING HISTORIC PRESERVATION COMMISSION MARCH 10, 2021 Chairperson Thompson opened the meeting at 4:30 p.m. Commissioners in attendance: Kara Thompson, Scott Kendrick, Roger Moyer, Jeff Halferty, Sheri Sanzone Commissioners not in attendance: n/a Staff present: Amy Simon, Planning Director Sarah Yoon, Historic Preservation Planner Kate Johnson, Assistant City Attorney Wes Graham, Deputy City Clerk APPROVAL OF MINUTES: Ms. Simon stated that the February 17th minutes will be pulled from approval. Mr. Kendrick moved to approve minutes from February 24th.; Mr. Moyer seconded. All in favor. PUBLIC COMMENT: None COMMISSIONER COMMENTS: None DISCLOSURE OF CONFLICT: None PROJECT MONITORING: Ms. Simon said she will be reaching out to Mr. Moyer, Mr. Halferty, and Ms. Thompson. Ms. Yoon stated she will be reaching out to Ms. Sanzone and Mr. Halferty. CERTIFICATE OF NO NEGATIVE EFFECT: None STAFF COMMENTS: Ms. Johnson stated that the appeal for 1020 E Cooper will be set for April 19th via WebEx and will only be based on the record of the previous meetings. Ms. Thompson asked if it would be appropriate if the HPC board could call in. Ms. Johnson yes that would be fine, it is a public meeting, not a public hearing. Ms. Simon stated that they do not anticipate taking public comment. OLD BUSINESS: 227 E. Bleeker-– Final Major Development, Kim Raymond Architecture + Interiors. Ms. Raymond stated that she will address each condition that was brought up at the last meeting. Condition #1: Investigating the historic framing for any evidence of historic material and openings. Ms. Raymond said that once they can start demolition her team will be able to investigate if the historic door and see if it was a door or window. She stated that her team will detail out the bay window and restore the closed-in porch to an open front porch. Ms. Raymond said the chimneys will be restored and will work with staff and monitor. Ms. Raymond stated that the parapet that was found shows evidence of being historic and will need further study once able to get into the site. Condition #2 Provide a detailed preservation plan. Ms. Raymond showed visuals of the preservation plan, she added that the plan is six pages with detail. Condition #3 lightwell curb height and other similar features to be 6” or less. She stated that the light wells will be just 6” above grade. Condition #4 approval of setbacks. Ms. Raymond stated that they were approved of the setbacks already. Condition #5 was the approval of the floor area bonus. Condition #6 proposed stormwater mitigation. She said that the biggest change made to this plan for positive drainage was to lift the historic resource. Ms. Raymond explained the back west corner is sinking into the ground and that the new plan is to lift the resource 7 ½” to provide positive drainage. She added that visual adjustment will look the same as it did historically. Condition #7 front walkway shall be 3’. Ms. Raymond stated that the walkway meets the width requirements. Condition #8 A restudy of the roof eave detail on the new addition and the fenestration on the north elevation of the new addition to be more compatible with the historic 4 REGULAR MEETING HISTORIC PRESERVATION COMMISSION MARCH 10, 2021 resource. Ms. Raymond said they added more material between the window and skylight and now it is more relatable to the resource. She pointed out the addition of a fascia board also relates to the cabin but is a product of its own time. Condition #9 Replace the glass floor patio adjacent to the historic home. Ms. Raymond said they will replace the glass plans with a material called thermory and will be treated pine to look aged. Condition #10 detailed roof plan showing all proposed vents, flues meters, and downspouts. Ms. Raymond showed a rendering of all the proposed snow gutters. She said that the new vents will be behind the ridgeline of the historic resource. Ms. Raymond stated that one of the original chimney flues will be used for the working chimney and the other will be used for a plumbing vent. Condition #11 detailed planting schedule for landscaping. Ms. Raymond stated that the front yard will be sod with a flower bed next to the resource, but there will be a band of mulch separating all landscaping and the historic resource. She added that as one moves back in the property the plants will get bigger to soften and give texture. Ms. Raymond said that the lilac bushes will be used to screen the transformer and parking that is located at the rear of the lot. Condition #12 restoration details for the historic resource. Ms. Raymond referred to the preservation plan. Condition #13 financial assurance. She said that this is no problem and will be in place. Ms. Raymond gave the history of the plate height of the new addition being lowered and the raising of the historic resource. She added that the new addition is well below the height limit. Ms. Raymond said that a jelly jar will be used for the exterior porch light and meets the dark sky requirements. She reviewed the Fire Department connection plan and placement on the front of the historic resource. Ms. Raymond reviewed the materials that will be used. She said for the front historic resource they will preserve what they can and match with any replacements. She added that on the east side of the linking element, it will be glass and the other side will be cementitious panels. The new additions will be made up of butt joint wood siding, steel sheet bands, glass railing, and a standing seam metal roof. She added that there will be a horizontal louver screen on the back porch for extra privacy. Ms. Thompson asked about the step up to the linking element and the role of the rain garden. Ms. Raymond stated that with the lifting of the historic resource the rain garden was no longer needed. Ms. Sanzone asked about the front yard stormwater mitigation plan for drainage. She said typically there would be a sod lid on the drain and not an exposed grate that is shown. Ms. Raymond said that the drains will have sod lids over them, and nothing will be visible. STAFF COMMENTS: Ms. Yoon stated that at the last HPC meeting the board directed the applicant to address specific concerns. She said the main concerns were the height difference between the resource and addition, stormwater mitigation, planting details, roof detail on the new addition to be more compatible with the resource, roof plan showing vents and fuels meters and mechanical equipment, and finally a preservation plan for foundation and chimney. Ms. Yoon stated that the height difference has been addressed, the change of grading has created that height difference between the two structures of 7 ¾”. She said that the roof detail plan is compliant with the historic design guidelines. She added that staff is excited to see the use and preservation of the historic chimneys. Ms. Yoon said that the landscape plan keeps the historic resource as the focal point while the sod is being maintained in the front yard, and all of this is in compliance with the design guidelines. She said that the pavers and patio materials will be pushed to the rear of the lot since this is an internal lot. Ms. Yoon pointed out that the material for the patio will be wood. Ms. Yoon stated that staff will continue to work with the applicant to refine the details of the preservation plan. She said that the concerns about the new addition’s fenestration where the skylight and window seem to be blend into one opening creating the illusion of the addition 5 REGULAR MEETING HISTORIC PRESERVATION COMMISSION MARCH 10, 2021 being taller. Ms. Yoon explained that the applicant created a disconnect between the two windows and has met staffs concerns. She added that the new fascia board on the addition relates to the resource while being a product of its own time. Mr. Moyer asked if the city has any policy about chimneys being capped. Ms. Yoon stated that there is no internal policy. COMMISSIONER COMMENTS: Ms. Thompson stated that all of her questions and concerns have been met. Mr. Halferty commended the applicant on the quick response to HPC’s concern. He said he could fully support the project. Mr. Kendrick stated that he agrees with all comments and appreciates the extra effort that went into the redesigns. Ms. Sanzone said that the information that was given this time was great and made the job that much easier to evaluate. Mr. Moyer said well done. Ms. Thompson moved to approve Resolution #06-2021; Mr. Moyer seconded. ROLL CALL: Mr. Kendrick, Yes; Mr. Moyer, Yes; Mr. Halferty; Yes, Ms. Thompson; Yes, Ms. Sanzone; Yes. All in favor. Motion The monitor for this project will be Mr. Halferty. NEW BUSINESS: 423 N. Second Street–Final Major Development Review. Bill Guth and Ro Rockett Design. Mario Nievera landscape architect. Mr. Ro reviewed the location and history of the Queen Anne Victorian. He showed a proposed design of the rotated Victorian placing the historic front door facing Second Street with a one- story linking element and new addition. Mr. Nievera stated that this is a multigenerational home and will be used year-round. He said that the fence that is shown is out of safety for the grandchildren from running into the street. Mr. Nievera stated that the landscape plan is to celebrate the historic resource. He explained the plan is to keep the landscaping low while incorporating some of the historic trees. Mr. Nievera added that there will be privacy elements added around the new structure and family recreation areas while conveying a welcoming feel through strategically placed bushes and not just a hedgerow. Mr. Nievera showed the plant material that will be used in the landscape plan and said there will be a mix of material to create a naturalistic feel against the property and interests shown throughout the year. He said that there will be a gravel trench wrapping around the historic building to ensure the foundation is exposed at all times. Mr. Ro stated that for the front porch restoration plan, his team looked at the neighborhood and other historic homes with open front porches. He said that the proposed porch will have a half-light door, an architectural post with semi-arched brackets, and a simple picket guardrail above an open lattice base. Mr. Ro stated that the fenestration on the new addition will resemble the resource with a taller and slender proportion. Mr. Ro stated that his team looked at the masonry architecture in the West End of Aspen and the importance that it plays. He added that the pairing of brick lends a historic patina to resources. Mr. Ro showed the proposed materials that will be used on the new addition and resource. For the addition, oversized artisan hand cast brick, light gray paving, light wood siding, and window frames. For the Victorian painted wood lap siding, grey metal skirting. Staff Comments: Ms. Simon said that the applicants did a really good job addressing the concerns HPC had with the new addition form, fenestration, and materials. Ms. Simon stated that in the landscaping plan, the plan shows some things easing on to the public right away within the canopy of the street trees. there are a couple of really large cottonwood trees along the property 6 REGULAR MEETING HISTORIC PRESERVATION COMMISSION MARCH 10, 2021 that are very important. She added that the city has had a policy against any kind of illusion of privatizing the right of way with planting beds that seem to extend the private property line. Ms. Simon said that additional input from the Parks Department will be needed. She stated that staff is proposing the removal of anything encroaching into the right of way. Ms. Simon pointed out concern about the two maple trees that flank the resource and obstructing views of the resource and a few willows on the pathway leading up to the building that may get larger than one typically will see in the foreground. Ms. Simon stated that the front walkway that is being shown is wider than the suggested in the guidelines of 3’. She said the east side seating area extends pretty far towards the front of the structure and should be reduced so that there's not so much hardscape and more landscape meeting the base of the building. Ms. Simon stated that there are several outdoor living features that are shown on the plan that are not allowed by zoning in yards anywhere between a building wall and a street. She said you are not allowed to have hot tubs, firepits built-in, or anything like that. She explained that they will work with the applicant for appropriate locations. Ms. Simon said there is a generator indicated and more information about that piece of equipment. She stated that staff is recommending a preservation plan, which is provided to some extent in the drawings. Ms. Simon explained that the applicant indicates various efforts they're going to make to restore the front porch, the front door, etc. She raised concerns about the vent, flues, and roof plan placement and if they are in the best location. Ms. Simon said the front porch light fixture needs to be modest and not overly ornate. Ms. Simon stated that staff recommends approval. Ms. Thompson asked if it was the trees in the linking element area causing concern or that they were close to the resource. Ms. Simon said that the staff concern immediately around the resource. COMMISSIONER COMMENTS: Ms. Thompson said that she generally agrees with staff comments. She said she likes the flow of the landscape past the property line and that it is a very delicate feature. Ms. Thompson stated that she agrees with staff’s comments relating to the proximity of the planting in the eastern patio and giving the resource a bit more breathing room. She said that she was impressed by the fenestration revisions and material revisions. Ms. Sanzone said that she agrees with the comments made by Ms. Thompson. She said that there are historic examples of allowing the planting beds beyond the fence line. Ms. Sanzone stated that this project was well done. Mr. Kendrick stated that this is a fantastic project and supports it moving forward. He said landscaping can be worked out with staff and monitors. Mr. Kendrick said that he has concerns about roof penetrations. Mr. Halferty said that he agrees with all the comments made by the board and staff. He said he could support the project. Mr. Moyer said that he agrees with staff and comments and supports the project. Mr. Guth said that they will be happy to work with staff and monitor on all concerns. Mr. Moyer moved to approve Resolution #07-2021. Mr. Kendrick seconded. ROLL CALL: Mr. Kendrick, Yes; Mr. Moyer, Yes; Mr. Halferty; Yes, Ms. Thompson; Yes, Ms. Sanzone; Yes. All in favor. Motion The monitors will be Ms. Thompson and Ms. Sanzone ADJOURN _________________________ Wes Graham, Deputy Clerk 7 Page 1 of 7 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com Memorandum TO: Aspen Historic Preservation Commission FROM: Sarah Yoon, Historic Preservation Planner THROUGH: Amy Simon, Planning Director MEETING DATE: March 24, 2021 RE: 121 West Bleeker Street – Conceptual Major Development, Relocation, Dimensional Variations and a Floor Area Bonus, PUBLIC HEARING APPLICANT /OWNER: 121 W Bleeker LLC REPRESENTATIVE: 1 Friday Design LOCATION: Street Address: 121 W. Bleeker Street Legal Description: The East ½ of Lot C, All of Lot D, and the West ½ of Lot E, Block 58, City and Townsite of Aspen, Colorado Parcel Identification Number: PID# 2735-124-39-003 CURRENT ZONING & USE R-6 (Moderate-Density Residential); Single-family home PROPOSED ZONING & USE: No change SUMMARY: The applicant requests approval for Conceptual Major Development to demolish all non-historic alterations and additions, to relocate the historic home on a new basement and to construct a new addition to the rear of the property. Dimensional variations and a 250 s.f. floor area bonus are requested for this proposal. As a historically designated landmark, the project is exempt from Residential Design Standards Review (RDS). STAFF RECOMMENDATION: Staff recommends continuation to restudy the design of the new addition with comments provided on page 6 of this memo. Site Locator Map – 121 W. Bleeker Street 121 8 Page 2 of 7 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com BACKGROUND: 121 W. Bleeker is a 6,000 s.f. lot in the R-6 residential zone district. This property contains a Victorian era home that was historically designated via Ordinance 34, Series of 1992. Building permit records show various alterations were made to the historic resource that include the addition of large dormers and a new porch to the west elevation. Setback variances for these extensions were granted by the Board of Adjustment in the early 1990s. Although the Sanborn Map indicates the home is in its original location, numerous alterations have resulted in the loss of historic building fabric. REQUEST OF HISTORIC PRESERVATION COMMISSION (HPC) The Applicant is requesting the following land use approvals: • Major Development (Section 26.415.070.D) to demolish non-historic alterations and additions made to the historic home and construct a new addition to the rear of the property. • Relocation (Section 26.415.090) to place the historic resource on a new basement but maintain the same location on the site. • Setback Variation (Section 26.415.110.C) to grant setback reductions for portions of the new addition and for mechanical equipment. • Height Exception (Section 26.575.020.F.4.j) for the measurement of the height of the new addition where it abuts a large lightwell on the east side of the property. • Floor Area Bonus (Section 26.415.110.F) to request up to 250 sf of additional floor area. The Historic Preservation Commission (HPC) is the final review authority, however, Conceptual approval is subject to Call-up Notice by City Council. PROJECT SUMMARY: The applicant proposes to remove all detrimental alterations on the historic resource and to restore it back to its historic appearance. Excavation for a new basement is proposed and the historic home will be relocated on a new foundation but maintain its historic location on the lot. The new addition is concentrated to the rear of the property and a large lightwell is proposed to the east side of the lot to provide more daylighting for the subgrade living area. Dimensional variations for the new addition and a 250 s.f. floor area bonus are requested for this design. STAFF COMMENTS: Compared to the size of the lot, the two-story historic resource has a rather small building footprint. The historic roof form and architectural character of the home as seen from Bleeker Street is evident, however, past alterations and expansions resulted in the permanent loss of historic building material, especially to the south elevation. Staff supports the removal of all non-historic additions and the restoration of the historic resource. Staff finds the proposed connecting element, which is wider than typically allowed, is appropriate for this project because much of the south Figure 1 – 121 W. Bleeker, 2000 9 Page 3 of 7 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com wall of the historic house has been demolished in the past. Staff supports the location of the new addition as it relates to the lot but recommends the applicant restudy the massing and footprint of the new addition. While dimensional variations for the new addition may be supported, staff recommends reducing the new massing that extends towards the east side yard. The floor area bonus of 250 s.f. may be appropriate if more of the new addition could be concentrated directly behind the historic resource. Staff recommends HPC discuss and provide more direction regarding the following topics. 1. Site Planning and Relocation: The historic resource appears to be in its original location according to the Sanborn Map. There are two large cottonwood tree street trees along West Bleeker Street and alley access for parking. A simple stone walkway is proposed with a bend due to the drip line of the cottonwood tree. Staff recommends the walkway be no more than 3’ in width, utilizing a historic native stone such as red sandstone, set in sand (Design Guideline 1.6). The green space that dominates the front of the site complements the historic resource as designed. A large patio is proposed directly behind the historic resource on the west side of the lot. A fire feature and an egress window well are incorporated into this patio feature. The location of the fire feature is not permitted according to the land use code (built in features are not permitted between a façade and a street) and will need to be relocated, and staff recommends the patio be pull away from the corner of the historic resource so that the resource meets natural landscape rather than the paving. Staff supports the general location of the addition on the lot but finds the proposed footprint to be out of scale as it spans the entire width of the lot, dominating the historic resource from the street view. The historic resource will sit on a new basement foundation, and a light well is proposed on the east façade. The foundation detail will need to appear similar in design and materials to the historic foundation and the curb height of the lightwell needs to be 6” or less in height to minimize visual impact (Design Guideline 9.5 and 9.6). Figure 2 – Proposed Site Plan 10 Page 4 of 7 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com 2. Historic Landmark – Restoration: Building permit files indicate the existing dormers on the Victorian were added in the 1960s, and a series of other additions and alterations followed. The entry porch was enclosed sometime between 1970-1980, and in 1991 a permit was issued to add another porch feature to the west elevation. The applicant proposes to remove the alterations that directly impact the historic resource and to restore the resource using historic photographs. Staff supports the restoration of the resource using historic documentation, building permit files and physical inspection. 3. New Addition – Form, Materials and Fenestration: The new addition has a 12’ long one- story connecting element directly behind the historic landmark. This connecting element is wider than the typical passageway that is preferred, but staff finds this is appropriate because the south elevation of the historic resource was demolished in the 1970s and 1980s when the home was significantly altered. Gabled roof forms and cedar siding are proposed for the new addition, which relates to the historic resource. The proposed fenestration deviates from the historic resource (Design Guideline 10.6). Although the new addition is pushed to the rear of the lot and the area for a new addition is limited due to the landmark remaining in its original location, staff recommends the applicant restudy the building footprint and massing of the new addition to be more directly on axis with the resource. The building footprint of the addition extends to the west of the property that places the exterior staircase in the side yard setback. Staff finds that the footprint of the addition is not minimal and the width of the second floor massing of the addition is visually impactful (Design Guidelines 10.8 & 10.10). 4. Dimensional Variations & Floor Area Bonus: Setback variations and floor area bonuses are benefits available to historic properties if granted by the HPC. For lightwells over 100 s.f., HPC may grant an exception to the methodology for calculating height. All historic preservation Figure 3 – Proposed North (Front) Elevation 11 Page 5 of 7 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com benefits are granted as site-specific approvals that are tied to a specific design reviewed for compatibility and appropriateness. Setback Variations: The applicant requests a reduction from the 10’ rear yard setback requirement for the proposed addition, above and below grade. The proposed design shows the subgrade level within the rear yard setback by approximately 5’. The proposed above grade two-car garage addition has livable space on top that is also 5’ within the rear yard setback. The mechanical equipment proposed in the east side yard setback is taller than 30” and needs a 3’-10” side yard setback reduction. Staff finds the request for the rear yard setback and east side yard setback variations meet the criteria. The applicant seeks a west side yard setback variation for the exterior stairs that provide access to the rooftop deck above the garage. As a result of the east and west side yard setback variations request, the applicant will also need a combined side yard setback variation. In response to the request for a west side yard setback reduction, staff recommends a restudy of the massing and building footprint for the addition because it does not meet the historic preservation design guidelines. See Exhibit A.3 for detailed staff findings. Floor Area Bonus: The applicant plans to demolish all non-historic additions and restore important architectural features such as the front porch and chimney. The proposed design reinforces the front entry as the main entrance to the home. While the restoration efforts will vastly improve the visual appearance of the historic home, staff recommends restudy of the new addition to be more compliant with Design Guidelines 10.8 and 10.10. See Exhibit A.4 for criteria and detailed staff findings. Height Exception for Lightwells: Any lightwell over 100 square feet in size triggers the requirement that building height be measured from the bottom of the lightwell, rather than from the ground level of the site. An exception to this is available as a benefit to landmark properties. The proposed lightwell on the on the east elevation of this project abuts the new addition, is over 100 s.q. and provides generous daylighting for the subgrade living space. This lightwell is located approximately 49’ from the front property line and is not easily visible from Bleeker Street. The east side yard is adjacent to an unusual condition, an access driveway that serves the Hotel Aspen and connects with the alley serving this block. A row of vegetation screens the 121 W. Bleeker property, and the proposed lightwell from clear view from this driveway. The larger lightwell improves livability for the basement level and has minimal visual impact as perceived from Bleeker Street. Staff finds the exception criteria are met to grant an exception to height for the proposed lightwell. The applicant will have to work with Zoning to confirm that, even with the granting of an exception to the methodology of calculating height, the above grade construction adjacent to the lightwell is within the 25’ height limitation. 12 Page 6 of 7 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com REFERRAL COMMENTS: The application was referred out to other City departments who have requirements that will significantly affect the permit review. Please see Exhibit B for full comments. A summary of the comments that must be resolved before HPC or carried forward as conditions of approval are: Engineering Department: 1. Proposed excavation for a water service line within the drip line of a large tree will need to be reviewed by the Parks Department. 2. Location of drywells need to be minimum of 10’ away from the property lines. A variance request can be submitted for review. 3. Clarification regarding the transformer is required. Information about available capacity needs to be reviewed by the City Electric Department. Building Department: 1. Fire sprinklers will be required because the fire area exceeds 5,000 s.f. 2. Proposed exterior stairs to the roof deck does not meet fire separation distance requirements. 3. Window wells without guard protection are not allowed in a patio. 4. An emergency escape and rescue opening is needed for the guest master suite located in the historic resource. 5. The location of hot tub proposed on the roof deck needs to be 18” from the edge of the deck, or a guard needs to extend 18” above the top of the hot tub. 6. Snow retention is needed on the east side of the historic roof where the window well is located. Zoning Department: 1. The proposed fire feature and built-in barbeque are not allowed between a street and structure. 2. Setback variations are needed for the proposed exterior stairs, second floor deck on the rear addition, and the AC units. 3. The proposed lightwell larger than 100 s.f. requires an exception from the methodology of calculating height from HPC. The height measurement needs to be clarified. RECOMMENDATION: A proposed resolution is attached, however staff recommends the Historic Preservation Commission (HPC) continue this application with the following direction: 1.) Restudy the building footprint and massing of the new addition, specifically the area that extends to the west side of the lot, to meet Design Guidelines 10.8 and 10.10 and reduce setback variations. 2.) Reduce the proposed patio on the west side of the lot to allow vegetation to surround the historic landmark, and remove or relocate the proposed fire feature and BBQ to zoning compliant locations. 3.) Work with relevant City Departments regarding comments related to the transformer, new water line and the stormwater mitigation plan. 13 Page 7 of 7 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com ATTACHMENTS: Resolution #____, Series of 2021 Exhibit A.1 – Historic Preservation Design Guidelines Criteria / Staff Findings Exhibit A.2 – Relocation Review Criteria / Staff Findings Exhibit A.3 – Dimensional Variations Review Criteria / Staff Findings Exhibit A.4 – Floor Area Bonus / Staff Findings Exhibit B – Referral Comments Exhibit C – Application 14 HPC Resolution #__, Series of 2021 Page 1 of 3 RESOLUTION #__, SERIES OF 2021 A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION (HPC) GRANTING CONCEPTUAL MAJOR DEVELOPMENT REVIEW, RELOCATION, DIMENSIONAL VARIATIONS AND A FLOOR AREA BONUS FOR THE PROPERTY LOCATED AT 121 WEST BLEEKER STREET, THE EAST ½ OF LOT C, ALL OF LOT D, AND THE WEST ½ OF LOT E, BLOCK 58, CITY AND TOWNSITE OF ASPEN, COLORADO PARCEL ID: 2735-124-39-003 WHEREAS, the applicant, 121 W Bleeker LLC, represented by 1 Friday Design, has requested HPC approval for Conceptual Major Development, Relocation, Setback Variations and a Floor Area Bonus for the property located at 121 W. Bleeker Street, the East ½ of Lot C, all of Lot D, and the West ½ of Lot E, Block 58, City and Townsite of Aspen, Colorado. As a historic landmark, the site is exempt from Residential Design Standards review; and WHEREAS, Section 26.415.070 of the Municipal Code states that “no building or structure shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or district until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review;” and WHEREAS, for Conceptual Major Development Review, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project’s conformance with the City of Aspen Historic Preservation Design Guidelines per Section 26.415.070.D.3.b.2 and 3 of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, for approval of Relocation, the application shall meet the requirements of Aspen Municipal Code Section 26.415.090, Relocation; and WHEREAS, for approval of Setback Variations, the application shall meet the requirements of Aspen Municipal Code Section 26.415.110.C, Setback Variations; and WHEREAS, for approval of an exception to the methodology for calculating height, the application shall meet the requirements of Aspen Municipal Code Section 26.575.020.F.4.j, Exemption for Lightwells and Basement Stairwells; and WHEREAS, for approval of Floor Area Bonus, the application shall meet the requirements of Aspen Municipal Code Section 26.415.110.F, Floor Area Bonus; and WHEREAS, Community Development Department staff reviewed the application for compliance with applicable review standards and recommends continuation; and 15 HPC Resolution #__, Series of 2021 Page 2 of 3 WHEREAS, HPC reviewed the project on March 24, 2021. HPC considered the application, the staff memo and public comment, and found the proposal consistent with the review standards and granted approval with conditions by a vote of _-_. NOW, THEREFORE, BE IT RESOLVED: That HPC hereby approves Conceptual Major Development, Relocation, Dimensional Variations and Floor Area Bonus for 121 W. Bleeker Street, the East ½ of Lot C, all of Lot D, and the West ½ of Lot E, Block 58, City and Townsite of Aspen, CO as follows: Section 1: Conceptual Major Development, Relocation, Dimensional Variations and a Floor Area Bonus. HPC hereby approves Conceptual Major Development, Relocation, Dimensional Variations and Floor Area Bonus as proposed with the following conditions: 1.) Work closely with all relevant City Departments to meet all requirements regarding the transformer, utility and water lines, and stormwater mitigation plan. 2.) Lightwell curb heights to be 6” or less in height. 3.) Provide a financial assurance of $30,000 for the relocation of the historic home onto a new basement foundation, to be provided prior to building permit submission. 4.) A 250 sf floor area bonus is granted for the approved design. 5.) An exception to the methodology for calculating height related to the west lightwell is granted. 6.) The following setback variations for the proposed addition are granted: a. 3’ rear yard setback reduction for the addition above and below grade, as represented in the approved application b. 3’-10” east and west side yard setback reduction for the proposed mechanical equipment c. 3’-10” west side yard setback reduction for the proposed exterior staircase d. 10’ combined side yard setback reduction for the new addition and the mechanical equipment as represented in the approved application 7.) A development application for a Final Development Plan shall be submitted within one (1) year of the date of approval of a Conceptual Development Plan. Failure to file such an application within this time period shall render null and void the approval of the Conceptual Development Plan. The Historic Preservation Commission may, at its sole discretion and for good cause shown, grant a one-time extension of the expiration date for a Conceptual Development Plan approval for up to six (6) months provided a written request for extension is received no less than thirty (30) days prior to the expiration date. Section 2: Material Representations All material representations and commitments made by the Applicant pursuant to the development proposal approvals as herein awarded, whether in public hearing or documentation presented before the Community Development Department, the Historic Preservation Commission, or the Aspen City Council are hereby incorporated in such plan development approvals and the same shall be complied with as if fully set forth herein, unless amended by other specific conditions or an authorized authority. 16 HPC Resolution #__, Series of 2021 Page 3 of 3 Section 3: Existing Litigation This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 4: Severability If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. APPROVED BY THE COMMISSION at its regular meeting on the 24th day of March, 2021. Approved as to Form: Approved as to Content: ________________________________ ________________________________ Katharine Johnson, Assistant City Attorney Kara Thompson, Vice Chair ATTEST: ________________________________ Wes Graham, Deputy City Clerk 17 Page 1 of 16 Exhibit A.1 Historic Preservation Design Guidelines Criteria Staff Findings NOTE: Staff responses begin on page 15 of this exhibit, following the list of applicable guidelines. 26.415.070.D Major Development. No building, structure or landscape shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or a property located within a Historic District until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review. An application for a building permit cannot be submitted without a development order. 3. Conceptual Development Plan Review b) The procedures for the review of conceptual development plans for major development projects are as follows: 1) The Community Development Director shall review the application materials submitted for conceptual or final development plan approval. If they are determined to be complete, the applicant will be notified in writing of this and a public hearing before the HPC shall be scheduled. Notice of the hearing shall be provided pursuant to Section 26.304.060.E.3 Paragraphs a, b and c. 2) Staff shall review the submittal material and prepare a report that analyzes the project's conformance with the design guidelines and other applicable Land Use Code sections. This report will be transmitted to the HPC with relevant information on the proposed project and a recommendation to continue, approve, disapprove or approve with conditions and the reasons for the recommendation. The HPC will review the application, the staff analysis report and the evidence presented at the hearing to determine the project's conformance with the City Historic Preservation Design Guidelines. 3) The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny. 4) A resolution of the HPC action shall be forwarded to the City Council in accordance with Section 26.415.120 - Appeals, notice to City Council, and call-up. No applications for Final Development Plan shall be accepted by the City and no associated permits shall be issued until the City Council takes action as described in said section. 18 Page 2 of 16 Chapter 1: Site Planning & Landscape Design MET NOT MET 1.1 All projects shall respect the historic development pattern or context of the block, neighborhood or district. 1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual impact. 1.5 Maintain the historic hierarchy of spaces. 1.6 Provide a simple walkway running perpendicular from the street to the front entry on residential projects. 1.7 Provide positive open space within a project site. 1.8 Consider stormwater quality needs early in the design process. 1.10 Built-in furnishings, such as water features, fire pits, grills, and hot tubs, that could interfere with or block views of historic structures are inappropriate. 1.11 Preserve and maintain historically significant landscaping on site, particularly landmark trees and shrubs. 1.12 Provide an appropriate context for historic structures. See diagram. 1.23 Re-grading the site in a manner that changes historic grade is generally not allowed and will be reviewed on a case by case basis. 1.26 Preserve the historic circulation system. Chapter 2: Rehabilitation - Building Materials MET NOT MET 2.1 Preserve original building materials. 2.2 The finish of materials should be as it would have existed historically. 2.3 Match the original material in composition, scale and finish when replacing materials on primary surfaces. 2.4 Do not use synthetic materials as replacements for original building materials. 2.5 Covering original building materials with new materials is inappropriate. 2.6 Remove layers that cover the original material. Chapter 3: Rehabilitation - Windows MET NOT MET 3.1 Preserve the functional and decorative features of a historic window. 3.2 Preserve the position, number, and arrangement of historic windows in a building wall. 3.3 Match a replacement window to the original in its design. 3.4 When replacing an original window, use materials that are the same as the original. 3.5 Preserve the size and proportion of a historic window opening. 3.6 Match, as closely as possible, the profile of the sash and its components to that of the original window. MET MET MET MET MET MET MET Historic Preservation Design Guidelines Review Criteria for 121 W. Bleeker The applicant is requesting Conceptual Major Development review for restoring the historic resource and a new above grade addition. The proposed design must meet applicable Historic Preservation Design Guidelines. MET MET MET MET MET CONDITION MET MET MET MET MET MET MET MET MET MET 19 Page 3 of 16 3.7 Adding new openings on a historic structure is generally not allowed. Chapter 4: Rehabilitation - Doors MET NOT MET 4.1 Preserve historically significant doors. 4.2 Maintain the original size of a door and its opening. 4.3 When a historic door or screen door is damaged, repair it and maintain its general historic appearance. 4.4 When replacing a door or screen door, use a design that has an appearance similar to the original door or a door associated with the style of the building. 4.7 Preserve historic hardware. Chapter 5: Rehabilitation - Porches & Balconies MET NOT MET 5.1 Preserve an original porch or balcony. 5.2 Avoid removing or covering historic materials and details. 5.3 Enclosing a porch or balcony is not appropriate. 5.4 If reconstruction is necessary, match the original in form, character and detail. 5.5 If new steps are to be added, construct them out of the same primary materials used on the original, and design them to be in scale with the porch or balcony 5.6 Avoid adding handrails or guardrails where they did not exist historically, particularly where visible from the street. Chapter 6: Rehabilitation - Architectural Details MET NOT MET 6.1 Preserve significant architectural features. 6.2 When disassembly of a historic element is necessary for its restoration, use methods that minimize damage to the original material. 6.3 Remove only the portion of the detail that is deteriorated and must be replaced. 6.4 Repair or replacement of missing or deteriorated features are required to be based on original designs. 6.5 Do not guess at “historic” designs for replacement parts. Chapter 7: Rehabilitation - Roofs MET NOT MET 7.1 Preserve the original form of a roof. 7.2 Preserve the original eave depth. 7.3 Minimize the visual impacts of skylights and other rooftop devices. 7.4 New vents should be minimized, carefully, placed and painted a dark color. 7.5 Preserve original chimneys, even if they are made non-functional. 7.7 Preserve original roof materials. 7.8 New or replacement roof materials should convey a scale, color and texture similar to the original. 7.9 Avoid using conjectural features on a roof. 7.10 Design gutters so that their visibility on the structure is minimized to the extent possible. MET MET MET MET MET MET MET MET MET MET MET MET MET MET MET MET MET MET MET MET MET MET CONDITION MET CONDITION MET 20 Page 4 of 16 Relevant Historic Preservation Design Guidelines: 1.1 All projects shall respect the historic development pattern or context of the block, neighborhood or district. • Building footprint and location should reinforce the traditional patterns of the neighborhood. • Allow for some porosity on a site. In a residential project, setback to setback development is typically uncharacteristic of the historic context. Do not design a project which leaves no useful open space visible from the street. 1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual impact. Chapter 9: New Construction - Excavation, Building Relocation & Foundations MET NOT MET 9.1 Developing a basement by underpinning and excavating while the historic structure remains in place may help to preserve the historic fabric. 9.2 Proposals to relocate a building will be considered on a case-by-case basis. 9.3 Site a relocated structure in a position similar to its historic orientation. 9.4 Position a relocated structure at its historic elevation above grade. 9.5 A new foundation shall appear similar in design and materials to the historic foundation. 9.6 Minimize the visual impact of lightwells. 9.7 All relocations of designated structures shall be performed by contractors who specialize in moving historic buildings, or can document adequate experience in successfully relocating such buildings. Chapter 10: New Construction - Building Additions MET NOT MET 10.2 A more recent addition that is not historically significant may be removed. 10.3 Design a new addition such that one's ability to interpret the historic character of the primary building is maintained. 10.4 The historic resource is to be the focus of the property, the entry point, and the predominant structure as viewed from the street. 10.6 Design a new addition to be recognized as a product of its own time. 10.8 Design an addition to be compatible in size and scale with the main building.NOT MET 10.9 If the addition is taller than a historic building, set it back from significant façades and use a “connector” to link it to the historic building. 10.10 Place an addition at the rear of a primary building or set it back substantially from the front to minimize the visual impact on the historic structure and to allow the original proportions and character to remain prominent. NOT MET 10.11 Roof forms shall be compatible with the historic building. 10.12 Design an addition to a historic structure that does not destroy or obscure historically important architectural features. Chapter 12: Accessibility, Lighting, Mech. Equipment, Services Areas & Signs MET NOT MET 12.4 Minimize the visual impacts of utilitarian areas, such as mechanical equipment and trash storage. MET CONDITION MET MET CONDITION MET MET MET CONDITION CONDITION MET MET MET MET MET 21 Page 5 of 16 • If an alley exists at the site, the new driveway must be located off it. • Tracks, gravel, light grey concrete with minimal seams, or similar materials are appropriate for driveways on Aspen Victorian properties. 1.5 Maintain the historic hierarchy of spaces. • Reflect the established progression of public to private spaces from the public sidewalk to a semi- public walkway, to a semi private entry feature, to private spaces. 1.6 Provide a simple walkway running perpendicular from the street to the front entry on residential projects. • Meandering walkways are not allowed, except where it is needed to avoid a tree or is typical of the period of significance. • Use paving materials that are similar to those used historically for the building style and install them in the manner that they would have been used historically. For example on an Aspen Victorian landmark set flagstone pavers in sand, rather than in concrete. Light grey concrete, brick or red sandstone are appropriate private walkway materials for most landmarks. • The width of a new entry sidewalk should generally be three feet or less for residential properties. A wider sidewalk may be appropriate for an AspenModern property. 1.7 Provide positive open space within a project site. • Ensure that open space on site is meaningful and consolidated into a few large spaces rather than many small unusable areas. • Open space should be designed to support and complement the historic building. 1.8 Consider stormwater quality needs early in the design process. • When included in the initial planning for a project, stormwater quality facilities can be better integrated into the proposal. All landscape plans presented for HPC review must include at least a preliminary representation of the stormwater design. A more detailed design must be reviewed and approved by Planning and Engineering prior to building permit submittal. • Site designs and stormwater management should provide positive drainage away from the historic landmark, preserve the use of natural drainage and treatment systems of the site, reduce the generation of additional stormwater runoff, and increase infiltration into the ground. Stormwater facilities and conveyances located in front of a landmark should have minimal visual impact when viewed from the public right of way. • Refer to City Engineering for additional guidance and requirements. 1.10 Built-in furnishings, such as water features, fire pits, grills, and hot tubs, that could interfere with or block views of historic structures are inappropriate. • Site furnishings that are added to the historic property should not be intrusive or degrade the integrity of the neighborhood patterns, site, or existing historic landscape. • Consolidating and screening these elements is preferred. 1.11 Preserve and maintain historically significant landscaping on site, particularly landmark trees and shrubs. • Retaining historic planting beds and landscape features is encouraged. 22 Page 6 of 16 • Protect historically significant vegetation during construction to avoid damage. Removal of damaged, aged, or diseased trees must be approved by the Parks Department. • If a significant tree must be removed, replace it with the same or similar species in coordination with the Parks Department. • The removal of non-historic planting schemes is encouraged. • Consider restoring the original landscape if information is available, including original plant materials. 1.12 Provide an appropriate context for historic structures. See diagram. • Simplicity and restraint are required. Do not overplant a site, or install a landscape which is overtextured or overly complex in relationship to the historic resource, particularly in Zone A. In Zone A, new planting shall be species that were used historically or species of similar attributes. • In areas immediately adjacent to the landmark, Zone A and Zone B, plants up 42” in height, sod, and low shrubs are often appropriate. • Contemporary planting, walls and other features are not appropriate in Zone A. A more contemporary landscape may surround new development or be located in the rear of the property, in Zone C. • Do not cover areas which were historically unpaved with hard surfaces, except for a limited patio where appropriate. • Where residential structures are being adapted to commercial use, proposals to alter the landscape will be considered on a case-by-case basis. The residential nature of the building must be honored. • In the case of a historic landmark lot split, careful consideration should be given so as not to over plant either property, or remove all evidence of the landscape characteristics from before the property was divided. • Contemporary landscapes that highlight an AspenModern architectural style are encouraged. 23 Page 7 of 16 1.23 Re-grading the site in a manner that changes historic grade is generally not allowed and will be reviewed on a case by case basis. 1.26 Preserve the historic circulation system. • Minimize the impact of new vehicular circulation. • Minimize the visual impact of new parking. • Maintain the separation of pedestrian and vehicle which occurred historically. 2.1 Preserve original building materials. • Do not remove siding that is in good condition or that can be repaired in place. • Masonry features that define the overall historic character, such as walls, cornices, pediments, steps and foundations, should be preserved. • Avoid rebuilding a major portion of an exterior wall that could be repaired in place. Reconstruction may result in a building which no longer retains its historic integrity. • Original AspenModern materials may be replaced in kind if it has been determined that the weathering detracts from the original design intent or philosophy. 2.2 The finish of materials should be as it would have existed historically. • Masonry naturally has a water-protective layer to protect it from the elements. Brick or stone that was not historically painted shall not be painted. • If masonry that was not painted historically was given a coat of paint at some more recent time, consider removing it, using appropriate methods. • Wood should be painted, stained or natural, as appropriate to the style and history of the building. 2.3 Match the original material in composition, scale and finish when replacing materials on primary surfaces. • If the original material is wood clapboard for example, then the replacement material must be wood as well. It should match the original in size, and the amount of exposed lap and finish. • Replace only the amount required. If a few boards are damaged beyond repair, then only those should be replaced, not the entire wall. For AspenModern buildings, sometimes the replacement of a larger area is required to preserve the integrity of the design intent. 2.4 Do not use synthetic materials as replacements for original building materials. • Original building materials such as wood siding and brick should not be replaced with synthetic materials. 2.5 Covering original building materials with new materials is inappropriate. • Regardless of their character, new materials obscure the original, historically significant material. • Any material that covers historic materials may also trap moisture between the two layers. This will cause accelerated deterioration to the historic material which may go unnoticed. 2.6 Remove layers that cover the original material. • Once the non-historic siding is removed, repair the original, underlying material. 3.1 Preserve the functional and decorative features of a historic window. 24 Page 8 of 16 • Features important to the character of a window include its frame, sash, muntins/mullions, sills, heads, jambs, moldings, operations, and groupings of windows. • Repair frames and sashes rather than replacing them. • Preserve the original glass. If original Victorian era glass is broken, consider using restoration glass for the repair. 3.2 Preserve the position, number, and arrangement of historic windows in a building wall. • Enclosing a historic window is inappropriate. • Do not change the size of an original window opening. 3.3 Match a replacement window to the original in its design. • If the original is double-hung, then the replacement window must also be double-hung. If the sash have divided lights, match that characteristic as well. 3.4 When replacing an original window, use materials that are the same as the original. 3.5 Preserve the size and proportion of a historic window opening. • Changing the window opening is not permitted. • Consider restoring an original window opening that was enclosed in the past. 3.6 Match, as closely as possible, the profile of the sash and its components to that of the original window. • A historic window often has a complex profile. Within the window’s casing, the sash steps back to the plane of the glazing (glass) in several increments. These increments, which individually only measure in eighths or quarters of inches, are important details. They distinguish the actual window from the surrounding plane of the wall. • The historic profile on AspenModern properties is typically minimal. 3.7 Adding new openings on a historic structure is generally not allowed. • Greater flexibility in installing new windows may be considered on rear or secondary walls. • New windows should be similar in scale to the historic openings on the building, but should in some way be distinguishable as new, through the use of somewhat different detailing, etc. • Preserve the historic ratio of window openings to solid wall on a façade. • Significantly increasing the amount of glass on a character defining façade will negatively affect the integrity of a structure. 4.1 Preserve historically significant doors. • Maintain features important to the character of a historic doorway. These include the door, door frame, screen door, threshold, glass panes, paneling, hardware, detailing, transoms and flanking sidelights. • Do not change the position and function of original front doors and primary entrances. • If a secondary entrance must be sealed shut, any work that is done must be reversible so that the door can be used at a later time, if necessary. Also, keep the door in place, in its historic position. 25 Page 9 of 16 • Previously enclosed original doors should be reopened when possible. 4.2 Maintain the original size of a door and its opening. • Altering its size and shape is inappropriate. It should not be widened or raised in height. 4.3 When a historic door or screen door is damaged, repair it and maintain its general historic appearance. 4.4 When replacing a door or screen door, use a design that has an appearance similar to the original door or a door associated with the style of the building. • A replica of the original, if evidence exists, is the preferred replacement. • A historic door or screen door from a similar building also may be considered. • Simple paneled doors were typical for Aspen Victorian properties. • Very ornate doors, including stained or leaded glass, are discouraged, unless photographic evidence can support their use. 4.7 Preserve historic hardware. • When new hardware is needed, it must be in scale with the door and appropriate to the style of the building. • On Aspen Victorian properties, conceal any modern elements such as entry key pads. 5.1 Preserve an original porch or balcony. • Replace missing posts and railings when necessary. Match the original proportions, material and spacing of balusters. • Expanding the size of a historic porch or balcony is inappropriate. 5.2 Avoid removing or covering historic materials and details. • Removing an original balustrade, for example, is inappropriate. 5.3 Enclosing a porch or balcony is not appropriate. • Reopening an enclosed porch or balcony is appropriate. 5.4 If reconstruction is necessary, match the original in form, character and detail. • Match original materials. • When reconstructing an original porch or balcony without historic photographs, use dimensions and characteristics found on comparable buildings. Keep style and form simple with minimal, if any, decorative elements. 5.5 If new steps are to be added, construct them out of the same primary materials used on the original, and design them to be in scale with the porch or balcony • Steps should be located in the original location. • Step width should relate to the scale of entry doors, spacing between posts, depth of deck, etc. 26 Page 10 of 16 • Brick, red sandstone, grey concrete, or wood are appropriate materials for steps. 5.6 Avoid adding handrails or guardrails where they did not exist historically, particularly where visible from the street. • If handrails or guardrails are needed according to building code, keep their design simple in character and different from the historic detailing on the porch or balcony. 6.1 Preserve significant architectural features. • Repair only those features that are deteriorated. • Patch, piece-in, splice, or consolidate to repair the existing materials, using recognized preservation methods whenever possible. • On AspenModern properties, repair is preferred, however, it may be more important to preserve the integrity of the original design intent, such as crisp edges, rather than to retain heavily deteriorated material. 6.2 When disassembly of a historic element is necessary for its restoration, use methods that minimize damage to the original material. • Document its location so it may be repositioned accurately. Always devise methods of replacing the disassembled material in its original configuration. 6.3 Remove only the portion of the detail that is deteriorated and must be replaced. • Match the original in composition, scale, and finish when replacing materials or features. • If the original detail was made of wood, for example, then the replacement material should be wood, when feasible. It should match the original in size and finish. 6.4 Repair or replacement of missing or deteriorated features are required to be based on original designs. • The design should be substantiated by physical or pictorial evidence to avoid creating a misrepresentation of the building’s heritage. • When reconstruction of an element is impossible because there is no historical evidence, develop a compatible new design that is a simplified interpretation of the original, and maintains similar scale, proportion and material. 6.5 Do not guess at “historic” designs for replacement parts. • Where scars on the exterior suggest that architectural features existed, but there is no other physical or photographic evidence, then new features may be designed that are similar in character to related buildings. • Using ornate materials on a building or adding new conjectural detailing for which there is no documentation is inappropriate. 7.1 Preserve the original form of a roof. • Do not alter the angle of a historic roof. Preserve the orientation and slope of the roof as seen from the street. • Retain and repair original and decorative roof detailing. 27 Page 11 of 16 • Where the original roof form has been altered, consider restoration. 7.2 Preserve the original eave depth. • Overhangs contribute to the scale and detailing of a historic resource. • AspenModern properties typically have very deep or extremely minimal overhangs that are key character defining features of the architectural style. 7.4 New vents should be minimized, carefully, placed and painted a dark color. • Direct vents for fireplaces are generally not permitted to be added on historic structures. • Locate vents on non-street facing facades. • Use historic chimneys as chases for new flues when possible. 7.5 Preserve original chimneys, even if they are made non-functional. • Reconstruct a missing chimney when documentation exists. 7.7 Preserve original roof materials. • Avoid removing historic roofing material that is in good condition. When replacement is necessary, use a material that is similar to the original in both style as well as physical qualities and use a color that is similar to that seen historically. 7.8 New or replacement roof materials should convey a scale, color and texture similar to the original. • If a substitute is used, such as composition shingle, the roof material should be earth tone and have a matte, non-reflective finish. • Flashing should be in scale with the roof material. • Flashing should be tin, lead coated copper, galvanized or painted metal and have a matte, non- reflective finish. • Design flashing, such as drip edges, so that architectural details are not obscured. • A metal roof is inappropriate for an Aspen Victorian primary home but may be appropriate for a secondary structure from that time period. • A metal roof material should have a matte, non-reflective finish and match the original seaming. 7.9 Avoid using conjectural features on a roof. • Adding ornamental cresting, for example, where there is no evidence that it existed, creates a false impression of the building’s original appearance, and is inappropriate. 7.10 Design gutters so that their visibility on the structure is minimized to the extent possible. • Downspouts should be placed in locations that are not visible from the street if possible, or in locations that do not obscure architectural detailing on the building. • The material used for the gutters should be in character with the style of the building. 9.1 Developing a basement by underpinning and excavating while the historic structure remains in place may help to preserve the historic fabric. 28 Page 12 of 16 • This activity will require the same level of documentation, structural assessment, and posting of financial assurances as a building relocation. 9.2 Proposals to relocate a building will be considered on a case-by-case basis. • In general, on-site relocation has less of an impact on individual landmark structures than those in a historic district. • In a district, where numerous adjacent historic structures may exist, the way that buildings were placed on the site historically, and the open yards visible from the street are characteristics that should be respected in new development. • Provide a figure ground study of the surrounding parcels to demonstrate the effects of a building relocation. • In some cases, the historic significance of the structure, the context of the site, the construction technique, and the architectural style may make on-site relocation too impactful to be appropriate. It must be demonstrated that on-site relocation is the best preservation alternative in order for approval to be granted. • If relocation would result in the need to reconstruct a substantial area of the original exterior surface of the building above grade, it is not an appropriate preservation option. 9.3 Site a relocated structure in a position similar to its historic orientation. • It must face the same direction and have a relatively similar setback. In general, a forward movement, rather than a lateral movement is preferred. HPC will consider setback variations where appropriate. • A primary structure may not be moved to the rear of the parcel to accommodate a new building in front of it. • Be aware of potential restrictions against locating buildings too close to mature trees. Consult with the City Forester early in the design process. Do not relocate a building so that it becomes obscured by trees. 9.4 Position a relocated structure at its historic elevation above grade. • Raising the finished floor of the building slightly above its original elevation is acceptable if needed to address drainage issues. A substantial change in position relative to grade is inappropriate. • Avoid making design decisions that require code related alterations which could have been avoided. In particular, consider how the relationship to grade could result in non-historic guardrails, etc. 9.5 A new foundation shall appear similar in design and materials to the historic foundation. • On modest structures, a simple foundation is appropriate. Constructing a stone foundation on a miner’s cottage where there is no evidence that one existed historically is out of character and is not allowed. • Exposed concrete or painted metal flashing are generally appropriate. • Where a stone or brick foundation existed historically, it must be replicated, ideally using stone salvaged from the original foundation as a veneer. The replacement must be similar in the cut of the stone and design of the mortar joints. • New AspenModern foundations shall be handled on a case by case basis to ensure preservation of the design intent. 29 Page 13 of 16 9.6 Minimize the visual impact of lightwells. • The size of any lightwell that faces a street should be minimized. • Lightwells must be placed so that they are not immediately adjacent to character defining features, such as front porches. • Lightwells must be protected with a flat grate, rather than a railing or may not be visible from a street. • Lightwells that face a street must abut the building foundation and generally may not “float” in the landscape except where they are screened, or on an AspenModern site. 9.7 All relocations of designated structures shall be performed by contractors who specialize in moving historic buildings, or can document adequate experience in successfully relocating such buildings. • The specific methodology to be used in relocating the structure must be approved by the HPC. • During the relocation process, panels must be mounted on the exterior of the building to protect existing openings and historic glass. Special care shall be taken to keep from damaging door and window frames and sashes in the process of covering the openings. Significant architectural details may need to be removed and securely stored until restoration. • The structure is expected to be stored on its original site during the construction process. Proposals for temporary storage on a different parcel will be considered on a case by case basis and may require special conditions of approval. • A historic resource may not be relocated outside of the City of Aspen. 10.2 A more recent addition that is not historically significant may be removed. • For Aspen Victorian properties, HPC generally relies on the 1904 Sanborn Fire Insurance maps to determine which portions of a building are historically significant and must be preserved. • HPC may insist on the removal of non-historic construction that is considered to be detrimental to the historic resource in any case when preservation benefits or variations are being approved. 10.3 Design a new addition such that one’s ability to interpret the historic character of the primary building is maintained. • A new addition must be compatible with the historic character of the primary building. • An addition must be subordinate, deferential, modest, and secondary in comparison to the architectural character of the primary building. • An addition that imitates the primary building’s historic style is not allowed. For example, a new faux Victorian detailed addition is inappropriate on an Aspen Victorian home. • An addition that covers historically significant features is inappropriate. • Proposals on corner lots require particular attention to creating compatibility. 10.4 The historic resource is to be the focus of the property, the entry point, and the predominant structure as viewed from the street. • The historic resource must be visually dominant on the site and must be distinguishable against the addition. • The total above grade floor area of an addition may be no more than 100% of the above grade floor area of the original historic resource. All other above grade development must be completely detached. HPC may consider exceptions to this policy if two or more of the following are met: 30 Page 14 of 16 o The proposed addition is all one story o The footprint of the new addition is closely related to the footprint of the historic resource and the proposed design is particularly sensitive to the scale and proportions of the historic resource o The project involves the demolition and replacement of an older addition that is considered to have been particularly detrimental to the historic resource o The interior of the resource is fully utilized, containing the same number of usable floors as existed historically o The project is on a large lot, allowing the addition to have a significant setback from the street o There are no variance requests in the application other than those related to historic conditions that aren’t being changed o The project is proposed as part of a voluntary AspenModern designation, or o The property is affected by non-preservation related site specific constraints such as trees that must be preserved, Environmentally Sensitive Areas review, etc. 10.6 Design a new addition to be recognized as a product of its own time. • An addition shall be distinguishable from the historic building and still be visually compatible with historic features. • A change in setbacks of the addition from the historic building, a subtle change in material, or a modern interpretation of a historic style are all techniques that may be considered to help define a change from historic construction to new construction. • Do not reference historic styles that have no basis in Aspen. • Consider these three aspects of an addition; form, materials, and fenestration. An addition must relate strongly to the historic resource in at least two of these elements. Departing from the historic resource in one of these categories allows for creativity and a contemporary design response. • Note that on a corner lot, departing from the form of the historic resource may not be allowed. • There is a spectrum of appropriate solutions to distinguishing new from old portions of a development. Some resources of particularly high significance or integrity may not be the right instance for a contrasting addition. 10.8 Design an addition to be compatible in size and scale with the main building. • An addition that is lower than, or similar to the height of the primary building, is preferred. 10.9 If the addition is taller than a historic building, set it back from significant façades and use a “connector” to link it to the historic building. • Only a one-story connector is allowed. • Usable space, including decks, is not allowed on top of connectors unless the connector has limited visibility and the deck is shielded with a solid parapet wall. • In all cases, the connector must attach to the historic resource underneath the eave. • The connector shall be a minimum of 10 feet long between the addition and the primary building. • Minimize the width of the connector. Ideally, it is no more than a passage between the historic resource and addition. The connector must reveal the original building corners. The connector may not be as wide as the historic resource. • Any street-facing doors installed in the connector must be minimized in height and width and accessed by a secondary pathway. See guideline 4.1 for further information. 31 Page 15 of 16 10.10 Place an addition at the rear of a primary building or set it back substantially from the front to minimize the visual impact on the historic structure and to allow the original proportions and character to remain prominent. • Locating an addition at the front of a primary building is inappropriate. • Additions to the side of a primary building are handled on a case-by-case basis and are approved based on site specific constraints that restrict rear additions. • Additional floor area may also be located under the building in a basement which will not alter the exterior mass of a building. 10.11 Roof forms shall be compatible with the historic building. • A simple roof form that does not compete with the historic building is appropriate. • On Aspen Victorian properties, a flat roof may only be used on an addition to a gable roofed structure if the addition is entirely one story in height, or if the flat roofed areas are limited, but the addition is primarily a pitched roof. 10.12 Design an addition to a historic structure that does not destroy or obscure historically important architectural features. • Loss or alteration of architectural details, cornices, and eavelines must be avoided. 12.4 Minimize the visual impacts of utilitarian areas, such as mechanical equipment and trash storage. • Place mechanical equipment on the ground where it can be screened. • Mechanical equipment may only be mounted on a building on an alley façade. • Rooftop mechanical equipment or vents must be grouped together to minimize their visual impact. Where rooftop units are visible, it may be appropriate to provide screening with materials that are compatible with those of the building itself. Use the smallest, low profile units available for the purpose. • Window air conditioning units are not allowed. • Minimize the visual impacts of utility connections and service boxes. Group them in a discrete location. Use pedestals when possible, rather than mounting on a historic building. • Paint mechanical equipment in a neutral color to minimize their appearance by blending with their backgrounds • In general, mechanical equipment should be vented through the roof, rather than a wall, in a manner that has the least visual impact possible. • Avoid surface mounted conduit on historic structures. Staff Finding: The applicable sections of the design guidelines are as follows: site planning, building materials, windows, doors, roofs, porches, and building additions. All relevant Design Guidelines in Chapter 2, 3, 4, 5, 6 and 7 related to the preservation plan need to be reviewed in detail as part of the permit submittal for further historic evidence and/or investigative demolition in order to ensure no historic fabric is being removed. This will be a condition of Final approval. Design Guideline 1.8 addresses plans for stormwater mitigation and positive drainage related to the historic structures. The applicant has submitted preliminary plans for stormwater management but a few 32 Page 16 of 16 comments related to specific features like the location of the drywells have been mentioned by other City Departments. It is important that these details related to stormwater mitigation and drainage are clearly addressed. Staff recommends the applicant continue to discuss the requirements with all relevant departments and ensure that no visible features are located in the foreground of the historic resource. Design Guidelines 7.4, 7.10, 9.5, 9.6 and 9.7 address various aspects of the restoration of historic features and the relocation of the historic resource. Staff recommends the applicant provide a detailed preservation plan to document the restoration of the resource. HPC will want to address appendages to the historic resource in the form of handrails, vents/flues, gutters, curb heights of lightwells and other similar features and the foundation detail. All of the features listed need to be minimal in size and located in areas with the least visual impact when viewing the historic resource. Staff recommends the listed details be provided for review during Final. Design Guidelines 10.8, 10.9 and 10.10 speak to the design expectations for the new addition. The proposed addition is located to the rear of the property but there is limited space for the addition because the historic resource will maintain its current positioning on the site. The connecting element that is directly behind the historic resource is one-story tall and 12’ feet long but wider than typical. The function of a narrow connecting element is to limit the removal of historic building fabric, but this resource has very little building material on the south elevation because of previous additions and alterations. Staff finds the wider connecting element is appropriate for this project given the lack of historic material. The addition is primarily two-stories, with a footprint which spans the width of the lot, extending beyond the resource and pushing an external staircase into the west side yard setback. Staff finds the footprint and orientation of the addition does not read as a minimal solution and recommends the applicant restudy the addition to better comply with Design Guidelines 10.8 and 10.10. In summary, staff recommends continuation to restudy the design to address the topics listed in the staff memo. 33 Page 1 of 2 Exhibit A.2 Relocation Criteria Staff Findings 26.415.090.C Relocation: Relocation for a building, structure or object will be approved if it is determined that it meets any one of the following standards: 1. It is considered a noncontributing element of a historic district and its relocation will not affect the character of the historic district; or 2. It does not contribute to the overall character of the historic district or parcel on which it is located and its relocation will not have an adverse impact on the Historic District or property; or 3. The owner has obtained a certificate of economic hardship; or 4. The relocation activity is demonstrated to be an acceptable preservation method given the character and integrity of the building, structure or object and its move will not adversely affect the integrity of the Historic District in which it was originally located or diminish the historic, architectural or aesthetic relationships of adjacent designated properties; and Additionally, for approval to relocate all of the following criteria must be met: 1. It has been determined that the building, structure or object is capable of withstanding the physical impacts of relocation; 2. An appropriate receiving site has been identified; and 3. An acceptable plan has been submitted providing for the safe relocation, repair and preservation of the building, structure or object including the provision of the necessary financial security. 26.415.090.C - Relocation. Relocation for a building, structure or object will be approved if it is determined that it meets any one of the following standards:MET NOT MET DOES NOT APPLY 1. It is considered a noncontributing element of a historic district and its relocation will not affect the character of the historic district; or N/A 2. It does not contribute to the overall character of the historic district or parcel on which it is located and its relocation will not have an adverse impact on the Historic District or property; or .N/A 3. The owner has obtained a certificate of economic hardship; or N/A 4. The relocation activity is demonstrated to be an acceptable preservation method given the character and integrity of the building, structure or object and its move will not adversely affect the integrity of the Historic District in which it was originally located or diminish the historic, architectural or aesthetic relationships of adjacent designated properties; and Additionally, for approval to relocate all of the following criteria must be met:MET NOT MET DOES NOT APPLY 1. It has been determined that the building, structure or object is capable of withstanding the physical impacts of relocation;CONDITION 2. An appropriate receiving site has been identified; and N/A 3. An acceptable plan has been submitted providing for the safe relocation, repair and preservation of the building, structure or object including the provision of the necessary financial security. CONDITION MET Review Criteria for 121 W. Bleeker The applicant is planning to relocate the historic home onto a new basement in the same historic location on the site. Summary of Review Criteria for Relocation Request 34 Page 2 of 2 Staff Finding: The applicant proposes to relocate the historic home on a new basement foundation, in the same location on site and maintaining the historic height. The proposed relocation does not diminish the historic integrity of the resource and maintains the historic relationship to the site. The necessary letter from an engineer determining the resource capable of withstanding the relocation and the financial assurance in the amount of $30,000 will be required prior to building permit submission. Unless there is evidence of a masonry foundation, the new foundation is to be a simple concrete finish or clad in painted metal flashing. Staff finds the relocation criteria are met. 35 Page 1 of 3 Exhibit A.3 Dimensional Variations Criteria Staff Findings 26.415.110.C Variations: Dimensional variations are allowed for projects involving designated properties to create development that is more consistent with the character of the historic property or district than what would be required by the underlying zoning's dimensional standards. 1. The HPC may grant variations of the Land Use Code for designated properties to allow: a) Development in the side, rear and front setbacks; b) Development that does not meet the minimum distance requirements between buildings; c) Up to five percent (5%) additional site coverage; d) Less public amenity than required for the on-site relocation of commercial historic properties. 2. In granting a variation, the HPC must make a finding that such a variation: a) Is similar to the pattern, features and character of the historic property or district; and/or b) Enhances or mitigates an adverse impact to the historic significance or architectural character of the historic property, an adjoining designated historic property or historic district. Staff Finding: The proposed design pushes the new addition towards the rear of the property and provides alley access to the two-car garage, which is consistent with the pattern in the area. The garage is located 5’ from the rear yard property line, which complies with the underlying zoning requirements. The applicant requests a rear yard setback for the below grade addition, which also lines up with the garage addition at 5’. According to the zone district, a principal building requires a 10’ rear yard setback. The design includes a deck above the two-car garage which is considered primary living space. The applicant requests a 5’ reduction for the deck feature above the garage addition. Staff supports the 5’ rear yard setback, above and below grade for the new 2. In granting a variation, the HPC must make a finding that such a variation:MET NOT MET DOES NOT APPLY a.) Is similar to the pattern, features and character of the historic property or district; and/or NOT MET b.) Enhances or mitigates an adverse impact to the historic significance or architectural character of the historic property, an adjoining designated historic property or historic district.NOT MET Review Criteria for 121 W. Bleeker HPC may grant dimensional variations of the Land Use Code to allow for development in the side, rear and front setbbacks. The applicant is requesting Setback Variations for the new addition and the mechanical equipment. Summary of Review Criteria for Setback Variation Request 26.415.110.C - Variation. Dimensional variations are allowed for projects involving designated properties to create development that is more consistent with the character of the historic property or district than what would be requried by the underlying zoning's dimensional standards. 36 Page 2 of 3 addition because it is consistent with the pattern of the area and mitigates adverse impacts to the historic resource without creating functional issues for vehicular activity in the alley. Mechanical equipment is proposed in the east side yard setback towards the alley. The proposed equipment is taller than 30” and will need a setback variation if they are to be sited in the side yard setback. This corner of the property abuts the ally on both sides and is not adjacent to another residential property. This location for the mechanical equipment is distanced from the historic resource and shows limited visual impact. In addition, the applicant will need to demonstrate that the selected mechanical equipment is under the maximum decibel level when measured from the property lines at all times of the day, as established in the City’s noise ordinance. Staff supports the request for a 3’-10” east side yard setback reduction for the mechanical equipment to sit in the east side yard setback. The request for a west side yard setback reduction is for the exterior staircase that provides access to the rooftop deck above the two-car garage. Staff finds this extension of the building footprint and massing to be inconsistent with the design guidelines and recommends the applicant restudy the addition. Staff finds this request to be inconsistent with the surrounding context and the design creates adverse impacts to the adjacent neighbor and does not meet building code requirements for fire separation. The proposed design will also require a combined side yard setback variation. Although staff supports two of the three requests for setback variations, since the west side yard setback and combined sideyard setback cannot be supported as designed, staff finds that the request for setback variations are not met. 26.575.020.F.4.j Exceptions for Lightwells and Basement Stairwells: The Historic Preservation Commission is authorized to grant an exception to height for lightwells larger than one hundred (100) square feet on historic landmark properties that contain a historic resource upon a finding that the following conditions are met: a) Lightwell is not easily visible from the right of way. b) Approval of the exemption supports the preservation of the historic resource. The Historic Preservation Commission is authorized to grant an exception to height for lightwells larger than one hundred (100) square feet on historic landmark properties that contain a historic resource upon a finding that the following conditions are met: MET NOT MET DOES NOT APPLY a.) Lightwell is not easily visible from the right of way b.) Approval of the exemption supports the preservation of the historic resource. MET Review Criteria for 121 W. Bleeker HPC may grant height variations related to lightwells that are over 100 square feet in area. The applicant is requesting a height variation for the proposed lightwell on the east elevation. MET Summary of Review Criteria for Height Variation Request for Lightwells 26.575.020.F.4.j - Exemptions for lightwells and basement stairwells: 37 Page 3 of 3 Staff Finding: The Municipal code allows HPC to grant an exception to the methodology for measuring height for lightwells over 100 square feet in area that increase the livability of subgrade spaces. The exception does not change the height limit of 25’, but allows the measurement to be made from the ground level of the site, rather than from the bottom of the lightwell, as is typically required for a lightwell of this size (197 s.f.). The subgrade floor plans shows a majority of the bedrooms are located in this area and the master suite is located on the second floor of the addition. The location of the lightwell is along the east side yard and significantly setback from Bleeker Street. The lightwell is not easily visible from the public right of way and helps to create more livable space subgrade. Staff supports the request for an exception to the methodology for measuring height for the proposed lightwell but recommends the extended footprint of the addition and the second floor massing of the addition to be restudied. 38 Page 1 of 3 Exhibit A.4 Floor Area Bonus Criteria Staff Findings 26.415.110.F Floor Area Bonus: 1. In selected circumstances, the HPC may grant up to five hundred (500) additional square feet of allowable floor area for projects involving designated historic properties. The potential bonus is determined by net lot area such that a 3,000-5,999 square foot lot is eligible for a maximum of a two hundred fifty (250) square foot floor area bonus, a 6,000-8,999 square foot lot is eligible for a maximum of a three hundred seventy five (375) square foot floor area bonus and a 9,000 square foot or larger lot is eligible for a maximum of a 500 square foot floor area bonus. Floor area bonuses are cumulative. More than one bonus may be approved up to the maximum amount allowed for the lot. If a property is subdivided, the maximum bonus will be based on the original lot size, though the bonus may be allocated amongst the newly created parcels to the extent permitted. On any lot where a historic property is permitted a duplex density while a non-historic property is not, the increased allowable floor area that results from the density will be deducted from the maximum bonus that the property may receive. To be considered for the bonus, it must be demonstrated that the project meets all of the following criteria: a) The historic building is the key element of the property, and the primary entry into the structure, and the addition is incorporated in a manner that maintains the visual integrity of the historic building; and b) If applicable, historically significant site and landscape features from the period of significance of the historic building are preserved; and the applicant is undertaking multiple significant restoration actions, including but not limited to, re-opening an enclosed porch, re-installing doors and windows in original openings that have been enclosed, removing paint or other nonoriginal finishes, or removing elements which are covering original materials or features; and c) The project retains a historic outbuilding, if one is present, as a free standing structure above grade; and d) The applicant is electing a preservation outcome that is a high priority for HPC, including but not limited to, creating at least two detached structures on the site, limiting the amount of above grade square footage added directly to a historic resource to no more than twice the above grade square footage of the historic resource, limiting the height of an addition to a historic resource to the height of the resource or lower, or demolishing and replacing a significantly City of Aspen Land Use Code Part 400 – Historic Preservation Page 29 incompatible non-historic addition to a historic resource with an addition that meets current guidelines. 2. Granting of additional allowable floor area is not a matter of right but is contingent upon the sole discretion of the HPC and the Commission's assessments of the merits of the proposed project and its ability to demonstrate exemplary historic preservation practices. 39 Page 2 of 3 3. The decision to grant a floor area bonus for major development projects will occur as part of the approval of a Conceptual Development Plan, pursuant to Subsection 26.415.070.D. 4. Floor area bonuses are only available for single-family, duplex or 100% affordable housing development. A property shall receive no more than 500 square feet total. The award of a bonus is project specific. At such time that more than 40% of an addition to a historic resource that was constructed as part of a project which previously received a floor area bonus is demolished, the bonus may be retained only if the proposed redevelopment is found to meet the requirements of this Section. 5. Separate from the floor area bonus described above, on a lot that contains a historic resource, HPC may exempt wall exposed by a light well that is larger than the minimum required for egress from the calculation of subgrade floor area only if the light well is internalized such that it is entirely recessed behind the vertical plane established by the portion of the building façade(s) closest to any street(s), the light well is screened from view from the street by building walls or fences, and any addition that is made to the affected resource simultaneous or after the construction of the light well is entirely one story. LOT SIZE MAXIMUM FLOOR AREA BONUS REQUESTED FLOOR AREA BONUS 5,982.3 S.F.250 S.F.250 S.F. To be considered for the bonus, it must be demonstrated that the project meets all of the following criteria: MET NOT MET DOES NOT APPLY a) The historic building is the key element of the property, and the primary entry into the structure, and the addition is incorporated in a manner that maintains the visual integrity of the historic building; and b) If applicable, historically significant site and landscape features from the period of significance of the historic building are preserved; and the applicant is undertaking multiple significant restoration actions, including but not limited to, re-opening an enclosed porch, re-installing doors and windows in original openings that have been enclosed, removing paint or other nonoriginal finishes, or removing elements which are covering original materials or features; and c) The project retains a historic outbuilding, if one is present, as a free standing structure above grade; and N/A d) The applicant is electing a preservation outcome that is a high priority for HPC, including but not limited to, creating at least two detached structures on the site, limiting the amount of above grade square footage added directly to a historic resource to no more than twice the above grade square footage of the historic resource, limiting the height of an addition to a historic resource to the height of the resource or lower, or demolishing and replacing a significantly City of Aspen Land Use Code Part 400 – Historic Preservation Page 29 incompatible non-historic addition to a historic resource with an addition that meets current guidelines. NOT MET MET Review Criteria for 121 W. Bleeker The applicant is requesting a 250 sf Floor Area Bonus for significant restoration efforts that include re-opening the front porch and removing detrimental alterations to the historic resource. The applicant may request up to 250 s.f. of floor area. Summary of Review Criteria for Floor Area Bonus Request 26.415.110.F - Floor Area Bonus. In selected circumstances, the HPC may grant up to five hundred (500) additional square feet of allowable floor area for projects involving designated historic properties. The potential bonus is determined by net lot area such that a 3,000-5,999 square foot lot is eligible for a maximum of a two hundred fifty (250) square foot floor area bonus, a 6,000-8,999 square foot lot is eligible for a maximum of a three hundred seventy five (375) square foot floor area bonus and a 9,000 square foot or larger lot is eligible for a maximum of a 500 square foot floor area bonus. Floor area bonuses are cumulative. MET 40 Page 3 of 3 Staff Finding: The applicant proposes to restore the historic resource by removing all non- historic alterations and additions that encumber the resource. According to the 1904 Sanborn Map, the resource appears to be in the same location but much of the south elevation has been removed and replaced with additions that were not sympathetic to the historic resource. Staff supports the proposed restoration efforts that include the opening of the front porch, removing the non-historic dormers and side porch, and restoring missing architectural features using photographic documentation. Staff recommends the applicant provide a preservation plan to document the existing conditions and identify the non-historic work that needs to be removed. This will serve as a guiding document for restoration and ensuring compliance with the rehabilitation guidelines found in the Historic Preservation Design Guidelines, Chapters 2-7. One of the criteria for granting a floor area bonus speaks to the importance of the historic entry and the visual integrity of the resource. Staff finds this important criteria will be met with the reopening of the front porch and the proposed primary walkway that leads to the front entrance. Older photographs show the details related to the porch prior to being enclosed. Restoration is a priority for this project, however, the proposed above grade addition appears to be much larger in size and scale when compared to the historic home. Staff recommended restudy of the new addition in regards to mass and building footprint. With the proposed design, staff finds that the criteria for granting a floor area bonus have not been met. This request may be revisited after the restudy of the addition. 41 121 W Bleeker – HPC Conceptual Review Engineering Comments Carly McGowan March 11th, 2021 Comments to be resolved prior to HPC approval: 1.The proposed water service line is shown to go through the drip line of a large tree, with excavation likely required into the drip lines of two other large trees. Applicant shall work with the Parks Dept to resolve this issue and coordinate water line placement prior to HPC approval. 2.Per the CoA Urban Runoff Management Plan (URMP), drywells must be located a minimum of 10’ away from property lines and structures. The plans show the water quality drywell located less than 10’ away from the property line. A variance will not be granted for the distance between the drywell and the property line. If a variance is requested for the distance between the drywell and the structure, applicant must submit a variance request and a letter from a geotechnical engineer that the building foundation will not be compromised. This shall be resolved before HPC approval. 3.What transformer serves the property and does the existing transformer have capacity for the increased use? Will this property require a new transformer? Work with the City Electric Department to determine available capacity. A Load Calc Form will be required at time of building permit. Hotel Aspen is planning on upgrading transformers on their property. Verify that the proposed work aligns with the planned transformer work at Hotel Aspen. This shall be resolved before HPC approval. Other Comments: 1.At building permit, plans shall show how the water service line ties into the structure. An unrestrained service line through the house is not recommended. Instead, plans should include a small mechanical room at the front of the house to switch to internal plumbing. 2.Since this property is in the Aspen Mountain Drainage Basin, detention is not required. However, it needs to be clearly shown how runoff above the WQCV leaves the site. With the proposed drywell the overflow route is not clear. At building permit, applicant will need to show how additional runoff is routed to the City’s storm system without impacting neighboring properties. If this can’t be accomplished, detention will need to be provided. 3.Stormwater from all impervious areas on the property must be treated for water quality. 4.Only one drywell is proposed on the planset, but the detail calls out the connection to a second drywell. If two drywells are proposed, both must meet the 10' setback from all structures and property lines. 5.Clarify the purpose of the filter fabric around the drywell. Studies show that filter fabric is the first thing to clog, and removing or repairing the filter fabric would require excavating the entire drywell. 6.Clarify what the 8.5’x24’ dotted line around the drywell represents. 7.This property is in a sidewalk deferred zone. A sidewalk will not be required at this time. EXHIBIT B - REFERRAL COMMENTS 42 From:Bonnie Muhigirwa To:Sarah Yoon Cc:Denis Murray; Nick Thompson Subject:RE: HPC Referral: 121 W. Bleeker Date:Friday, March 12, 2021 2:59:46 PM Attachments:image003.png image004.png image005.png image002.png image007.jpg image008.jpg image009.jpg image010.jpg image011.png Hi Sarah, Building Comments: Fire sprinklers will be required because the fire area exceeds 5,000 sf. Exterior stair to the roof deck does not meet fire separation distance requirements per 2015 IRC Table 302.1(2). Projections need to be at least 2 feet from the property line and have a 1 hour fire-resistance rating if less than 3 feet from the property line. Window well can not be located in a patio without guard protection per city policy https://www.cityofaspen.com/DocumentCenter/View/6195/Emergency-Escape-and-Rescue- Window-Wells The guest mater suite located in the historic resource needs a compliant emergency escape and rescue opening per R310.2.1 Hot tub at the roof deck will need to be located at least 18” from the deck edge or the guard height will need to extend 18” above the top of the hot tub per city policy https://www.cityofaspen.com/DocumentCenter/View/6202/Hot-Tub-and-Spa-Safety-Railings Snow fencing is required on the historic roof where snow sheds into the window well on the east side. Thanks, Bonnie Muhigirwa Plans Examiner / Building Inspector III Community Development 130 S Galena St. Aspen, CO 81611 p: 970.429.2787 c: 970.309.5119 www.cityofaspen.com 43 From:Jim Pomeroy To:Sarah Yoon Subject:Zoning notes for 121 W. Bleeker Date:Saturday, March 13, 2021 1:54:32 PM Attachments:image009.png image010.jpg image011.jpg image012.jpg Here are zoning notes for 121 W. Bleeker. 1. Yard exceptions needed: Fire feature, and possibly a built in barbeque (it only shows on a couple of sheets) that are placed between a street and structure. 2. The exterior stairs in the west side yard setback need an exception. 3. The rear basement and second floor deck need a 5’ rear setback variance 4. The east side yard has AC units taller than allowed. If those can be set lower into the ground in some sort of “vault” so they are no more than 30” above the surrounding grade, then no setback variance to the east will be required. If they cannot be lowered the applicant will need an east side yard setback variance for the higher than 30” AC units. 5. Combined side yard setback – the combined side yards are supposed to be 14.94’. If the stairs and the AC units receive a variance, then the combined side yard will be reduced to 10’. 6. There are height challenges for the rear, non-historical, section of the project. Because the areaway/lightwell is larger than 100 sq. ft., height for all of the rear element on the property will be counted from the bottom of the areaway per 26.575.020.F.4, Allowed Exceptions to Height. Currently as drawn, the entire rear (new) section of the house does not meet height. The applicant will either need to reduce the size of the areaway to 100 sq. ft. or less or ask HPC for a variance. There are currently no height points being shown on the plans. Without these height points being added, there is no guarantee that the applicant meets height even without the areaway. Please review section 26.575.020.F.2.c) for how to measure height when there are multiple pitches within one vertical plane. To promote the health and safety of our staff and community and to minimize the spread of COVID-19, Community Development staff are conducting business by email and phone and are only available in person by appointment. Contact information for our entire staff and how best to get the services you need can be found on our website: cityofaspen.com/177/Community- Development. Thank you for your understanding. Cheers,     Jim Pomeroy Zoning Enforcement Officer 130 S. Galena St. Aspen, CO 81611 p 970.429.2745 44 c 970.319.2565 www.cityofaspen.com www.aspencommunityvoice.com          Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contained in the email are based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. 45 1 January 26, 2021 Attn: Ms. Sarah Yoon, Ms. Amy Simon & City of Aspen Historic Preservation Commission Historic Preservation Commission c/o Aspen City Hall 130 South Galena Street, 3rd Floor Aspen, CO 81611 Re: 121 West Bleeker Street Conceptual HPC Review / 2735-124-39-003 / EXHIBITS “A” + “B” 121 West Bleeker as seen from Bleeker Street Circa 2020 Dear Sarah and HPC, Please accept this application for Conceptual Major Development Review and an FAR Bonus for the property located at 121 West Bleeker Street. The property is located on a west end R- 6 (Medium Density Residential) zoned lot 5,982.3 square feet (sf) in size, and is a designated historic local landmark (Ordinance 7-1982). The unique two-story landmark is indicative of Aspen’s Vernacular Gable End architecture which can be found in and throughout the West End neighborhood. This structure is representative of Aspen’s mining-era character. 121 West Bleeker has the characteristics of typical mining-era structures such as: size, roof pitch, and modest decorative elements. One notable feature of 121 West Bleeker structure is its unusual comparative height (a full two story structure) to other Aspen PO Box 7928 Aspen, CO 81612 970.309.0695 derek@1friday.com 46 2 Gable End examples (typically 1 to 1-1/2 stories). The home also has an unusual cut out porch and tall gable-end. Background Affectionately coined the “Blueberry House”, the home’s original construction dates to 1887 and while the primary Victorian residence aspect of the property remains predominantly intact to it primary street and adjoining elevations, it appears the home has undergone multiple evolutions throughout its history. Most recently, a remodel in the late 1980s / early 1990s resulted in major alterations to the property’s structure and with it, the likely replacement of original materials such as siding, detailing elements and window trim per imaging we can find. This late 1980s/ early 1990s remodel has resulted in a substantial obscuring between the original and historic forms predominantly to the home’s west and south facades. Additionally, while significant areas of the home’s original materials do still exist along the east and north (Bleeker) facades, it is unclear as to the extent of existing historical framing remaining within the home’s interior. Additionally, it should be noted significant material alterations are present along the south and east facades. 121 West Bleeker as seen from Bleeker Street looking south and west Circa 1950s Proposal It is our intention to restore the primary features that have been obscured through the home’s many remodels and iterations over the decades since 121’s original construction with the focus of retuning the Victorian’s three primary facades - north (Bleeker Street), west (neighboring lot) and east (side alley), along with the home’s unique cross gable roof structure to its original design intent. An addition to the main two story historic home and a full subgrade excavation /basement are proposed. The property is to be a single family home. All currently existing non-historic additions 47 3 are proposed to be removed and replaced with a smaller and more historically sensitive above grade massing strategy for the 121 residence. Significant cottonwood trees along the street facades are protected and preserved in the proposal. There are no obstructing trees or driplines that further affect the design as proposed for 121. The application proposes to reduce the existing legal non-conformities of the property as currently exists. The 250 sf FAR bonus (the eligible FA sum for lots ranging in size between 3,000 to 5,999 square feet – 121 is just under the 6,000 sq ft mark with a total of 5,982.5 sq ft) is respectfully requested as part of this application – as demonstrated in Exhibits A and B, significant restoration, preservation and removal of non-historic and non-compliant additions are proposed. Variations In order to best respond to the Aspen Historic Design Criteria, several variations are to be requested as follows: Existing Victorian Requested Variations: • Both the cross gable roof massing and roof chimney element of the 121 residence exceed and therefore, are in violation Aspen’s current R-6 25’ height maximum allowable definition. While the home’s ridge height (31’-5.5” above grade – V.I.F.) is proposed to remain at its existing current height (note: we are still researching the chimney (estimated ht. 35’-6” above finished grade – TBD) as to it’s historical configuration, which does appear thinner and taller in imaging than the current existing constructed condition), variations to accommodate said elements are requested as deemed necessary by city of Aspen zoning policy. Proposed Site & Addition Requested Variations: West Side Yard Setback Request Variation: - 1’-2” (Purpose: While all above and below grade proposed massing conditions and light wells for the project are located within the required 5’ side yard setback, we are proposing an exterior stair along the east side of the property to cantilever out from the wall accordingly. On the wall below the stair, electrical and gas meters per holy cross energy code requirements are proposed to be located. • East Side Yard Setback Variation: - 1’-2” (Purpose: Again, all above and below grade proposed massing conditions and light wells for the project are located within the required 5’ side yard setback. The variation is requested due to the city of aspen zoning code pertaining to mechanical equipment. As for warranty and installation purposes, all condensing units (to be situated on a concrete pad ) are anticipated to be no more than 40” in height – this said, in order to place the units as far away from the historical resource as desired and to address the city’s 30” maximum allowable above grade policy for mechanical equipment, we are requesting said variation. • Combined Side Yard Setback Variation: 2-4” (Purpose: Per the Side Yard setbacks as described, we are seeking a combined side yard setback variation of 2’-4” accordingly). 48 4 • Rear Yard Setback variation: 5’ Below Grade/ Deck Habitable Variation (Purpose: While all above grade habitable (10’ setback minimum) and garage (5’ setback minimum) requirements are met, we are seeking the technical ability to maintain a subgrade foundation that “tracks” with the above grade garage construction for subgrade mechanical area. As we also are creating a one story massing potential for usable deck area on top of the garage along the alley situated in this defined “zone” by Aspen code. The massing above grade is unaffected by this variation request. • East Alley Side Yard Light Well Size (196 sq ft) / Height Variation (26’-6.5” Connector to LW T.O. Concrete - If Necessary) : (Purpose: Although the proposed 196 sq ft light well is situated outside of the required 5’ side yard setback, it is proposed with an out to out dimension of 196 square feet and a light well floor to top of connector height of 26 feet 6.5 inches. I believe the revised code may already allow this, but in the event of being cautious, the request is provided accordingly if necessary.) Thank you for reviewing this application. Additional computer modeling will be presented to the HPC during the public hearing for this project. Please reach out should you need additional information to complete your review. Sincerely, Derek Skalko, Principal – 1 Friday design Exhibits A – HP Conceptual Review and Variation Criteria B – FAR Bonus request C – Pre application summary D – Agreement to Pay E – Land Use application F – HOA form G – Authorization to represent H – Proof of ownership I – Vicinity Map J – Mailing List K – Streetscape context images L - Drawing set including 1) stamped survey, 2) drainage and grading planning and details, 3) existing and proposed floor area calculations demonstrating how the bonus is to be applied for predominantly subgrade consideration, 4) existing plans and elevations and proposed areas of removal, 5) proposed site plan, architectural planning and elevations with preliminary material and fenestration indication 49 5 Exhibit A –Conceptual HP Review 26.415.060.A Approvals Required. Any development involving properties designated on the aspen Inventory of Historic Landmark Sites and Structures, as an individual property or located within the boundaries of a Historic District, unless determined exempt, requires the approval of a development order and either a certificate of no negative effect or a certificate of appropriateness before a building permit or any other work authorization will be issued by the City. HPC shall provide referral comments for major projects to rights of way located within the boundaries of a Historic District. Response: Applicable Design Guidelines are addressed below: Streetscape 1.1 All projects shall respect the historic development pattern or context of the block, neighborhood or district. • Building footprint and location should reinforce the traditional patterns of the neighborhood. • Allow for some porosity on a site. In a residential project, setback to setback development is typically uncharacteristic of the historic context. Do not design a project which leaves no useful open space visible from the street. Response – The Victorian home is located in its original location. Useful open space is preserved around the historic landmark. New construction is significantly setback from the Bleeker historic street facing façade. Per Aspen’s HPC Guidelines, a comparative diagram is being provided in relation to the proposal for 121 West Bleeker following: Above : Aspen HPC Diagram , Page 43 Right: 121 Proposed Site Plan Diagram in Relation 50 6 1.2 Preserve the system and character of historic streets, alleys, and ditches. When HPC input is requested, the following bullet points may be applicable. • Retain and preserve the variety and character found in historic alleys, including retaining historic ancillary buildings or constructing new ones. • Retain and preserve the simple character of historic ditches. Do not plant flowers or add landscape. • Abandoning or re-routing a street in a historic area is generally discouraged. • Consider the value of unpaved alleys in residential areas. • Opening a platted right of way which was abandoned or never graded may be encouraged on a case by case basis. Response – The character defining cottonwoods that front 121 West Bleeker are protected and preserved. 1.3 Remove driveways or parking areas accessed directly from the street if they were not part of the original development of the site. • Do not introduce new curb cuts on streets. • Non-historic driveways accessed from the street should be removed if they can be relocated to the alley. Response – n/a. 1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual impact. • If an alley exists at the site, the new driveway must be located off it. • Tracks, gravel, light grey concrete with minimal seams, or similar materials are appropriate for driveways on Aspen Victorian properties. Response – The driveway is proposed to be located off the property’s south rear yard alley. 1.5 Maintain the historic hierarchy of spaces. • Reflect the established progression of public to private spaces from the public sidewalk to a semi-public walkway, to a semi private entry feature, to private spaces. Response – A simple walkway into the main entry is proposed from Bleeker Street to the front entry porch of the Victorian. The walkway leading to the non-historic west side entrance, and the west side non-historic entry porch and massing, is to be removed. The Victorian’s north entry front porch enclosure and walkway to the west side yard addition we believe were added previously when the building was last remodeled late 1980’s / early 1990’s. 1.6 Provide a simple walkway running perpendicular from the street to the front entry on residential projects. 51 7 • Meandering walkways are not allowed, except where it is needed to avoid a tree or is typical of the period of significance. • Use paving materials that are similar to those used historically for the building style and install them in the manner that they would have been used historically. For example, on an Aspen Victorian landmark set flagstone pavers in sand, rather than in concrete. Light grey concrete, brick or red sandstone are appropriate private walkway materials for most landmarks. • The width of a new entry sidewalk should generally be three feet or less for residential properties. A wider sidewalk may be appropriate for an AspenModern property. Response – A simple linear walkway is proposed. Paving materials will be presented at Final Design Review. 1.7 Provide positive open space within a project site. • Ensure that open space on site is meaningful and consolidated into a few large spaces rather than many small unusable areas. • Open space should be designed to support and complement the historic building. Response – Open space on the site is provided per the proposed planning (Sheets A2.005 / A2.007/ A2.008) There is only green space proposed around the Victorian landmark to the North (Bleeker), East (Side Alley) and (West) Neighboring sides . 1.8 Consider stormwater quality needs early in the design process. • When included in the initial planning for a project, stormwater quality facilities can be better integrated into the proposal. All landscape plans presented for HPC review must include at least a preliminary representation of the stormwater design. A more detailed design must be reviewed and approved by Planning and Engineering prior to building permit submittal. • Site designs and stormwater management should provide positive drainage away from the historic landmark, preserve the use of natural drainage and treatment systems of the site, reduce the generation of additional stormwater runoff, and increase infiltration into the ground. Stormwater facilities and conveyances located in front of a landmark should have minimal visual impact when viewed from the public right of way. • Refer to City Engineering for additional guidance and requirements. Response – A conceptual drainage plan (Sheets C2 +C3) is being developed that directs drainage away from the landmarks. Two drywells are proposed onsite in the conceptual drainage plan. The drywells will be covered and with a sod lid and completely hidden in the lawn. There will not be any dip in the grade near the lid – the drywell does not have an open grate which allows surrounding grade to remain unchanged. 1.9 Landscape development on AspenModern landmarks shall be addressed on a case by case basis. Response – n/a. 1.10 Built-in furnishings, such as water features, fire pits, grills, and hot tubs, that could interfere with or block views of historic structures are inappropriate. 52 8 • Site furnishings that are added to the historic property should not be intrusive or degrade the integrity of the neighborhood patterns, site, or existing historic landscape. • Consolidating and screening these elements is preferred. Response – A conceptual site plan is proposed for preliminary review. (Sheets A2.005/ A2.007/ A2.008) Built in furnishings are located behind the landmarks and are proposed to be fully screened from the street. 1.11 Preserve and maintain historically significant landscaping on site, particularly landmark trees and shrubs. • Retaining historic planting beds and landscape features is encouraged. • Protect historically significant vegetation during construction to avoid damage. Removal of damaged, aged, or diseased trees must be approved by the Parks Department. • If a significant tree must be removed, replace it with the same or similar species in coordination with the Parks Department. • The removal of non-historic planting schemes is encouraged. • Consider restoring the original landscape if information is available, including original plant materials. Response – Mature cottonwood trees that border the streets are protected and preserved. We are proposing to utilize the South Alley versus the east side yard alley due to existing vegetation conditions, which should not affect the design as proposed at this time. 1.12 Provide an appropriate context for historic structures. See diagram. • Simplicity and restraint are required. Do not overplant a site, or install a landscape which is over textured or overly complex in relationship to the historic resource, particularly in Zone A. In Zone A, new planting shall be species that were used historically or species of similar attributes. • In areas immediately adjacent to the landmark, Zone A and Zone B, plants up 42” in height, sod, and low shrubs are often appropriate. • Contemporary planting, walls and other features are not appropriate in Zone A. A more contemporary landscape may surround new development or be located in the rear of the property, in Zone C. • Do not cover areas which were historically unpaved with hard surfaces, except for a limited patio where appropriate. • Where residential structures are being adapted to commercial use, proposals to alter the landscape will be considered on a case-by-case basis. The residential nature of the building must be honored. 53 • 9 In the case of a historic landmark lot split, careful consideration should be given so as not to over plant either property, or remove all evidence of the landscape characteristics from before the property was divided. • Contemporary landscapes that highlight an AspenModern architectural style are encouraged. Response – A simple landscape with traditional plantings is to be proposed. A reduced version of Sheet A2.008 is included below. Conceptual Landscape as Proposed for 121 Bleeker- Sheet A2.008 1.13 Additions of plant material to the landscape that could interfere with or block views of historic structures are inappropriate. • Low plantings and ground covers are preferred. • Do not place trees, shrubs, or hedgerows in locations that will obscure, damage, or block significant architectural features or views to the building. Hedgerows are not allowed as fences. • Consider mature canopy size when planting new trees adjacent to historic resources. Planting trees too close to a landmark may result in building deteriorate or blocked views and is inappropriate. • Climbing vines can damage historic structures and are not allowed. Response – No new planting material is proposed that will damage or obscure the primary views (from Bleeker Street) of the historic structure. A detailed landscape plan will be provided at Final Design Review in addition to the conceptual plan provided as Sheet A2.008. 1.14 Minimize the visual impacts of landscape lighting. 54 10 • Landscape and pathway lighting is not permitted in Zone A (refer to diagram) on Aspen Victorian properties unless an exception is approved by HPC based on safety considerations. • Landscape, driveway, and pathway lighting on Aspen Modern properties is addressed on a case-by-case basis. Landscape light fixtures should be carefully selected so that they are compatible with the building, yet recognizable as a product of their own time. • Driveway lighting is not permitted on Aspen Victorian properties. • Landscape up lighting is not allowed. Response – Landscape lighting is not proposed as this time. 1.15 Preserve original fences. • Fences which are considered part of the historic significance of a site should not be moved, removed, or inappropriately altered. • Replace only those portions of a historic fence that are deteriorated beyond repair. • Replacement elements must match the existing. Response – The fence and historic considerations will be discussed with the Aspen HPC. It is likely the original construction was a wood painted fence per the images we can find. Currently, an ornate iron fence is installed, which can be discussed further with the Aspen when meeting as to how to collectively best proceed forward on this matter. Above : Images of the various fence conditions for 121 Bleeker – Top right indicates the current / existing condition. 55 • 11 1.16 When possible, replicate a missing historic fence based on photographic evidence. Response – Per the response provided 1.15. 1.17 No fence in the front yard is often the most appropriate solution. • Reserve fences for back yards and behind street facing façades, as the best way to preserve the character of a property. Response – Per the response provided 1.15. 1.18 When building an entirely new fence, use materials that are appropriate to the building type and style. • The new fence should use materials that were used on similar properties during the period of significance. • A wood fence is the appropriate solution in most locations. • Ornate fences, including wrought iron, may create a false history are not appropriate for Aspen Victorian landmarks unless there is evidence that a decorative fence historically existed on the site. • A modest wire fence was common locally in the early 1900s and is appropriate for Aspen Victorian properties. This fence type has many desirable characteristics including transparency, a low height, and a simple design. When this material is used, posts should be simply detailed and not oversized. Response – Per response provided 1.15. 1.19 A new fence should have a transparent quality, allowing views into the yard from the street. • A fence that defines a front yard must be low in height and transparent in nature. • For a picket fence, spacing between the pickets must be a minimum of 1/2 the width of the picket. For Post-WWII properties where a more solid type of fence may be historically appropriate, proposals will be reviewed on a case-by-case basis. • Fence columns or piers should be proportional to the fence segment. Response – 1.15. 1.20 Any fence taller than 42” should be designed so that it avoids blocking public views of important features of a designated building. • A privacy fence should incorporate transparent elements to minimize the possible visual impacts. Consider staggering the fence boards on either side of the fence rail. This will give 56 12 the appearance of a solid plank fence when seen head on. Also consider using lattice, or other transparent detailing on the upper portions of the fence. • A privacy fence should allow the building corners and any important architectural features that are visible from the street to continue to be viewed. • All hedgerows (trees, shrub bushes, etc.) are prohibited in Zones A and B. Response – 1.15. 1.21 Preserve original retaining walls • Replace only those portions that are deteriorated beyond repair. Any replacement materials should match the original in color, texture, size and finish. • Painting or covering a historic masonry retaining wall or covering is not allowed. • Increasing the height of a retaining wall is inappropriate. Response – n/a. 1.22 When a new retaining wall is necessary, its height and visibility should be minimized. • All wall materials, including veneer and mortar, will be reviewed on a case by case basis and should be compatible with the palette used on the historic structure. Response – n/a. 1.23 Re-grading the site in a manner that changes historic grade is generally not allowed and will be reviewed on a case by case basis. Response – The historic building is proposed to maintain grade similar to existing conditions. 1.24 Preserve historically significant landscapes with few or no alterations. • An analysis of the historic landscape and an assessment of the current condition of the landscape should be done before the beginning of any project. • The key features of the historic landscape and its overall design intent must be preserved. Response – The character defining cottonwoods are preserved and protected. The existing trees and bushes along the east (alley) lot line are preserved where possible. 1.25 New development on these sites should respect the historic design of the landscape and its built features. • Do not add features that damage the integrity of the historic landscape. • Maintain the existing pattern of setbacks and siting of structures. • Maintain the historic relationship of the built landscape to natural features on the site. • All additions to these landscapes must be clearly identifiable as recent work. • New artwork must be subordinate to the designed landscape in terms of placement, height, material, and overall appearance. Place new art away from significant landscape features. • Avoid installing utility trenches in cultural landscapes if possible. Response – The simple historic design of the landscape is maintained in the proposal. The landscape intent is to simplify and significant trees are protected. 57 • 13 1.26 Preserve the historic circulation system. • Minimize the impact of new vehicular circulation. • Minimize the visual impact of new parking. • Maintain the separation of pedestrian and vehicle which occurred historically. Response – All parking is located off the alley in the prosed two-car garage. Currently, 121 Bleeker only provides for 1 on-site parking space. 1.27 Preserve and maintain significant landscaping on site. • Protect established vegetation during any construction. • If any tree or shrub needs to be removed, replace it with the same or similar species. • New planting should be of a species used historically or a similar species. • Maintain and preserve any gardens and/or ornamental planting on the site. • Maintain and preserve any historic landscape elements. Response – n/a. Per 1.25. Restoration Materials 2.1 Preserve original building materials. • Do not remove siding that is in good condition or that can be repaired in place. • Masonry features that define the overall historic character, such as walls, cornices, pediments, steps and foundations, should be preserved. • Avoid rebuilding a major portion of an exterior wall that could be repaired in place. Reconstruction may result in a building which no longer retains its historic integrity. Original AspenModern materials may be replaced in kind if it has been determined that the weathering detracts from the original design intent or philosophy. 2.2 The finish of materials should be as it would have existed historically. • Masonry naturally has a water-protective layer to protect it from the elements. Brick or stone that was not historically painted shall not be painted. • If masonry that was not painted historically was given a coat of paint at some more recent time, consider removing it, using appropriate methods. • Wood should be painted, stained or natural, as appropriate to the style and history of the building. 58 14 2.3 Match the original material in composition, scale and finish when replacing materials on primary surfaces. • If the original material is wood clapboard for example, then the replacement material must be wood as well. It should match the original in size, and the amount of exposed lap and finish. • Replace only the amount required. If a few boards are damaged beyond repair, then only those should be replaced, not the entire wall. For AspenModern buildings, sometimes the replacement of a larger area is required to preserve the integrity of the design intent. 2.4 Do not use synthetic materials as replacements for original building materials. • Original building materials such as wood siding and brick should not be replaced with synthetic materials. 2.5 Covering original building materials with new materials is inappropriate. • Regardless of their character, new materials obscure the original, historically significant material. • Any material that covers historic materials may also trap moisture between the two layers. This will cause accelerated deterioration to the historic material which may go unnoticed. 2.6 Remove layers that cover the original material. • Once the non-historic siding is removed, repair the original, underlying material. Response – The Victorian is proposed to be fully restored using historic photographs as we have available. Any replacement materials on the Victorian will match the original conditions as described in Guideline 2.3. Original material with integrity will be restored or repaired. Original building materials will not be covered. Windows 3.1 Preserve the functional and decorative features of a historic window. • Features important to the character of a window include its frame, sash, muntins/mullions, sills, heads, jambs, moldings, operations, and groupings of windows. • Repair frames and sashes rather than replacing them. • Preserve the original glass. If original Victorian era glass is broken, consider using restoration glass for the repair. 3.2 Preserve the position, number, and arrangement of historic windows in a building wall. • Enclosing a historic window is inappropriate. • Do not change the size of an original window opening. 59 • 15 3.3 Match a replacement window to the original in its design. • If the original is double-hung, then the replacement window must also be double-hung. If the sash have divided lights, match that characteristic as well. 3.4 When replacing an original window, use materials that are the same as the original. 3.5 Preserve the size and proportion of a historic window opening. • Changing the window opening is not permitted. • Consider restoring an original window opening that was enclosed in the past. 3.6 Match, as closely as possible, the profile of the sash and its components to that of the original window. • A historic window often has a complex profile. Within the window’s casing, the sash steps back to the plane of the glazing (glass) in several increments. These increments, which individually only measure in eighths or quarters of inches, are important details. They distinguish the actual window from the surrounding plane of the wall. • The historic profile on AspenModern properties is typically minimal. 3.7 Adding new openings on a historic structure is generally not allowed. • Greater flexibility in installing new windows may be considered on rear or secondary walls. • New windows should be similar in scale to the historic openings on the building, but should in some way be distinguishable as new, through the use of somewhat different detailing, etc. • Preserve the historic ratio of window openings to solid wall on a façade. • Significantly increasing the amount of glass on a character defining façade will negatively affect the integrity of a structure. 3.8 Use a storm window to enhance energy conservation rather than replace a historic window. • Install a storm window on the interior, when feasible. This will allow the character of the original window to be seen from the public way. 60 16 • If a storm window is to be installed on the exterior, match the sash design and material of the original window. It should fit tightly within the window opening without the need for subframes or panning around the perimeter. A storm window should not include muntins unless necessary for structure. Any muntin should be placed to match horizontal or vertical divisions of the historic window. Response – All historic windows will be preserved, and operational components will be repaired as needed. Window locations are maintained and / or restored in the Victorian as shown in the architectural drawing set provided (Sheets A2.001 through A3.006). Doors 4.1 Preserve historically significant doors. • Maintain features important to the character of a historic doorway. These include the door, door frame, screen door, threshold, glass panes, paneling, hardware, detailing, transoms and flanking sidelights. • Do not change the position and function of original front doors and primary entrances. • If a secondary entrance must be sealed shut, any work that is done must be reversible so that the door can be used at a later time, if necessary. Also, keep the door in place, in its historic position. • Previously enclosed original doors should be reopened when possible. 4.2 Maintain the original size of a door and its opening. • Altering its size and shape is inappropriate. It should not be widened or raised in height. 4.3 When a historic door or screen door is damaged, repair it and maintain its general historic appearance. 4.4 When replacing a door or screen door, use a design that has an appearance similar to the original door or a door associated with the style of the building. • A replica of the original, if evidence exists, is the preferred replacement. • A historic door or screen door from a similar building also may be considered. • Simple paneled doors were typical for Aspen Victorian properties. • Very ornate doors, including stained or leaded glass, are discouraged, unless photographic evidence can support their use. 4.5 Adding new doors on a historic building is generally not allowed. • Place new doors in any proposed addition rather than altering the historic resource. • Greater flexibility in installing a door in a new location may be considered on rear or secondary walls. • A new door in a new location should be similar in scale and style to historic openings on the building and should be a product of its own time. 61 17 • Preserve the historic ratio of openings to solid wall on a façade. Significantly increasing the openings on a character defining façade negatively affects the integrity of a structure. 4.6 If energy conservation and heat loss are concerns, use a storm door instead of replacing a historic entry door. • Match the material, frame design, character, and color of the primary door. • Simple features that do not detract from the historic entry door are appropriate for a new storm door. • New screen doors should be in character with the primary door. 4.7 Preserve historic hardware. • When new hardware is needed, it must be in scale with the door and appropriate to the style of the building. • On Aspen Victorian properties, conceal any modern elements such as entry key pads. Response – Original door openings and historic hardware will be preserved. The original front entry to the Victorian will be restored to an open porch condition as historically indicated and the non-historic west side yard entry and porch area is proposed to be removed. Porch 5.1 Preserve an original porch or balcony. • Replace missing posts and railings when necessary. Match the original proportions, material and spacing of balusters. • Expanding the size of a historic porch or balcony is inappropriate. 5.2 Avoid removing or covering historic materials and details. • Removing an original balustrade, for example, is inappropriate. 5.3 Enclosing a porch or balcony is not appropriate. • Reopening an enclosed porch or balcony is appropriate. 5.4 If reconstruction is necessary, match the original in form, character and detail. • Match original materials. • When reconstructing an original porch or balcony without historic photographs, use dimensions and characteristics found on comparable buildings. Keep style and form simple with minimal, if any, decorative elements. 5.5 If new steps are to be added, construct them out of the same primary materials used on the original, and design them to be in scale with the porch or balcony 62 18 • Steps should be located in the original location. • Step width should relate to the scale of entry doors, spacing between posts, depth of deck, etc. • Brick, red sandstone, grey concrete, or wood are appropriate materials for steps. 5.6 Avoid adding handrails or guardrails where they did not exist historically, particularly where visible from the street. • If handrails or guardrails are needed according to building code, keep their design simple in character and different from the historic detailing on the porch or balcony. Response – The historic front entry porch on the main two story historic landmark is proposed to be restored to its original condition per imaging provided. The non-original side entry porch on the historic home (west elevation) is to be removed. Architectural Details 6.1 Preserve significant architectural features. • Repair only those features that are deteriorated. • Patch, piece-in, splice, or consolidate to repair the existing materials, using recognized preservation methods whenever possible. • On AspenModern properties, repair is preferred, however, it may be more important to preserve the integrity of the original design intent, such as crisp edges, rather than to retain heavily deteriorated material. 6.2 When disassembly of a historic element is necessary for its restoration, use methods that minimize damage to the original material. • Document its location so it may be repositioned accurately. Always devise methods of replacing the disassembled material in its original configuration. 6.3 Remove only the portion of the detail that is deteriorated and must be replaced. • Match the original in composition, scale, and finish when replacing materials or features. • If the original detail was made of wood, for example, then the replacement material should be wood, when feasible. It should match the original in size and finish. 6.4 Repair or replacement of missing or deteriorated features are required to be based on original designs. • The design should be substantiated by physical or pictorial evidence to avoid creating a misrepresentation of the building’s heritage. • When reconstruction of an element is impossible because there is no historical evidence, develop a compatible new design that is a simplified interpretation of the original, and maintains similar scale, proportion and material. 6.5 Do not guess at “historic” designs for replacement parts. 63 19 • Where scars on the exterior suggest that architectural features existed, but there is no other physical or photographic evidence, then new features may be designed that are similar in character to related buildings. • Using ornate materials on a building or adding new conjectural detailing for which there is no documentation is inappropriate. Response – Architectural details will be repaired and / or restored as needed. Historic photographs will be used to accurately restore the detailing and roof massing of the Victorian. Roof 7.1 Preserve the original form of a roof. • Do not alter the angle of a historic roof. Preserve the orientation and slope of the roof as seen from the street. • Retain and repair original and decorative roof detailing. • Where the original roof form has been altered, consider restoration. 7.2 Preserve the original eave depth. • Overhangs contribute to the scale and detailing of a historic resource. • AspenModern properties typically have very deep or extremely minimal overhangs that are key character defining features of the architectural style. 7.3 Minimize the visual impacts of skylights and other rooftop devices. • Skylights and solar panels are generally not allowed on a historic structure. These elements may be appropriate on an addition. 7.4 New vents should be minimized, carefully, placed and painted a dark color. • Direct vents for fireplaces are generally not permitted to be added on historic structures. • Locate vents on non-street facing facades. • Use historic chimneys as chases for new flues when possible. 7.5 Preserve original chimneys, even if they are made non-functional. • Reconstruct a missing chimney when documentation exists. 7.6 A new dormer should remain subordinate to the historic roof in scale and character. • A new dormer is not appropriate on a primary, character defining façade. • A new dormer should fit within the existing wall plane. It should be lower than the ridgeline and set in from the eave. It should also be in proportion with the building. • The mass and scale of a dormer addition must be subordinate to the scale of the historic building. • While dormers improve the livability of upper floor spaces where low plate heights exist, they also complicate the roof and may not be appropriate on very simple structures. 64 20 • Dormers are not generally not permitted on AspenModern properties since they are not characteristics of these building styles. 7.7 Preserve original roof materials. • Avoid removing historic roofing material that is in good condition. When replacement is necessary, use a material that is similar to the original in both style as well as physical qualities and use a color that is similar to that seen historically. 7.8 New or replacement roof materials should convey a scale, color and texture similar to the original. • If a substitute is used, such as composition shingle, the roof material should be earth tone and have a matte, non-reflective finish. • Flashing should be in scale with the roof material. • Flashing should be tin, lead coated copper, galvanized or painted metal and have a matte, nonreflective finish. • Design flashing, such as drip edges, so that architectural details are not obscured. • A metal roof is inappropriate for an Aspen Victorian primary home but may be appropriate for a secondary structure from that time period. • A metal roof material should have a matte, non-reflective finish and match the original seaming. 7.9 Avoid using conjectural features on a roof. • Adding ornamental cresting, for example, where there is no evidence that it existed, creates a false impression of the building’s original appearance, and is inappropriate. 7.10 Design gutters so that their visibility on the structure is minimized to the extent possible. • Downspouts should be placed in locations that are not visible from the street if possible, or in locations that do not obscure architectural detailing on the building. • The material used for the gutters should be in character with the style of the building. Response – The rear (south elevation) massing and configuration, as indicated per architectural Sheets A2.004 through A3.006, is proposed to be restored. A historic chimney is proposed to be reconstructed per historic photographs and used for venting purposes as necessary. Wood shingles are proposed for the historic resource. Gutters and downspouts are to be discussed with the HPC collectively to determine most appropriate steps forward. Carriage House 8.1 If an existing secondary structure is historically significant, then it must be preserved. • When treating a historic secondary building, respect its character-defining features. These include its materials, roof form, windows, doors, and architectural details. 65 21 • If a secondary structure is not historically significant, then its preservation is optional. The determination of significance is based on documentation of the construction date of the outbuilding and/or physical inspection. A secondary structure that is related to the period of significance of the primary structure will likely require preservation. Response – n/a. 8.2 Preserve a historic secondary building as a detached structure. • Any proposal to attach a secondary structure is reviewed on a case-by-case basis. • The position and orientation of the structure should be maintained except when HPC finds that an alternative is the best preservation option. • Some AspenModern properties incorporated garages and carports into the architecture. This pattern should be maintained. Response – n/a. 8.3 Do not add detailing or features to a secondary structure that are conjectural and not in keeping with its original character as a utilitarian structure. • Most secondary structures are basic rectangular solids, with simple finishes and no ornamentation. Response –n/a. 8.4 When adding on to a secondary structure, distinguish the addition as new construction and minimize removal of historic fabric. • Additions to a secondary structure must be smaller in footprint than the original building and lower in height. Maintaining the overall mass and scale is particularly important. • Do not alter the original roof form. • An addition must be inset from the corners of the wall to which it attaches. Response – n/a. 8.5 Preserve the original building materials, or match in kind when necessary. Response – n/a. 8.6 Preserve original door and window openings and minimize new openings. • If an original carriage door exists, and can be made to function for automobile use, this is preferred. Response – n/a. 66 22 8.7 If a new garage door is added, it must be compatible with the character of the historic structure. • The materials and detailing should be simple. Response – n/a. 8.8 Adaptation of an obsolete secondary structure to a functional use is encouraged. • The reuse of any secondary structure should be sensitive so that its character is not lost. Response – n/a. Ne w Addition 10.1 Preserve an older addition that has achieved historic significance in its own right. Response – n/a. 10.2 A more recent addition that is not historically significant may be removed. • For Aspen Victorian properties, HPC generally relies on the 1904 Sanborn Fire Insurance maps to determine which portions of a building are historically significant and must be preserved. • HPC may insist on the removal of non-historic construction that is considered to be detrimental to the historic resource in any case when preservation benefits or variations are being approved. Response – The 1990s rear addition, street facing enclosure of the front entry porch, and non-historic west side yard porch are proposed to be removed as shown in the roof plan below. 121 Bleeker existing site plan. Gray shading represents area for proposed demolition. 67 23 10.3 Design a new addition such that one’s ability to interpret the historic character of the primary building is maintained. • A new addition must be compatible with the historic character of the primary building. • An addition must be subordinate, deferential, modest, and secondary in comparison to the architectural character of the primary building. • An addition that imitates the primary building’s historic style is not allowed. For example, a new faux Victorian detailed addition is inappropriate on an Aspen Victorian home. • An addition that covers historically significant features is inappropriate. • Proposals on corner lots require particular attention to creating compatibility. Response – The new rear addition is attempting to push the concentrated mass away from the Victorian in an opposite manner as currently exists. 121;s intent is to clearly differentiate the historic landmark from new construction and to highlight the historic resource as experienced from Bleeker Street. West interior elevation with proposed restoration of Victorian roof massing indicated. The proposed two story module is significantly setback. 68 24 10.4 The historic resource is to be the focus of the property, the entry point, and the predominant structure as viewed from the street. • The historic resource must be visually dominant on the site and must be distinguishable against the addition. • The total above grade floor area of an addition may be no more than 100% of the above grade floor area of the original historic resource. All other above grade development must be completely detached. HPC may consider exceptions to this policy if two or more of the following are met: o The proposed addition is all one story o The footprint of the new addition is closely related to the footprint of the historic resource and the proposed design is particularly sensitive to the scale and proportions of the historic resource o The project involves the demolition and replacement of an older addition that is considered to have been particularly detrimental to the historic resource o The interior of the resource is fully utilized, containing the same number of usable floors as existed historically o The project is on a large lot, allowing the addition to have a significant setback from the street o There are no variance requests in the application other than those related to historic conditions that aren’t being changed o The project is proposed as part of a voluntary AspenModern designation, or o The property is affected by non-preservation related site specific constraints such as trees that must be preserved, Environmentally Sensitive Areas review, etc. Response – We believe whole heartedly the demolition and replacement of the existing non historic addition, in addition to the major corrections proposed for the existing Victorian, more than validate what we believe is a reasonable and fair request regarding our application The gross historic square footage of the main Victorian (note: in its historically proposed state – currently, there is almost 500 sf of non-historic area in the second level) is 1,560.2 sf (~791.6 main + 768.6 upper) and the proposed new gross square footage for the addition is (~808.7 first floor + 857.4 second floor bedroom) = 1,666.1 sf. There is a difference of ~105.9 sf between historic square footage and the new addition habitable areas. Regarding the proposed garage gross sf, the reasoning for our increase in this area is a direct response to on site parking requirements. Currently, 121 has ability for one on site parking spot (a single stall garage), and we are proposing a modest two stall garage intended to be accessed off of the south alley existing condition. Four of the criteria to grant an exception above are met. 69 25 o The footprint of the new addition is closely related to the footprint of the historic resource and the proposed design is particularly sensitive to the scale and proportions of the historic resource. The new addition is mostly one story in height and the shape and size of the footprint relate to the two historic landmarks on the site. o The project involves the demolition and replacement of an older addition that is considered to have been particularly detrimental to the historic resource. Non-historic additions and lightwells are proposed to be removed. The existing additions to both historic resources blend new and old construction and confuse the historic interpretation of the site. o The interior of the resource is fully utilized, containing the same number of usable floors as existed historically. The interior of the two-story landmark is fully utilized. o The project is on a large lot, allowing the addition to have a significant setback from the street The property is 9,000 sf in size. The addition is significantly setback from the street and centrally located on the lot. o There are no variance requests in the application other than those related to historic conditions that aren’t being changed. We are requesting variations for the property as listed previously. o The property is affected by non-preservation related site specific constraints such as trees that must be preserved, Environmentally Sensitive Areas review, etc. N/A. 10.5 On a corner lot, no portion of an addition to a one story historic resource may be more than one story tall, directly behind that resource, unless completely detached above grade by a distance of at least 10 feet. HPC may consider exceptions to this policy if two or more of the following are met: • The connector element that links the new and old construction is a breezeway or transparent corridor, well recessed from the street facing side(s) of the historic resource and the area of two story construction that appears directly behind the one story historic resource is minimal • The footprint of the new addition is closely related to the footprint of the historic resource and the proposed design is particularly sensitive to the scale and proportions of the historic resource • The project involves the demolition and replacement of an older addition that is considered to have been particularly detrimental to the historic resource • The interior of the resource is fully utilized, containing the same number of usable floors as existed historically 70 26 • There are no variance requests in the application other than those related to historic conditions that aren’t being changed • The project is proposed as part of a voluntary AspenModern designation, or • The property is affected by non-preservation related site specific constraints such as trees that must be preserved, Environmentally Sensitive Areas review, etc. Response – n/a. The landmark is located on an interior / two sided alley lot. 10.6 Design a new addition to be recognized as a product of its own time. • An addition shall be distinguishable from the historic building and still be visually compatible with historic features. • A change in setbacks of the addition from the historic building, a subtle change in material, or a modern interpretation of a historic style are all techniques that may be considered to help define a change from historic construction to new construction. • Do not reference historic styles that have no basis in Aspen. • Consider these three aspects of an addition; form, materials, and fenestration. An addition must relate strongly to the historic resource in at least two of these elements. Departing from the historic resource in one of these categories allows for creativity and a contemporary design response. • Note that on a corner lot, departing from the form of the historic resource may not be allowed. • There is a spectrum of appropriate solutions to distinguishing new from old portions of a development. Some resources of particularly high significance or integrity may not be the right instance for a contrasting addition. Response – The new addition is primarily a gable roof form with a flat roof one story connection between the two story landmark and above the garage. The façade material is 3” wide horizontal cedar boards. Form and materials relate strongly to the landmark. The new opening on the north elevation facing Bleeker Street are vertically oriented and proportional to the historic double hung windows in the landmark. The windows in the addition facing the interior and alley sides have a more modern shape and style to differentiate new from historic architecture. The new addition is setback more than 53 feet from the front (north façade) of the two story landmark. 10.7 When planning an addition to a building in a historic district, preserve historic alignments on the street. • Some roof lines and porch eaves on historic buildings may align at approximately the same height. An addition can not be placed in a location where these relationships would be altered or obscured. Response – n/a. 10.8 Design an addition to be compatible in size and scale with the main building. • An addition that is lower than, or similar to the height of the primary building, is preferred. 71 27 Response – The addition’s highest gable point is lower than the height of the primary building. The proposed location of the second floor is significantly setback and central to the lot in order to minimize the massing as visually experienced from Bleeker Street. 10.9 If the addition is taller than a historic building, set it back from significant façades and use a “connector” to link it to the historic building. • Only a one-story connector is allowed. • Usable space, including decks, is not allowed on top of connectors unless the connector has limited visibility and the deck is shielded with a solid parapet wall. • In all cases, the connector must attach to the historic resource underneath the eave. • The connector shall be a minimum of 10 feet long between the addition and the primary building. • Minimize the width of the connector. Ideally, it is no more than a passage between the historic resource and addition. The connector must reveal the original building corners. The connector may not be as wide as the historic resource. • Any street-facing doors installed in the connector must be minimized in height and width and accessed by a secondary pathway. See guideline 4.1 for further information. Response – n/a. The addition is not taller than the historic building. A single story connecting element is proposed between the two story landmark and above the garage. 10.10 Place an addition at the rear of a primary building or set it back substantially from the front to minimize the visual impact on the historic structure and to allow the original proportions and character to remain prominent. • Locating an addition at the front of a primary building is inappropriate. • Additions to the side of a primary building are handled on a case-by-case basis and are approved based on site specific constraints that restrict rear additions. • Additional floor area may also be located under the building in a basement which will not alter the exterior mass of a building. Response – The addition is located to the rear of the primary building and is significantly setback from the front façade a distance of 53’ behind the Victorian and 96’ to the area where directly visible from Bleeker Street. The proposed addition highlights the original footprint of the landmark and replaces non-historic additions. A full basement exists and is proposed to be enlarged within the building envelope. 10.11 Roof forms shall be compatible with the historic building. • A simple roof form that does not compete with the historic building is appropriate. • On Aspen Victorian properties, a flat roof may only be used on an addition to a gable roofed structure if the addition is entirely one story in height, or if the flat roofed areas are limited, but the addition is primarily a pitched roof. Response – A simple gable roof, common to additions throughout historic Aspen, is the primary form proposed. A flat roof connecting element is proposed as secondary roof form to link the garage and the main landmark. 72 28 10.12 Design an addition to a historic structure that does not destroy or obscure historically important architectural features. • Loss or alteration of architectural details, cornices, and eave lines must be avoided. Response – n/a. The addition does not obscure historically important features, but rather highlights and restores character defining features. 10.13 When constructing a rooftop addition, keep the mass and scale subordinate to that of the historic building. Response – n/a. 10.14 Set a rooftop addition back from the street facing façades to preserve the original profile of the historic resource. • Set the addition back from street facing façades a distance approximately equal to its height. Response – n/a. 10.15 The roof form of a rooftop addition must be in character with the historic building. Response – n/a. Variations for existing conditions 26.415.110. Benefits. The City is committed to providing support to property owners to assist their efforts to maintain, preserve and enhance their historic properties. Recognizing that these properties are valuable community assets is the basic premise underlying the provision of special procedures and programs for designated historic properties and districts. Benefits to encourage good historic preservation practices by the owners of historic properties are an important aspect of Aspen's historic preservation program. Historic resources are a valuable community asset and their continued protection is the basic premise supporting the creation of an innovative package of preservation tools that are unlike any other in the country. Aspen's preservation benefits are in response to tight historic preservation controls that have been legislated by the City since 1972. The Community Development Department and Historic Preservation Commission (HPC) are dedicated to assisting property owners in renovating and maintaining their property. 73 29 Aspen is unique. Its historic resources and spirit of community have not been duplicated anywhere else in the world. It is this basic character that has helped make the City both economically vital and cherished by many. Only designated properties may be eligible for the following benefits. C. Variations. Dimensional variations are allowed for projects involving designated properties to create development that is more consistent with the character of the historic property or district than what would be required by the underlying zoning's dimensional standards. 1. The HPC may grant variances of the Land Use Code for designated properties to allow: a) Development in the side, rear and front setbacks; b) Development that does not meet the minimum distance requirements between buildings; c) Up to five percent (5%) additional site coverage; d) Less public amenity than required for the on-site relocation of commercial historic properties. 2. In granting a variance, the HPC must make a finding that such a variance: a) Is similar to the pattern, features and character of the historic property or district; and/or b) Enhances or mitigates an adverse impact to the historic significance or architectural character of the historic property, an adjoining designated historic property or historic district. Response: In order to best respond to the Aspen Historic Design Criteria, several variations are to be requested as follows: Existing Victorian Requested Variations: • Both the cross gable roof massing and roof chimney element of the 121 residence exceed and therefore, are in violation Aspen’s current R-6 25’ height maximum allowable definition. While the home’s ridge height (31’-5.5” above grade – V.I.F.) is proposed to remain at its existing current height (note: we are still researching the chimney (estimated ht. 35’-6” above finished grade – TBD) as to it’s historical configuration, which does appear thinner and taller in imaging than the current existing constructed condition), variations to accommodate said elements are requested as deemed necessary by city of Aspen zoning policy. Proposed Site & Addition Requested Variations: West Side Yard Setback Request Variation: - 1’-2” (Purpose: While all above and below grade proposed massing conditions and light wells for the project are located within the required 5’ side yard setback, we are proposing an exterior stair along the east side of the property to cantilever out from the wall accordingly. On the wall below the stair, electrical and gas meters per holy cross energy code requirements are proposed to be located. 74 30 • East Side Yard Setback Variation: - 1’-2” (Purpose: Again, all above and below grade proposed massing conditions and light wells for the project are located within the required 5’ side yard setback. The variation is requested due to the city of aspen zoning code pertaining to mechanical equipment. As for warranty and installation purposes, all condensing units (to be situated on a concrete pad ) are anticipated to be no more than 40” in height – this said, in order to place the units as far away from the historical resource as desired and to address the city’s 30” maximum allowable above grade policy for mechanical equipment, we are requesting said variation. • Combined Side Yard Setback Variation: 2-4” (Purpose: Per the Side Yard setbacks as described, we are seeking a combined side yard setback variation of 2’-4” accordingly). • Rear Yard Setback variation: 5’ Below Grade/ Deck Habitable Variation (Purpose: While all above grade habitable (10’ setback minimum) and garage (5’ setback minimum) requirements are met, we are seeking the technical ability to maintain a subgrade foundation that “tracks” with the above grade garage construction for subgrade mechanical area. As we also are creating a one story massing potential for usable deck area on top of the garage along the alley situated in this defined “zone” by Aspen code. The massing above grade is unaffected by this variation request. • East Alley Side Yard Light Well Size (196 sq ft) / Height Variation (26’-6.5” Connector to LW T.O. Concrete - If Necessary) : (Purpose: Although the proposed 196 sq ft light well is situated outside of the required 5’ side yard setback, it is proposed with an out to out dimension of 196 square feet and a light well floor to top of connector height of 26 feet 6.5 inches. I believe the revised code may already allow this, but in the event of being cautious, the request is provided accordingly if necessary.) 75 31 Exhibit B – FAR Bonus 26.415.110 Benefits F. Floor area bonus. 1. In selected circumstances, the HPC may grant up to five hundred additional square feet of allowable floor area for projects involving designated historic properties. The potential bonus is determined by net lot area such that a 3,000 – 5,999 square foot lot is eligible for a maximum of two hundred fifty square foot floor area bonus, a 6,000-8,999 square foot lot is eligible for a maximum of a three hundred and seventy five square foot floor area bonus and a 9,000 square foot or larger lot is eligible for a maximum of a 500 square foot floor area bonus. Floor area bonuses are cumulative. More than one bonus may be approved up to the maximum amount allowed for the lot. If a property is subdivided, the maximum bonus will be based on the original lot size, though the bonus may be allocated amongst the newly created parcels to the extent permitted. On any lot where a historic property is permitted a duplex density while a non-historic property is not, the increased allowable floor area that results from the density will be deducted from the maximum bonus that the property may receive. To be considered for the bonus, it must be demonstrated that the project meets all of the following criteria: a) The historic building is the key element of the property, and the primary entry into the structure, and the addition is incorporated in a manner that maintains the visual integrity of the historic building; and The landmark is the primary entrance into the property. The addition is mostly one story in height, and highlights the proportions, architectural details and form of the landmark. b) If applicable, historically significant site and landscape features from the period of significant of the historic building are preserved; and the applicant is undertaking multiple significant restoration actions, including but not limited to, re-opening an enclosed porch, reinstalling doors and windows in original openings that have been enclosed, removing paint or other non-original finishes, or removing elements which are covering original materials or features; and Character defining site features such as the Victorian and mature cottonwood trees are to be preserved and / or restored to historical conditions as understood. Restoration is proposed including removing non-historic additions that appear to be historic, restoring the rear roof configuration and massing/ historical corner returns, removing nonconforming additions and porches, and a full restoration of the primary Victorian. c) The project retains a historic outbuilding, if one is present, as a free standing structure above grade; and 76 32 Response: n/a. The applicant is electing a preservation outcome that is a high priority for HPC, including but not limited to, creating at least two detached structure on the site, limiting the amount of above grade square footage added directly to a historic resource to no more than twice that above grade square footage of the historic resource, limited the height of an addition to a historic resource to the height of the resource or lower, or demolishing and replacing a significantly incompatible non-historic addition to a historic resource with an addition that meets current guidelines. Preservation is the top priority for this project. The height of the addition is predominantly one story with a modest two story module that is lower than the height of the landmark. The Victorian is to be fully restored – windows, primary main entrance, and siding will be restored and repaired. A non-historic west porch addition in addition to all encompassing non historic massing to the south side of the Victorian is to be removed / restored as well. A significantly incompatible non-historic addition to the main landmark is removed and replaced with an addition that more closely responds to the guidelines. 2. Granting of additional allowable floor area is not a matter of right but is contingent upon the sole discretion of the HPC and the Commission’s assessments of the merits of the proposed project and its ability to demonstrate exemplary historic preservation practices. 3. The decision to grant a floor area bonus for major development projects will occur as part of the approval of a Conceptual Development Plan, pursuant to Subsection 26.415.070.D. 4. Floor area bonuses are only available for single family, duplex, or 100% affordable housing development. A property shall receive no more than 500 square feet in total. The award of a bonus is project specific. At such a time that more than 40% of an addition to a historic resource that was constructed as part of a project which previously received a floor area bonus is demolished, the bonus may be retained only if the property redevelopment is found to meet the requirements of this Section. A 250 sf FAR bonus is respectfully requested. 5. Separate from the floor area bonus described above, on a lot that contains a historic resource, HPC may exempt wall exposed by a light well that is larger than the minimum required for egress from the calculation of subgrade floor area only if the light well is internalized such that it is entirely recessed behind the vertical plane established by the portion of the building facades closest to any street, the light well is screened from view from the street by building walls or fences, and any addition that is made to the affected resource simultaneous or after the construction of the light well is entirely one story. Response: 77 33 East Alley Side Yard Light Well Size (196 sq ft) / Height Variation (26’-6.5” Connector to LW T.O. Concrete - If Necessary) : (Purpose: Although the proposed 196 sq ft light well is situated outside of the required 5’ side yard setback, it is proposed with an out to out dimension of 196 square feet and a light well floor to top of connector height of 26 feet 6.5 inches. I believe the revised code may already allow this, but in the event of being cautious, the request is provided accordingly if necessary. 78 CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY PLANNER: Sarah Yoon, 970.920.5144 DATE: March 23, 2018 PROJECT: 121 W. Bleeker REPRESENTATIVE: Derek Skalko, 1 Friday Design REQUEST: HPC Major Development, Relocation, Variances, HP Benefits DESCRIPTION: 121 W. Bleeker is a 6,000 square foot lot located in the R-6 zone district. This lot permits a single-family residence with a maximum floor area of 3,240 square feet. Two detached dwellings or a duplex of up to 3,600 square feet is another option. If more than one unit is proposed, ownership may be separated through condominiumization (Section 26.480.050.A). This Victorian era miner’s cottage demonstrates contributing architectural features such as steep pitched roofs, cross gable floorplan, fishscale details on the gable ends, wood clapboard siding, and a projecting front bay window. Over the years, various alterations and additions like the new side porch and the glass enclosure of the original front porch have altered the appearance of the historic resource. The applicant proposes to demolish non-historic changes and/or additions and restore elements of the historic resource. The applicant plans to request for a floor area bonus for their preservation work. Excavation underneath the historic resource may occur to add a new basement, which will require the resource to be lifted and will be considered relocation. The proposed new additions may or may not require setback variations or Residential Design Standard (RDS) variances. The impact of this development is beyond the scope of minor development because it includes one or more of the following activities: a.) the construction of a new structure within a historic district; and/or b.) alterations to more than three (3) elements of a building façade including its windows, doors, roof planes or materials, exterior wall material, dormers, porches, exterior staircase, balcony or ornamental trim; and/or c.) expansion of a building increasing the floor area by more than two hundred and fifty (250) square feet; and/or d.) any new development that has not been determined to be minor development. (Section 26.415.070.D.1). REVIEW PROCESS: Step 1: At Conceptual Design Review HPC will review all submitted documents regarding scale, massing, and site planning for major development, including the Staff report, then provide recommendations to continue, approve, disapprove or approve with conditions and the reasons for recommendations based on the Historic Preservation Design Guidelines. Following Conceptual, HPC will inform City Council of their decision, allowing them the opportunity to “Call-Up” any aspects of the approval that they find require additional HPC review. This is a standard practice for all significant projects reviewed by HPC. Step 2: At Final Design Review HPC will review all submitted materials detailing landscape, lighting and materials, and then provide final decision to approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny. When approved a development order will be issued from the Community Development Director. Below are links to the Land Use Application form and Land Use Code for your convenience: Land Use Code: http://cityofaspen.com/276/Title-26-Land-Use-Code HPC Design Guidelines: https://www.cityofaspen.com/DocumentCenter/Home/View/310 Land Use Application: EXHIBIT - C 79 2 http://cityofaspen.com/DocumentCenter/Home/View/305 Relevant Land Use Code Section(s): 26.304 Common Development Review Procedures 26.410 Residential Design Standards (RDS) 26.415 Historic Preservation 26.415.070.D Certificate of Appropriateness for Major Development 26.415.080 Demolition 26.415.090 Relocation of Designated Historic Properties 26.415.110 Benefits 26.575.020 Calculations and Measurements 26.610 Impact Fees 26.710.040 Medium-Density Residential (R-6) Review by: Staff for completeness and recommendation HPC for decisions. Public Hearing: Yes, at Conceptual and Final review. Neighborhood Outreach: No. Planning Fees: $1,950 deposit for 6 billable hours of staff time. (Additional/ lesser hours will be billed/ refunded at a rate of $325 per hour.) Total Deposit: $1,950. Below is a list of submittal requirements for Conceptual and Final. Submit 1 complete copy of the following information at each review step: Completed Land Use Application and signed fee agreement. Pre-application Conference Summary (this document). Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (no older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application. Applicant’s name, address and telephone number in a letter signed by the applicant that states the name, address and telephone number of the representative authorized to act on behalf of the applicant. HOA Compliance form (Attached). List of adjacent property owners within 300’ for public hearing. An 8 1/2” by 11” vicinity map locating the parcel within the City of Aspen. 80 3  A site improvement survey (no older than a year from submittal) including topography and vegetation showing the current status of the parcel certified by a registered land surveyor by licensed in the State of Colorado.  A written description of the proposal and an explanation of how the proposed development, and any requested variations or bonuses, complies with the review standards and design guidelines relevant to the application.  A proposed site plan.  Scaled drawings of all proposed structure(s) or addition(s) depicting their form, including their height, massing, scale, proportions and roof plan; and the primary features of all elevations.  At Conceptual review, graphics identifying preliminary selection of primary exterior building materials.  Verification that the proposal complies with Chapter 26.410, Residential design standards or a written request for a variance from any standard that is not being met.  Supplemental materials to provide a visual description of the context surrounding the designated historic property or historic district including at least one (1) of the following: diagrams, maps, photographs, models or streetscape elevations.  At Final review, drawings of the street facing facades must be provided at 1/4” scale.  At Final review, provide final selection of all exterior materials, and samples or clearly illustrated photographs. Samples are preferred for the presentation to HPC.  At Final review, provide a lighting plan and landscape plan. Once copy is deemed complete by staff, the following items will then need to be submitted at each review step:  1 digital PDF copy of the complete application packet  12 sets of all graphics printed at 11x17  Total deposit for review of the application. Applicants are advised that building plans will be required to meet the International Building Code as adopted by the City of Aspen, the Federal Fair Housing Act, and CRS 9.5.112. Please make sure that your application submittal addresses these building-related and accessibility regulations. You may contact the Building Department at 920-5090 for additional information. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. 81 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen | 130 S. Galena Street. | (970) 920 5090 Historic Land Use Application Requirements, Updated: March, 2020 Land Use Review Fee Policy The City of Aspen has established a review fee policy for the processing of land use applications. A flat fee or deposit is collected for land use applications based on the type of application submitted. A flat fee is collected by Community Development for applications which normally take a minimal and predictable amount of staff time to process. Review fees for other City Departments reviewing the application (referral departments) will also be collected when necessary. Flat fees are cumulative – meaning an application with multiple flat fees must be pay the sum of those flat fee. Flat fees are not refundable. A review fee deposit is collected by Community Development when more extensive staff time is required. Actual staff time spent will be charged against the deposit. Various City staff may also charge their time spent on the case in addition to the case planner. Deposit amount may be reduces if, in the opinion of the Community Development Director, the project is expected to take significantly less time to process than the deposit indicates. A determination on the deposit amount shall be made during the pre-application conference by the case planner. Hourly billing shall still apply. All applications must include an Agreement to Pay Application Fees. One payment including the deposit for Planning and referral agency fees must be submitted with each land use application, made payable to the City of Aspen. Applications will not be accepted for processing without the required fee. The Community Development Department shall keep an accurate record of the actual time required for the processing of a land use application requiring a deposit. The City can provide a summary report of fees due at the applicant’s request. The applicant will be billed for the additional costs incurred by the City when the processing of an application by the Community Development Department takes more time or expense than is covered by the deposit. Any direct costs attributable to a project review shall be billed to the applicant with no additional administrative charge. In the event the processing of an application takes less time than provided for by the deposit, the department shall refund the unused portion of the deposited fee to the applicant. Fees shall be due regardless of whether an applicant receives approval. Unless otherwise combined by the Director for simplicity of billing, all applications for conceptual, final and recordation of approval documents shall be handled as individual cases for the purpose of billing. Upon conceptual approval all billing shall be reconciled and past due invoices shall be paid prior to the Director accepting an application for final review. Final review shall require a new deposit at the rate in effect at the time of final submission. Upon final approval all billing shall be again reconciled prior to the Director accepting an application for review of technical documents for recordation. The Community Development Director may cease processing of a land use application for which an unpaid invoice is 30 or more days past due. Unpaid invoices of 90 days or more past due may be assessed a late fee of 1.75% per month. An unpaid invoice of 120 days or more may be subject to additional actions as may be assigned by the Municipal Court Judge. All payment information is public domain. All invoices shall be paid prior to issuance of a Development Order or recordation of development agreements and plats. The City will not accept a building permit for a property until all invoices are paid in full. For permits already accepted, and unpaid invoice of 90 days or more days may result in cessation of building permit processing or issuance of a stop work order until full payment is made. The property owner of record is the party responsible for payment of all costs associated with a land use application for the property. Any secondary agreement between a property owner and an applicant representing the owner (e.g. a contract purchaser) regarding payment of fees is solely between those private parties. EXHIBIT-D 82 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen | 130 S. Galena Street. | (970) 920 5090 Historic Land Use Application Requirements, Updated: March, 2020 City Use: Fees Due: $ Received $ Agreement to Pay Application Fees An agreement between the City of Aspen (“City”) and Property Phone No.: Owner (“I”): Email: Address of Billing Property: Address: (Subject of (send bills here) application) I understand that the City has adopted, via Ordinance No., Series of 2011, review fees for Land Use applications and payment of these fees is a condition precedent to determining application completeness. I understand that as the property owner that I am responsible for paying all fees for this development application. For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees are non-refundable. $ flat fee for $ flat fee for $ flat fee for $ flat fee for For Deposit cases only: The City and I understand that because of the size, nature or scope of the proposed project, it is not possible at this time to know the full extent or total costs involved in processing the application. I understand that additional costs over and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete processing, review and presentation of sufficient information to enable legally required findings to be made for project consideration, unless invoices are paid in full. The City and I understand and agree that invoices mailed by the City to the above listed billing address and not returned to the City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an invoice by the City for such services. I have read, understood, and agree to the Land Use Review Fee Policy including consequences for no-payment. I agree to pay the following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does not render and application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I agree to pay additional monthly billings to the City to reimburse the City for the processing of my application at the hourly rates hereinafter stated. $ deposit for hours of Community Development Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. $ deposit for hours of Engineering Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. City of Aspen: Phillip Supino, AICP Community Development Director Name: Title: 121 W BLEEKER LLC 121 W BLEEKER RESIDENCE 121 West Bleeker Street Aspen, Colorado 81611 ATTN: Derek Skalko PO BOX 7928 Aspen, Colorado 81611 646.247.5508-KN-G / 970.309.0695 -DS c/o" derek@1friday.com $1950.00 6 Derek Skalko, 1 Friday Design c/o: 121 W BLEEKER LLC Owners Representative - HPC Process: 121 W Bleeker LLC 2-1-2021 83 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen | 130 S. Galena Street. | (970) 920 5090 Historic Land Use Application Requirements, Updated: March, 2020 ATTACHMENT 2 - Historic Preservation Land Use Application PROJECT: APPLICANT: Name: Address: Phone #: Fax#: E-mail: REPRESENTATIVE: Name: Address: Phone #: Fax#: E-mail: TYPE OF APPLICATION: (please check all that apply): EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) PROPOSAL: (description of proposed buildings, uses, modifications, etc.) Name: Location: (Indicate street address, lot & block number or metes and bounds description of property) Parcel ID # (REQUIRED)  Historic Designation  Certificate of No Negative Effect Certificate of Appropriateness  Minor Historic Development  Major Historic Development Conceptual Historic Development Final Historic Development  Relocation (temporary, on or off-site)  Demolition (total demolition)  Substantial Amendment  Historic Landmark Lot Split 2735 - 124 - 39 - 003 121 W BLEEKER RESIDENCE 121 WEST BLEEKER STREET, CITY + TOWNSITE OF ASPEN BLOCK 58, EAST 1/2 LOT C, LOT D, + WEST 1/2 OF LOT E 121 W BLEEKER LLC 121 WEST BLEEKER STREET , ASPEN , COLORADO 81611 C/O: 970.309.0695 DEREK@1FRIDAY.COM DEREK SKALKO, 1 FRIDAY DESIGN PO BOX 7928 . ASPEN .. COLORADO 81612 970.309.0695 DEREK@1FRIDAY.COM x x Existing Historically Designated Victorian (1887) with significant non-historic rear/ side yard addition circa 1980s / 1990s Proposed removal of all non-historical existing construction, full renovation of historical Victorian and proposed new addition with full subgrade basement as proposed - house to be lifted / new foundation proposed 84 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen | 130 S. Galena Street. | (970) 920 5090 Historic Land Use Application Requirements, Updated: March, 2020 General Information Please check the appropriate boxes below and submit this page along with your application. This information will help us review your plans and, if necessary, coordinate with other agencies that may be involved. YES NO   Does the work you are planning include exterior work; including additions, demolitions, new construction, remodeling, rehabilitation or restoration?   Does the work you are planning include interior work, including remodeling, rehabilitation, or restoration?   Do you plan other future changes or improvements that could be reviewed at this time?   In addition to City of Aspen approval for a Certificate of Appropriateness or No Negative Effect and a building permit, are you seeking to meet the Secretary of the Interior’s Standards for Rehabilitation or restoration of a National Register of Historic Places Property in order to qualify for state or federal tax credits?   If yes, are you seeking federal rehabilitation investment tax credits in Conjunction with this project? (Only income producing properties listed on the National Register are eligible. Owner-occupied residential properties are not.)   If yes, are you seeking the Colorado State Income Tax Credit for Historical Preservation? Please check all City of Aspen Historic Preservation Benefits which you plan to use:  Rehabilitation Loan Fund  Dimensional Variances  Tax Credits  Increased Density  Conservation Easement Program  Waiver of Park Dedication Fees  Conditional Uses  Historic Landmark Lot Split X X X X X X X 85 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen | 130 S. Galena Street. | (970) 920 5090 Historic Land Use Application Requirements, Updated: March, 2020 ATTACHMENT 3 - Dimensional Requirements Form (Item #10 on the submittal requirements key. Not necessary for all projects.) Project: Applicant: Project Location: Zone District: Lot Size: Lot Area: (For the purposes of calculating Floor Area, Lot Area may be reduced for areas within the high-water mark, easements, and steep slopes. Please refer to the definition of Lot Area in the Municipal Code.) Commercial net leasable: Existing: Proposed: Number of residential units: Existing: Proposed: _______________________________ Proposed % of demolition: ____________________________________% DIMENSIONS: (write N/A where no requirement exists in the zone district) Floor Area: Height Existing: Allowable: Proposed: Principal Bldg.: Existing: Allowable: Proposed: Accessory Bldg.: Existing: Allowable: Proposed: On-Site parking: Existing: Required: Proposed: % Site coverage: Existing: Required: Proposed: % Open Space: Existing: Required: Proposed: Front Setback: Existing: Required: Proposed: Rear Setback: Existing: Required: Proposed: Combined Front/Rear: Indicate N, S, E, W Existing: Required: Proposed: _______________ Side Setback: Existing: Required: Proposed: Side Setback: Existing: Required: Proposed: Combined Sides: Existing: Required: Proposed: Distance between buildings Existing: Required: Proposed: Existing non-conformities or encroachments and note if encroachment licenses have been issued: Variations requested (identify the exact variances needed): 121 West Bleeker Residence 121 W BLEEKER LLC 121 West Bleeker Street Aspen, Colorado, 81611 R-6 5,982.3 SF 5,982.3 SF TBD (all non-historic area proposed) n/a n/a 1(SFR)1(SFR) 3,327.92 FA 3,235.04 FA (BASE)3,484.37 FA Proposed (3,235.04 base + 250 FA Bonus Requested) = 3,485.04 FA n/a 25' no limitationno requisiten/a n/a 25'n/a 16'-9"10'16'-9" 0 (11.5" over)5' gar/ 10' hab n/a 2 21 37.47%36.70% Refer to Exhibit A for detailed information (attached) n/a 5'n/a 10' + 1'per 300 sf up to 15' 5' 5' (N) (S) (E) (W) (E-W) (N-S)16'-9"21'-11" gar/ 26'-11" hab 10'-1" hab / 5'-3" gar garage / habitable rear massing over lot line approx 11.5", 4-1/4" from west side yard property, 1" from east side yard property, existing Victorian exceeds 25 ft height limit as defined, habitable exceeds rear yard setback allowance, unknown if any licenses have been issued 5-1/4"2'-4" 1"1'-2" (mechanical) 1--2" (cantilevered stair)4-1/4" (spa) 35'-5 1/2" (v.i.f.)35'-5 1/2" (v.i.f.) 86 1 Variations In order to best respond to the Aspen Historic Design Criteria, several variations are to be requested as follows: Existing Victorian Requested Variations: • Both the cross gable roof massing and roof chimney element of the 121 residence exceed and therefore, are in violation Aspen’s current R-6 25’ height maximum allowable definition. While the home’s ridge height (31’-5.5” above grade – V.I.F.) is proposed to remain at its existing current height (note: we are still researching the chimney (estimated ht. 35’-6” above finished grade – TBD) as to it’s historical configuration, which does appear thinner and taller in imaging than the current existing constructed condition), variations to accommodate said elements are requested as deemed necessary by city of Aspen zoning policy. Proposed Site & Addition Requested Variations: West Side Yard Setback Request Variation: - 1’-2” (Purpose: While all above and below grade proposed massing conditions and light wells for the project are located within the required 5’ side yard setback, we are proposing an exterior stair along the east side of the property to cantilever out from the wall accordingly. On the wall below the stair, electrical and gas meters per holy cross energy code requirements are proposed to be located. • East Side Yard Setback Variation: - 1’-2” (Purpose: Again, all above and below grade proposed massing conditions and light wells for the project are located within the required 5’ side yard setback. The variation is requested due to the city of aspen zoning code pertaining to mechanical equipment. As for warranty and installation purposes, all condensing units (to be situated on a concrete pad ) are anticipated to be no more than 40” in height – this said, in order to place the units as far away from the historical resource as desired and to address the city’s 30” maximum allowable above grade policy for mechanical equipment, we are requesting said variation. • Combined Side Yard Setback Variation: 2-4” (Purpose: Per the Side Yard setbacks as described, we are seeking a combined side yard setback variation of 2’-4” accordingly). • Rear Yard Setback variation: 5’ Below Grade/ Deck Habitable Variation (Purpose: While all above grade habitable (10’ setback minimum) and garage (5’ setback minimum) requirements are met, we are seeking the technical ability to maintain a subgrade foundation that “tracks” with the above grade garage construction for subgrade mechanical area. As we also are creating a one story massing potential for usable deck area on top of the garage along the alley situated in this defined “zone” by Aspen code. The massing above grade is unaffected by this variation request. • East Alley Side Yard Light Well Size (196 sq ft) / Height Variation (26’-6.5” Connector to LW T.O. Concrete - If Necessary) : (Purpose: Although the proposed 196 sq ft light well is situated outside of the required 5’ side yard setback, it is proposed with an out to out dimension of 196 square feet and a light well floor to top of connector height of 26 feet 6.5 inches. I believe the revised code may already allow this, but in the event of being cautious, the request is provided accordingly if necessary.) 87 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen | 130 S. Galena Street. | (970) 920 5090 Historic Land Use Application Requirements, Updated: March, 2020 Matrix of the City of Aspen’s Historic Preservation Land Use Application Requirements To review full procedures for all applications, reference 26.415 of the City of Aspen building code, Historic Preservation Ordinance. When submitting multiple step applications, do not replicate submission materials. Two copies of the application are required for a Certificate of No Negative Effect, 15 copies are required for each meeting. Also note that an electronic version of all text documents is required. Type of Review Application Requirements Fees Deposit Fee Notice Requirements Designation 1-9, 11,12 $0 Publication, Posting and Mailing Pursuant to Sections: 26.304.060 (E) (3) (a) (b) (c.) at HPC and Council Exempt Development Consult with Historic Preservation Officer to confirm exempt status $0 None Certificate of No Negative Effect 1-9, 15, 17 $245 None Minor Development 1-10, 15, 16, 17, 36 $735 Posting Pursuant to Sections: 26.304.060 (E) (3) (b) Major Development/Conceptual 1-10, 14, 17, 18, 19, 20 Development under 1,000 sf, $1,470 Development over 1,000 sf, $2,940 Publication, Posting and Mailing Pursuant to Sections: 26.304.060 (E) (3) (a) (b) (c.) Major Development/Final 1-10, 16, 21, 22, 36 Paid at time of conceptual Publication, Posting and Mailing Pursuant to Sections: 26.304.060 (E) (3) (a) (b) (c.) Substantial Amendment 1-10, 16, 23, 24, 25, 36 $735 Publication, Posting and Mailing Pursuant to Sections: 26.304.060 (E) (3) (a) (b) (c.) Demolition 1-9, 26 $2,940 Publication, Posting and Mailing Pursuant to Sections: 26.304.060 (E) (3) (a) (b) (c.) Relocation 1-9, 27-34 $2,940 Publication, Posting and Mailing Pursuant to Sections: 26.304.060 (E) (3) (a) (b) (c.) Historic Landmark Lot Split 1-10 $1,470 Publication, Posting and Mailing Pursuant to Sections: 26.304.060 (E) (3) (a) (b) (c.) at HPC and Council Rescinding Designation 1-9, 35 $1,470 Publication, Posting and Mailing Pursuant to Sections: 26.304.060 (E) (3) (a) (b) (c.) at HPC and Council 88 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen | 130 S. Galena Street. | (970) 920 5090 Historic Land Use Application Requirements, Updated: March, 2020 KEY 1.Contained within a letter signed by the applicant, the applicant's name, address and telephone number, and the name, address, and telephone number of any representative authorized to act on behalf of the applicant. 2.The street address, legal description, and parcel identification number of the property proposed for development. 3.A disclosure of ownership of the parcel proposed for development, consisting of a current certificate from a Title insurance company, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner's right to apply for the Development Application. 4.An 8 1/2" x 11" vicinity map locating the subject parcel within the City of Aspen. 5.A site plan depicting the proposed layout and the project’s physical relationship to the land and its surroundings. 6.A site improvement survey certified by a registered land surveyor, licensed in the State of Colorado, showing the current status of the parcel including the current topography and vegetation. (This requirement, or any part thereof, may be waived by the Community Development Director if the project is determined not to warrant a survey document.) 7.A written description of the proposal and a written explanation of how the proposed development complies with the review criteria and The City of Aspen Historic Preservation Design Guidelines relevant to the development application. 8.Additional materials, documentation, or reports as deemed necessary by the Community Development Director. 9.Completed Land Use Application Form, Signed Fee Agreement, and Fee. 10.Dimensional Requirement Form. Site or historic district boundary map. 11.Property or district description including narrative text, photographs and/or other graphic materials that document its physical characteristics. 12.Identification of the character-defining features that distinguish the entity which should be preserved. 13.Verification that the proposal complies with Section 26.410, Residential Design Standards, or a written request for a variance from any standard that is not being met. 14.Photographs, building material samples and other exhibits, as needed, to accurately depict location, extent and design of the proposed work. 15.An accurate representation of all major building materials and finishes to be used in the development, depicted through samples or photographs. 16.Scaled elevations and/or drawings of the proposed work and its relationship to the designated historic buildings, structures, sites and features in its context. 17.Scaled drawings of the proposed structure(s) or addition(s) depicting their form, including their height, massing, scale, proportions and roof plan; and the primary features of all elevations in the neighborhood context. 18.Supplemental materials to provide a visual description of the context surrounding the designated historic property or historic district including at least one (1) of the following: diagrams, maps, photographs, 3- D model (digital or physical) or streetscape elevations. 19.Preliminary selection of primary building materials to be used in construction represented by samples and/or photographs. 20.A statement, including narrative text or graphics, indicating how the Final Development Plan conforms to representations made or stipulations placed as a condition of the approval of the Conceptual Development Plan. 21.Final drawings of all proposed structures(s) and/or addition(s) included as part of the development at ¼” = 1.0’ scale 22.A revised site plan 23.Revised scaled elevations and drawings 24.Photographs and other exhibits to illustrate the proposed changes. 25.Written documentation that the Chief Building Official has determined the building an imminent hazard, or narrative 26.text, graphic illustrations or other exhibits that provide evidence that the building, structure or object is of no historic or architectural value or importance. 27.A written description and/or graphic illustrations of the building, structure or object proposed for relocation. 28.A written explanation of the type of relocation requested (temporary, on-site or off-site) and justification for the need for relocation. 29.A written report from a licensed engineer or architect regarding the soundness of the building, structure or object, its ability to withstand the physical move and its rehabilitation needs, once relocated. 30.A conceptual plan for the receiving site providing preliminary information on the property boundaries, existing improvements and site characteristics and the associated planned improvements. 31.Evidence of the financial ability to undertake the safe relocation, preservation and repair of the building, structure or object; site preparation and construction of necessary infrastructure through the posting of bonds or other financial measures deemed appropriate. 32.Supplementary materials to provide an understanding of the larger context for the relocated property and its impact on adjacent properties, the neighborhood or streetscape. 33.If the applicant does not own the receiving site, proof from the site’s property owner of the willingness to accept the relocated building, structure or object. 34.Evidence that the applicant has or is seeking the necessary approvals to place the building on the identified receiving site. If the site is outside of the city limits, verification that the building will be preserved on its new site through a formal action of the other jurisdiction or a preservation easement. 35.A written description of how the property does not meet these criteria for designation. 36.A lighting plan indicating the location of all exterior light fixtures and site lighting, and cut sheets for each type of fixture proposed. Light fixtures must comply with the "City of Aspen Historic Preservation Design Guidelines" and meet the City Lighting Code. 89 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen | 130 S. Galena Street. | (970) 920 5090 Historic Land Use Application Requirements, Updated: March, ATTACHMENT 4 - General Summary of Historic Preservation Review Process (Please see Section 26.415 of the Aspen Municipal Code for more detailed information) 1.An application is first transmitted to the Community Development Director to determine if it is complete. A complete application for a Certificate of No Negative Effect may be approved by the Community Development Director with no further review if it meets the requirements set forth for that type of work in the Aspen Municipal Code. 2.For all other types of reviews, the applicant shall be notified in writing whether the information is complete or if additional materials are required. 3.A date for a public hearing on a complete application will be scheduled before the HPC. Notice of the hearing shall be provided as required in the Aspen Municipal Code. 4.City Community Development Staff will review the submittal material and prepare a report that analyzes the project’s conformance with the design guidelines and other applicable Land Use Code sections. This report will be transmitted to the HPC with relevant information on the proposed project and a recommendation to approve, disapprove or approve with conditions and the reasons for the recommendation. 5.The HPC will review the application, the report and the evidence presented at the hearing to determine the project’s conformance with the City of Aspen Historic Preservation Design Guidelines. The order of proceedings at the HPC meeting are as follows: 1.Applicant and public are sworn in 2.Staff presentation 3.Commission member questions 4.Public comment 5.Commission member comments 6.Applicant response/clarification 7.Commission motion and vote 6.The HPC will approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny. If the application is a one- step review, and it is approved, the HPC will issue a Certificate of Appropriateness and the Community Development Director will issue a Development Order. If the application requires submittal for a final review, materials must be prepared and submitted according to the processes described above. A project that receives final approval will be issued a Certificate of Appropriateness and the Community Development Director will issue a Development Order. 7.HPC decisions are final unless appealed by the applicant or a landowner within three hundred (300) feet of the subject property, as provided in the Aspen Municipal Code. For Major Development, Demolition, or Relocation, a resolution of the HPC action will be forwarded to the City Council to allow them an opportunity to “call up” the decision if they feel there has been an abuse of discretion or denial of due process. No building permit can be issued for construction of the project until the thirty (30) day “call up” period has expired. 90 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen | 130 S. Galena Street. | (970) 920 5090 Historic Land Use Application Requirements, Updated: March, 8.For Historic Designation and Historic Landmark Lot Split, the two types of historic preservation reviews in which City Council makes the final determination, staff will prepare a report including the recommendation of the HPC, and a hearing will be scheduled before Council. Council will evaluate the application to determine if the review criteria are met. The Council may approve, disapprove or continue the application to request additional information necessary to make a decision to approve or deny. 9.HPC assigns a member of the Commission to be the “project monitor” for each project they approve. The monitor (and Staff) may periodically visit the site as work is under construction. If the applicant requests a change to any aspects of the project change after the HPC approval, the applicant, Staff, and the project monitor will attempt to address them without returning to the full HPC. 10.Before an application for a building permit can be submitted, a final set of plans reflecting any or all required changes by the HPC or City Council must be on file with the City. Any conditions of approval or outstanding issues which must be addressed in the field or at a later time shall be noted on the plans. 11.Once a Development Order has been received, a building permit application may be submitted. At this time the proposal will be reviewed for compliance with the Uniform Building Code and zoning regulations. Fees for water, sewer, park dedication fees, and employee housing will be collected if due. Any document, such as a plat, deed restriction, or other agreement which is required to be filed, must be recorded before the building permit will be issued. 91 COMMUNITY DEVELOPMENT DEPARTMENT Homeowner Association Compliance Policy All land use applications within the City of Aspen are required to include a Homeowner Association Compliance Form (this form) certifying the scope of work included in the land use application complies with all applicable covenants and homeowner association policies. The certification must be signed by the property owner or Attorney representing the property owner. Property Name : 121 W BLEEKER LLC RESIDENCE Owner ("I"): Ema,·1 ·. c/o: derek@lfriday.com Phone No.: c/o: 970.309 .0695 Address of Property: (subject of application) 121 WEST BLEEKER STREET ASPEN ,CO 81611 I certify as follows: (pick one) I This property is not subject to a homeowners association or other form of private covenant. D This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application do not require approval by the homeowners association or covenant beneficiary. D This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application have been approved by the homeowners association or covenant beneficiary . Evidence of approval is attached. I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws . I understand that is ~o71ument is a ~blic d~~ument. , /(-t //,u,rvH1t-~ul~ 111/10/Jj Owner signature: --:--;"-~.c......,-......... ~..1..r.--r--.i,.__ date : 0 I / (-) /10 L \ k-t-rty 1Vi n1r1 1 ,:1 -7 ,N-.,-1H -..v1- Owner printed name: 7 vf)D c C7vb-/J7ttE!t_ or, Attorney signature : __________ date: ____ _ Attorney printed name: EXHIBIT - F 92 1 FRIDAY DESIGN AUr HENl lC IN APPROACH DI FFEREN T 0Y DESIGN MEMO PO Box 7928 Aspen, CO 81612 Phone: 970.309 .0695 E-mail: derek@lfriday.com ATTN : City of Aspen HPC C/O: Ms. Sarah Yoon Community Development Department Historic Preservation Planner 130 South Galena Street Aspen , CO 81611 (o) 970.920.5144 / (m) 970.319.0720 sar ah .yoon@ cityofas pen .co m CC: Office, Mr. Derek Skalko RE : DATE: 10 JANUARY 2021 Letter of Authorization : Derek Skalko , 1 Friday Design Regarding 121 W BLEEKER LLC-121 West Bleeker, Aspen CO 81611 o Applicant's name, address and telephone number in a letter signed by the applicant that states the name, address and telephone number of the representative authorized to act on behalf of the applicant. Dear Sarah & the Aspen HPC, Per requisite, please accept this Letter of Authorization for: Derek M Skalka, Owner & Principal of 1 Friday Design PO BOX 7928, Aspen CO 81612 (p) 970.309.0695 / (e) dere k@1friday .com To serve as our acting representative on behalf of all HPC major Conceptual & Final Development applications, notification issuances, and any requested clarifications/ RFl's in relation to the 121 W BLEEKER LLC Application, for the subject property Located at 121 West Bleeker Street, Aspen CO 81611. Thank you, Applicant' Name: 121 W BLEEKER LLC, Mr. Todd Guenther & Mrs. Kelly Nimmo-Guenther; Owners/ Managers Address: 121 West Bleeker Street, Aspen CO 81611 (p) 646.247.5508 Date:_l_/_;tJ_/-_'.L_e.1_~_! __ If Jsl lh t, \ EXHIBIT - G 93 620 East Hopkins Avenue Aspen, CO 81611 Phone: 970-925-3577 Fax: 970-300-4423 www.titlecorockies.com COMMITMENT TRANSMITTAL Commitment Ordered By:Inquiries should be directed to: Title Company of the Rockies 620 East Hopkins Avenue Aspen, CO 81611 Phone: 970-925-3577 Fax: 970-300-4423 email: Commitment Number:0706947 Buyer's Name(s):Purchaser with contractual rights under a purchaser agreement with the vested owner identified at item 4 below Seller's Name(s):121 W Bleeker LLC Property:121 W Bleeker St., Aspen, CO 81611 City and Townsite of Aspen, Block 58, Lot D & E, Pitkin County, CO COPIES / MAILING LIST Purchaser with contractual rights under a purchaser agreement with the vested owner identified at item 4 below 1 Friday Design c/o Derek Skalko PO Box 7928 Aspen, CO 81612 Home: (970) 309-0695 121 W Bleeker LLC COLORADO NOTARIES MAY REMOTELY NOTARIZE REAL ESTATE DEEDS AND OTHER DOCUMENTS USING REAL-TIME AUDIO-VIDEO COMMUNICATION TECHNOLOGY. YOU MAY CHOOSE NOT TO USE REMOTE NOTARIZATION FOR ANY DOCUMENT. Service Beyond Expectation in Colorado for: Eagle, Garfield, Grand, Pitkin and Summit Counties. (Limited Coverage: Jackson, Lake, Park and Routt Counties) Locations In: Avon/Beaver Creek, Basalt, Breckenridge, Grand Lake and Winter Park. (Closing Services available in Aspen and Glenwood Springs). Page 1 of 1 January 4, 2021 11:35 AM EXHIBIT - H 94 620 East Hopkins Avenue Aspen, CO 81611 Phone: 970-925-3577 Fax: 970-300-4423 www.titlecorockies.com Commitment Ordered By:Inquiries should be directed to: Title Company of the Rockies 620 East Hopkins Avenue Aspen, CO 81611 Phone: 970-925-3577 Fax: 970-300-4423 email: Commitment Number:0706947 Buyer's Name(s):Purchaser with contractual rights under a purchaser agreement with the vested owner identified at item 4 below Seller's Name(s):121 W Bleeker LLC Property:121 W Bleeker St., Aspen, CO 81611 City and Townsite of Aspen, Block 58, Lot D & E, Pitkin County, CO TITLE CHARGES These charges are based on issuance of the policy or policies described in the attached Commitment for Title Insurance, and includes premiums for the proposed coverage amount(s) and endorsement(s) referred to therein, and may also include additional work and/or third party charges related thereto. If applicable, the designation of “Buyer” and “Seller” shown below may be based on traditional settlement practices in Pitkin County, Colorado, and/or certain terms of any contract, or other information provided with the Application for Title Insurance. Owner’s Policy Premium: Loan Policy Premium: Additional Lender Charge(s): Additional Other Charge(s): Tax Certificate: Total Endorsement Charge(s): TBD Charge(s): TOTAL CHARGES: $300.00 $0.00 $300.00 Service Beyond Expectation in Colorado for: Eagle, Garfield, Grand, Pitkin and Summit Counties. (Limited Coverage: Jackson, Lake, Park and Routt Counties) Locations In: Avon/Beaver Creek, Basalt, Breckenridge, Grand Lake and Winter Park. (Closing Services available in Aspen and Glenwood Springs). 95 ALTA Commitment (6-17-06) ALTA Commitment Form COMMITMENT FOR TITLE INSURANCE Stewart Title Guaranty Company, a Texas Corporation ("Company"), for a valuable consideration, commits to issue its policy or policies of title insurance, as identified in Schedule A, in favor of the Proposed Insured named in Schedule A, as owner or mortgagee of the estate or interest in the land described or referred to in Schedule A, upon payment of the premiums and charges and compliance with the Requirements; all subject to the provisions of Schedules A and B and to the Conditions of this Commitment. This Commitment shall be effective only when the identity of the Proposed Insured and the amount of the policy or policies committed for have been inserted in Schedule A by the Company. All liability and obligation under this Commitment shall cease and terminate 6 months after the Effective Date or when the policy or policies committed for shall issue, whichever first occurs, provided that the failure to issue such policy or policies is not the fault of the Company. The Company will provide a sample of the policy form upon request. This commitment shall not be valid or binding until countersigned by a validating officer or authorized signatory. IN WITNESS WHEREOF, Stewart Title Guaranty Company has caused its corporate name and seal to be affixed by its duly authorized officers on the date shown in Schedule A. 004-UN ALTA Commitment (6-17-06) Issued by: 620 East Hopkins Avenue Aspen, CO 81611 Authorized Agent 96 CONDITIONS The term mortgage, when used herein, shall include deed of trust, trust deed, or other security1. instrument. If the proposed Insured has or acquired actual knowledge of any defect, lien, encumbrance, adverse2. claim or other matter affecting the estate or interest or mortgage thereon covered by this Commitment other than those shown in Schedule B hereof, and shall fail to disclose such knowledge to the Company in writing, the Company shall be relieved from liability for any loss or damage resulting from any act of reliance hereon to the extent the Company is prejudiced by failure to so disclose such knowledge. If the proposed Insured shall disclose such knowledge to the Company, or if the Company otherwise acquires actual knowledge of any such defect, lien, encumbrance, adverse claim or other matter, the Company at its option may amend Schedule B of this Commitment accordingly, but such amendment shall not relieve the Company from liability previously incurred pursuant to paragraph 3 of these Conditions and Stipulations. Liability of the Company under this Commitment shall be only to the named proposed Insured and3. such parties included under the definition of Insured in the form of policy or policies committed for and only for actual loss incurred in reliance hereon in undertaking in good faith (a) to comply with the requirements hereof, or (b) to eliminate exceptions shown in Schedule B, or (c) to acquire or create the estate or interest or mortgage thereon covered by this Commitment. In no event shall such liability exceed the amount stated in Schedule A for the policy or policies committed for and such liability is subject to the insuring provisions and Conditions and Stipulations and the Exclusions from Coverage of the form of policy or policies committed for in favor of the proposed Insured which are hereby incorporated by reference and are made a part of this Commitment except as expressly modified herein. This Commitment is a contract to issue one or more title insurance policies and is not an abstract of4. title or a report of the condition of title. Any action or actions or rights of action that the proposed Insured may have or may bring against the Company arising out of the status of the title to the estate or interest or the status of the mortgage thereon covered by this Commitment must be based on and are subject to the provisions of this Commitment. The policy to be issued contains an arbitration clause. All arbitrable matters when the Amount of5. Insurance is $2,000,000 or less shall be arbitrated at the option of either the Company or the Insured as the exclusive remedy of the parties. You may review a copy of the arbitration rules at< http://www.alta.org/>. 97 COMMITMENT FOR TITLE INSURANCE Issued by as agent for Stewart Title Guaranty Company SCHEDULE A Reference:Commitment Number: 0706947 1.Effective Date: December 31, 2020, 7:00 am Issue Date: January 04, 2021 2. Policy (or Policies) to be issued: ALTA Owner's Policy (6-17-06)Policy Amount:Amount to be Determined Premium:Amount to be Determined Proposed Insured:Purchaser with contractual rights under a purchaser agreement with the vested owner identified at item 4 below 3.The estate or interest in the land described or referred to in this Commitment is Fee Simple. 4.The Title is, at the Commitment Date, vested in: 121 W Bleeker LLC, a Colorado limited liability company 5.The land referred to in this Commitment is described as follows: FOR LEGAL DESCRIPTION SEE SCHEDULE A CONTINUED ON NEXT PAGE For Informational Purposes Only - APN: R001080 Countersigned The Title Company of the Rockies By: Kurt Beereboom This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Stewart Title Guaranty Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Commitment for Title Insurance (8-1-2016) Technical Correction 4-2-2018 Schedule A Page 1 98 Commitment No: 0706947 SCHEDULE A (continued) LEGAL DESCRIPTION The Land referred to herein is located in the County of Pitkin, State of Colorado, and described as follows: The East 1/2 of Lot C, all of Lot D, and the West 1/2 of Lot E, Block 58, CITY AND TOWNSITE OF ASPEN This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Stewart Title Guaranty Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Commitment for Title Insurance (8-1-2016) Technical Correction 4-2-2018 Schedule A Page 2 99 Commitment No: 0706947 COMMITMENT FOR TITLE INSURANCE Issued by Stewart Title Guaranty Company SCHEDULE B, PART I Requirements All of the following Requirements must be met: 1. The Proposed Insured must notify the Company in writing of the name of any party not referred to in this Commitment who will obtain an interest in the Land or who will make a loan on the Land. The Company may then make additional Requirements or Exceptions. 2. Pay the agreed amount for the estate or interest to be insured. 3. Pay the premiums, fees, and charges for the Policy to the Company. 4. Documents satisfactory to the Company that convey the Title or create the Mortgage to be insured, or both, must be properly authorized, executed, delivered, and recorded in the Public Records. NONE THE COMPANY RESERVES THE RIGHT TO CONDUCT AN ADDITIONAL SEARCH OF THE RECORDS IN THE OFFICE OF THE CLERK AND RECORDER FOR PITKIN COUNTY, COLORADO FOR JUDGMENT LIENS, TAX LIENS OR OTHER SIMILAR OR DISSIMILAR INVOLUNTARY MATTERS AFFECTING THE GRANTEE OR GRANTEES, AND TO MAKE SUCH ADDITIONAL REQUIREMENTS AS IT DEEMS NECESSARY, AFTER THE IDENTITY OF THE GRANTEE OR GRANTEES HAS BEEN DISCLOSED TO THE COMPANY. NOTE: THIS COMMITMENT IS ISSUED UPON THE EXPRESS AGREEMENT AND UNDERSTANDING THAT THE APPLICABLE PREMIUMS, CHARGES AND FEES SHALL BE PAID BY THE APPLICANT IF THE APPLICANT AND/OR ITS DESIGNEE OR NOMINEE CLOSES THE TRANSACTION CONTEMPLATED BY OR OTHERWISE RELIES UPON THE COMMITMENT, ALL IN ACCORDANCE WITH THE RULES AND SCHEDULES OF RATES ON FILE WITH THE COLORADO DEPARTMENT OF INSURANCE. This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Stewart Title Guaranty Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Commitment for Title Insurance (8-1-2016) Technical Correction 4-2-2018 Schedule B - Part I Page 3 100 Commitment No: 0706947 This Title Report is issued for informational purposes only. No title policy or insurance will be issued based upon this report. Vesting Deed recorded 6/18/2020 as Reception No. 665278 This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Stewart Title Guaranty Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Commitment for Title Insurance (8-1-2016) Technical Correction 4-2-2018 Schedule B - Part I - continued Page 4 101 Commitment No: 0706947 SCHEDULE B, PART II Exceptions THIS COMMITMENT DOES NOT REPUBLISH ANY COVENANT, CONDITION, RESTRICTION, OR LIMITATION CONTAINED IN ANY DOCUMENT REFERRED TO IN THIS COMMITMENT TO THE EXTENT THAT THE SPECIFIC COVENANT, CONDITION, RESTRICTION, OR LIMITATION VIOLATES STATE OR FEDERAL LAW BASED ON RACE, COLOR, RELIGION, SEX, SEXUAL ORIENTATION, GENDER IDENTITY, HANDICAP, FAMILIAL STATUS, OR NATIONAL ORIGIN. Schedule B of the policy or policies to be issued will contain exceptions to the following matters unless the same are disposed of to the satisfaction of the Company. Any loss or damage, including attorney fees, by reason of the matters shown below: Any facts, right, interests, or claims which are not shown by the Public Records but which could1. be ascertained by an inspection of said Land or by making inquiry of persons in possession thereof. Easements or claims of easements, not shown by the Public Records.2. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the3. Title that would be disclosed by an accurate and complete land survey of the Land. 4. Any lien, or right to a lien for services, labor or material heretofore or hereafter furnished, imposed by law and not shown by the Public Records. 5. Defects, liens, encumbrances, adverse claims or other matters, if any created, first appearing in the Public Records or attaching subsequent to the effective date hereof, but prior to the date of the proposed insured acquires of record for value the estate or interest or mortgage thereon covered by this Commitment. 6. (a) Taxes or assessments that are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a public agency that may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records. The effect of inclusions in any general or specific water conservancy, fire protection, soil7. conservation or other district or inclusion in any water service or street improvement area. Exceptions and Reservations set forth in the Act authorizing the issuance of the Patent for the8. City and Townsite of Aspen recorded March 1, 1987 in Book 139 at Page 216. This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Stewart Title Guaranty Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Commitment for Title Insurance (8-1-2016) Technical Correction 4-2-2018 Schedule B - Part II Page 5 102 Commitment No: 0706947 Any mine of gold, silver, cinnabar or copper, or to any valid mining claim or possession9. as set forth in Deeds recorded in Book 59 at Page 349 and in Book 79 at Page 15. Encroachment of house 0.4 feet into alley as shown on survey by Aspen Survey10. Engineers, dated May 7, 1988 as Job No. 18323 and updated August 30, 1990 and November 22, 2000. Deed of Trust from 121 W Bleeker LLC for the benefit of Citibank, NA in the amount of11. $4,160,000.00 recorded 06/18/2020 as Reception No. 665279. This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Stewart Title Guaranty Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Commitment for Title Insurance (8-1-2016) Technical Correction 4-2-2018 Schedule B - Part II - continued Page 6 103 Commitment No: 0706947 DISCLOSURE STATEMENTS Note 1: Colorado Division of Insurance Regulations 3-5-1, Paragraph C of Article VII, requires that "Every Title entity shall be responsible for all matters which appear of record prior to the time of recording whenever the Title entity conducts the closing and is responsible for recording or filing of legal documents resulting from the transaction which was closed.” (Gap Protection) Note 2: Exception No. 4 of Schedule B, Section 2 of this Commitment may be deleted from the Owner's Policy to be issued hereunder upon compliance with the following conditions: The Land described in Schedule A of this commitment must be a single-family residence, which includes a1. condominium or townhouse unit. No labor or materials may have been furnished by mechanics or materialmen for purpose of construction on2. the Land described in Schedule A of this Commitment within the past 13 months. The Company must receive an appropriate affidavit indemnifying the Company against unfiled mechanic's3. and materialmen's liens. Any deviation from conditions A though C above is subject to such additional requirements or Information4. as the Company may deem necessary, or, at its option, the Company may refuse to delete the exception. Payment of the premium for said coverage.5. Note 3: The following disclosures are hereby made pursuant to §10-11-122, C.R.S.: The subject real property may be located in a special taxing district;(i) A certificate of taxes due listing each taxing jurisdiction shall be obtained from the County Treasurer or the(ii) County Treasurer's authorized agent; and Information regarding special districts and the boundaries of such districts may be obtained from the(iii) County Commissioners, the County Clerk and Recorder, or the County Assessor. Note 4: If the sales price of the subject property exceeds $100,000.00, the seller shall be required to comply with the disclosure or withholding provisions of C.R.S. §39-22-604.5 (Non-resident withholding). Note 5: Pursuant to C.R.S. §10-11-123 Notice is hereby given: (a) If there is recorded evidence that a mineral estate has been severed, leased or otherwise conveyed from the surface estate then there is a substantial likelihood that a third party holds some or all interest in oil, gas, other minerals, or geothermal energy in the property, and (b) That such mineral estate may include the right to enter and use the property without the surface owner's permission. Note 6: Effective September 1, 1997, C.R.S. §30-10-406 requires that all documents received for recording or filing in the clerk and recorder's office shall contain a top margin of at least one inch and a left, right and bottom margin of at least one-half inch the clerk and recorder may refuse to record or file any document that does not conform. Note 7: Our Privacy Policy: We will not reveal nonpublic personal customer information to any external non-affiliated organization unless we have been authorized by the customer, or are required by law. Note 8: Records: Regulation 3-5-1 Section 7 (N) provides that each title entity shall maintain adequate documentation and records sufficient to show compliance with this regulation and Title 10 of the Colorado Revised Statutes for a period of not less than seven (7) years, except as otherwise permitted by law. Note 9: Pursuant Regulation 3-5-1 Section 9 (F) notice is hereby given that “A title entity shall not earn interest on fiduciary funds unless disclosure is made to all necessary parties to a transaction that interest is or has been earned. Said disclosure must offer the opportunity to receive payment of any interest earned on such funds beyond any administrative fees as may be on file with the division. Said disclosure must be clear and conspicuous, and may be made at any time up to and including closing.” Be advised that the closing agent will or could charge an Administrative Fee for processing such an additional services request and any resulting payee will also be subjected to a W-9 or other required tax documentation for such Page 7 104 purpose(s). Be further advised that, for many transactions, the imposed Administrative Fee associated with such an additional service may exceed any such interest earned. Therefore, you may have the right to some of the interest earned over and above the Administrative Fee, if applicable (e.g., any money over any administrative fees involved in figuring the amounts earned). Note 10: Pursuant to Regulation 3-5-1 Section 9 (G) notice is hereby given that “Until a title entity receives written instructions pertaining to the holding of fiduciary funds, in a form agreeable to the title entity, it shall comply with the following: The title entity shall deposit funds into an escrow, trust, or other fiduciary account and hold them in a1. fiduciary capacity. The title entity shall use any funds designated as “earnest money” for the consummation of the transaction2. as evidenced by the contract to buy and sell real estate applicable to said transaction, except as otherwise provided in this section. If the transaction does not close, the title entity shall: Release the earnest money funds as directed by written instructions signed by both the buyer and seller;(a) or If acceptable written instructions are not received, uncontested funds shall be held by the title entity for(b) 180 days from the scheduled date of closing, after which the title entity shall return said funds to the payor. In the event of any controversy regarding the funds held by the title entity (notwithstanding any termination3. of the contract), the title entity shall not be required to take any action unless and until such controversy is resolved. At its option and discretion, the title entity may: Await any proceeding; or(a) Interplead all parties and deposit such funds into a court of competent jurisdiction, and recover court(b) costs and reasonable attorney and legal fees; or Deliver written notice to the buyer and seller that unless the title entity receives a copy of a summons(c) and complaint or claim (between buyer and seller), containing the case number of the lawsuit or lawsuits, within 120 days of the title entity's written notice delivered to the parties, title entity shall return the funds to the depositing party.” Note 11: Pursuant to Colorado Division of Insurance Regulation 8-1-3,Section 5, Paragraph C (11)(f), a closing protection letter is available to the consumer. Page 8 105 Commitment No: 0706947 Page 9 106 107 2,669 444.9 Legend 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Feet0444.9222.46 Notes Pitkin Maps & More THIS MAP IS FOR INFORMATIONAL PURPOSES. Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content represented. Map Created on 3:30 PM 01/29/21 at http://www.pitkinmapsandmore.com State Highway Road Centerline 4K Primary Road Secondary Road Service Road Rivers and Creeks Continuous Intermittent River, Lake or Pond Town Boundary Federal Land Boundary BLM State of Colorado USFS EXHIBIT - J108 Pitkin County Mailing List of 300 Feet Radius Pitkin County GIS presents the information and data on this web site as a service to the public. Every effort has been made to ensure that the information and data contained in this electronic system is accurate, but the accuracy may change. Mineral estate ownership is not included in this mailing list. Pitkin County does not maintain a database of mineral estate owners. Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content at this site or at other sites to which we link. Assessing accuracy and reliability of information and data is the sole responsibility of the user. The user understands he or she is solely responsible and liable for use, modification, or distribution of any information or data obtained on this web site. This document contains a Mailing List formatted to be printed on Avery 5160 Labels. If printing, DO NOT "fit to page" or "shrink oversized pages." This will manipulate the margins such that they no longer line up on the labels sheet. Print actual size. From Parcel: 273512439003 on 01/29/2021 Instructions: Disclaimer: http://www.pitkinmapsandmore.com 109 GLICKMAN ADAM SAN JUAN PUERTO RICO 00907-3122, 644 FERNANDEZ JUNCOS AVE #301 DISTRICT VIEW PLAZA MIRAMAR TIRPAK BRADLEY ASPEN, CO 81611 101 BLEEKER ST #A GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 PESIKOFF DAVID HOUSTON, TX 77098 1811 NORTH BLVD GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 DIRE WOLF LLC ASPEN, CO 81611 100 E MAIN ST # 1 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 CHISHOLM HEATHER M ASPEN, CO 81611 205 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 ZATS JULIE ASPEN, CO 81611 118 N GARMISCH SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 HILL LESLEY ASPEN, CO 81611 214 W BLEEKER ST GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 FLEMING KIMBERLY PAIGE ASPEN, CO 81612 PO BOX 2869 220 WEST MAIN LLC AUSTIN, TX 78757 8500 SHOAL CREEK BLVD BLDG 4 #150 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 MELTON DAVID ASPEN, CO 81611 135 W MAIN ST #A GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 TYROL APARTMENTS LLC ASPEN, CO 81611 200 W MAIN ST 220 WMAC LLC ASPEN, CO 81612 PO BOX 8346 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 110 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 PARDUBA JIRI ASPEN, CO 81612 116 N GARMISCH ST SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 FREEDMAN RYAN D WAYNE, PA 19087 PO BOX 638 CITY OF ASPEN ASPEN, CO 81611 130 S GALENA ST 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 HOTEL ASPEN CONDO ASSOC ASPEN, CO 81611 COMMON AREA 110 W MAIN ST 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE KETTELKAMP TRUST PUEBLO, CO 81008 3408 MORRIS AVE SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 DIMITRIUS RALLI TRUST PASADENA, CA 91103 535 FREMONT DR GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 ASPEN MAIN OFFICE CONDO ASSOC ASPEN, CO 81611 220 W MAIN ST 220 WEST MAIN LLC AUSTIN, TX 78757 8500 SHOAL CREEK BLVD BLDG 4 #150 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 111 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE KELLY BRIAN NEW YORK, NY 10013 448 GREENWICH ST #5 120 EAST MAIN PARTNERS LLC ASPEN, CO 81611 120 E MAIN ST TIMBERLINE BANK GRAND JUNCTION, CO 81505 633 24 RD STEVENSON KAREN H ASPEN, CO 81611 205 W MAIN ST 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 STEVENS LESLEY ASPEN, CO 81611 214 W BLEEKER ST VICTORIANS AT BLEEKER CONDO ASSOC ASPEN, CO 81611 101 E BLEEKER ST GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 TARVER CHARLES ASPEN, CO 81611 616 E HYMAN AVE HANOVER ASPEN LLC WOODY CREEK, CO 81656 PO BOX 481 ANISSIMOVA-FREEDMAN ANGELINA WAYNE, PA 19087 PO BOX 638 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 100 EAST MAIN STREET LLC ASPEN, CO 81611 312 AABC STE D 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARCIA STEVEN J ASPEN, CO 81611 120 N GARMISCH 220 WMAC LLC ASPEN, CO 81612 PO BOX 8346 100 EAST MAIN STREET LLC ASPEN, CO 81611 312 AABC STE D GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 112 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 120 EAST MAIN PARTNERS LLC ASPEN, CO 81611 120 E MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 HAYMAX LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 RILEY AMY CLARK ASPEN, CO 81611 129 W BLEEKER ST SILVER INN LLC COMPTON, CA 90220 401 W ARTESIA BLVD JDH INVESTMENT MGMT LLC DALLAS, TX 75205 12200 STEMMONS FWY GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 NORTHSTAR OFFICE BUILDING CONDO ASSOC ASPEN, CO 81611 COMMON AREA 122 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 100 EAST MAIN STREET CONDO ASSOC ASPEN, CO 81611 100 E MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 TIMBERLINE BANK GRAND JUNCTION, CO 81505 633 24 RD 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE 220 WEST MAIN LLC AUSTIN, TX 78757 8500 SHOAL CREEK BLVD BLDG 4 #150 ELLERMAN JEFFREY S & PAMELA C DALLAS, TX 75225 3600 CARUTH BLVD AJAX VIEW COMMERCIAL/NORTH STAR OFFICE ASPEN, CO 81611 132 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 CRAWFORD RANDALL & ABIGAIL ASPEN, CO 81611 124 N GARMISCH ST 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 113 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 TYROLEAN LODGE LLC ASPEN, CO 81611 200 W MAIN ST 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE LORENZ KATHERINE ASPEN, CO 81611 101 BLEEKER ST #A HERRON LLC HOUSTON, TX 77006 1627 S BLVD BLEEKER LLC CARBONDALE, CO 81623 111 PINNACLE CT 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 220 WEST MAIN STREET LLC ASPEN, CO 81611 201 CASTLE RIDGE NORTH STAR LODGE LLC GRAND JUNCTION, CO 81505 633 24 RD GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 114 EXHIBIT - K115 116 121 W est Bleeker Residence - HPC Conceptual Submission Cover Letter/ Application - 1 Friday Design Survey, Civil & Architectural Related Drawings / Documents Boundaries Unlimited Inc. + 1 Friday Design A-COVER / INDEX : HPC Conceptual Submission Sheet Index - 2021 - "121 West Bleeker" Structural Related Drawings / Documents JJR Structural TBD " 1 2 1 W e s t B l e e k e r " 1 2 1 w e s t b l e e k e r s t r e e t l c i t y o f a s p e n | c o l o r a d o R E S I D E N C E HPC CONCEPTUAL - JANUARY 2021 SURVEY : 121 West Bleeker Site & Topographical Stamped/ Certified Survey - 1' Contour Intervals - Boundaries Unlimited Inc. (1/8" Architectural) C2.0: 121 West Bleeker Conceptual Grading & Drainage Plan (1/8" Architectural) & Vicinity Map, Detail of Block 58 (1:60 Engineering Scale) C2.0: 121 West Bleeker Conceptual Detailing - Grading & Drainage Planning ZN-001 : Preliminary Project Summary & Existing / Proposed Gross Sq Ft & Floor Area Calculation Summaries - 250 SF HPC Bonus Requested ZN-003 : Existing + Proposed Site Coverage Calculations and Graphic Diagrams (1/8" Architectural) ZN-004 : Existing Floor Area Calculations & Graphic Breakdowns : Subgrade & Main Levels (1/8" Architectural) ZN-005 : Existing Floor Area Calculations & Graphic Breakdowns : Upper & Roof Levels (1/8" Architectural) ZN-006 : Proposed Floor Area Calculations & Graphic Breakdowns : Lower / Subgrade Level (1/8" Architectural) - 250 SF Bonus Requested ZN-007 : Proposed Floor Area Calculations & Graphic Breakdowns : Main + Upper Levels (1/8" Architectural) - 250 SF Bonus Requested A2.01 : Existing Main Level Plan & Historical / Non-Historical Graphic Indication ( 1/4" Architectural) A2.02 : Existing Upper Level Plan & Historical / Non-Historical Graphic Indication ( 1/4" Architectural) A2.03 : Existing Roof Plan & Historical / Non-Historical Graphic Indication ( 1/4" Architectural) A2.04 : Proposed Lower Level / Subgrade Plan ( 1/4" Architectural) A2.05 : Proposed Main Level / Ground Floor Plan ( 1/4" Architectural) A2.06 : Proposed Upper Level Floor Plans - Historical (Street Facing) and Proposed New Construction (South Alley) ( 1/4" Architectural) A2.07 : Proposed Roof Plan ( 1/4" Architectural) A3.01 : Existing Elevations & Non - Historical / Areas Proposed for Removal ( 1/4" Architectural) A3.02 : Existing Elevations & Non - Historical / Areas Proposed for Removal ( 1/4" Architectural) A3.03 : Existing Elevations & Non - Historical / Areas Proposed for Removal ( 1/4" Architectural) A3.04 : Proposed Elevations & Preliminary Materials Development ( 1/4" Architectural) A3.05 : Proposed Elevations & Preliminary Materials Development ( 1/4" Architectural) A3.06: Proposed Elevations & Preliminary Materials Development ( 1/4" Architectural) A2.08 : Proposed Conceptual Landscape Plan ( 3/16" Architectural) HPC JANUARY 2021 COVER HPC CONCEPTUAL COVER SHEET + INDEX 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP 117 HPC JANUARY 2021 SURVEY CITY OF ASPEN COMPLIANT SURVEY 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP 118 HPC JANUARY 2021 C-2 HPC CONCEPTUAL GRADING + DRAINAGE PLAN 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP 119 HPC JANUARY 2021 C-3 HPC CONCEPTUAL CIVIL DETAILS 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP 120 Zoning Allowance & Project Summary Proposed Development Single Family Residence :: Historic Remodel + New Addition Parcel ID #2735 - 124 - 39 - 003 Legal Description of Property 121 West Bleeker Street . City & Townsite of Aspen . Block 58 . East 1/2 Lot C, Lot D, and West 1/2 Lot E Zone District Medium Density Residential (R-6) Reference 26.710.040 26.710.040 26.710.040 26.710.040 26.710.040 26.710.040 26.710.040 Setbacks Existing Allowed (Principle)Allowed (Accessory)Proposed (Principle)Proposed (Accessory) Front Rear Combined Front / Rear Side Combined Side Distance Between Building Corner Lot 16 feet 9 inches (Victorian) - North 0 inches South (11-1/2 inches over property) N/A 4-1/4 inches W :: 1 inch E 5-1/4 inches N/A No N/A N/A N/A N/A N/A N/A N/A 10 feet 10 feet HAB / 5 feet GAR N/A 5 feet W :: 5 feet E 10 feet + 1 foot per 300 sq ft GLA 5 feet 15 feet 5 feet N/A 5 feet W :: 5 feet E 30 feet + 1 foot per 200 sq ft GLA 5 feet 10 ft 1 in HAB / 5 ft 3 in GAR 22 feet 0 inches 1 feet 2 ins W (stair) :: 1 ft 2 in E (mech) 2 feet 4 inches N/A ReferenceSupplemental Breakdown Information Existing Proposed Required Net Leasable / Commercial Square Feet Open Space % Site Coverage 37.47% N/A 0 feet N/A 36.70% Not Required For R-6 Single Family Residence No Limitation For lots less than 6,000 square feet in R-6 Not Required For R-6 Single Family Residence 26.710.040 26.710.040 26.710.040 N/A Reference 26.710.040 Site Coverage Exsiting Proposed Gross Lot Area (Square Feet) Area of Building Footprint Site Coverage % (No Limitation on R-6 Lot : 0 - 5,999 Sq Ft) 5,982.3 square feet 2,241.70 square feet 37.47% 5,982.3 square feet 36.70% 26.710.040 26.710.040 ReferenceTransferable Development Right (TDR) Received TDR Certificate Sent TDR Certificate Transferred TDR Certificate No No No Land Value Summary Actual Value Reference Land Improvements Total 5,371,700 1,971,700 3,400,000 Pitkin County Assessor Pitkin County Assessor Pitkin County Assessor TBD 16 feet 9 inches (Victorian - AG) 2,195.24 square feet TBD TBD Floor Area Summary Existing Gross (Sq Ft)Existing Floor Area (Sq Ft) Proposed Gross (Sq Ft)Proposed Floor Area (Sq Ft) Reference ZN-004, ZN-006 ZN-005, ZN-007 Basement Habitable (Lower Subgrade Level)215.47 0.0 360.422,617.40 Main Level Habitable (Ground Floor)1,900.55 1,900.55 Upper Level Habitable (Existing) ZN-004 - ZN-007 Porch/ Stair Access / Patio/ Roof Deck Area Total 3,563.67 Hab / 372.16 Gar 3,327.92 (FA)3,484.87 (FA)5,709.07 Hab / 524.08 Gar Floor Area Allowable For 121 West Bleeker 3,235.04 square foot FA For SFR FA per SFR on 5,982.3 square foot lot 3,235.04 Total Allowable FA For SFR FA per SFR on 5,982.3 square foot lot with 250 SF HPC FA Bonus (Proposed) = 3,485.04 FA 524.08Main Level Garage (Ground Floor)372.16 61.08 149.08 Exterior Storage Area - Mechanical Usage 4.09 N/A N/A0.0 1,600.70 ZN-005, ZN-007 ZN-005, ZN-007 ZN-005, ZN-007 ZN-005, ZN-007 1,600.70 1,102.60 - V (FRT) / 340.96 - (ALY)576.0 - V (FRT) / 914.97 - (ALY) 527.67 - V (FRT) / 847.0 - (ALY)1,066.80 - V (FRT) / 299.49 - (ALY) 0 FA Countable / 485.26 Allowable0 FA Countable / 485.26 Allowable467.71 (Total) / 130.72 (Exempt)922.01 (Total) / 64.34 (Exempt) HPC JANUARY 2021 ZN-001 ZONING ALLOWANCE + PROJECT NUMERIC BREAKDOWNS 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP 121 EXPOSED SITE NON-ENCLOSED AREAS / CANOPY OVERHEAD LEGEND ENCLOSED STRUCTURE EXISTING SITE COVERAGE CALCULATIONS TOTAL STRUCTURE FOOTPRINT AREA (SQ FT) 2,241.70 (SF) EXISTING SITE COVERAGE DIAGRAM : 1/8" = 1'-0"EXISTING SITE PLAN : 1/8" = 1'-0" GROSS LOT SIZE / NET LOT SIZE (SQ FT) EXISTING SITE COVERAGE (R-6 MAX = 40%)37.47% (ALLOWABLE) PROPOSED SITE COVERAGE CALCULATIONS PROPOSED SITE COVERAGE (R-6 MAX = NOLIMITATION) 2,195.24 (SF)PROPOSED 121 W BLEEKER SITE COVERAGE (SQ FT) GROSS LOT SIZE / NET LOT SIZE (SQ FT) 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINE10' FRONT YARD SETBACK5' SIDE YARD SETBACK 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACK12 16 CEDAR SHINGLE ROOFING PROPOSED FLASH & WATERPROOF AS NECESSARY RIDGE RIDGE RIDGE RIDGE RIDGERIDGERIDGERIDGE12 16 12 16 12 16 12 1612 16 12 16 12 16 12 16 12 16 12 16 12 16 12 16 12 16 12 16 12 16 CEDAR SHINGLE ROOFING PROPOSED FLASH & WATERPROOF AS NECESSARY MASONRY CHIMNEY CUSTOM JACUZZI & RAISED PLATFORM AREA - 5'-0" x 5'-0" SPA FLAT ROOF STANDARD STONE BALLAST TOPPING PROPOSED SLOPE 2 MIN SLOPE 2 MIN SLOPE2 MINSLOPE2 MIN0 0 00NON-PERMEABLE DECK AREA : PROPOSED STONE DECKING SLOPE 2 MIN SLOPE 2 MIN SLOPE2 MINSLOPE2 MIN0 0 00SLOPE 2 MIN SLOPE 2 MIN SLOPE2 MINSLOPE2 MIN0 0 00SLOPE 2 MIN SLOPE 2 MIN SLOPE2 MINSLOPE2 MIN0 0 00ROOF DECK-MASTER U-214 T.O. F.F. Master Deck ELEV - 111'-11 1/2" (V.I.F.) T.O. Plwd. Mst. Deck / Garage ELEV - 111'-5" (V.I.F.) T.O. Plwd. Connector ELEV - 111'-10" (V.I.F.) FLAT ROOF WITH NEW RUBBER DRAINAGE MATT, STONE BALLAST & WATERPROOFING AS NECESSARY. FLASH & WATERPROOF ROOFING CONDITIONS AS REQUIRED.PV-134 PANEL PVROOF SYSTEM SITUATED @ 45 DEGREES PV-2PV-18 PV-19 PV-20PV-3 PV-4PV-21PV-5PV-22 PV-23PV-6 PV-7PV-24 PV-25PV-8 PV-9PV-26PV-10PV-27 PV-28PV-11 PV-12PV-29 PV-30 PV-31PV-13 PV-14 PV-15PV-32PV-16PV-33 PV-34PV-17NON REFLECTIVE MATTE / PAINT LOCKED METAL ROOFING PROPOSED 12 1 PROPOSED RESTORATION OF (BELIEVED PER HISTORICAL IMAGERY & EXISTING CONDITIONS) ORIGINAL SOUTH FACADE ROOF MASSING + FORM FP CHIMNEY NON REFLECTIVE MATTE / PAINT LOCKED METAL ROOFING PROPOSED 12 12 12 12 FLAT ROOF WITH NEW RUBBER DRAINAGE MATT, STONE BALLAST & WATERPROOFING AS NECESSARY. FLASH & WATERPROOF ROOFING CONDITIONS AS REQUIRED. PROPOSED SITE COVERAGE DIAGRAM : 1/8" = 1'-0"PROPOSED SITE PLAN : 1/8" = 1'-0" PROPOSED BUILDING FOOTPRINT - 2,195.24 sq ft 121 WEST BLEEKER E 12 Lot C, Lot D + W 12 Lot E - 5,982.3 sq ft SITE COVERAGE 2,195.24 sq ft / 6,000 sq ft = 36.70 % Site Coverage Proposed 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINE10' FRONT YARD SETBACK5' SIDE YARD SETBACK 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACKDN MASTER DECK 211 ROOF DECK 214 12 16 RIDGE RIDGE RIDGE RIDGE RIDGERIDGERIDGERIDGE12 16 12 16 12 16 12 1612 16 12 16 12 16 12 16 12 4 12 16 12 4 12 16 12 16 12 16 MASONRY CHIMNEY 12 16 12 16 12 16 12 8 12 16 12 16 12 16 12 8 12 8 12 4 12 16 12 16 12 2 12 2 12 2 12 2 RIDGE RIDGERIDGE RIDGE LIGHT SHADED AREA REPRESENTS NON HISTORICAL MASSING & FEATURES OF RESIDENCE TO BE REMOVED REAR ALLEY (SOUTH) - PUBLIC ROWEXISTING BUILDING FOOTPRINT - 2,241.70 sq ft 121 WEST BLEEKER E 12 Lot C, Lot D + W 12 Lot E - 5,982.3 sq ft SITE COVERAGE 2,241.70 sq ft / 6,000 sq ft = 37.47 % Site Coverage Exisitng 5,982.3 (SF) / 5,982.3 (SF) EXISTING 121 W BLEEKER SITE COVERAGE (SQ FT) 2,241.70 (SF)2,195.24 (SF)TOTAL STRUCTURE FOOTPRINT AREA (SQ FT) 36.70% (ALLOWABLE) 5,982.3 (SF) / 5,982.3 (SF) HPC JANUARY 2021 ZN-003 SITE COVERAGEDIAGRAMS &NUMERIC BREAKDOWNS 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP 122 EXISTING BASEMENT/ SUBGRADE FLOOR AREA PLANNING DIAGRAM : 1/8" = 1'-0" FAR (Z-004) EXISTING MAIN LEVEL FLOOR AREA PLANNING DIAGRAM : 1/8" = 1'-0" 215.47 GROSS SQ FT TOTAL SUBGRADE: 0% WALL EXPOSURE MECHANICAL SUBGRADE EXCAVATION 0 SQ FT FA COUNTABLE 10'-1134"10'-1134"KEY - SUBGRADE LVL. / EXISTING SUBGRADE WALL DIAGRAMS : 1/8" = 1'-0"5'-9"16'-2" 92.96 sq ft UNDERSIDE OF JOIST 5'-9"10'-113 4" 63.13 sq ft UNDERSIDE OF JOIST 5'-9"16'-2" 92.96 sq ft UNDERSIDE OF JOIST 5'-9"10'-113 4" 63.13 sq ft UNDERSIDE OF JOIST HABITABLE GARAGE PORCH/ DECK EXTERIOR STORAGE LEGEND EXISTING MAIN / GROUND FLOOR AREA CALCULATIONS - 121 EXISTING FLOOR AREA CALCULATIONS EXISTING SUBGRADE / LOWER LVL. WALL AREA CALCULATIONS - 121 Floor Area Summary Existing Gross (Sq Ft)Existing Floor Area (Sq Ft) Proposed Gross (Sq Ft)Proposed Floor Area (Sq Ft) Reference ZN-004, ZN-006 ZN-005, ZN-007 Basement Habitable (Lower Subgrade Level)215.47 0.0 360.422,617.40 Main Level Habitable (Ground Floor)1,900.55 1,900.55 Upper Level Habitable (Existing) ZN-004 - ZN-007 Porch/ Stair Access / Patio/ Roof Deck Area Total 3,563.67 Hab / 372.16 Gar 3,327.92 (FA)3,484.87 (FA)5,709.07 Hab / 524.08 Gar Floor Area Allowable For 121 West Bleeker 3,235.04 square foot FA For SFR FA per SFR on 5,982.3 square foot lot 3,235.04 Total Allowable FA For SFR FA per SFR on 5,982.3 square foot lot with 250 SF HPC FA Bonus (Proposed) = 3.485.04 FA 524.08Main Level Garage (Ground Floor)372.16 61.08 149.08 Exterior Storage Area - Mechanical Usage 4.09 N/A N/A0.0 372.16 (GROSS) 1900.55 (FA) 4.09 (GROSS) 61.08 (FA) 294.08 (GROSS) 4.09 SF Exterior Storage (15% of 3235.04) = 485.26 allow 1900.55 (GROSS) 1,600.70 ZN-005, ZN-007 ZN-005, ZN-007 ZN-005, ZN-007 ZN-005, ZN-007 1,600.70 1,102.60 - V (FRT) / 340.96 - (ALY)576.0 - V (FRT) / 914.97 - (ALY) 527.67 - V (FRT) / 847.0 - (ALY)1,066.80 - V (FRT) / 299.49 - (ALY) 0 FA Countable / 485.26 Allowable0 FA Countable / 485.26 Allowable467.71 (Total) / 130.72 (Exempt) 1,961.63 (FA)TOTAL EXISTING GROUND FLOOR AREA (SQ FT) TOTAL EXISTING FLOOR AREA CALCULATIONS - 121 BASEMENT FLOOR AREA (SQ FT) GROUND FLOOR AREA (SQ FT) 2ND FLOOR AREA (SQ FT) PORCH/ DECK AREA TOTAL (SQ FT) TOTAL EXISTING FLOOR AREA (SQ FT) GARAGE FLOOR AREA (SQ FT) 215.47 / 0.0 (FA) 1,900.55 / 1,900.55 (FA) 598.43 GROSS / 0 (FA) 3,327.92 (FA)(3,327.92 FA > 3,235.04 FA) 372.16 / 61.08 (FA) (3,235.04 x .15%) = 485.26 all 1,443.56 / 1,366.29 (FA) 922.01 (Total) / 64.34 (Exempt) 372.16 SF GARAGE 1st 250 SF EXEMPT 2nd 250 SF @ 1/2 122.16 / 2 = 61.08 SF FA COUNTABLE 1900.55 GROSS SQUARE FEET AREA 1900.55 SF FA COUNTABLEL-A :M-A : M-F M-B : 4.09 SF EXTERIOR STORAGE UP TO 36 SF EXEMPT THEREFORE, 0 SF FA COUNTABLE M-C : 15.97 SF EXT. ENTRY (PRIMARY) STEPS STREET FACING / HISTORIC THEREFORE, 0 SF FA COUNTABLE M-D : 114.75 SF EXT. ENTRY (SECONDARY) STEPS + PORCH STREET FACING / (NON-HISTORIC) THEREFORE, 0 SF FA COUNTABLE M-E : 163.36 SF RAISED DECK + SPA AREA (GREATER THAN 30") 163.36 SF FA COUNTABLE M-F : KEY - EXISTING MAIN / GROUND LVL. BASEMENT FLOOR WALL LABEL TOTAL WALL AREA (SQ FT) EXPOSED WALL AREA (SQ FT) 1 92.96 0 2 63.13 0 3 92.96 0 4 63.13 0 OVERALL TOTAL WALL AREA (SQ FT)312.18 EXPOSED WALL AREA (SQ FT)0 % OF EXPOSED WALL (EXPOSED / TOTAL)0.0% SUBGRADE 121 WALL EXPOSURE CALCULATION 0% (312.18 ACTUAL WALL SF) = 0.0 SF FA COUNTABLE EXISTING BASEMENT/ SUNGRADE FLOOR AREA CALCULATIONS - 121 MECHANICAL / SUBGRADE FLOOR AREA (SQ FT)215.47 (0.0% X 215.47)0.0121 SUBGRADE COUNTABLE FLOOR AREA (SQ FT) 215.47 FA - (0.0% EXPOSURE) = 0.0 FATOTAL BASEMENT COUNTABLE FLR AREA (SQ FT) PORCH/ DECK AREA COUNTABLE (SQ FT) EXTERIOR STORAGE AREA (SQ FT) GROUND FLOOR AREA (SQ FT) - FA GROUND PORCH/ DECK AREA (GROSS SQ FT) GROUND FLOOR STAIR & MISC. EXEMPTIONS: INT. GROUND FLOOR AREA (GROSS SQ FT HAB) GARAGE FLOOR AREA (SQ FT) - FA GARAGE FLOOR AREA (GROSS SQ FT) GROUND PORCH/ DECK AREA (COUNTABLE FA)163.36 -M / 304.35 -U (467.71) LEGEND (WALLS) EXPOSED WALL WALL BELOW GRADE Blkr Entry Porches/ Stairs Exempt 4.09 / 0.0 (FA) 163.36 -M / 304.35 -U = (467.71), therefore 0 FA ZN-004 EXISTING FLOOR DIAGRAMS &NUMERIC BREAKDOWNS 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC JANUARY 2021 AREA 123 HABITABLE GARAGE PORCH/ DECK EXTERIOR STORAGE LEGEND EXISTING UPPER LVL. / FLOOR AREA PLANNING DIAGRAM : 1/8" = 1'-0"EXISTING ROOF AREA DIAGRAM : 1/8" = 1'-0" EXISTING UPPER FLOOR AREA CALCULATIONS - VICTORIAN (FRONT) + ALLEY MASSING EXISTING FLOOR AREA CALCULATIONS 340.96 (GROSS) UPPER FLOOR AREA - VICTORIAN (SQ FT) - FA 85.37UPPER PORCH/ DECK AREA VICTORIAN (GROSS SQ FT) UPPER FLOOR STAIR & MISC. EXEMPTIONS: INT. 1066.80 (FA) 35.80 (GROSS) UPPER FLOOR AREA - REAR (GROSS SQ FT HAB) 41.47 (GROSS) 299.49 (FA) 35.80 Open Stair Exemption 1102.60 (GROSS)UPPER FLOOR AREA- VICTORIAN (GROSS SQ FT) UPPER FLOOR STAIR & MISC. EXEMPTIONS: INT. UPPER FLOOR AREA - REAR : (SQ FT) - FA 41.47 Open Stair Exemption KEY - EXISTING UPPER LEVELS ALL SF (FA) COUNTABLE ROOF AREAS REPRESENTED ON UPPER LEVEL PLANNING DIAGRAM U-A :NOTE : KEY - EXISTING ROOF LVL. 1102.60 GROSS SQUARE FEET AREA 1066.80 SF FA COUNTABLE VICTORIAN 35.80 SQ FT EXEMPT AREA FOR OPEN STAIR (VICTORIAN) EXISTING UPPER FLOOR DECK AREA TOTAL (SQ FT) UPPER PORCH/ DECK AREA GARAGE (GROSS SQ FT) 1,366.29 (FA)TOTAL EXISTING UPPER FLOOR AREA (SQ FT) 85.37 SQ FT EXT PORCH (COUNTABLE FA) 218.62 SQ FT EXT DECK AREA (COUNTABLE FA) 340.96 GROSS SQUARE FEET AREA 299.49 SF FA COUNTABLE REAR MASSING 41.47 SQ FT EXEMPT AREA FOR OPEN STAIR (REAR STAIR) U-B : U-C : U-D : U-E : U-F : U-C (3,235.04 x .15%) = 485.26 all (3,235.04 x .15%) = 485.26 all 163.36 -M / 304.35 -U (467.71) 218.62 Floor Area Summary Existing Gross (Sq Ft)Existing Floor Area (Sq Ft) Proposed Gross (Sq Ft)Proposed Floor Area (Sq Ft) Reference ZN-004, ZN-006 ZN-005, ZN-007 Basement Habitable (Lower Subgrade Level) 215.47 0.0 360.422,617.40 Main Level Habitable (Ground Floor)1,900.55 1,900.55 Upper Level Habitable (Existing) ZN-004 - ZN-007 Porch/ Stair Access / Patio/ Roof Deck Area Total 3,563.67 Hab / 372.16 Gar 3,327.92 (FA)3,484.87 (FA)5,709.07 Hab / 524.08 Gar Floor Area Allowable For 121 West Bleeker 3,235.04 square foot FA For SFR FA per SFR on 5,982.3 square foot lot 3,235.04 Total Allowable FA For SFR FA per SFR on 5,982.3 square foot lot with 250 SF HPC FA Bonus (Proposed) = 3,485.04 FA 524.08Main Level Garage (Ground Floor)372.16 61.08 149.08 Exterior Storage Area - Mechanical Usage 4.09 N/A N/A0.0 1,600.70 ZN-005, ZN-007 ZN-005, ZN-007 ZN-005, ZN-007 ZN-005, ZN-007 1,600.70 1,102.60 - V (FRT) / 340.96 - (ALY)576.0 - V (FRT) / 914.97 - (ALY) 527.67 - V (FRT) / 847.0 - (ALY)1,066.80 - V (FRT) / 299.49 - (ALY) 0 FA Countable / 485.26 Allowable0 FA Countable / 485.26 Allowable467.71 (Total) / 130.72 (Exempt)922.01 (Total) / 64.34 (Exempt)ZN-005 EXISTING FLOOR DIAGRAMS &NUMERIC BREAKDOWNS 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC JANUARY 2021 AREA 124 EXPOSED WALL WALL BELOW GRADE LEGEND HABITABLE TOTAL PROPOSED FLOOR AREA CALCULATIONS BASEMENT FLOOR AREA (SQ FT) GROUND FLOOR AREA (SQ FT) 2ND FLOOR AREA (SQ FT) PORCH/ DECK AREA (SQ FT) TOTAL PROPOSED FLOOR AREA (SQ FT) GARAGE FLOOR AREA (SQ FT) 2,617.40 / 360.42 (FA) 1,600.70 / 1,600.70 (FA) 3,124.45 (FA) Above Grade / 360.42 (FA) Subgrade (3,235.04 FA + 250 FA Bonus = 3,485.04FA) 3,484.87 FA 524.08 / 149.08 (FA) (3,235.04 x .15%) = 485.26 allowable PROPOSED BASEMENT FLOOR AREA DIAGRAM : 1/8" = 1'-0"PROPOSED FLOOR AREA CALCULATIONS FAR (Z-006)10'26'-35 8" 325.62 sq ft / 81.10 sq ft ex UNDERSIDE OF STRUCT. 1,490.97 / 1,374.67 (FA) 428.98 total / 0 (FA) 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINE10' FRONT YARD SETBACK5' SIDE YARD SETBACK LIGHT SHADED AREA REPRESENTS 6000 SF R-6 SETBACKS PER COA LAND USE CODE WASH DRY 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACKELEVATOR SSP 36 x 60 UP L-001 Egress IRC Egress IRCSTAIR TO MAIN L-002 MEDIA AREA / RECREATION ROOM L-003BEDROOM HALLWAY L-005 LIGHTWELL L-002 LIGHTWELL L-002 A/V CLOSETREFDW ELEVATOR MECH / STORAGE L-006 LAUNDRY ROOM L-007 ELECTRICAL/ DRY MECH L-008 PRIMARY MECHANICAL L-009 BUNK ROOM L-002 BEDROOM SUITE 1 L-002 BATHROOM SUITE 1 L-002 BEDROOM / FLEX ROOM L-002 BEDROOM SUITE 2 L-002 BATHROOM SUITE 1 L-002 BATHROOM/ POWDER L-010 BATHROOM BUNK AREA L-002 WALK OUT JACUZZI/ GROTTO AREA/ LIGHTWELL L-002 BAR - WINE AREA/ BEVERAGE PENINSULA L-004-B BAR - WINE AREA/ BEVERAGE L-004-A DROP DOWN PROJECTOR INTEGRATED MEDIA / MILLWORK WALL (LARGE PROJECTION - 100"+) BUILT-IN MEDIA & STORAGE SHELVING SYSTEMSBUILT-IN MEDIA &STORAGESHELVING SYSTEMSBUILT-IN CLOSET & STORAGE SHELVING SYSTEMS BUILT-IN CLOSET &STORAGESHELVING SYSTEMSBUILT-IN CLOSET &STORAGESHELVING SYSTEMSBUILT-IN JACUZZI & RAISED PLATFORM AREA - 6'-0" x 6'-0" SPA SHELVING/ ART NICHE WINESTORAGE8' x 5' AREA FOR TWO MATS / WORKOUT SPACE OPAQUE SKYLIGHT ABOVE 42 X 24 WEIGHT RACK 48 X 24 BIKE +9 +18+27+36 -2 FROM INTERIOR 64 X 28 TREADMILL 60 X 24 BENCH AREA GYM/ WORKOUT AREA L-002 MIRRORMIRROR FLOOR TO CEILING 12' X 10' SLIDING GLAZED PANEL 24 T @ 11" (landings v.i.f.)25 R @ 6-1/2" = 13'-6 3/4"T.O. F.F. Lower Level ELEV - 86'-8 1/4" (V.I.F.) T.O. Conc. Lower Level ELEV - 86'-7 1/4" (V.I.F.) T.O. Conc. Lower Level Mech ELEV - 85'-3 1/4" (V.I.F.) T.O. Conc. Grotto ELEV - 86'-3 1/4" (V.I.F.)(2) FULL(2) TWINREAR ALLEY (SOUTH) - PUBLIC ROWEAST SIDE YARD ALLEY - PUBLIC ROW 26'-35 8"28'-5"12'-11"8"7'-11"11'-238"35'-4"4'-2" 24'-2"21'-4"3'-2"12'-1034"22'-458"27'-15 8" (10) (12) (14) LP-A :2,617.40 GROSS SQUARE FEET TOTAL SUBGRADE PERIMETER CONSTRUCTION: 19.51% SUBGRADE WALL EXPOSURE, THEREFORE 510.65 SQ FT FA COUNTABLE 12'EXPOSED LW 8'-61 2"8'-111 2"8'-95 8"10'12'8" 8.00 sq ft 10'28'-5" 366.96 sq ft / 243.12 sq ft ex UNDERSIDE OF STRUCT.12'EXPOSED LW 3'-8"21'-1"3'-8"10'12'7'-11" UNDERSIDE OF STRUCT. 95.23 sq ft 10'12'12'-11" UNDERSIDE OF STRUCT. 155.01sq ft 10'13'4'-2" UNDERSIDE OF STRUCT. 56.34 sq ft / 2.17 sq ft ex13'-614"SKYLIGHT WALL EXPOSURE PROPOSED GRADE 10'12'11'-23 8" UNDERSIDE OF STRUCT. 134.37 sq ft 10'13'-014"35'-4" UNDERSIDE OF STRUCT. 452.61 sq ft / 2.83 sq ft ex13'-614"29'-8"5'-8" SKYLIGHT WALL EXPOSURE PROPOSED GRADE 12'21'-4" UNDERSIDE OF STRUCT. (MECH) 255.99 sq ft 12'3'-2" UNDERSIDE OF STRUCT. (MECH) 37.99 sq ft 10'12'12'-103 4" UNDERSIDE OF STRUCT. 154.74 sq ft10'26'-35 8" 331.78 sq ft / 81.10 sq ft ex UNDERSIDE OF STRUCT.12'EXPOSED LW 10'-01 2"8'-111 2"7'-35 8"10'12'27'-15 8" UNDERSIDE OF STRUCT. 341.61 sq ft 10'12'22'-45 8" UNDERSIDE OF STRUCT. 268.61 sq ft IF 250 SF FA BONUS GRANTED LP-A ZN-006 PROPOSED FLOOR DIAGRAMS &NUMERIC BREAKDOWNS 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC JANUARY 2021 AREA 125 HABITABLE GARAGE PORCH/ DECK EXTERIOR STORAGE LEGEND PROPOSED MAIN FLOOR AREA PLANNING DIAGRAM : 1/8" = 1'-0"PROPOSED UPPER FLOOR AREA PLANNING DIAGRAM PROPOSED UPPER FLOOR AREA CALCULATIONS - VICTORIAN + ALLEY MASTER BEDROOM MASSING PROPOSED FLOOR AREA CALCULATIONS PROPOSED MAIN LEVEL / GROUND FLOOR AREA CALCULATIONS 1,608.70 (FA)GROUND FLOOR AREA (SQ FT) - FA 71.25 (Count) /64.34 (Exempt)GROUND PORCH/ DECK AREA (GROSS SQ FT) GROUND FLOOR STAIR & MISC. EXEMPTIONS: INT.0 1,600.70 (GROSS)GROUND FLOOR AREA (GROSS SQ FT HAB) GARAGE FLOOR AREA (SQ FT) - FA GARAGE FLOOR AREA (GROSS SQ FT)524.08 (GROSS) 149.08 (FA) Standard R-6 Zoning Allowance All SF 1:1 Countable 485.26 Lot Total Allowable 1600.70 GROSS SQ FT AREA 1600.70 SF FA COUNTABLE MAIN LVL. RESIDENCE UPPER FLOOR AREA - FRONT : VIC (SQ FT) - FA (293.39 Countable)UPPER PORCH/ DECK AREA (GROSS SQ FT) 527.67 (FA) 48.33 (GROSS) UPPER FLOOR AREA - BACK (GROSS SQ FT HAB) 847.0 (FA) 48.33 Open Stair Exemption 576.0 (GROSS)UPPER FLOOR AREA- FRONT (GROSS SQ FT HAB) 1st 250 Exempt / 2nd 250 - 50% UPPER FLOOR STAIR & MISC. EXEMPTIONS: INT. UPPER FLOOR AREA - BACK : MB (SQ FT) - FA 37.97 Open Stair Exemption 1,374.67 (FA)TOTAL PROPOSED UPPER FLOOR AREA (SQ FT) KEY - PROPOSED MAIN LEVEL MP-A : KEY - PROPOSED UPPER LEVELS MP-B : MP-C : MP-D : MP-E : MP-F :64.34 SQ FT EXT PRIMARY PORCH HISTORICAL / STREET FACING (EXEMPT FA) 455.53 SQ FT EXTERIOR PATIO 4" ABOVE GRADE CONDITION (EXEMPT FA) 37.5 SQ FT EXT REAR PATIO 4" ABOVE GRADE CONDITION (EXEMPT FA) 524.08 SF GARAGE 1st 250 SF EXEMPT 2nd 250 SF @ 1/2 = 125 SF 149.08 SF FA COUNTABLE 71.25 SQ FT EXTERIOR STAIR TO MASTER BECK AREA (COUNTABLE FA) 576.0 GROSS SQUARE FEET AREA 527.67 SF FA COUNTABLE VICTORIAN MASSING 48.33 SQ FT EXEMPT AREA FOR OPEN STAIR (VICTORIAN) 914.97 GROSS SQUARE FEET AREA 847.0 SF FA COUNTABLE ALLEY MASSING 67.97 SQ FT EXEMPT AREA FOR OPEN STAIR (REAR STAIR) 293.39 SQ FT MASTER DECK AREA (COUNTABLE FA) UP-A : UP-B : UP-C : UP-D : UP-E : UPPER FLOOR STAIR & MISC. EXEMPTIONS: INT. 914.97 (GROSS) 67.97 (GROSS) 485.26 Lot Total Allowable GROUND PATIO AREAS (GROSS SQ FT- NON FA) 493.03 (GROSS) TOTAL PROPOSED GROUND FLOOR AREA (SQ FT)1,757.78 (FA) MP-B MP-E TOTAL PROPOSED FLOOR AREA CALCULATIONS BASEMENT FLOOR AREA (SQ FT) GROUND FLOOR AREA (SQ FT) 2ND FLOOR AREA (SQ FT) PORCH/ DECK AREA (SQ FT) TOTAL PROPOSED FLOOR AREA (SQ FT) GARAGE FLOOR AREA (SQ FT) 2,617.40 / 360.42 (FA) 1,600.70 / 1,600.70 (FA) 3,124.45 (FA) Above Grade / 360.42 (FA) Subgrade (3,235.04 FA + 250 FA Bonus = 3,485.04FA) 3,484.87 FA 524.08 / 149.08 (FA) (3,235.04 x .15%) = 485.26 allowable 1,490.97 / 1,374.67 (FA) 428.98 total / 0 (FA) IF 250 SF FA BONUS GRANTED Floor Area Summary Existing Gross (Sq Ft)Existing Floor Area (Sq Ft) Proposed Gross (Sq Ft)Proposed Floor Area (Sq Ft) Reference ZN-004, ZN-006 ZN-005, ZN-007 Basement Habitable (Lower Subgrade Level)215.47 0.0 360.422,617.40 Main Level Habitable (Ground Floor)1,900.55 1,900.55 Upper Level Habitable (Existing) ZN-004 - ZN-007 Porch/ Stair Access / Patio/ Roof Deck Area Total 3,563.67 Hab / 372.16 Gar 3,327.92 (FA)3,484.87 (FA)5,709.07 Hab / 524.08 Gar Floor Area Allowable For 121 West Bleeker 3,235.04 square foot FA For SFR FA per SFR on 5,982.3 square foot lot 3,235.04 Total Allowable FA For SFR FA per SFR on 5,982.3 square foot lot with 250 SF HPC FA Bonus (Proposed) = 3,485.04 FA 524.08Main Level Garage (Ground Floor)372.16 61.08 149.08 Exterior Storage Area - Mechanical Usage 4.09 N/A N/A0.0 1,600.70 ZN-005, ZN-007 ZN-005, ZN-007 ZN-005, ZN-007 ZN-005, ZN-007 1,600.70 1,102.60 - V (FRT) / 340.96 - (ALY)576.0 - V (FRT) / 914.97 - (ALY) 527.67 - V (FRT) / 847.0 - (ALY)1,066.80 - V (FRT) / 299.49 - (ALY) 0 FA Countable / 485.26 Allowable0 FA Countable / 485.26 Allowable467.71 (Total) / 130.72 (Exempt)922.01 (Total) / 64.34 (Exempt)ZN-007 PROPOSED FLOOR DIAGRAMS &NUMERIC BREAKDOWNS 1/8" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC JANUARY 2021 AREA 126 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINE10' FRONT YARD SETBACK5' SIDE YARD SETBACK 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACKUP UP UP DN 3.5" DN 4"DN 5" UP 8" ENTRY PORCH 100 ENTRY / STAIR 101 ENTRY CL. 102 LIVING ROOM 103 BEDROOM 1 / STUDY 104 CLOSET 105 BATHROOM 106 PANTRY 107 KITCHEN 108 DINING ROOM 108 COATS / MUDROOM 110 WEST ENTRY PORCH 109 INTERIOR BREEZEWAY 111 MEDIA / RECREATION 112 BATHROOM 113 1-1/2 STALL GARAGE 114 PATIO AREA 115 SPA AREA 116 UP UP UP OUTDOOR HOT TUBMECHANICALACCESS TO MECHANICAL SUBGRADE AREA LOCATION OF MECHANICAL CRAWLSPACE BELOW OUTDOOR WOOD BURNING FIRELPACE FIREPLACE LIGHT SHADED AREA REPRESENTS NON HISTORICAL MASSING & FEATURES OF RESIDENCE TO BE REMOVED DN 7" DN 12"REAR ALLEY (SOUTH) - PUBLIC ROWEAST SIDE YARD ALLEY - PUBLIC ROW 1 HPC-2.001 EXISTING MAIN LEVEL FLOOR PLAN :: 121 WEST BLEEKER SCALE : 1/4" = 1'-0" EXISTING FLOOR PLAN: MAIN LEVEL ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC :: JANUARY 2021 HPC-2.001 127 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINE10' FRONT YARD SETBACK5' SIDE YARD SETBACK 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACKDN STAIRCLOSET 204 200 HALLWAY 201 HALL CL. 203 HALL CL. 202 BEDROOM 2 203 BATHROOM 205 MST. BATHROOM 207 DN HERS CLOSET A 208 DN DN MASTER BEDROOM 206 HIS CLOSET 210 HERS CLOSET B 209 MASTER DECK 211 ROOF DECK 214 LOFT AREA / BEDROOM 3 212 CLOSET 213 LIGHT SHADED AREA REPRESENTS NON HISTORICAL MASSING & FEATURES OF RESIDENCE TO BE REMOVED REAR ALLEY (SOUTH) - PUBLIC ROWEAST SIDE YARD ALLEY - PUBLIC ROW 1 HPC-2.002 EXISTING UPPER LEVEL FLOOR PLAN :: 121 WEST BLEEKER SCALE : 1/4" = 1'-0" EXISTING FLOOR PLAN: UPPER LEVEL ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC :: JANUARY 2021 HPC-2.002 128 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINE10' FRONT YARD SETBACK5' SIDE YARD SETBACK 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACKDN MASTER DECK 211 ROOF DECK 214 12 16 RIDGE RIDGE RIDGE RIDGE RIDGERIDGERIDGERIDGE12 16 12 16 12 16 12 1612 16 12 16 12 16 12 16 12 4 12 16 12 4 12 16 12 16 12 16 MASONRY CHIMNEY 12 16 12 16 12 16 12 8 12 16 12 16 12 16 12 8 12 8 12 4 12 16 12 16 12 2 12 2 12 2 12 2 RIDGE RIDGERIDGE RIDGE LIGHT SHADED AREA REPRESENTS NON HISTORICAL MASSING & FEATURES OF RESIDENCE TO BE REMOVED REAR ALLEY (SOUTH) - PUBLIC ROWEAST SIDE YARD ALLEY - PUBLIC ROW 1 HPC-2.003 EXISTING ROOF PLAN :: 121 WEST BLEEKER SCALE : 1/4" = 1'-0" EXISTING FLOOR PLAN: ROOF PLAN ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC :: JANUARY 2021 HPC-2.003 129 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINE10' FRONT YARD SETBACK5' SIDE YARD SETBACK LIGHT SHADED AREA REPRESENTS 6000 SF R-6 SETBACKS PER COA LAND USE CODE WASH DRY 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACKELEVATOR SSP 36 x 60 UP L-001 Egress IRC Egress IRCSTAIR TO MAIN L-002 MEDIA AREA / RECREATION ROOM L-003BEDROOM HALLWAY L-005 LIGHTWELL L-002 LIGHTWELL L-002 A/V CLOSETREFDW ELEVATOR MECH / STORAGE L-006 LAUNDRY ROOM L-007 ELECTRICAL/ DRY MECH L-008 PRIMARY MECHANICAL L-009 BUNK ROOM L-002 BEDROOM SUITE 1 L-002 BATHROOM SUITE 1 L-002 BEDROOM / FLEX ROOM L-002 BEDROOM SUITE 2 L-002 BATHROOM SUITE 1 L-002 BATHROOM/ POWDER L-010 BATHROOM BUNK AREA L-002 WALK OUT JACUZZI/ GROTTO AREA/ LIGHTWELL L-002 BAR - WINE AREA/ BEVERAGE PENINSULA L-004-B BAR - WINE AREA/ BEVERAGE L-004-A DROP DOWN PROJECTOR INTEGRATED MEDIA / MILLWORK WALL (LARGE PROJECTION - 100"+) BUILT-IN MEDIA & STORAGE SHELVING SYSTEMSBUILT-IN MEDIA &STORAGESHELVING SYSTEMSBUILT-IN CLOSET & STORAGE SHELVING SYSTEMS BUILT-IN CLOSET &STORAGESHELVING SYSTEMSBUILT-IN CLOSET &STORAGESHELVING SYSTEMSBUILT-IN JACUZZI & RAISED PLATFORM AREA - 6'-0" x 6'-0" SPA SHELVING/ ART NICHE WINESTORAGE8' x 5' AREA FOR TWO MATS / WORKOUT SPACE OPAQUE SKYLIGHT ABOVE 42 X 24 WEIGHT RACK 48 X 24 BIKE +9 +18+27+36 -2 FROM INTERIOR 64 X 28 TREADMILL 60 X 24 BENCH AREA GYM/ WORKOUT AREA L-002 MIRRORMIRROR FLOOR TO CEILING 12' X 10' SLIDING GLAZED PANEL 24 T @ 11" (landings v.i.f.)25 R @ 6-1/2" = 13'-6 3/4"T.O. F.F. Lower Level ELEV - 86'-8 1/4" (V.I.F.) T.O. Conc. Lower Level ELEV - 86'-7 1/4" (V.I.F.) T.O. Conc. Lower Level Mech ELEV - 85'-3 1/4" (V.I.F.) T.O. Conc. Grotto ELEV - 86'-3 1/4" (V.I.F.)(2) FULL(2) TWIN75'-115 8" 27'-115 8"28'-5"14'-7"5' 75'-115 8"5'-83 4" 27'-115 8"25'23' 10'-21 2"10'-31 2"4'-6" 8'-81 2"10'-31 2"8'-115 8"3'22'-5"3'49'-038"4'13'-834"24'-058"4'3'-3"49'-038"37'12'-038"18'-17 8"5'-9"5'-278"5'-10516"18'-15 8"5'-35 8"REAR ALLEY (SOUTH) - PUBLIC ROWEAST SIDE YARD ALLEY - PUBLIC ROW PLAN NOTES DIMENSIONS: DO NOT SCALE DRAWINGS. SCOPE ENTAILS THE PARTIAL DEMOLITION AND PRESERVATION OF AN EXISTING HISTORIC HOUSE, AND CONSTRUCTION OF A NEW BASEMENT AND ADDITION LAYOUT OF THE DESIGN RELIES ON ALIGNMENTS AND HOLD DIMENSIONS AS WELL AS POSSIBLE ADJUSTMENTS DUE TO FIELD CONDITIONS AND TRADE COORDINATION. ALL WORK MUST BE CHALKED AND LAID OUT BY THE GC PRIOR TO CONSTRUCTION. ALL DISCREPANCIES MUST BE RECTIFIED BY THE GC AND ARCHITECT PRIOR TO CONSTRUCTION. CONTENT LOCATION: ELEVATIONS: SHEET A-30.01 BUILDING SECTION: SHEET A-31.01 PARTITIONS: SHEET A-80.01 PARTITIONS: SEE SHEET A-80.01 -ALL NEW PARTITIONS SHALL BE TYPE A41 UNLESS OTHERWISE NOTED. -ALL FURRING SHALL BE MIN. 312" + FINISH UNLESS OTHERWISE DIMENSIONED. PARTITION TYPES SAFETY GLAZING ALL GLASS SHALL BE TEMPERED/SAFETY GLASS UNLESS OTHERWISE NOTED EMERGENCY ESCAPE ALL EMERGENCY ESCAPE EGRESS WINDOWS SHALL HAVE SILLS 40" A.F.F. UNLESS OTHERWISE NOTED (SEE ELEVATION AND SECTION DWGS). SYMBOLS LEGEND * SEE G-002.00 FOR ADDITIONAL SYMBOLS A PARTITIONS & WALLS:CEILING OBJECTS:LEGEND: TRUE NORTH 14.7 O 1 HPC-2.004 PROPOSED LOWER LEVEL FLOOR PLAN :: 121 WEST BLEEKER SCALE : 1/4" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC-2.004 PROPOSED LOWER LEVEL HPC JANUARY 2021 FLOOR PLAN: 130 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINE10' FRONT YARD SETBACK5' SIDE YARD SETBACK 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACKUP ENTRY PORCH (OPENED) M-100 ENTRY / STAIR TO UPPER GUEST SUITE M-103 24" MICRO/ COFFEE DRAWERS BELOW DW PIANO/ DEN M-104 BUILT IN CLOSET KITCHEN PENINSULA M-107-B TWO STALL GARAGE M-113 30" REF 24" FRE KITCHEN M-107-A BENCH48" FIREPLACE (OPEN TWO SIDES) UTILITIES TO BE LOCATED ALONG EAST STAIR WALL - 48" HEIGHT PROPOSED LIVING AREA M-105 121 ENTRY AREA (MAIN) M-101 MUDROOM M-111 UP DN 6'-9" x 30" TALL SERVING BUFFET / STORAGE BELOW 24" DOUBLE OVENS BELOW RANGE STORAGE / PANTRY 45" GAS / 6BURNER COOKTOPW/ DOWNDRAFTVENTSTORAGE 8' x 4' TABLE REPRESENTED 121 STAIR / ELEVATOR HALLWAY / CIRCULATION M-108 SSP 36 x 60 ELEVATOR M-109 DINING AREA M-106 ON GRADE PATIO AREA M-104-A GARAGE HALL M-110 UP 30" TALL PLANTING FOR SCREENING FROM BLEEKER 24" TALL INTEGRATED FIRE FEATURE & LIGHTWELL EGRESS SHAFT STORAGE BELOWCOUNTERCOUNTER APPLIANCE GARAGE w/ SHELVING STORAGE OPAQUE SKYLIGHT DW DN DN BUILT IN HEARTH PROPOSED STAIRS (TUBE STEEL CHANNEL) TO MASTER DECK/ BEDROOM AREA ABOVE GARAGE GRATED LIGHTWELL CONDITION GRATED LIGHTWELL CONDITION FIRE FEATURE WINDOW BUMP OUT WINDOWBUMP OUT13 T @ 11" (landings v.i.f.) 14 R @ 7-3/4" = 9'-1/2" 1 T @ 1-2" (landing 4') 2 R @ 7" = 1'-2" UP POWDER M-102 COATS 20 T @ 11" (landings v.i.f.)21 R @ 6-3/4" = 11'-9 3/4"24 T @ 11" (landings v.i.f.)25 R @ 6-1/2" = 13'-6 3/4"20 T @ 1'-4"2 R @ 7" = 1'-2"19 T @ 12" (landings v.i.f.) 20 R @ 7 3/8" = 12'-4" T.O. F.F. Conc. Garage ELEV - 101'-5" (V.I.F.) T.O. Plwd. Garage ELEV - 101'-0" (V.I.F.) T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Plwd. Main Level ELEV - 100'-0" (V.I.F.) T.O. F.F. Entry ELEV - 101'-5" (V.I.F.) T.O. F.F. Entry ELEV - 101'-5" (V.I.F.) 2 T @ 1'-6" (landings v.i.f.) 3 R @ 6-3/4" = 1'-8 1/4" T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Plwd. Main Level ELEV - 100'-0" (V.I.F.) T.O. F.F. Exterior Patio ELEV - 100'-2 3/4" (V.I.F.) T.O. F.F. Exterior Patio ELEV - 101'-4 3/4" (V.I.F.) -2 SLOPE FROM INTERIOR -2 SLOPE FROM INTERIOR -1 SLOPE FROM INTERIOR G E PROPOSED RESTORATION OF ( PER HISTORICAL IMAGERY) ORIGINAL OPEN NORTH ENTRY PORCH + DETAILING CU-1 CU-2 CU-3 CU-4 CU-5 BENCH W/ HOOKS ABOVE CUBBIES COATS/ HANGING POWDER M-11212'-578"24'-058"17'-834"4'1'-4916"18'-17 8"75'-115 8"5'-83 4" 22'-111 2"25'-01 2"27'-115 8" 16'-113 8"12'-634"11'-578"7'-3"5'-278"77'-2"5'-35 8"16'-111 4" 10'-35 8"14'-7"28'-5"27'-115 8"1'-23 8" 3'22'-5"3'5'-918"1'-23 8"53'-038"1'-112"5'-9"4'23'26'-038"REAR ALLEY (SOUTH) - PUBLIC ROWEAST SIDE YARD ALLEY - PUBLIC ROW PLAN NOTES DIMENSIONS: DO NOT SCALE DRAWINGS. SCOPE ENTAILS THE PARTIAL DEMOLITION AND PRESERVATION OF AN EXISTING HISTORIC HOUSE, AND CONSTRUCTION OF A NEW BASEMENT AND ADDITION LAYOUT OF THE DESIGN RELIES ON ALIGNMENTS AND HOLD DIMENSIONS AS WELL AS POSSIBLE ADJUSTMENTS DUE TO FIELD CONDITIONS AND TRADE COORDINATION. ALL WORK MUST BE CHALKED AND LAID OUT BY THE GC PRIOR TO CONSTRUCTION. ALL DISCREPANCIES MUST BE RECTIFIED BY THE GC AND ARCHITECT PRIOR TO CONSTRUCTION. CONTENT LOCATION: ELEVATIONS: SHEET A-30.01 BUILDING SECTION: SHEET A-31.01 PARTITIONS: SHEET A-80.01 PARTITIONS: SEE SHEET A-80.01 -ALL NEW PARTITIONS SHALL BE TYPE A41 UNLESS OTHERWISE NOTED. -ALL FURRING SHALL BE MIN. 312" + FINISH UNLESS OTHERWISE DIMENSIONED. PARTITION TYPES SAFETY GLAZING ALL GLASS SHALL BE TEMPERED/SAFETY GLASS UNLESS OTHERWISE NOTED EMERGENCY ESCAPE ALL EMERGENCY ESCAPE EGRESS WINDOWS SHALL HAVE SILLS 40" A.F.F. UNLESS OTHERWISE NOTED (SEE ELEVATION AND SECTION DWGS). SYMBOLS LEGEND * SEE G-002.00 FOR ADDITIONAL SYMBOLS A PARTITIONS & WALLS:CEILING OBJECTS:LEGEND: TRUE NORTH 14.7 O HPC-2.005 1 HPC-2.005 PROPOSED MAIN LEVEL FLOOR PLAN :: 121 WEST BLEEKER SCALE : 1/4" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP PROPOSED MAIN LEVEL HPC JANUARY 2021 FLOOR PLAN: 131 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINE5' SIDE YARD SETBACK 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACKGUEST MASTER SUITE U-201 GUEST MASTER SUITE STAIR U-200 GUEST MASTER SUITE CLOSET U-202 GUEST MASTER SUITE CLOSET U-203 SEASONAL STORAGE U-204 BUILT IN HANGING/ SHELVING BUILT IN DESK/ STORAGE MEDIA OPEN TO BELOW DN 121 STAIR / ELEVATOR MASTER HALLWAY U-206 SSP 36 x 60 ELEVATOR U-205 ORTAL (2 SIDED) BUILT IN FIREPLACE BUILT-IN CABINETRY W/ DOORS, SHELVES, & BED RECESSED INTO AREA. INTEGRATED LIGHTINGCUSTOM BUILT INSHELVING W/ DOORSCUSTOM BUILT INSHELVING W/ DOORSROOF DECK-MASTER U-214 MASTER CLOSET A U-207 MASTER BEDROOM SUITE U-210 MASTER BATHROOM U-211 CUSTOM JACUZZI & RAISED PLATFORM AREA - 5'-0" x 5'-0" SPA BUILT-IN DESK AND STORAGE MASTER OFFICE U-209 M-212 TOILET M-213 WASH MST. CLOSET B U-208 DN 4 T @ 11" (landings v.i.f.) 5 R @ 6-11/16" = 2'-9 1/2"UP 13 T @ 11" (landings v.i.f.) 14 R @ 7-3/4" = 9'-1/2"DN GUEST MASTER BATHROOM U-205 20 T @ 11" (landings v.i.f.)21 R @ 6-3/4" = 11'-9 3/4"19 T @ 12" (landings v.i.f.) 20 R @ 7 3/8" = 12'-4" T.O. F.F. Upper Level ELEV - 112'-1" (V.I.F.) T.O. Plwd. Upper Level ELEV - 111'-10" (V.I.F.) T.O. F.F. Master Deck ELEV - 111'-11 1/2" (V.I.F.) T.O. Plwd. Master Deck / Garage ELEV - 111'-5 1/4" (V.I.F.) T.O. F.F. Upper / Mater Suite Level ELEV - 112'-3/4" (V.I.F.) T.O. Plwd. Upper Level ELEV - 111'-9 3/4" (V.I.F.) PROPOSED RESTORATION OF (BELIEVED PER HISTORICAL IMAGERY & EXISTING CONDITIONS) ORIGINAL SOUTH FACADE ROOF MASSING + FORM CU-1 CU-2 CU-3 CU-4 CU-5 STACKED W/D 23'-734"24'-058"12'-578"27'-115 8"25' 18'-17 8"75'-115 8"5'-83 4" 23' 18'10'-83 4" 70'-115 8"10'-35 8" 27'-115 8"25'18' 12'13' 18'-15 8" 16'-111 4" 1'-23 8" 18'-115 16" 12'13'1'-112"53'-038"5'-9"40'14'-178"4'9'-038"13'-1158"26'-038"REAR ALLEY (SOUTH) - PUBLIC ROWEAST SIDE YARD ALLEY - PUBLIC ROW PLAN NOTES DIMENSIONS: DO NOT SCALE DRAWINGS. SCOPE ENTAILS THE PARTIAL DEMOLITION AND PRESERVATION OF AN EXISTING HISTORIC HOUSE, AND CONSTRUCTION OF A NEW BASEMENT AND ADDITION LAYOUT OF THE DESIGN RELIES ON ALIGNMENTS AND HOLD DIMENSIONS AS WELL AS POSSIBLE ADJUSTMENTS DUE TO FIELD CONDITIONS AND TRADE COORDINATION. ALL WORK MUST BE CHALKED AND LAID OUT BY THE GC PRIOR TO CONSTRUCTION. ALL DISCREPANCIES MUST BE RECTIFIED BY THE GC AND ARCHITECT PRIOR TO CONSTRUCTION. CONTENT LOCATION: ELEVATIONS: SHEET A-30.01 BUILDING SECTION: SHEET A-31.01 PARTITIONS: SHEET A-80.01 PARTITIONS: SEE SHEET A-80.01 -ALL NEW PARTITIONS SHALL BE TYPE A41 UNLESS OTHERWISE NOTED. -ALL FURRING SHALL BE MIN. 312" + FINISH UNLESS OTHERWISE DIMENSIONED. PARTITION TYPES SAFETY GLAZING ALL GLASS SHALL BE TEMPERED/SAFETY GLASS UNLESS OTHERWISE NOTED EMERGENCY ESCAPE ALL EMERGENCY ESCAPE EGRESS WINDOWS SHALL HAVE SILLS 40" A.F.F. UNLESS OTHERWISE NOTED (SEE ELEVATION AND SECTION DWGS). SYMBOLS LEGEND * SEE G-002.00 FOR ADDITIONAL SYMBOLS A PARTITIONS & WALLS:CEILING OBJECTS:LEGEND: TRUE NORTH 14.7 O 1 HPC-2.006 PROPOSED UPPER LEVEL FLOOR PLAN :: 121 WEST BLEEKER SCALE : 1/4" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC-2.006 PROPOSED UPPER LEVEL HPC JANUARY 2021 FLOOR PLAN: 132 121 WEST BLEEKER E 1/2 LOT C, LOT D & W 1 2 LOT E - BLOCK 58 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINE10' FRONT YARD SETBACK5' SIDE YARD SETBACK 5' SIDE YARD SETBACK 5' REAR YARD SETBACK(GARAGE)10' HABITABLE REAR SETBACKREAR ALLEY (SOUTH) - PUBLIC ROW12 16 CEDAR SHINGLE ROOFING PROPOSED FLASH & WATERPROOF AS NECESSARY RIDGE RIDGE RIDGE RIDGE RIDGERIDGERIDGERIDGE12 16 12 16 12 16 12 1612 16 12 16 12 16 12 16 12 16 12 16 12 16 12 16 12 16 12 16 12 16 CEDAR SHINGLE ROOFING PROPOSED FLASH & WATERPROOF AS NECESSARY MASONRY CHIMNEY CUSTOM JACUZZI & RAISED PLATFORM AREA - 5'-0" x 5'-0" SPA FLAT ROOF STANDARD STONE BALLAST TOPPING PROPOSED SLOPE 2 MIN SLOPE 2 MIN SLOPE2 MINSLOPE2 MIN0 0 00NON-PERMEABLE DECK AREA : PROPOSED STONE DECKING SLOPE 2 MIN SLOPE 2 MIN SLOPE2 MINSLOPE2 MIN0 0 00SLOPE 2 MIN SLOPE 2 MIN SLOPE2 MINSLOPE2 MIN0 0 00SLOPE 2 MIN SLOPE 2 MIN SLOPE2 MINSLOPE2 MIN0 0 00ROOF DECK-MASTER U-214 T.O. F.F. Master Deck ELEV - 111'-11 1/2" (V.I.F.) T.O. Plwd. Mst. Deck / Garage ELEV - 111'-5" (V.I.F.) T.O. Plwd. Connector ELEV - 111'-10" (V.I.F.) FLAT ROOF WITH NEW RUBBER DRAINAGE MATT, STONE BALLAST & WATERPROOFING AS NECESSARY. FLASH & WATERPROOF ROOFING CONDITIONS AS REQUIRED.PV-134 PANEL PV ROOF SYSTEM SITUATED @ 45 DEGREES PV-2PV-18 PV-19 PV-20PV-3 PV-4PV-21PV-5PV-22 PV-23PV-6 PV-7PV-24 PV-25PV-8 PV-9PV-26PV-10PV-27 PV-28PV-11 PV-12PV-29 PV-30 PV-31PV-13 PV-14 PV-15PV-32PV-16PV-33 PV-34PV-17NON REFLECTIVE MATTE / PAINT LOCKED METAL ROOFING PROPOSED 12 1 PROPOSED RESTORATION OF (BELIEVED PER HISTORICAL IMAGERY & EXISTING CONDITIONS) ORIGINAL SOUTH FACADE ROOF MASSING + FORM FP CHIMNEY NON REFLECTIVE MATTE / PAINT LOCKED METAL ROOFING PROPOSED 12 12 12 12 FLAT ROOF WITH NEW RUBBER DRAINAGE MATT, STONE BALLAST & WATERPROOFING AS NECESSARY. FLASH & WATERPROOF ROOFING CONDITIONS AS REQUIRED. EAST SIDE YARD ALLEY - PUBLIC ROW ROOF PLAN NOTES LEGEND: ROOFING SLOPES: 1. FOR ROOFING MATERIALS AND NOTES SEE 'MATERIAL NOTES ON A-30 SERIES ELEVATION SHEETS. 2. ROOF SLOPES ARE SHOWN DIRECTLY ON ROOF PLAN. 3. ALL FLAT ROOFS AND BALCONIES SHALL SLOPE A MINIMUM OF 2% TOWARD DRAINS. 4. PROVIDE 3/4” PLYWOOD SHEATHING OVER 2x STRIPPING A 16” O.C. TO PROVIDE SLOPE TO DRAINS AT FLAT ROOF CONDITIONS. 5. WATER SHALL NOT BE ALLOWED TO PUDDLE OR POOL ON ANY PART OF THE ROOF. NO OBSTACLE SHALL IMPEDE THE FLOW OF WATER TO DESIGNATED DRAIN. 6. CRICKETS SHALL BE CONSTRUCTED WITH 3/4” CDX PLYWOOD AND SHALL BE PROTECTED AND FLASHED WITH METAL CRICKET SADDLES WITH LOCKED AND SOLDERED JOINTS. GUTTERS, DOWNSPOUTS AND ROOF DRAINS: 7. GUTTERS SHALL BE CONSTRUCTED 24 GA PAINTED STEEL WIT 5/8” EXPANSION JOINTS EVERY 30 FT (MAX) 8. GUTTERS SHALL SLOPE A MIN OF 1/8” TOWARD DOWNSPOUTS. 9. SEE ROOF PLAN AND ELEVATIONS FOR DOWNSPOUT LOCATIONS. 10. PROVIDE DOME WIRE BASKET AT EACH DOWNSPOUT/DRAIN LOCATION. 11. CONTRACTOR SHALL TEST ALL CONCEALED DOWNSPOUTS FOR LEAKAGE PRIOR TO CLOSE IN. CONTRACTOR SHALL PROVIDE A 10 YEAR WARRANTY AGAINST LEAKAGE. 12. ROOF DRAINAGE TO BE CONNECTED TO AN APPROVED CITY DRAINAGE DEVICE. ALL RAINWATER TO BE DIRECTED TO STREET OR APPROVED OUTLET. ATTIC VENTILATION AND ROOF VENTS: 13. VENTS AT FLAT ROOFS AND ROOF STACKS SHALL PROJECT ABOVE THE ROOF THE MINIMUM DISTANCE REQUIRED BY THE CODE AND SHALL BE LOCATED IN AREAS NOT VISIBLE FOR THE STREET. EXACT LOCATIONS TO BE COORDINATED WITH THE ARCHITECT PRIOR TO INSTALLATION. 14. ALL VENT AND ROOF STACKS TO HAVE RAIN PROTECTION CAPS. 15. PROVIDE WATERPROOFING, FLASHING AND COUNTER FLASHING AT ALL ROOF PENETRATIONS. ALL SEAMS AND JOINTS SHALL BE CAULKED AND SEALED. 16. COLOR OF EXPOSED ROOF VENTS AND STACKS SHALL MATCH THE COLOR OF THE ROOF TILES OR FINISHED ROOF MATERIAL. 17. ATTIC VENTILATION SHALL BE A MI. OF 1 /150 OF THE AREA TO BE VENTILATED AND SHALL HAVE A VAPOR RETARDER HAVING A TRANSMISSION RATE NOT EXCEEDING 1 PERM INSTALLED ON THE WARM SIDE OF THE INSULATION. 18. VENTILATION IS NOT REQUIRED IN AREAS WHERE ROOF INSULATION IS INSTALLED BETWEEN RAFTERS WITH NO AIR SPACE BETWEEN INSULATION AND ROOF SHEATHING. 19. VENTS SHALL BE CONSTRUCTED WITH 24 GA PAINTED METAL. LOUVERS AND 1/4x1/4x WIRE CLOTH SHALL CONFORM TO SMACNA GUIDE LINES. LOUVERS SHALL BE CONSTRUCTED TO DEFLECT DRIVEN RAIN. ROOF DRAINAGE (FLAT ROOF CONDITIONS (WHERE APPLICABLE): ALL ROOFS SHALL BE PROVIDED WITH ROOF DRAINS AND OVERFLOW DRAINS. DRAINS SHALL BE CONNECTED TO 4” LEADERS (GALVANIZED STEEL). SECONDARY OVERFLOW PIPING SHALL BE INDEPENDENT OF PRIMARY PIPING AND SHALL DISCHARGE IN A VISIBLE, CONSPICUOUS LOCATION, ABOVE GRADE. OVERFLOW DRAIN SHALL EXTEND 2” ABOVE THE ROOF. 4” SIZING OF PIPES (AT A 1/8”/FT ROOF SLOPE) WILL PROVIDE DRAINAGE FOR 2,900 SF OF ROOF AREA. STRAINERS SHALL BE PROVIDED. STRAINERS SHALL NOT EXTEND LESS THAN 4” ABOVE THE SURFACE OF THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN. TRUE NORTH 14.7 O 1 HPC-2.007 PROPOSED ROOF PLAN :: 121 WEST BLEEKER SCALE : 1/4" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC-2.007 PROPOSED HPC JANUARY 2021 ROOF PLAN: 133 134 1.RESTORE FRONT ENTRY (BLEEKER STREET) PORCH TO OPEN CONDITION PER HISTORICAL RECORD. RAILING AND ORNATE DETAILING, POSTS TO BE RESTORED / SIMPLIFIED TO ORIGINAL DETAILING CONDITIONS PER HISTORICAL IMAGING. REFER TO PROPOSED ELEVATIONS. 2. NON-HISTORIC WEST SIDE YARD PORCH & SECONDARY ENTRY / MUDROOM / TIE IN TO ENCLOSED BREEZEWAY / CONNECTOR TO BE REMOVED. WEST WALL HISTORIC WINDOW OPENINGS AND DORMER TO REMAIN AND BE RESTORED PER HISTORIC CONDITIONS. ALL NON-HOSTORIC DETAILING TO BE REMOVED ACCORDINGLY. 3. NON-HISTORIC 4/12 GABLE MASSING DIRECTLY ABUTTED TO THE SOUTH ELEVATION OF THE HISTORIC VICTORIAN TO BE REMOVED IN ITS ENTIRETY. PER HISTORICAL IMAGERY AND EXISTING IMAGING - DESIGN INTENT TO RE-ESTABLISH THE HISTORICAL 16/ 12 MASS AND FORM CONSISTENT WITH THE EXISTING HISTORICAL CONDITIONS "MIRRORED" E-W / N-S. DETAILING TO MATCH EXISTING HISTORICAL CONDITIONS. SOUTH WEST REAR CORNER OF VICTORIAN TO BE RE-ESTABLISHED PER PROPOSED ELEVATIONS AND PLANNING. 4. EAST ELEVATION MASSING DIRECTLY ABUTTED TO EXISTING VICTORIAN TO BE REMOVED. SOUTH EAST REAR ORIGINAL VICTORIAN CORNER TO BE RE-ESTABLISHED PER PROPOSED ELEVATIONS AND PLANNING. 5. EXISTING GARAGE AND SECONDARY 16/12 GABLE MASSING AREA OF THE EXISTING HOME TO BE REMOVED IN ITS ENTIRETY. PROPOSED NEW MASSING BRINGS ALL PROPOSED MASSING TO BE LEGALLY DEVELOPED WITHIN THE PROPERTY BOUNDARY. 6. PER HISTORICAL IMAGING, CHIMNEY HEIGHT + PROPORTION WAS LIKELY RECONSTRUCTED PER 1990'S ADDITIONS. PROPOSE TO RESTORE / RECONSTRUCT HISTORICAL VICTORIAN CHIMNEY TO MORE ACCURATE HISTORICAL DESIGN INTENT.EAST SIDE YARDPROPERTY LINE(SIDE ALLEY)WEST SIDE YARDPROPERTY LINE5' SIDE YARD SETBACK5' SIDE YARD SETBACK16 12 16 12 EAST SIDE YARDALLEY START25' R-6 Height Limit T.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) 7894 T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. F.F. Main Lvl. (Victorian) ELEV - 101'-5" (V.I.F.) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) 1/3 Height of 16/12 Historic Gable Roof ELEV - 119'-3 3/4" (V.I.F.) 1 4 12 8 12 2 3 3 3 5 5 4 12 HISTORIC RESTORATION KEY / DEMOLITION : AREAS SHADED TO BE REMOVED 6 5 3 4 EAST SIDE YARDALLEY STARTEAST SIDE YARDPROPERTY LINE(SIDE ALLEY)5' SIDE YARD SETBACK5' SIDE YARD SETBACKWEST SIDE YARDPROPERTY LINE7894 T.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) 25' R-6 Height Limit Historic Victorian + Associative Massing T.O. F.F. Main Lvl. (Victorian) ELEV - 101'-5" (V.I.F.) 5 5 5 5 5 2 2 12 9 12 1 HPC-3.001 EXISTING ELEVATION/ SECTIONS - NORTH ELEVATION (121 BLEEKER) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC-3.001 2 HPC-3.001 EXISTING ELEVATION/ SECTIONS - NORTH ELEVATION (INTERIOR : CONNECTOR / ADDITION) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" EXISTING HPC JANUARY 2021 ELEVATIONS 135 7894PROPERTY LINEEDGE OF CURB:BLEEKER STREET7894 7895.4 ALLEY ASPHALTREAR YARDPROPERTY LINE5' REAR YARDSETBACK (GARAGE)10' REAR YARD SETBACK(HABITABLE)10' FRONT YARDSETBACK7895 7896 7894 25' R-6 Height Limit T.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) CURB : BLEEKER STREET 16 12 16 121/3 Height of 16/12 Historic Gable Roof ELEV - 119'-3 3/4" (V.I.F.) T.O. F.F. Main Lvl. (Victorian) ELEV - 101'-5" (V.I.F.) 16 12 5 5 5 5 5 5 1 2 2 2 2 53 3 3 6 HISTORIC RESTORATION KEY / DEMOLITION : AREAS SHADED TO BE REMOVED 1. RESTORE FRONT ENTRY (BLEEKER STREET) PORCH TO OPEN CONDITION PER HISTORICAL RECORD. RAILING AND ORNATE DETAILING, POSTS TO BE RESTORED / SIMPLIFIED TO ORIGINAL DETAILING CONDITIONS PER HISTORICAL IMAGING. REFER TO PROPOSED ELEVATIONS. 2. NON-HISTORIC WEST SIDE YARD PORCH & SECONDARY ENTRY / MUDROOM / TIE IN TO ENCLOSED BREEZEWAY / CONNECTOR TO BE REMOVED. WEST WALL HISTORIC WINDOW OPENINGS AND DORMER TO REMAIN AND BE RESTORED PER HISTORIC CONDITIONS. ALL NON-HOSTORIC DETAILING TO BE REMOVED ACCORDINGLY. 3. NON-HISTORIC 4/12 GABLE MASSING DIRECTLY ABUTTED TO THE SOUTH ELEVATION OF THE HISTORIC VICTORIAN TO BE REMOVED IN ITS ENTIRETY. PER HISTORICAL IMAGERY AND EXISTING IMAGING - DESIGN INTENT TO RE-ESTABLISH THE HISTORICAL 16/ 12 MASS AND FORM CONSISTENT WITH THE EXISTING HISTORICAL CONDITIONS "MIRRORED" E-W / N-S. DETAILING TO MATCH EXISTING HISTORICAL CONDITIONS. SOUTH WEST REAR CORNER OF VICTORIAN TO BE RE-ESTABLISHED PER PROPOSED ELEVATIONS AND PLANNING. 4. EAST ELEVATION MASSING DIRECTLY ABUTTED TO EXISTING VICTORIAN TO BE REMOVED. SOUTH EAST REAR ORIGINAL VICTORIAN CORNER TO BE RE-ESTABLISHED PER PROPOSED ELEVATIONS AND PLANNING. 5. EXISTING GARAGE AND SECONDARY 16/12 GABLE MASSING AREA OF THE EXISTING HOME TO BE REMOVED IN ITS ENTIRETY. PROPOSED NEW MASSING BRINGS ALL PROPOSED MASSING TO BE LEGALLY DEVELOPED WITHIN THE PROPERTY BOUNDARY. 6. PER HISTORICAL IMAGING, CHIMNEY HEIGHT + PROPORTION WAS LIKELY RECONSTRUCTED PER 1990'S ADDITIONS. PROPOSE TO RESTORE / RECONSTRUCT HISTORICAL VICTORIAN CHIMNEY TO MORE ACCURATE HISTORICAL DESIGN INTENT.REAR YARDPROPERTY LINE5' REAR YARDSETBACK (GARAGE)10' REAR YARD SETBACK(HABITABLE)25' R-6 Height Limit 10' FRONT YARDSETBACKPROPERTY LINEEDGE OF CURB:BLEEKER STREETT.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) 7896 7895.4 ALLEY ASPHALT 7895 7894 78947894 T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) CURB : BLEEKER STREET 16 12 16 12 T.O. F.F. Main Lvl. (Victorian) ELEV - 101'-5" (V.I.F.) 16 12 16 12 16 12 6 5 35 5 5 5 3 3 44 4 1 1 1 HPC-3.002 EXISTING ELEVATION/ SECTIONS - WEST ELEVATION (NEIGHBORING) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC-3.002 2 HPC-3.002 EXISTING ELEVATION/ SECTIONS - EAST ELEVATION (SIDE ALLEY) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" EXISTING HPC JANUARY 2021 ELEVATIONS 136 WEST SIDE YARDPROPERTY LINE5' SIDE YARD SETBACK5' SIDE YARD SETBACKEAST SIDE YARDPROPERTY LINE(SIDE ALLEY)EAST SIDE YARDALLEY STARTT.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) 7894 25' R-6 Height Limit 1/3 Height of 16/12 Historic Gable Roof ELEV - 119'-3 3/4" (V.I.F.) HISTORIC RESTORATION KEY / DEMOLITION : AREAS SHADED TO BE REMOVED 1. RESTORE FRONT ENTRY (BLEEKER STREET) PORCH TO OPEN CONDITION PER HISTORICAL RECORD. RAILING AND ORNATE DETAILING, POSTS TO BE RESTORED / SIMPLIFIED TO ORIGINAL DETAILING CONDITIONS PER HISTORICAL IMAGING. REFER TO PROPOSED ELEVATIONS. 2. NON-HISTORIC WEST SIDE YARD PORCH & SECONDARY ENTRY / MUDROOM / TIE IN TO ENCLOSED BREEZEWAY / CONNECTOR TO BE REMOVED. WEST WALL HISTORIC WINDOW OPENINGS AND DORMER TO REMAIN AND BE RESTORED PER HISTORIC CONDITIONS. ALL NON-HOSTORIC DETAILING TO BE REMOVED ACCORDINGLY. 3. NON-HISTORIC 4/12 GABLE MASSING DIRECTLY ABUTTED TO THE SOUTH ELEVATION OF THE HISTORIC VICTORIAN TO BE REMOVED IN ITS ENTIRETY. PER HISTORICAL IMAGERY AND EXISTING IMAGING - DESIGN INTENT TO RE-ESTABLISH THE HISTORICAL 16/ 12 MASS AND FORM CONSISTENT WITH THE EXISTING HISTORICAL CONDITIONS "MIRRORED" E-W / N-S. DETAILING TO MATCH EXISTING HISTORICAL CONDITIONS. SOUTH WEST REAR CORNER OF VICTORIAN TO BE RE-ESTABLISHED PER PROPOSED ELEVATIONS AND PLANNING. 4. EAST ELEVATION MASSING DIRECTLY ABUTTED TO EXISTING VICTORIAN TO BE REMOVED. SOUTH EAST REAR ORIGINAL VICTORIAN CORNER TO BE RE-ESTABLISHED PER PROPOSED ELEVATIONS AND PLANNING. 5. EXISTING GARAGE AND SECONDARY 16/12 GABLE MASSING AREA OF THE EXISTING HOME TO BE REMOVED IN ITS ENTIRETY. PROPOSED NEW MASSING BRINGS ALL PROPOSED MASSING TO BE LEGALLY DEVELOPED WITHIN THE PROPERTY BOUNDARY. 6. PER HISTORICAL IMAGING, CHIMNEY HEIGHT + PROPORTION WAS LIKELY RECONSTRUCTED PER 1990'S ADDITIONS. PROPOSE TO RESTORE / RECONSTRUCT HISTORICAL VICTORIAN CHIMNEY TO MORE ACCURATE HISTORICAL DESIGN INTENT. 6 T.O. F.F. Main Lvl. (Victorian) ELEV - 101'-5" (V.I.F.) 5 3 5 3 5 3 3 5 2 5 2 2 4 4 4 4 4 5 16 12 16 12 4 12 4 12 8 12 Existing Massing Behind South Alley ElevationWEST SIDE YARDPROPERTY LINE5' SIDE YARD SETBACK25' R-6 Height Limit 5' SIDE YARD SETBACKEAST SIDE YARDPROPERTY LINE(SIDE ALLEY)EAST SIDE YARDALLEY START5 5 5 5 2 12 4 12 16 12 1 HPC-3.003 EXISTING ELEVATION/ SECTIONS - SOUTH ELEVATION (INTERIOR : HISTORIC VICTORIAN) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC-3.003 2 HPC-3.003 EXISTING ELEVATION/ SECTIONS - SOUTH ELEVATION (REAR ALLEY) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" EXISTING HPC JANUARY 2021 ELEVATIONS 137 EAST SIDE YARDPROPERTY LINE(SIDE ALLEY)WEST SIDE YARDPROPERTY LINE5' SIDE YARD SETBACK5' SIDE YARD SETBACK16 12 16 12 EAST SIDE YARDALLEY START25' R-6 Height Limit T.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. Plwd. Main Level (13" lower than existing floor)ELEV - 100'-0" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) T.O. Ceiling Lower (Subgrade) Level (Not Lower - TBD) ELEV - 96'-9 1/4" (V.I.F.) 7894 T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. F.F. Main Lvl. Entry (Victorian) ELEV - 101'-5" (V.I.F.) T.O. Conc. Lower Level ( TBD) ELEV - 86'-7 1/4" (V.I.F.) (TBD) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) T.O. Conc. Light Well (2'-6" above Proposed F.F.)ELEV - 89'-1 1/4" (V.I.F.) T.O. Conc. Grotto ( TBD) ELEV - 86'-3 1/4" (V.I.F.) (TBD) ACH 101'-5" = 7895.5 ELEV (V.I.F.)15' Maximum. Subgrade Line of F.F. 1/3 Height of 16/12 Historic Gable Roof ELEV - 119'-3 3/4" (V.I.F.)EAST SIDE YARDALLEY STARTEAST SIDE YARDPROPERTY LINE(SIDE ALLEY)5' SIDE YARD SETBACK5' SIDE YARD SETBACKWEST SIDE YARDPROPERTY LINE7894 T.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. Plwd. Main Level (13" lower than existing floor)ELEV - 100'-0" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. F.F. Main Lvl. Entry (Victorian) ELEV - 101'-5" (V.I.F.) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) 25' R-6 Height Limit T.O. Ceiling Lower (Subgrade) Level (Not Lower - TBD) ELEV - 96'-9 1/4" (V.I.F.) T.O. Conc. Lower Level ( TBD) ELEV - 86'-7 1/4" (V.I.F.) (TBD) T.O. Conc. Light Well (2'-6" above Proposed F.F.)ELEV - 89'-1 1/4" (V.I.F.) T.O. Conc. Grotto ( TBD) ELEV - 86'-3 1/4" (V.I.F.) (TBD) ACH 101'-5" = 7895.5 ELEV (V.I.F.)15' Maximum. Subgrade Line of F.F. Historic Victorian Massing 1 HPC-3.004 PROPOSED ELEVATION/ SECTIONS - NORTH ELEVATION (121 BLEEKER) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC-3.004 2 HPC-3.004 PROPOSED ELEVATION/ SECTIONS - NORTH ELEVATION (INTERIOR : CONNECTOR / ADDITION) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" PROPOSED HPC JANUARY 2021 ELEVATIONS 138 7894PROPERTY LINEEDGE OF CURB:BLEEKER STREET7894 7895.4 ALLEY ASPHALT REAR YARDPROPERTY LINE5' REAR YARDSETBACK (GARAGE)10' REAR YARD SETBACK(HABITABLE)10' FRONT YARDSETBACK7895 7896 7894 25' R-6 Height Limit 1/3 Height of 12/12 Gable Roof ELEV - 123'-9 1/4" (V.I.F.) G E 15' Maximum. Subgrade Line of F.F. 25' R-6 Height Limit T.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. Plwd. Main Level (13" lower than existing floor)ELEV - 100'-0" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) T.O. Ceiling Lower (Subgrade) Level (Not Lower - TBD) ELEV - 96'-9 1/4" (V.I.F.) T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. F.F. Main Lvl. Entry (Victorian) ELEV - 101'-5" (V.I.F.) T.O. Conc. Lower Level ( TBD) ELEV - 86'-7 1/4" (V.I.F.) (TBD) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) CURB : BLEEKER STREET T.O. Conc. Light Well (2'-6" above Proposed F.F.)ELEV - 89'-1 1/4" (V.I.F.) T.O. Plwd. Main Level ELEV - 100'-0" (V.I.F.) T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Ceiling Lower (Subgrade) Level (Not Lower - TBD) ELEV - 96'-9 1/4" (V.I.F.) T.O. Conc. Lower Level ELEV - 86'-7 1/4" (V.I.F.) (TBD) T.O. Conc. Light Well (2'-6" above Proposed F.F.)ELEV - 89'-1 1/4" (V.I.F.) T.O. Plwd. Garage Level ELEV - 101'-0" (V.I.F.) T.O. F.F. Garage Level ELEV - 101'-5" (V.I.F.) ELEV - 110'-5 1/4" (V.I.F.) T.O. Plate Main Level/ Garage (Not Lower - TBD) T.O. Plwd. Main Master Deck Over Garage ELEV - 111'-5 1/4" (V.I.F.) T.O. Plwd. Upper Level/ Master Suite ELEV - 111'-10" (V.I.F.) T.O. F.F. Upper/ Master Suite Level ELEV - 112'-1" (V.I.F.) T.O. Wood Master Deck Railing/ Wall ELEV - 115'-8" (V.I.F.) T.O. Plate / Spring Point 1/12 Shed Dormer (Low) ELEV - 120'-1" (V.I.F.) T.O. Plate Master Bed Alley Bump Up ELEV - 121'-2" (V.I.F.) ELEV - 129'-9 3/8" (V.I.F.) ELEV - 119'-7" (V.I.F.) T.O. Plate/ Spring Point Master Bed 12/12 Gable T.O. Ridge Height of 12/12 Gable Roof 16 12 16 12 12 12 12 1 ACH 101'-5" = 7895.5 ELEV (V.I.F.) 1/3 Height of 16/12 Historic Gable Roof ELEV - 119'-3 3/4" (V.I.F.)HC ELECTRICGASREAR YARDPROPERTY LINE5' REAR YARDSETBACK (GARAGE)10' REAR YARD SETBACK(HABITABLE)25' R-6 Height Limit 10' FRONT YARDSETBACKPROPERTY LINEEDGE OF CURB:BLEEKER STREETT.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. Plwd. Main Level (13" lower than existing floor)ELEV - 100'-0" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) T.O. Ceiling Lower (Subgrade) Level (Not Lower - TBD) ELEV - 96'-9 1/4" (V.I.F.) 7896 7895.4 ALLEY ASPHALT 7895 7894 78947894 15' Maximum. Subgrade Line of F.F. T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. F.F. Main Lvl. Entry (Victorian) ELEV - 101'-5" (V.I.F.) T.O. Conc. Lower Level ( TBD) ELEV - 86'-7 1/4" (V.I.F.) (TBD) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) CURB : BLEEKER STREET T.O. Conc. Light Well (2'-6" above Proposed F.F.)ELEV - 89'-1 1/4" (V.I.F.) 16 12 16 12 12 12 12 1 1/3 Height of 12/12 Gable Roof ELEV - 123'-9 1/4" (V.I.F.) T.O. Plwd. Main Level ELEV - 100'-0" (V.I.F.) T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Ceiling Lower (Subgrade) Level (Not Lower - TBD) ELEV - 96'-9 1/4" (V.I.F.) T.O. Conc. Lower Level ELEV - 86'-7 1/4" (V.I.F.) (TBD) T.O. Conc. Light Well (2'-6" above Proposed F.F.)ELEV - 89'-1 1/4" (V.I.F.) T.O. Plwd. Garage Level ELEV - 101'-0" (V.I.F.) T.O. F.F. Garage Level ELEV - 101'-5" (V.I.F.) ELEV - 110'-5 1/4" (V.I.F.) T.O. Plate Main Level/ Garage (Not Lower - TBD) T.O. Plwd. Main Master Deck Over Garage ELEV - 111'-5 1/4" (V.I.F.) T.O. Plwd. Upper Level/ Master Suite ELEV - 111'-10" (V.I.F.) T.O. F.F. Upper/ Master Suite Level ELEV - 112'-1" (V.I.F.) T.O. Wood Master Deck Railing/ Wall ELEV - 115'-8" (V.I.F.) T.O. Plate / Spring Point 1/12 Shed Dormer (Low) ELEV - 120'-1" (V.I.F.) T.O. Plate Master Bed Alley Bump Up ELEV - 121'-2" (V.I.F.) ELEV - 129'-9 3/8" (V.I.F.) ELEV - 119'-7" (V.I.F.) T.O. Plate/ Spring Point Master Bed 12/12 Gable T.O. Ridge Height of 12/12 Gable Roof T.O. Conc. Grotto ( TBD) ELEV - 86'-3 1/4" (V.I.F.) (TBD) ACH 101'-5" = 7895.5 ELEV (V.I.F.) 16 12 1 HPC-3.005 PROPOSED ELEVATION/ SECTIONS - WEST ELEVATION (NEIGHBORING) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC-3.005 2 HPC-3.005 PROPOSED ELEVATION/ SECTIONS - EAST ELEVATION (SIDE ALLEY) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" PROPOSED HPC JANUARY 2021 ELEVATIONS 139 WEST SIDE YARDPROPERTY LINE5' SIDE YARD SETBACK5' SIDE YARD SETBACKEAST SIDE YARDPROPERTY LINE(SIDE ALLEY)EAST SIDE YARDALLEY STARTT.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. Plwd. Main Level (13" lower than existing floor)ELEV - 100'-0" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) T.O. Ceiling Lower (Subgrade) Level (Not Lower - TBD) ELEV - 96'-9 1/4" (V.I.F.) T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. F.F. Main Lvl. Entry (Victorian) ELEV - 101'-5" (V.I.F.) T.O. Conc. Lower Level ( TBD) ELEV - 86'-7 1/4" (V.I.F.) (TBD) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) T.O. Conc. Light Well (2'-6" above Proposed F.F.)ELEV - 89'-1 1/4" (V.I.F.) T.O. Conc. Grotto ( TBD) ELEV - 86'-3 1/4" (V.I.F.) (TBD) ACH 101'-5" = 7895.5 ELEV (V.I.F.) 7894 25' R-6 Height Limit 15' Maximum. Subgrade Line of F.F. Proposed Massing Behind 1/3 Height of 16/12 Historic Gable Roof ELEV - 119'-3 3/4" (V.I.F.)WEST SIDE YARDPROPERTY LINE5' SIDE YARD SETBACKPV-1 34 PANEL PV ROOF SYSTEM SITUATED @ 45 DEGREES PV-2 PV-18 PV-19 PV-20 PV-3 PV-4 PV-21 PV-5 PV-22 PV-23 PV-6 PV-7 PV-24 PV-25 PV-8 PV-9 PV-26 PV-10 PV-27 PV-28 PV-11 PV-12 PV-29 PV-30 PV-31 PV-13 PV-14 PV-15 PV-32 PV-16 PV-33 PV-34 PV-17 T.O. Plwd. Upper (Hold Ex. Plwd. Ht.) ELEV - 111'-10" (V.I.F.) T.O. Plwd. Main Level (13" lower than existing floor)ELEV - 100'-0" (V.I.F.) T.O. F.F. Upper Level Victorian ELEV - 112'-1" (V.I.F.) T.O. F.F. Main Level ELEV - 100'-3" (V.I.F.) T.O. Plate Main Level (Not Lower - TBD) ELEV - 110'-5 1/4" (V.I.F.) T.O. 16/12 Ridge(Secondary) Cross Gable ELEV - 122'-11" (V.I.F.) T.O. F.F. Main Lvl. Entry (Victorian) ELEV - 101'-5" (V.I.F.) T.O. Masonry Chimney (TBD) ELEV - 135'-2 1/8" (V.I.F.) T.O. Upper Level 16/12 Spring Point ELEV - 113'-6" (V.I.F.) T.O. 16/12 N-S Ridge Primary Gable ELEV - 130'-10 1/8" (V.I.F.) T.O. 16/12 E-W Dormer Ridges ELEV - 125'-7 1/4" (V.I.F.) 25' R-6 Height Limit T.O. Ceiling Lower (Subgrade) Level (Not Lower - TBD) ELEV - 96'-9 1/4" (V.I.F.) T.O. Conc. Lower Level ( TBD) ELEV - 86'-7 1/4" (V.I.F.) (TBD) T.O. Conc. Light Well (2'-6" above Proposed F.F.)ELEV - 89'-1 1/4" (V.I.F.) T.O. Conc. Grotto ( TBD) ELEV - 86'-3 1/4" (V.I.F.) (TBD) ACH 101'-5" = 7895.5 ELEV (V.I.F.)15' Maximum. Subgrade Line of F.F. T.O. 16/12 E-W Dormer Spring Points ELEV - 121'-5" (V.I.F.)5' SIDE YARD SETBACKEAST SIDE YARDPROPERTY LINE(SIDE ALLEY)EAST SIDE YARDALLEY START1 HPC-3.006 PROPOSED ELEVATION/ SECTIONS - SOUTH ELEVATION (INTERIOR : HISTORIC VICTORIAN) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" ISSUANCE SEAL DRAWING NO: DRAWING TITLE: PROJECT # SCALE DATE 121- BLEEKER 01 HPC / CONCEPTUAL c 1 FRIDAY DESIGN, LLC 2020121 WEST BLEEKERRESIDENCE"TANGLED UP IN BLUE"121 West Bleeker Street, Aspen, CO 81611Owners: 121 W Bleeker LLC 121 West Bleeker Street Aspen, CO 81611 SURVEY ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com PROJECT DESIGNER / CITY REPRESENTATIVE 1 Friday Design PO BOX 7928 Aspen, Colorado 81612 T: 970.309.0695 www.1friday.com STRUCTURAL ENGINEER James Jackson Romeo, P.E. Structural Design Consultant, LLC 3901 Mountain Drive #11 Glenwood Springs, CO 81601 T: 970.945.4742 www.jjrstructural.com d e r e k m s k a l k o GENERAL CONTRACTOR Kaegebein Fine Homebuilding PO BOX 1570 Carbondale, Colorado 81623 T: 970.510.5797 www.kfhomebuilding.com CIVIL ENGINEER Boundaries Unlimited Inc. 923 Cooper Avenue, Suite 201 Glenwood Springs, CO 81601 T: 970.945.5252 www.bu-inc.com OWNERSHIP HPC-3.006 2 HPC-3.006 PROPOSED ELEVATION/ SECTIONS - SOUTH ELEVATION (REAR ALLEY) :: 121 WEST BLEEKER SCALE : 3/16" = 1'-0" PROPOSED HPC JANUARY 2021 ELEVATIONS 140