Loading...
HomeMy WebLinkAboutMaster Permit.215 S Monarch St.0041-2020-BCOM (3) 215 S. Monarch St. ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET ITYOFASPEN FOR PLAN REVIEW QUESTIONS Mark Janian •" • . •- • • Name Phone E-mail FOR INSPECTION QUESTIONS Name Mark Janian Phone970-618-2977 E-mail OWNER Name 215 Monarch. LLC Phone713-202-1300 Cell Phone713-202-1300 Mailing 188 Meadowood Dr. Aspen CO 81611 Address City State ZIP E-mail john@enco.re Address OWNER'S AUTHORIZED AGENT Name Phone Cell Phone Mailing Address City State ZIP E-mail Address APPLICATION BEST CONTACT Name Mark Janian Phone Cell Phone •-� Mailing 188 Meadowood Dr. Aspen CO 81611 Address City State ZIP E-mail mark@b2aspen.com Address ARCHITECT OR DESIGNER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address CIVIL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address GENERAL CONTRACTOR Name V ar anon Phone Cell Phone • • Mailing Address City State ZIP E-mail mark@b2aspen.com Address INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. Contractor (I4 Date 7/30/2020 Signature ❑ Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/kiuiIding affi ay i . (CITY USE ONLY) Owner builder approved by: Date: Affidavit on file ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO/81611j BUILDING DEPARTMENT 215 S. Monarch St. ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM CITY OF ASPEN • All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. 215 S. Monarch St. 103C&D ADDRESS UNIT# PARCEL ID# I, the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. ® This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. 7/30/2020 Owner Signature Date Owner Printed Name John Ford OR Owner's Attorney Signature Date Owner's Attorney Printed Name 2,0 ( CITY OF ASPEN January2018 130 S. GALENA ST I ASPEN, CO/81611j BUILDING DEPARTMENT 215 S. Monarch St. ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ,,'►►. SCOPE OF WORK CHECKLIST CITY OFASPEN • LAND USE QUESTIONS If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your permit application. Does your permit involve any of the following? ElPart of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District ❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high non-unit space water mark ❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure ❑ Work involves exterior of structure Changes to elevator or stair configuration ElChanging the number of residential units Changes to the use of existing structure or space ❑ Changes to number or location of onsite parking ADDITIONAL SCOPE OF WORK QUESTIONS Does your permit involve any of the following? ❑ Exterior lighting added or changed ❑ Work involves exterior wall penetrations ElWork involves roof penetrations El Work involves digging or excavation Work adds, removes, or changes ❑ Work involves restaurant or food service plumbing fixtures ElDisturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys 12 months ❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines ❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries dripline of a tree • RECEIVE 08( CITY OF ASPE NAugust 2017 130 S. GALENA ST I ASPEN, CO/81611j t l BUILDING DEPARTMENT ADDRESS: 215 S. Monarch St. PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ;�11�,� 4► ,0►► ASBESTOS VERIFICATION AND CHECKLIST CITY OFASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks, or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ElYes❑ No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑■ Yes❑ No Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. John Ford 970-618-2977 Owner Phone # John Ford 970-618-2977 Applicant (print name) Phone # Applicant Signature904 Date 7/30/2020 Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you havelquestioris•-' " about asbestos, interpreting your test results, or other matters. ( CITY OF ASPEN August2017 os/17 c 130 S. GALENA ST ASPEN, CO 8,161611� PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC CITY OF ASPEN • BUILDING CODE INFORMATION ❑ 2015 IRC ❑ 2015 IBC 0 2015 IEBC 0 Other (Please Explain) Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted and Amended) Fire Sprinkler System I Existing? 0No I Required? ONeo, I Type 0 NFPA 13 ❑ NFPA 13 R ❑ NFPA 13 D Type Of Construction ❑ VA 0 VB❑ IV 0 IIIA ■❑ IIIB ❑ IIA ❑ IIB 0 IA 0 IB Fire Alarms Installed ❑ Yes No Required Special Inspections ❑ High-Strength Bolting 0 Epoxy Anchors ❑ Structual Steel Welding ❑ Permanent Micropiles 0 Sprayed Fire-Resistants ❑ Other Energy Code Compliance I] Prescriptive Table ❑ Other ❑ RESCheck UA Alternative ❑ COMCheck UA Alternative Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool (Existing + New) Building Type/ I ❑ A ❑■ B ❑ F ❑ E ❑ R_ I ❑ One Family ❑ Two Family Occupancy Group g ❑ B (A<50) ❑ H_ ❑M ❑ S_ R C ❑ I ❑ U C ❑ Townhouse UNIT DESCRIPTION AS PROPOSED Gross Area of Building: 240 Gross Area of Unit: 240 ADU BUILDING DESCRIPTION Occupant Load: Is there an ADU? ❑ Yes III No # Stories Above Grade 1 # Stories Below Grade # Living Rooms Attached Garage Detached Garage Carport # Kitchens Parking Spaces U Parking Spaces U Parking Spaces 0 # Full Baths # Bedrooms 0 # Full Baths 0 Deck Area 0 # 3/4 Baths # 3/4 Baths 0 # 1/2 Baths 0 # Bed Baths # Bedrooms # Kitchens 0 #Wood Fireplaces 0 #Other Rooms (List) # Gas Appliances 0 # Gas Logs° BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement Main Level Office space 2nd Floor 3rd Floor Additional Reviewed By: Date:7/30/2020 I ( CITY OF ASPEN January 2018 130 S. GALENA ST I ASPEN, CO�816112) J 215 S. Monarch St. ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ,,''►►. VALUATION AFFIDAVIT CITY OF ASPEN • AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application,the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that this document is a public document. Owner Signature: ( "dt 1 Date:7/30/2020 Owner Printed Name: John Ford or, Authorized Agent Signature: Date: Authorized Agent Printed Name: RECEIVE 08/ 2,0 ( CITY OF ASPEN January2019 130 S. GALENA ST I ASPEN, CO 81611j t l BUILDING DEPARTMENT ADDRESS: 215 S. Monarch St. PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT 11�,� ZONING COMPLIANCE VERIFICATION POLICY CITY OFASPEN • Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed ur Additional roof plans showing location of measurements may be necessary. ( CITY OF ASPEN August2017 os/17 c 130 S. GALENA ST ASPEN, CO 8,161611� PERMIT NUMBER: ADDRESS: 215 S. Monarch St. COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY CITY OFASPEN • 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: Mark Janian I (contractor name) understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: 7/30/20 Date: REDE1V } 48/17/20 0 ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 81611 t l BUILDING DEPARTMENT