HomeMy WebLinkAboutMaster Permit.100 Dean St.0092-2022-BCHO (4) 1
DATE: 1/17/2021 MASTER PERMIT: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT N
BUILDING PERMIT APPLICATION 1,0../p4
CITY OF ASPEN
PROPERTY INFORMATION
ADDRESS 100 E DEAN ST UNIT#3B PARCEL ID# 273513115016
LOT BLOCK TRACT
OR SUBDIVISION
OWNER NAME MIMI RUDERMAN CELL 303-981-8148 EMAIL mimiruderman@gmail.com
BEST CONTACT MARC CELL JACOPS EMAIL marc@thunderbowlarchitects.com
NAME
PROJECT DETAILS (READ DEFINITIONS BELOW) COMPLETED IN ITS ENTIRETY
DESCRIPTION OF DUE TO FLOOD IN THE UNIT INTERIOR REMODEL OF EXISTING BATHROOMS AND KITCHEN.UPDATE PLUMBING FIXTURES AND
WORK IN DETAIL LIGHTING.
PROJECT $25,000 Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION
❑ Commerical ❑ New 2 Toilets,Bidets Major Engineering Review
SQ FT OF ❑■ Multi-Family ❑ Addition Bathtub •Projects involving less than 50%
BUILDING
GEA 162 El Single Family 0 Alteration 2 Lavatory(Wash Basin) hardscape area and work affecting
WORK AR
0 Mixed-Use ❑■ Repair Shower 75%or greater of unit sq ft
i Kitchen Sink(+Disposal) •Projects involving greater than
UNIT SQ FT 922 0 ❑■ IFFR Dishwasher 50%hardscape area and work
LOT SIZE NA ❑ Tenant Finish Laundry Bar,Utility Sink affecting 50%or greater of unit
(SQ FT) Will there be ❑ Demolition Clothes Washer sq ft
SQ FT OF SOIL 0 any roof/wall 0 Change Order =Floor Sink •Projects involving 1,000+sq ft of
DISTURBANCE penetrations? ❑ Floor Drain soil disturbance area
❑ Yes Water Heater(Pan Req)
NEW SQ FT 0 ❑■ No #Gas Outlets Water Efficient Landscaping
Water Treatment •Projects that trigger a major
BUILDING NA _Other engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
or construction authorized is not commenced within
HARDSCAPE 0 180 days,or if construction or work is suspended or alterations affecting 50%or more
AREA abandoned for a period of 180 days at any time after of exisiting gross square footage
ZONE L work is commenced.
DISTRICT
Project Valuation:Cost of project as defined in Valuation Affadavit.
2 Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
O Unit Sq Ft:Gross square footage,not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance:Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved
LT
Building Footprint:Grade floor square footage of the permitted structure. PC
CI Hardscape Area:Square footage of impervious lot surface.
Zone District:Underlying zone district of permitted parcel. Zoning
HPC
Building
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire
Building Building Parks Impact Engineering
Review Permit Fee CMP
Engineering Zoning School Lands Water
Review Review(50%) Dedication Stormwater
Zoning o CMP(50%) TDM Impact Sanitation
Review(50%)
Energy Code REMP Pedestrian Env. Health
Review Payment Amenity ' Parks
CMP(50%) GIS Housing Cash in Lieu Landscape
City Use Efficiency
Parks Review Water Tap
Tax Approved 1! tr 4_,-, t
County Use To Issue `I a ' ` ' a "
Utility Review Tax Sanitation
Issuance
( CITY OF ASPEN January L►1/1161
130 S. GALENA ST ASPEN, CO 81611
ADDRESS: 100 E Dean St, Unit 3B PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
FOR PLAN REVIEW QUESTIONS
Name MARC JACOPS Phone • •• E-mail marc • Un•er•Oil • •
FOR INSPECTION QUESTIONS
Name ANDREW BURLINGAME Phone E-mail rr A • S
OWNER
. -
Name Phone Cell Phone
Mailing 100 E DEAN ST. UNIT 3B ASPEN CO 81611
Address City State ZIP
E-mail Address mimiruderman@gmail.com
OWNER'S AUTHORIZED AGENT
Name MARC JACOPS Phone -• •• Cell Phone
Mailing 4612 S ZENOBIA ST DENVER CO 80236
Address City State ZIP
E-mail Address marc@thunderbowlarchitects.com
APPLICATION BEST CONTACT
Name MARC JACOPS Phone -• •• Cell Phone
Mailing 4612 S ZENOBIA ST DENVER CO 80236
Address City State ZIP
E-mail Address marc@thunderbowlarchitects.com
ARCHITECT OR DESIGNER OF RECORD
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
CIVIL ENGINEER OF RECORD
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
STRUCTUAL ENGINEER OF RECORD
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
GENERAL CONTRACTOR
David Mansor, Burlin game Construction
Name 9 Phone Cell Phone
Mailing 210 AABC, Suite MM ityAspen StateCO ZIP81611
E-mail Address david@bcaspen.com
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances
governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate
or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the
approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes.
Additionally,I understand that I am responsible for ensuring that all sub-permits associated with my project are submitted to the City in compliance
with the approved Master plan set.I understand that the City does not review sub-permits for compliance with the master plan set
Contractor \ Date 1/1.7/2022
Signature
� Check if you are a tested o ner builder(single-family homes only).You must take a test and complete the owne I
(CITY USE ONLY) Owner builder approved by: Date: Affidavit on file
( CITY OF ASPEN October 2020 0 l/19
130 S. GALENA ST I ASPEN, CO 8,161611�
ADDRESS: 100 E Dean St, Unit 3B PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
ADDRESS 100 E DEAN ST UNIT#3B PARCEL ID# 273513115016
I, the property owner, certify as follows: (pick one)
❑ This property is not subject to a homeowners association or other form of private covenant.
▪ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Digitally signed by MIMI RUDERMAN
"°-US,
1 /17/2022
E=mart@thunderbowlard,itects.com.
MIMI RUDERMAN
CN=MIMI RUDERMAN Owner Signature Date:2022.01.14 08 23 40 07'00' Date
Owner Printed Name MIMI RUDERMAN
OR
Owner's Attorney Signature Date
Owner's Attorney Printed Name
( CITY OF ASPEN January2018 130 S. GALENA ST I ASPEN, CO/81611j
iir- %Or J
BUILDING DEPARTMENT
ADDRESS: 100 E Dean St, Unit 3B PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFIDAVIT
CITY OFASPEN
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuation is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand o;ha 9tth,15„ I,q apent is a public document.
DN:C=US,
MIMI RUDERMAN E=marc@hondebowlarchitects.com i/i �/n Of�/�
CN=MIMI RUDERMAN I I G LL
Owner Signature: Dats:2 22.�,.,6, :,6:26- Date:
Owner Printed Name: MIMI RUDERMAN
or,
Authorized Agent Signature: Date:
Authorized Agent Printed Name:
RECEIVE
( CITY OF ASPEN January2019 130 S. GALENA ST I ASPEN, CO/81611j
%Or 41
BUILDING DEPARTMENT
ADDRESS: 1ooE Dean St,Unit 3B PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT i14011
ASBESTOS VERIFICATION AND CHECKLIST
CITY°FAWN
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days,
weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future,long after the renovation activity occurred.The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban
on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
[ Yes❑No
Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes❑No
Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean. This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
I hereby certify that the above information is true and complete.
Owner MIMI RUDERMAN Phone #303-619-5993
Applicant (print name) MIMI RUDERMAN Phone#970-925-2391
D gitally cgned by MIMI RUDERMAN MIMI RUDERMAN DN=MM i ItEzr tcA underbowlarchitects.com, 1 /1 7/2022
Applicant Signature Date
Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you have'questioris
about asbestos, interpreting your test results, or other matters.
of/i9
130 S. GALENA ST I ASPEN, CO 81611j( CITY OF ASPENp.„"gZo1�
ADDRESS: 100 E DEAN ST UNIT 3B _ PERMIT NUMBER:
•
COMMUNITY DEVELOPMENT DEPARTMENT iio�
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN!
Applicability: All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed mea5,ur m p :£; `;�;
Additional roof plans showing location of measurements may be necessary. r 1
( CITY OF ASPEN August2017 O1/19. GALENA ST I ASPEN, CO 8161611�130 S.
1
PERMIT NUMBER: ADDRESS: 100 E DEAN ST UNIT 3B
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY u
_I7 or ASPEN
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
David Mansor
I (contractor name) understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoning limitations.
Contractor Signature:
1/12/22
Date:
RECEIVE
01/19/20
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 81611j
.-- %Or 41
BUILDING DEPARTMENT