Loading...
HomeMy WebLinkAboutMaster Permit.100 Dean St.0092-2022-BCHO (9) SCOPE OF WORK NARRATIVE 100 E DEAN ST UNIT 3B Due to a flood that happened this summer, during exterior renovations to the building, the owners of unit 3B have been faced with a repair-renovation. The flood destroyed the ceiling drywall, lighting, flooring, and various cabinetry. The owners would like to renovate the unit leaving all plumbing fixtures in their original locations other than the primary shower will be extended roughly 1' to allow for a larger shower and the existing laundry machines will be relocated. RECEIVED 01/19/2022 ASPEN BUILDING DEPARTMENT