Loading...
HomeMy WebLinkAboutLOC.100 Dean St.0092-2022-BCHO (2) ► 410 , 1 ► CITY OF ASPEN 427 Rio Grande Place, Aspen, CO 81611 (970) 920.5090 www.aspen.gov NOTICE OF EXEMPTION AND AUTHORIZATION TO APPLY FOR LAND USE/BUILDING PERMITS DURING THE EFFECTIVE TERM OF ORDINANCE#27, SERIES OF 2021 Property Address: 100 E DEAN ST UNIT 3B Parcel ID Number: 273513115016 Property Owner: MIMI RUDERMAN Representative/email: MARC JACOPS marc©thunderbowlarchitects.com Scope of Work (Provide narrative here and a separate pdf which is a succinct and clear set of supporting documents, to be attached to this form as Exhibit A, such as Letters of Completeness, Resolutions, Development Orders, Land Use Case numbers, Building Permit numbers etc. If the representation being made is that the work does not involve dimensional changes prohibited by the moratorium provide existing and proposed calculations, floor Plans and and elevations to be attached: DUE TO FLOOD IN THE UNIT INTERIOR REMODEL OF EXISTING BATHROOMS AND KITCHEN.UPDATE PLUMBING FIXTURES AND LIGHTING. Due to the circumstances noted below, the above referenced project as defined by the Scope of Work is exempt from the application of Ordinance #27, Series of 2021, and is authorized to pursue a land use review and/or building permit review during the effective term of Ordinance #27, Series of 2021, an ordinance which generally places a moratorium on residential development. This authorization does not guarantee issuance of a building permit or approval of any land use application. The applicant must submit complete information and pursue all authorized approvals in a timely fashion, adhering to all deadlines for submission, terms of Vested Rights, response times required to maintain an active building permit, and all other Land Use Code and Building Code requirements in effect as of December 8, 2021. Any amendments and or additional approvals not addressed or identified in the application, may be subject to Ordinance #27, Series of 2021. The project described above is permitted to proceed with land use review because (check all that apply): ❑ A land use application for a Development Order or Notice of Approval was submitted to the Community Development Department prior to final passage of the ordinance on December 8, 2021, and was subsequently deemed to be complete by the Community Development Department Director. ❑ The land use application is seeking a Development Order or Notice of Approval for a project consisting of 100°/0 Affordable Housing as that term is defined at §26.104.100 of the Aspen Municipal Code, or as may be deemed necessary for the issuance of Certificates of Affordable Housing for a 100% Affordable Housing project, or as determined by the Community Development Director. ❑ The land use application involves Voluntary AspenModern designation processes that meet the requirements of Section 26.415.025.0 and 26.415.030. ❑ The land use application or administrative request may be necessary to issue exempt building permits as described below, and as determined by the Community Development Director. The project described above is permitted to submit for building permit review because (check all that apply): ❑ A building permit application was submitted to the Community Development Department prior to final passage of the ordinance on December 8, 2021, and was subsequently deemed to be complete by the Chief Building Official. ❑ It is a building permit for a project that will not increase the gross square footage of development, Net leasable area, or Net livable area of any building and does not meet the definition of demolition. o It is a building permit for a project that will not increase the Height of any building. This includes additions to or replacement of mechanical equipment or energy efficiency systems pursuant to height exemptions as set forth at §26.575.020 of the Aspen Municipal Code, or as determined by the Community Development Director. ❑ It is a building permit for commercial and lodge development as stand-alone uses on a parcel or property. ❑ The project has received or is eligible to receive a Development Order or Notice of Approval on the effective date of this ordinance. ❑ It is a building permit for 100% affordable housing projects as that term is defined at §26.104.100 of the Aspen Municipal Code. ❑ It is a building permit for demolition or repair of non-habitable structures. Issued on February 11 20 22 , this certificate is valid through the effective date of Ordinance #27, Series of 2021, or any Ordinance which supersedes a provision of Ordinance #27, Series of 2021 in a manner which is relevant to the Scope of Work. A copy of this certificate is required when applying for any land use review or building permit. This Notice is not a Development Order or Administrative Determination that is subject to appeal. 47.. Planning Director, for Phillip Supino Community Development Director Disclaimer: This exemption is given based on the information provided by the applicant. If changes are made, or the scope,after a more detailed review, is found to be subject to Ordinance 27, 2021, the exemption may be revoked. Exhibit A: Floor plans and elevations representing scope of work Amy Simon From: Marc Jacops <marc@thunderbowlarchitects.com> Sent: Wednesday, February 9, 2022 9:28 AM To: Amy Simon Subject: RE: 100 E Dean Unit 3B Attachments: 90.ARCHITECTURAL PLANS.2022.01.17.pdf Good Morning Amy, I have attached the Permit set for the project. I did not do a complete floor area sheet as this was a rush to get in and the floor area will definitely not change. On the Cover Page I have indicated the proposed and existing floor area at 922 sq ft. The overall scope of the project is to repair and update the existing unit due to a roof leak which led to a flood in the unit. We will be replacing the flooring, replacing the drywall on the ceiling, updating the lighting, updating the kitchen-one-for-one with respect to plumbing and appliances. Updating the bathrooms. We will be relocating an existing ductless washer/dryer unit into a newly constructed niche next to the new boiler. Please let me know if you need anything else. Thank you MARC JACOPS THUNDERBOWL I ARCHITECTS (a)300 Spring Street,Suite 201 Aspen,CO 81611 (c)303.619.5993 (e)marcthunderbowlarchitects.com (w)thunderbowlarchitects.com ABOUT THIS E-MAIL:The information transmitted is intended only for the person or entity to which it is addressed and may contain confidential material.Any review, retransmission,dissemination or other use of this information by persons or entities other than the intended recipient is prohibited.If you received this in error,please contact the sender and delete the material from any computer. Please consider the environment before printing this e-mail From:Amy Simon <amy.simon@aspen.gov> Sent: Monday, February 7, 2022 4:50 PM To: marc@thunderbowlarchitects.com Subject: 100 E Dean Unit 3B Hi Marc-sorry for the delay on reviewing your request to proceed with a building permit on this remodel during the residential development moratorium. Do you have drawings labeled with the scope of work? I would like to see a more clear description of the project before determining if it is exempt. Please clarify if there are any exterior changes or expansion to the unit size (which would not be ok right now) proposed. Thank you. You can email the info directly back to me. ildid0/11 4dirigF AO? CITY OF ASPEN CITY OF ASPEN Amy Sin on (he/her/hem) P kinn izg D iector IC om m unity D evebpm ent (3 ):970 429 2758 C):970 30 9 9353 1 SCOPE OF WORK NARRATIVE 100 E DEAN ST UNIT 3B Due to a flood that happened this summer, during exterior renovations to the building, the owners of unit 3B have been faced with a repair-renovation. The flood destroyed the ceiling drywall, lighting, flooring, and various cabinetry. The owners would like to renovate the unit leaving all plumbing fixtures in their original locations other than the primary shower will be extended roughly 1' to allow for a larger shower and the existing laundry machines will be relocated. 7 GENERAL NOTES SHEET INDEX 1. The work included under this contract consists of all labor,materials,transportation,tools and equipment necessary for the SHEET TITLE DATES ISSUED construction of the project leaving all work ready for use. 2. The construction documents are the properly of Thunderbowl Architects Inc and its Consultants and are to be used as instruments of service for construction of This project only.Use for any other purpose,without authorization,is not allowed. 'I- ke> 3. The plans indicate the general extent of new construction necessary for the work,but are not intended to be all-inclusive. G-000 COVER SHEET ■ All demolition and all new work necessary to allow for a finished job in accordance with the intention of the drawing is Z-002 PRE AREA RAN ■ included regardless of whether shown on the drawings or mentioned in the notes. 100 E I:) EST 11.J I T 3 B Z-003 NET LEASABLE RAN ■ 4. Any errors,omissions or conflicts found Sr the various parts of the construction documents shall be brought to the attention A-100% EXISTING ML ROOR RAN ■ of the Architect and the Owner for clarification before proceeding wlth the work. A-110X EXISTING ML RCP ■ A.100 PROPOSED ML ROOR PLAN ■ 5. The General Contractor shall maintain a current and complete set of the construction documents on the job site during all A.101 PROPOSED RNISH RAN ■ phases of construction for use of all the trades and shall provide all the subcontractors with current and complete Aspen Colorado A.110 PROPOSED ML RCP ■ construction documents as required including specifications and architectural supplementary instructions. A. The General Contractor shall verify and assume responsibility for all dimensions and site conditions.The General Contractor shall inspect the existing premises and take note of existing conditions prior to submitting prices.No claim shell be allowed for difficulties encountered which could have reasonably been inferred from such an examination. 7. Written dimensions fake precedence.Do not scale drawings. P E R M I T S E T 8. See SYMBOLS area of this sheet for dimension standards. 9. All dimensions noted'verify'and'hV.LF..are to be checked by Contractor prior to construction.Immediately report any variances to the Architect for resolution,then coordinate resolufwn w/all work of all trades. 10. Coordinate all work with existing conditions,including but not limited to:irrigation pipes,electrical conduit,water lines,gas 1 / 1 7 / 2 022 lines,drainage lines,etc.Nosily Architect immediately of any conflicts. 11. Provide adequate temporary support as necessary to assure the structural value or integrity of the building. 12. Protect all existing building and site conditions to remain,including walls,cabinets,finishes,trees and shrubs,paving,etc. 13. Details shown are typical.Similar details apply in similar conditions. 14. Verify all architectural details with structural,civil,landscape and design/build drawings before ordering or installation of any work 15. All changes in floor materials occur at centerline of door or framed opening unless otherwise indicated on the drawings. 16. Install all fixtures,equipment and materials per manufacturer's recommendations. ABBREVIATIONS 17. Verify clearances for flues,vents,chases,soffits,fixtures,etc before any construction,ordering of,or installation of any & And CONC. Concrete F.B. Rat Bar HDW. Hardware MISC. Miscellaneous REG. Register T. Tread items of work. < Angle COND. Condition F.D. Floor Drain HDWD. Hardwood MID. Mounted REINF Reinforced T.B. Towel Bar Q At CONN. Connection F.E. Pre Extinguisher HGR. Hanger MUL. Mullion REQ. Required T.C. Top of Curb 18. Sealant,caulking and flashing,eta locations shown on drawings are not intended to be inclusive.Follow manufacturer's CONSTR. Construction Cabinet HGT. Height RESIL. Resilient TEL. Telephone NCO installation recommendations and standard industry and building practices. 0 Diameter or Round CONT. Continuous FH.M.S. Rat Head Machine H.M. Hollow Metal INI New RET. Retaining TEMP. Tampered m 19. The General Contractor shall remove all rubbish and waste materials of all subcontracts and trades an a regular basis, # Pound or Number CONTR. Contractor Srew HORIZ. Horizontal N. Nord REV. Revision/Revised/Reversed T.&G. Tongue&Groove Cr)CLOS. Closet FH.W.S. Rat Head Wood Screw HR. Hour N.I.C. Not in Contract RM. Room TER. Terrazzo O and shall exercise a strict control over job cleaning to prevent any direct debris or dust from affecting,in any way,finished Air Conditioning or C.T. Ceramic Gin RN. Fnish H.R. Handrail NO.or# Number REMOV. Removable THK. Thick areas in or outside job site. A.C. Asphaltic Concrete CIR. Center PXT. Arturo H.W.H. Hot Water Heater NOM. Nominal R.O. Rough Opening T.M.E. To Match Existing O I f) ACOUS. Acoustical C.W. Cold Water PR. Floor N.T.S. Not to kale MD. Redwood T.O.C. Top of Concrete 20. Contractor shall leave premises and all affected areas clean and orderly,ready for occupancy.This includes cleaning of all A.D.D Area Drain RASH. Hashing .D. nside Diameter toy. Top of Pate glass(inside and outside)and frames,both new and existing. ADJ. Adjustable DEL Double RUOR. Puorescent N. nth O.A. Overall S. South T.O.FLY Top of Plywood o ii- ADJAC. Adjacent DET. Detail P.O.C. Face of Concrete NSUL. nsulation O.C. On Center S. South T.O.W. Top of Wall E1. Any survey monuments within the area of construction shall be preserved or reset bye registered civil engineer ore AGGR. Aggregate D.F. DrinkingFountain EO.F. Face of finish NT. nterior 0.D. Outside Diameter Dim. S.A.F.F Self-Adhesive Pexible lashing TYP. Typical Q M licensed land surveyor. lternat (Dim.) g ypica Y ALL Alternate DIA. Diameter E0.Ply Face of Plywood NTER. ntermediate OPNG. Opening S.C.D. See Civil Drawings D _, (- ALUM. Aluminum DIM. Dimension FO.S. Face of Stud OP. Opposite S.D. Storm Drain, U.B.C. Uniform Building Code 22. Verify all finish materials with the Architect and the Owner prior to installation.On site mock-ups of building assemblies, APPROX. Approximate DISP. Dispenser F.P.R.F. Pre root AN. anitor Soap Dispenser/Dish UNEXC. Unexcavated O V) finish assemblies, t and/or stain samples,etc.maybe required for I. r hiteut a p p ` pain p q approval. ARCH. Architectural DN. Down R<. Fame B unction Box PERIM. Perimeter $GHED. Schedule DNF. Unfinished M ASPH. Asphalt DR. Door FT. Foot or Feet ST. Joist R. Rate SECT. Section U.O.N. Unless Otherwise Noted I- J 23. Contractor to coordinate uMitles shown on architectural drawings with electrical,plumbing,mechanical,and any other D.W. Dishwasher FIG. Footing T. Joint P.LAM. Plastic Laminate S.E.D. See Electrical Drawings consultant drawings.Contractor to coordinate all the trades. BD. Board DWG. Drawing RJRR. Furring PAS. Plaster SEP. Separation VAR. Varies Cr) O 24. Structural observation shall 6e required bythe Engineer for structural conformance to the approvedplans. BITUM. Bituminous DWR. Drawer RJT. Future KIT. Kitchen RYWD. Plywood S.H. Sprinkler Head V.C.T. Vinyl Composition Tile Cal q gpprove BLDG. Building PNL Panel SHT Sheet YEN. Veneer BLK. Black EA. Each G. Gas Outlet LAM. Laminate PIT. Paint SHTG. Sheathing VERT. Vertical 7 �/ 25. H is the General Contractors responsibility to obtain inspections and special inspections as necessary. BLKG. Blacking (E) Existing GA. Gauge LAY. Lavatory P.5.1. Per Square Inds SIM. Similar VEST. Vestibule L 26. All construction to de a waterproof,weather tight building. should flash and caulk as necessary to achieve 8M. Beam E.LES. Exterior Insulation& GALY Galvanised LB. Pound PT. Paint SL. Sliding V.G.D.F. Vertical Grain Douglas Fr Q ` provide p g gY B.O. Bottom of Fnish System G.D. Garbage Disposal LIN. Linear P.T. Pressure Treated S.C.D. See Civil Drawings V.I.F. Verify in field 0 this requirement. BOT Bottom E.1. Expansion Joint GEN. General LT. Light Post Tensioned S.G.D. See Garage Drawings VOL. Volume LU Z B.P. Building Paper EL Elevator G.F.I. Ground Fault PID. Painted S.L.D. See Landscape Drawings - BTWN. Between ELEC. Electrical Interrupt P.T.D. Paper Towel Dispenser S.LT.D. See Lighting Drawings W. West 0 L LI EMER. Emergency GL. Glass MACH. Machine PIN. Partition S.M.D. See Mechanical Drawings W/ With C.B. Catch Basin ENCL. Enclosure GND. Ground MAINT. Maintain P.T.R. Paper Towel Receptacle S.P.D. See Plumbing Drawings W.C. Wall Covering CEM. Cement E.O.S. Edge of Slab GR. Grade MAT. Material SPEC. Specification or Special WD. Wood LL.I Cl) LW CER. Ceramic E.P.B. Electrical Panel Board G.S.M. Galvanized Sheet MAX. Maximum Q.T. Quarry Tile SILL Square W.H. Water Heater CI Control Joint EQ. Equal Metal M.B. Machine Bolt S.S. Stainless Steel W/O Without Q U CLG. Ceiling EQUIP. Equipment GYP. Gypsum M.C. Medicine Cabinet R. Riser S.S.D. See Structural Drawing W.P. Work Point or CLKG. Caulking EXIST. Existing M.D.O. Medium Density R.A. Return Air STD. Standard Waterproofing O r CLR. Clear EXP. Expansion H.B. Hose Bibb Overlay RAD. Radius ST1. Steel W.P.M. Waterproof Membrane O C.M.U. Concrete Masonry EXT. Exterior H.C. Hollow Core or MECH. Mechanical STOR. Storage WSCT. Wainscot Q Unit Handicapped MEMB. Membrane REC. Recessed STRL. Structural W$.P. Wet Standpipe o CNTR. Counter HD. Head MR. Metal REF. Reference S.V. Sheet Vinyl WT. Weight C.O. Clean-Out F.A. fire Alarm HDBD. Hardboard MFR. Manufacturer RER. Reflected S.W. Shear Wall WR. Water Resistant COL. Column F.A.U. Forced Air Unit HDR. Header MIN. Minimum REPR. Refrigerator SYM. Symmetrical WAN. Welded Wire SYS. System VICINITY PLAN SYMBOLS PROJECT STATISTICS PROJECT DIRECTORY DATE 01/17/2022 PERMIT SET 1 PROJECT ADDRESS: 100E DEAN ST,ASPEN CO 81611 OWNER/REPRESENTATIVE SITE Mimi Ruderman Tel:(303)981.8148 100 E DEAN ST UNIT 30 4 2 INTERIOR ELEVADON NUMBERS w HOSE BIBB PARCEL ID: 2 7 3 513115 016 CONTACT Mimi Ruderman Email:mimiruderman@eeeibwm ASPEN,CO 81611 SHEET NUMBER 100E DEAN ST UNIT 3B JUNCTION BOX Aspen,CO 81611 3 ARE SPRINKLER SYSTEM INSTALLED: NO CONTRACTOR • 0 BUILDING SECDON NUMBER APPLICABLE CODES Burlingame Construction Tel 19701 925 2391 yam= '1-'r Lf' FINISH MATERIAL 2015 BC 1lntemol anal Building Cadet Chapters 110 CONTACT Andrew Burlingame Email andrew@bcaspen.com tr. s YF � a �'. � t+ -.a< � SHEET NUMBER !'/ 2015 IBC appendixes: 210 Aspen Airport Business Center suite MM aid �1 �f -� -l+ COLOR Manufactured homes,F.Radon,l Existing Bu ld ngz 8 Structures OPtio Covers K Sound Transmission. Asp CO 81611 2015 IPC(lnternaM1onal Plumb ng Code) © MECHANICAL DESIGN ,x -1*--,:,.._ ay �C DETAIL NUMBER 2015 IMC Rntemofional Meehan wl Codeh A y! ^ a � "• r SHEET NUMBER �� REVISION 2015 IFGC 1lmernat oval Fuel Gas Coda) Nauman Air ie119701625.4352 `COVER SHEET t::-$ .r' 'x �a�t1R CONTACT.Sarah Roper Emol sar@mountainair.biz�. t 2015 IECC(International Energy Conservation Code1•Prescriptive Path J. -Eyr,•ssT e.,, i i QFn,�: 2015 IFC(International Are Cadet 601 W End 3t 8B a 1 - Rifle,CO 81650 2017 NEC(National Electrical Code) .+�., 4111F4 -. • �, ©r ENLARGED DETAIL NUMBER 1 P ,•.F.. v ,,` ®�J +n'-n• j CEILING HEIGHT A.FF , � 1 SHEET NUMBER SCALE �� , v f 14 DOOR SYMBOL nuom of s oruxsox TO ORIDLINE, ZONING: L 3/16'-I'-0 PROJECT �EP cue A i ice: r ,i y{ '" 3'' TO FRAMING TICK LEADER DENOTES DIMENSION FA.R. 922 p 1t EXISTING.922zq H PROPOSED.(N0 CHANGE) 21DD1.DD V .rr - S` y.�..� v r,.+s�Ylp OA WINDOW SYMBOL ili _ ..: PERMITTED USE: Residential dr SAL~ h• '1 c R a" IA PARDRON TYPE �/' oruNsaNronxsx SETBACKS: NA o "g9Jy s ��I ( ARROW TYPE: Type V-Nonrated ` W y ,; • S 4 (N)/(E)CONSTRUCTION ` {' �� "w � ' DIMENSIONING KEY OVERALL PROJECT HEIGHT AND AREA: Maximum HeightN/A-Area N/A ■ INCLUDED IN THIS SET c cs vnn EXCEPT PROJECT SUMMARY: DUE TO ROOD IN THE UNIT INTERIOR REMODEL OF 0 0 0 ,�. IMPAIR. EXISTING BARROOMS AND KITCHEN.UPDATE PLUMBING ❑ NOT INCLUDED IN THIS SET _ O FIXTURES AND LIGHTING. g ® DELETED FROM SET E L LI 7 7 FIRE AREA LEGEND eFIRE AREA 56'-7 1/4' / / EXISTING RRE AREA UNIT 3B 922.05 sq.N. TOTAL NET LEASABLE 922.05 sq.ft. O \ u PROPOSED RRE AREA ____ UNIT 38 922.05 sq.N. "\ 2, TOTAL NET LEASABLE 922.05 aq.ft. i\\ I/ I //ll ,— — y V U 0 n UNIT 3B PROPOSED FIRE AREA \ r 1 ■■ I ,III 922.05 5Q.FT. �al r 1 — I "I J L _,, , __,,, L I ----, O a .p cc, M O 1_ O in UNIT 3B PROPOSED Z o r M e FIRE AREA PLAN D w .- 1/4"=1'0" In O I— J N O N Z U O O Q 56' 1/4'/ / w -7 Q W C LJJ N w I I Q U O C r 114 <07 ---c: , ,H___I; EXISTING RRE AREA I A UNIT 36 922.05 SQ.Ff. r I __ 01/17/2022 PERMIT SET I—] I --, I I J1 , , 517, 1 1 1 O i - - - - - Z-002 FIRE AREA PLAN SCALE I/4'=1'-0" I I e---\ 21001.00 Z_ UNIT 3B EXISTING \ i g FIRE AREA PLAN �" O 1/4"_Y-0" I 0 1 2 4 Scale:3/8"=1'-0" L- 7 7 NET LEASABLE LEGEND 0 NET LEASABLE AREA 56'-7 1/4' / / EXISTING NET LEASABLE AREA UNIT 3B 922.05 sq.N. TOTAL NET LEASABLE 922.05 sq.ft. O \ u PROPOSED NET LEASABLE AREA ____ UNIT 38 922.05 sq.N. "A. 2, TOTAL NET LEASABLE 922.05 sq.ft. likkihh.: 1 / \ I/ I //ll U— — y V U 0(1UNIT 3B PROPOSED NET \ 'r 1 ■■ I ,IIILEASABLE AREA h�pl -- 922.05 SQ.Ff. r 1 — L , , , ‘,___, 1 1 O a .p cc, M O 1_ O in UNIT 3B PROPOSED Z in co © NET LEASABLE PLAN D w in�g 1/4"=1'0" O I— J N O N Z U O O Q 56'-71/4' w — / / Q W CL J LV N Lu I I < U O cC X- 0 _ -- HI AL ' 1 T I , --11. ; UNIT 3B EXISTING NET I LEASABLE AREA 922.05 SQ.FT. r I __ 01/17/2022 PERMIT SET J1 , , 517\. 1 1 1 O I - - - - - NET LEASABLE PLAN WALE 1/4'=1'-0" mogcT I I /� 21001.00 Z UNIT 3B EXISTING 1 NET LEASABLE PLAN Z-003 1/4"=1'0" 0 Scale:3/8"=1'-0"4 1 2 Z-003 L- 7 7 7 FLOOR PLAN GENERAL NOTES I. ALL WALLS WITH SHEAR PLYWOOD SHALL HAVE A CONTINUOUS RUSH KNISH.R1RR WALLS OR CONTINUE PLYWOOD TO MAINTAIN TINE REQUIRED RUSH KNISH. 2.OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE RUSH. 3. PROVIDE BLOCKING FOR ALL ARTWORK,TOWEL BARS AND TISSUE HOLDERS,TYP. 4.PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FUTURES,UNDER AND AROUND IUB AND SHOWER ENCLOSURES TO A HEIGHT OF 70"MIN.ABOVE THE DRAIN INLET.,OR APPROVED BACKER BOARD UNDER TILE. ....., � �� 5.KNISH MATERIALS FOR ALL BATHS,SHOWERS,WALLS AT SHOWER ENCLOSURES SHALL 1 ^ HAVE A SMOOTH,HARD,NON-ABSORBANT SURFACE SUCH Al 11LES/CERAMIC TILES, \ / \ 2 PORTLANT CEMENT OR EQ. V V 56'-7 1/4" / / SEE A0.00 FOR LEGEND NOT HOWN HERE.SYMBOLS 55'-5' / A 16'-41/2' 5'-01/2' 4'-11" 27'-10 3/4" (E)CONST.TO BE REMOVED / // // / / 14.-4 1/2" 2'-a' 2'-61/2" 2.-1 1/4' to'-z" a'-4" 6'-8 3/4" 2'-8• EXISTING CONSTRUCTION -/ t // // / SHOWER WALL TO , / / / / / BE RELOCATED \A I OR NEW CONSTRUCTION WASHER/DRYER TO - T11B TO BE / BE RELOCATED REMOVED __ NEW MASONRY WALL rI- \ H _ y BaR-BBa 1 HOUR RATED CONST. O %cll E Is i -, �I o — FP 1 -RR- 2 HOUR RATED CONST. 1307 I I BED 1 1302 I �� CO 306 I DINING FIREPLACE TO \ M BATH 1 a HOT H2O TO BE IS��CI REMAIN.SURROUND 1305 I I RELOCATED .z..z� TO BE UPDATED. RADIATOR/RUNTAL I' 1 I O Lf) TO BE REPLACED TH 2 a I303 I C*-j`I - �� �- ��� J Z In -i N KITCHEN L J N QM ? II KITCHEN TO BE UPDATED.FIXTURE f _1 ii LOCATION TO REMAIN. 1301 I 0 Ln BATHROOM TO 304 BATHROOM TO ELECTRIC PANEL TO BE REPLACE LIVING J CI) 11,3 BE UPDATED I I BE UPDATED AND RELOCATED \7. _____ \� N O \ HALL CV L BOILER TO BE REPLACED.LOCATION U RADIATOR/RUNTAL I TO REMAIN. RADIATOR/RUNTAL 300 Z TO BE REPLACED I 6- L 1308 I r \ - C TO BE REPLACED ENTRY L7.7W W Q 44 BED 2 P- 0 o CLOSET \ V N W V) W i Q U \CB) ^ \ - - - - - - O Q 13'-0• 1'-111/2• 1'-8 1/4" 3'-11/2• 19'-51/4" 2'-111/4' 1.11/ // / / // // // / 15'-4 1/4" 15'-11" 25'-0 1/2" / / // / 60'-10" DATE 01/17/2022 PERMIT SET EXISTING ML FLOOR PLAN SCALE 3/8•=1'-0" PROJECT % 21001.00 c Z I UNIT 3B O 1 EXISTING FLOOR PLAN "_ naoox 3/8"=1'0" I Z OScale:3/8"=1'-0"4 A-�OOX i E L LI 7 O REFLECTED CEILING PLAN GENERAL NOTES I. ALL DIMENSIONS ARE TO FACE OF RN.,CENTER OF FIXTURE/REGISTER UNLESS NOTED OTHERWISE. 2. VERIFY IN FIELD ALL EXISTING DIMENSIONS. 3. LIGHT FIXTURES SHOWN ON THIS FLAN ARE FOR REFERENCE ONLY.SEE LIGHTING DRAWINGS FOR TYPE,LOCATION,AND CIRCUITING. 4 ALSO SEE INTERIOR ELEVATIONS FOR LOCATION OF SCONCES,TYP. ^ 5. PAINT ALL RECESSED CAN TRIMS/MECHANICAL GRILLES THE COLOR OF THE CEILING IN / WHICH THEY APPEAR. 1 / \ 2 6. COORDINATE KXTURE LAYOUT WITH ALL EXISTING AND PROPOSED STRUCTURE. V V 56'-7 1/4"/ / SEE LEGEND SYMBOLS NOTE SHOWN HERE. 1 © SEE LIGHTING DRAWINGS FOR ALL LIGHT SYMBOLS ® AIR OUTLET,VERIFY WITH MECH.SUB. Z AIR INTAKE,VERIFY WITH MECH.SUB. A DSD CEILING MOUNTED SMOKE DETECTOR I 7- UNDER CABINET LIGHTING SP SPEAKER,VERIFY AV REQUIREMENTS WITH OWNER H- W _ v� - o- +B'-0 CEILING/SOFFIT HEIGHT SYMBOL r-c i �� ;—o — FP B.D. c(i ___,__-1 )11 I C.O. 1307 II CO l 302 I m BED 1 CIF F I .II z ' ++:� DINING 0 O M O 306 I 1305 II _ O O $4.O" BATH 1 jH2jj *- I- GI �0� L II 1303 I u rX - _ l Q M ) Q KITCHEN \ 8-0 r I < 8'-0" 1301 I 0 Q J LIVING M 8'-O„ O O I HALL I O RAT ~ J N N f L� — O O O U 1308 I I �� • ENTRY300 Z 0 Q _ BED 2 � 0 ❑ I W Z _ S.D. Q W C.O. I— H I CLOSET — 0 LU N W Q U 0 fY B 7 _ 0_ DATE 01/17/2022 PERMIT SET EXISTING ML RCP SCALE PROJECT O- 21001.00 e Z' UNIT 3B EXISTING RCP A-11OX 3/8"=1'-0" a OScale:3/8"=V-0"4 A 1 1 1 1 O X i E O O 7 7 FLOOR PLAN GENERAL NOTES I. ALL WALLS WITH SHEAR PLYWOOD SHALL HAVE A CONTINUOUS RUSH KNISH.R1RR WALLS OR CONTINUE PLYWOOD TO MAINTAIN THE REQUIRED RUSH KNISH. 2.OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE RUSH. 3. PROVIDE BLOCKING FOR ALL ARTWORK,TOWEL BARS AND TISSUE HOLDERS,TYP. 4.PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FUTURES,UNDER AND AROUND 1GB AND SHOWER ENCLOSURES TO A HEIGHT OF 70"MIN.ABOVE THE DRAIN INLET.,OR APPROVED BACKER BOARD UNDER TILE. .....„/"� �� 5.KNISH MATERIALS FOR ALL BATHS,SHOWERS,WALLS AT SHOWER ENCLOSURES SHALL 1 ^ HAVE A SMOOTH,HARD,NON-ABSORBANT SURFACE SUCH Al TILES/CERAMIC TILES, \ / \ 2 PORTLANT CEMENT OR EQ. V V 56'-7 1/4" / / SEE A0.00 FOR LEGEND NOT HOWN HERE.SYMBOLS 55'-5" / A 16'-41/2' 5.-0 1/2' 4'-11' 27.-10 3/4" (E)CONST.TO BE REMOVED / // X/ / / 14.-4 1/2" 2'-0" 3'-6 1/2" 1'-1 1/4' 9'-51/2' 9'-A 1/2" 6'-8 3/4" 2'-8• EXISTING CONSTRUCTION / // // / e / / / / K A\) ` \ \ OR NEW CONSTRUCTION UPDATED UPDATED SHOWER SHOWER NEW SINK AND FAUCET NEW MASONRY WALL H- H \ \ E>_E�EE>_ 1 HOUR RATED CONST. O V DW FP u� 2 HOUR RATED CONST. VALANCE TAIN/ 307 r \ 1 ,___A ± NEW DW BED 1 _x r` inI I I 1303 I 1302 I m NO 1306 I _ Cil I I I KITCHEN / \ -0QDINING — \BATH 1 1�I RRERACE TO REMAIN. M 0 1305 I LI-- NEW UC _ UPDATE SURROUND 4 BATH 2 MICROWAVE NEW COOK TOP W/ I— O In U/C OVEN NEW RADIATOR/ NEW ILET 1,4 � J - Z ;I- N RUNTAL l (--.).11 N Mr? r I NEW VANITY/ NEW VANITY/ NEW 1301 I - FIXTURE NEW TOILET FIXTURE REFRIGERATOR/ LIVING O 0,)1.0 1304 I FREEZER NEW ELECTRIC PANEL I— .J N \ HALL // LOCATION \ Cl) CV % NEW CURTAIN/ U NEW RADIATOR/ I. it VALANCE RUNTAL I • 1 300 I Z �\ W/D ENTRY Q 1308 I r � � W Z BED 2 PULL OUT PANTRY. ,. --- 0 LJJ - H KNISH TO MATCH ll \ RUSH PANEL DOOR 0- J KITCHEN CABINETS CLOSET TO MATCH DRYWALL N L1J \ O RUSH PANEL DOOR EXISTING WASHER/ KNISH.PUSH LATCH NEW RADIATOR/ LJJ NEW CURTAIN/ TO MATCH DRYWALL DRYER IN NEW OPENING RUNTAL Q () VALANCE flNISH.PUSH LATCH I LOCATION 0 W ` _ OPENING 0 CB) \ \ 1 I NEW BOILER/HOT Q H2O 0- 13'-0' 1'-111/2' 1'-8 3/16' 3'-1 1/2' 3'-10' 15.-7 1/4" 2'-11 1/4' j // / // 15.-4 1/4" 15'-11" 25'-0 1/2" / / / 60'-10' / i I DATE 01/17/2022 PERMIT SET PROPOSED ML FLOOR PLAN SCALE 3/8'=1'-0" PROJECT 21001.00 c Z' UNIT 3B ° PROPOSED FLOOR PLAN A-100 3/8"=1'0" 1— 1 a OScale:3/8"=1'-0"4 A 1 l00 i E L_ 7 7 FLOOR PLAN GENERAL NOTES I. ALL WALLS WITH SHEAR PLYWOOD SHALL HAVE A CONTINUOUS RUSH KNISH.R1RR WALLS OR CONTINUE PLYWOOD TO MAINTAIN THE REQUIRED RUSH KNISH. 2.ONSET STUDS WHERE REQUIRED SO THAT KNISH WALL SURFACES WILL BE RUSH. 3. PROVIDE BLOCKING FOR ALL ARTWORK,TOWEL BARS AND ISSUE HOLDERS,TYP. d.PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FUTURES,UNDER AND AROUND TUB AND SHOWER ENCLOSURES TO A HEIGHT OF 70"MIN.ABOVE THE DRAIN INLET.,OR APPROVED BACKER BOARD UNDER TILE. ....., � �� 5.KNISH MATERIALS FOR ALL BATHS,SHOWERS WALLS AT SHOWER ENCLOSURES SHALL 1 ^ HAVE A SMOOTH,HARD,NON.ABSORBANT SURFACE SUCH Al TILES/CERAMIC TILES, \ / \ 2 PORTLANT CEMENT OR EQ. V V 56'-7 1/4" / / SEE A0.00 FOR LEGEND NOT HOWN HERE.SYMBOLS (E)CONST.TO BE REMOVED EXISTING CONSTRUCTION OR NEW CONSTRUCTION A - - - - - - - imm �V~v; .- NEW MASONRY WALL ■ ■ ��1 _ra +EE_EE_ 1 HOUR RATED CONST. ., /.7. ,._ r , ` ;�■� irm I,I —_/` 2 HOUR RATED CONST. 1 307 I BED 1 �_..It'�I 7���_�_� r - I _`or / �O LI a ■ ■ ■ ■ c It■1j1','1,111II IRM==W . I 1302 I ��I CO I. .,1.1 ii[oPMJIiI III___/( m I_:lI(u'"" . 0 1 1k1 b T�' ■ O. II '. U U —_ DINING �1 M WOOD�11111�111�'1�111�� I1WI �._.MA L _ , _ail] MW ` , �� = Ln Alia 1! 111111/ 111 �I _. , i_ O I�■1■1■11, 16 1?�.. a �i■� o n ���• � ID II�_J�I .I���. ■ III DW ■Ill!• z CO ■.�7T�I Q M li•� ��.._ I ILIA...■, -T- �II� I i f ■ sa =_ Ln O ■IiRL• I— _1M N O L , � 7 N 300 Z V 1 W/D I ENTRY Q 308 I BED 2 . 1 W Z p �7a 0- MI Mari �� Lu N LJJ _ Q U B ' o a 0_ DATE 01/17/2022 PERMIT SET PROPOSED FINISH PLAN 3/8'=IA" PROJECT % 21001.00 c e Z' UNIT 3B i 0 PROPOSED FINISH PLAN \, A-101 3/8"=1'0" 1— I a O Scale:3/8"=1'-0"4 A 10 1 i E L_ 7 REFLECTED CEILING PLAN GENERAL NOTES I. ALL DIMENSIONS ARE TO FACE OF RN.,CENTER OF FIXTURE/REGISTER UNLESS NOTED OTHERWISE. 2. VERIFY IN FIELD ALL EXISTING DIMENSIONS. 3. LIGHT FIXTURES SHOWN ON THIS FLAN ARE FOR REFERENCE ONLY.SEE LIGHTING DRAWINGS FOR TYPE,LOCATION,AND CIRCUITING. 4. ALSO SEE INTERIOR ELEVATIONS FOR LOCATION OF SCONCES,TYP. ^ 5. PAINT ALL RECESSED CAN TRIMS/MECHANICAL GRILLES THE COLOR OF THE CEILING IN / WHICH THEY APPEAR. 1 / \ 2 6. COORDINATE SUTURE LAYOUT WITH ALL EXISTING AND PROPOSED STRUCTURE. V V 56'-7 1/4"/ / SEE LEGEND SYMBOLS NOTE SHOWN HERE. © SEE LIGHTING DRAWINGS FOR ALL LIGHT SYMBOLS ® AIR OUTLET,VERIFY WITH MECH.SUB. AIR INTAKE,VERIFY WITH MECH.SUB. A OSD CEILING MOUNTED SMOKE DETECTOR El SPEAKER,VERIFY AV REQUIREMENTS WITH OWNER W — — vD >T</ +8'-0 CEILING/SOFFIT HEIGHT SYMBOL 0 ro., ((. - 7 — - FP M''1 t - C- ><---, o 1302 I _- El IZa i - DINING r l-- 1 .o Q m ill F 3 F �❑� I I �y U + M < In BATHTH 1 1 L I_-—J 1303 I /11 LJ ❑ CD 1305 8r-On BATH 2 KITCHEN J I— O io CE ) I n Z v M � _ Ej II 111 \ O,-OII D o 0 ce r Q 1 301 I O Lc) JLIVING LJ ❑a I304 I \ 84_On 0 I— J \ 8'-0" HALL RAT NN. 11 O N n o o Z U ❑o 1300 I ` L1308 I I I ENTRY Q �ED \�.i I W Z .D. 0 W .o. � H CLOSET 0 0 w V) W Q U 0 w B7 - o Q 0_ FLOOR-CEILING SYSTEMS.WOOD FRAMED GA FILE NO.FC 5509 I PROPRIETARY' 1 HOUR 1 DATE FIRE 01/17/2022 PERMIT SET WOOD JOISTS,GLASS MAT GYPSUM SUBSTRATE One layer u:propnelsry Type X glass mat gypsum substrate applied at night angles to 2 X I _ _ 10 wood tomes 46"o.c with 6d coated nails,I Ns fora,0 0915'shank,1f.heads.6'a.d Ill Wood MOSS supporting 1'nominal wood subfioar and I'nominal wood horse Root,of 14well1 Wu"plywood finished floor w long edges T8G end 'mte plywood nor plyod Wail exterior (Eue subnoa w11 perpendicular lu Joists h Pads staggered. 1� PROPRIETARY GYPSUM PANEL PRODUCTS Corlarnined Gypsum Inc N(i GlasRacg••Sheathing Typo X Gypsum Panels Apptoo Coding Georgia Pacific Gypsum LLC - he DensGFas.E FireguardT Sheathing Weight 2-5 psf Tempin-Iraend - be GreenGEass Type X Fee Tost' UL R36601015167, OINK21103.2d-02; PROPOSED ML UL 136937,076407391. RCP 9.1946. UL Dodge L501 SCALE 3/8'=I'-0" PROJECT % 21001.00 '0 Z' UNIT 3B UNIT 3B \ / ° 2 PROPOSED CEILING ASSEMBLY 1 PROPOSED RCP __ " A ° NTS A-110 3/8"=1'-0" I I O Scale:3/8"=1'-0"4 A 110 i E I—