HomeMy WebLinkAboutMaster Permit.215 S Monarch St.0041-2020-BCOM (7) irifl COMcheck Software Version COMcheckWeb
Envelope Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: 215 S Monarch St #103CandD
Location: Aspen, Colorado
Climate Zone: 7
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
215 S Monarch St#103C&D John Ford Brandon Manka
Aspen, Colorado 81611 215 Monarch, LLC Powerhouse Engineering Partners
713-202-1300 970-315-2035
john@enco.re brandon@powerhouseep.com
Building Area Floor Area
1-Private Office(Office) : Nonresidential 250
Envelope Assemblies
Envelope TBD: No envelope assemblies specified
RFC Elfn
Project Title: 215 S Monarch St#103CandD Report te: 11/ V
Data filename: 1ar/1dlf20720
ASPEN
BUILDING DEPARTMENT
COMcheck Software Version COMcheckWeb
ril Interior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC t�eill
Project Title: 215 S Monarch St #103CandD C12/°7/2°2°J
1 FORCOUtaliMANCE
bonniem
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
215 S Monarch St#103C&D John Ford Brandon Manka
Aspen, Colorado 81611 215 Monarch, LLC Powerhouse Engineering Partners
713-202-1300 970-315-2035
john@enco.re brandon@powerhouseep.com
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed
(ft2) Watts /ft2 Watts
1-Common Space Types:Office- Enclosed 250 1.11 278
Total Allowed Watts = 278
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
Common Space Types: Office - Enclosed (250 sq.ft.)
LED: LED PAR 11W: 1 9 11 99
Total Proposed Watts = 99
Interior Lighting PASSES
Interior Lighting Compliance
Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any
applicable mandatory requirements listed in the Inspection Checklist. /�—
Rrd annn Manka- lesigner `/ "�� 11/16/2020
Name-Title Signature Date
Project Title: 215 S Monarch St#103CandD Re�o t�'at `: / YFD
Data filename: 1 Bate/1,2/g0720
ASPENSL
BUILDING DEPARTMENT
COMcheck Software Version COMcheckWeb
rit Exterior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: 215 S Monarch St #103CandD
Project Type: Alteration
Exterior Lighting Zone 0 (Unspecified)
Construction Site: Owner/Agent: Designer/Contractor:
215 S Monarch St#103C&D John Ford Brandon Manka
Aspen, Colorado 81611 215 Monarch, LLC Powerhouse Engineering Partners
713-202-1300 970-315-2035
john@enco.re brandon@powerhouseep.com
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Tradable Allowed Watts
Watts / Wattage (B X C)
Total Tradable Watts (a) = 0
Total Allowed Watts = 0
Total Allowed Supplemental Watts (b) = 500
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable
areas/surfaces.
Proposed Exterior Lighting Power
Exterior Lighting TBD: Exterior lighting zone not specified (see project screen)
Project Title: 215 S Monarch St#103CandD Re�o t�'at `: / YFD
Data filename: 1 Bate/1,3/g0720
ASPENSL
BUILDING DEPARTMENT
COMcheck Software Version COMcheckWeb
rit Mechanical Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: 215 S Monarch St #103CandD
Location: Aspen, Colorado
Climate Zone: 7
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
215 S Monarch St#103C&D John Ford Brandon Manka
Aspen, Colorado 81611 215 Monarch, LLC Powerhouse Engineering Partners
713-202-1300 970-315-2035
john@enco.re brandon@powerhouseep.com
Mechanical Systems List
Quantity System Type & Description
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name-Title Signature Date
Project Title: 215 S Monarch St#103CandD Re o at6: 11/!YFI)
Data filename: 1 Bate/1 d/qf„072 O
ASPEN
BUILDING DEPARTMENT
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 2015 IECC
ril
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans, specifications, and/or EComplies Requirement will be met.
[PR4]1 calculations provide all information Does Not
with which compliance can be
determined for the interior lighting ❑Not Observable
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts,transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 215 S Monarch St#103CandD Re o the 9Yol'a�
Data filename: 1 Bate/1,5/qf,�072 O
ASPENSL
BUILDING DEPARTMENT
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID 1 ,
C405.2.1 I Lighting controls installed to uniformly ❑Complies Requirement will be met.
[EL15]1 I reduce the lighting load by at least ❑Does Not
50%. [Not Observable
I ENot Applicable
C405.2.1 ;Occupancy sensors installed in ❑Complies Requirement will be met.
[EL18]1 I required spaces. ❑Does Not
[Not Observable I
ENot Applicable
C405.2.1, Independent lighting controls installed I❑Complies Requirement will be met.
C405.2.2. per approved lighting plans and all 11=1Does Not
3 manual controls readily accessible and III
Not Observable
[EL23]2 visible to occupants.
ENot Applicable
C405.2.2. Automatic controls to shut off all ;❑Complies Requirement will be met.
1 i building lighting installed in all ❑Does Not
[EL22]2 ;buildings. ❑Not Observable
I ❑Not Applicable
01 .3 Daylight zones provided with ❑Complies Exception: Lighting required to have specific application
individual controls that control the ❑Does Not controls.
lights independent of general area
lighting. ❑Not Observable
❑Not Applicable
C405.2.3, I Primary sidelighted areas are Complies Requirement will be met.
C405.2.3. equipped with required lighting ❑Does Not
1, controls.
C405.2.3. ❑Not Observable
2 ❑Not Applicable
[EL20]1
1
C405.2.3, Enclosed spaces with daylight area ;❑Complies Requirement will be met.
C405.2.3. under skylights and rooftop monitors ❑Does Not
1, are equipped with required lighting
C405.2.3. (controls. ENot Observable
3 1 ❑Not Applicable
[EL21]1
C405.2.4 i Separate lighting control devices for EComplies Requirement will be met.
[EL4]1 specific uses installed per approved Does Not
lighting plans.
ENot Observable
j ENot Applicable 1
C405.2.4 Additional interior lighting power ❑Complies Requirement will be met.
[EL8]1 allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and ['Not Observable
separated from general lighting. ENot Applicable
C405.3 Exit signs do not exceed 5 watts per ❑Complies Exception: Requirement does not apply.
[EL6]1 face. ❑Does Not
❑Not Observable
ENot Applicable
Additional Comments/Assumptions:
High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) PFrIFIVP
Project Title: 215 S Monarch St#103CandD Report date: 11/16/2
Data filename: plar'1d7k0720
ASPEN
BUILDING DEPARTMENT
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C303.3, ;Furnished O&M instructions for ❑Complies Requirement will be met.
C408.2.5. systems and equipment to the ❑Does Not
2 building owner or designated
[F117]3 representative. [Not Observable
❑Not Applicable
C405.4.1 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values.
[F118]1 lighting power is consistent with what ❑Does Not
is shown on the approved lighting
plans, demonstrating proposed watts ['Not Observable
are less than or equal to allowed ❑Not Applicable
watts.
C408.2.5. :Furnished as-built drawings for ❑Complies Requirement will be met.
1 :electric power systems within 90 days ❑Does Not
[F116]3 of system acceptance.
[Not Observable
ENot Applicable
C408.3 1Lighting systems have been tested to ❑Complies Requirement will be met.
[F133]1 ensure proper calibration, adjustment, ❑Does Not
programming, and operation. [Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RFCIFI\JP
Project Title: 215 S Monarch St#103CandD Report date: 11/16/2
Data filename: Ile/
1,7 gf„0720
ASPEN
BUILDING DEPARTMENT