Loading...
HomeMy WebLinkAboutMaster Permit.520 E Hyman Ave.0025-2023-BCOM (7) 1116 COMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Project Information Energy Code: 2021 IECC Project Title: 520 E Hyman _ 2b Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 520 E Hyman - Unit 2b GELD, LLC Eric Westerman Aspen, Colorado 81611 PO Box 1247 523 Architecture Aspen, Colorado 81612 PO Box 4857 310.463.0498 Basalt, Colorado 81621 logaryfreedman@gmail.com 970.319.5627 eric@523architecture.com Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed (ft2) Watts /ft2 Watts 1-Common Space Types:Sales Area 694 1.05 729 Total Allowed Watts = 729 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Common Space Types: Sales Area (694 sq.ft.) LED: Recessed Can: LED PAR 15W: 1 31 17 527 LED: Wall Sconce: LED A Lamp 12W: 1 1 12 12 Total Proposed Watts = 539 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2021 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist._ `` 523 Architecture, Eric Westerman l __ lil1%.— 06.07.2023 Name-Title Signature Date Project Title: 520 E Hyman_2b Report date: 06/07/23 Data filename: Page 2 of 8 a EWEU RECEIVED wR °w'�wYE 06/07/2023 ASPEN BUILDINGOEPARIMENT COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 2021 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans, specifications, and/or EComplies [PR4]1 calculations provide all information Does Not with which compliance can be determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 520 E Hyman_2b Report date: 06/07/23 Data filename: Page 5 of 8 WENS oC RECEIVED 06/07/2023 ASPEN BUILDINGOEPARIMENT Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.3. Spaces required to have light- ❑Complies 1 reduction controls have a manual ❑Does Not [EL22]1 control that allows the occupant to reduce the connected lighting load in ['Not Observable a reasonably uniform illumination ENot Applicable pattern >= 50 percent. C405.2.1, Occupancy sensors installed in ❑Complies C405.2.1. classrooms/lecture/training rooms, :EDoes Not 1 conference/meeting/multipurpose [EL18]1 rooms, copy/print rooms, ['Not Observable lounges/breakrooms, enclosed offices, ❑Not Applicable open plan office areas, restrooms, storage rooms, locker rooms, corridors, warehouse storage areas, and other spaces <= 300 sqft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in warehouses and section C405.2.1.3 for open plan office spaces. i C405.2.1. Occupancy sensors control function in ❑Complies 2 warehouses: In warehouses,the ❑Does Not [EL19]1 lighting in aisleways and open areas is controlled with occupant sensors that ['Not Observable automatically reduce lighting power ❑Not Applicable by 50%or more within 20 minutes of when the areas are unoccupied.The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. Lights not turned off by occupant sensors is done so by time- switch. C405.2.1. Occupant sensor control function in EComplies 3 open plan office areas: Occupant ❑Does Not [EL2O]1 sensor controls in open office spaces ['Not Observable >= 300 sq.ft. have controls 1) ❑Not Applicable e configured so that general lighting can pp be controlled separately in control zones with floor areas <= 600 sq.ft. within the space, 2) general lighting in each zone permitted to turn on upon occupancy in control zone, 3) automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space, 4) are configured so that general lighting power in each control zone is reduced by>= 80%of the full zone general lighting power within 20 minutes of all occupants leaving that control zone. C405.2.2, Each area not served by occupancy ❑Complies C405. sensors(per C405.2.1.1) have time- ❑Does Not 1 switch controls and functions detailed [EL21]2 in sections C405.2.2.1. ❑Not Observable ❑Not Applicable I I 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 520 E Hyman_2b Report date: 06/07/23 Data filename: Page 6 of 8 INEWE oC RECEIVED � ° 06/07/2023 ASPEN RDILSNG DEPARTMENT Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.4, :Daylight zones provided with ❑Complies C405.2.4. individual controls that control the ❑Does Not I 1, lights independent of general area C405.2.4. lighting. See code section C405.2.3 ['Not Observable 2 Daylight-responsive controls for ENot Applicable 1 [EL23]2 applicable spaces, C405.2.3.1 Daylight 1 responsive control function and section C405.2.3.2 Sidelit zone. C405.2.5 Additional interior lighting power ❑Complies [EL27]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and Not Observable separated from general lighting. ❑Not Applicable C405.7 Low-voltage dry-type distribution ❑Complies [EL26]2 electric transformers meet the ❑Does Not minimum efficiency requirements of Table C405.6. ❑Not Observable ❑Not Applicable C405.8 :Electric motors meet the minimum ❑Complies [EL27]2 'efficiency requirements of Tables• ❑Does Not C405.7(1)through C405.7(4). ❑Not Observable Efficiency verified through certification under an approved certification ❑Not Applicable program or the equipment efficiency :ratings shall be provided by motor manufacturer(where certification programs do not exist). C405.9.1, :Escalators and moving walks comply ❑Complies C405.9.2 with ASME A17.1/CSA B44 and have ❑Does Not [EL28]2 ;automatic controls configured to :reduce speed to the minimum ['Not Observable permitted speed in accordance with ❑Not Applicable :ASME A17.1/CSA B44 or applicable :local code when not conveying passengers. C405.10 Total voltage drop across the I❑Complies [EL29]2 combination of feeders and branch ❑Does Not circuits <= 5%. ['Not Observable ❑Not Applicable C405.1.1 ;At least 90%of dwelling unit ❑Complies [EL30]2 permanently installed lighting shall ❑Does Not :have lamp efficacy>= 65 Im/W or :luminaires with efficacy>= 45 Im/W ['Not Observable I or comply with C405.2.4 or C405.3. ❑Not Applicable C405.11, 150%of 15/20 amp receptacles ❑Complies C405.11.1 installed in enclosed offices, ❑Does Not [EL31]2 conference rooms, copy rooms, break rooms, classrooms and workstations Not Observable and > 25%of branch circuit feeders Observable,__, Applicable ;for modular furniture will have :automatic receptacle control in :accordance with C405.11.1. Additional Comments/Assumptions: High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) ' Project Title: 520 E Hyman_2b Report date: 06/07/23 Data filename: Page 7 of 8 iiINEWEoU RECEIVED � ,.3.111111° 06/07/2023 ASPEN BUILDINGOEPARIMENT Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, :Furnished O&M instructions for ❑Complies C408.2.5. systems and equipment to the ❑Does Not 2 building owner or designated [F117]3 representative. ❑Not Observable ❑Not Applicable i C408.1.1 Building operations and maintenance ❑Complies [F157]1 documents will be provided to the ❑Does Not owner. Documents will cover manufacturers' information, ❑Not Observable specifications, programming ❑Not Applicable procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated. C408.2.5 Furnished as-built drawings for OComplies [F116]3 electric power systems within 90 days ❑Does Not of system acceptance. ❑Not Observable ❑Not Applicable C408.3 Lighting systems have been tested to❑Complies [F133]1 ensure proper calibration, adjustment, ❑Does Not programming, and operation. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 520 E Hyman_2b Report date: 06/07/23 Data filename: Page 8 of 8 oU RECEIVED � ° 06/07/2023 ASPEN RDILSNG DEPARTMENT