HomeMy WebLinkAboutMaster Permit.520 E Hyman Ave.0025-2023-BCOM (8) 44;;o, City of Aspen Building Permit Application Checklist
for Commercial and Multifamily Projects (IBC)
CITY OF ASPEN PROJECT ADDRESS 520 E. Hyman - Unit 2B DATE 3/30/23
Note:This checklist is specific to Building Department requirements for various building permit application types.For Zoning,Engineering,Parks,
Utilities,and WELS requirements visit their pages at http://www.aspen.gov.
Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted.Refer to the
IBC Building Submittal Guide for more information about each requirement. Submittal guides,required forms and other resources can be found in
the Building Department Document and Resource Library.
Submit all documents and drawings in PDF format via the Salesforce portal.Follow File Preparation Standards for all files submitted.
REQUIRED 8 %Z" X 11" DOCUMENTS
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Permit
Application ❑ ❑ ❑ ❑ ❑
Packet*
Asbestos test and
clearance reports ❑ ❑ ❑ ❑
State Asbestos
Demolition ❑
Approval Notice ilha.
Fireplace
Registration Form
in Manufacturer's El El
❑
installation
instructions
Energy Code
Compliance ❑ ❑ ❑ ❑
(REScheck,
COMcheck, or
prescriptive path)
U-Factor
Fenestration ❑ ❑ ❑
Docs
CREMP/RREMP
documents ❑ ❑ ❑
Line Grade
Verification Form ❑ ❑
RECEIVED
Updated 3/9/22 Page 1 of 5
05/10/2023
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Signed Special ❑
Inspection and ❑ ❑ n For post encapsulation ❑
Testing
Agreement if not in drywall
Verification of
Structural ❑ ❑ ❑
Integrity
Soils Report
Mechanical Docs
❑ ❑ ❑ If any
changes
Photos
Z LI
Unit/Building
relationship ❑ ^ ❑
CMP**
El Z 111 El
Residential ECU -
Calculator** ❑ ❑ El If any El
Water
fixtures
Water/sewer
Service D ❑
Disconnect
Applications
*Permit Application Packet must be filled out entirely or your submission will not be accepted.
**CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss.
REQUIRED 24"x36" PLANS
Note: Sheets must be in the following order. Existing plans required for all additions &alterations.
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Cover Sheet
Survey
111
Fire Area Sheet
El
.y f
Updated 3/9/22 Page 2 of 5
05/10/2023
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Site Plan
El El El El El
CREMP/RREMP ;-
Plan ❑ ❑ ❑ ❑ ❑
Floor Plans:
Existing &
Proposed ❑ ❑ ❑ Z ❑ ❑
Reflected Ceiling
Plans ❑ ❑ ❑ El
Lighting Plan w/
spec sheet(s) ❑ ❑ ❑
El
Occupancy/
Means of Egress ❑ ❑
Plans
Separation/Fire
Resistance Plans ❑ I I ❑ El ❑
Fire Resistant
Assembly Listed ❑ ❑ ❑ ❑
Installation
Details
Accessibility
Plans &Details ❑ ❑ ❑ El
Roof Plan
Elevations/
Height ❑ ❑ ❑ ❑ ❑
Sections
❑ ❑ ❑ ❑✓
II
Details
O 111 Z widaLlid
Fireplace Details
❑ ❑ ❑ ❑
RECEIVED
Updated 3/9/22 Page 3 of 5
05/10/2023
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Schedules
❑ ❑ ❑
Excavation/
Earth Retention El
Plans
Civil Plans
*dhcussng directlyrin ❑ ❑ ❑ ❑
with Engineering
Electrical Plans
❑ ❑ ❑ a
Kitchen Plans
❑ ❑ ❑ ❑
Mechanical Plans
❑ ❑ ❑
Plumbing
Isometics/ El
❑ ❑
Flatomrtric
Structural Plans
❑ ❑ ❑ 111
ADDITIONAL NOTES and/or REQUIREMENTS
RECEIV ' D
Updated 3/9/22 Page 4 of 5
05/10/2023
ASPEN
BUILDING DEPARTMENT
PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED:
Digitally signed by Jim Pomeroy
Jim Pomeroy DN C=US E=jim pomept.,CNtyofaspePomeron oomy,O=City of
Aspen,OU=Building Dept.,CN=Jim
CITY STAFF NAME: Date:2023.03.3014:30:31-06'00'
DATE: 3/30/23
PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING
WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A
LENGTHIER BUILDING REVIEW PROCESS:
PERMIT APPLICANT NAME:
DATE:
RECEIVED
Updated 3/9/22 Page 5 of 5
05/10/2023
ASPEN
BUILDING DEPARTMENT