Loading...
HomeMy WebLinkAboutMaster Permit.520 E Hyman Ave.0025-2023-BCOM (8) 44;;o, City of Aspen Building Permit Application Checklist for Commercial and Multifamily Projects (IBC) CITY OF ASPEN PROJECT ADDRESS 520 E. Hyman - Unit 2B DATE 3/30/23 Note:This checklist is specific to Building Department requirements for various building permit application types.For Zoning,Engineering,Parks, Utilities,and WELS requirements visit their pages at http://www.aspen.gov. Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted.Refer to the IBC Building Submittal Guide for more information about each requirement. Submittal guides,required forms and other resources can be found in the Building Department Document and Resource Library. Submit all documents and drawings in PDF format via the Salesforce portal.Follow File Preparation Standards for all files submitted. REQUIRED 8 %Z" X 11" DOCUMENTS Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Permit Application ❑ ❑ ❑ ❑ ❑ Packet* Asbestos test and clearance reports ❑ ❑ ❑ ❑ State Asbestos Demolition ❑ Approval Notice ilha. Fireplace Registration Form in Manufacturer's El El ❑ installation instructions Energy Code Compliance ❑ ❑ ❑ ❑ (REScheck, COMcheck, or prescriptive path) U-Factor Fenestration ❑ ❑ ❑ Docs CREMP/RREMP documents ❑ ❑ ❑ Line Grade Verification Form ❑ ❑ RECEIVED Updated 3/9/22 Page 1 of 5 05/10/2023 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Signed Special ❑ Inspection and ❑ ❑ n For post encapsulation ❑ Testing Agreement if not in drywall Verification of Structural ❑ ❑ ❑ Integrity Soils Report Mechanical Docs ❑ ❑ ❑ If any changes Photos Z LI Unit/Building relationship ❑ ^ ❑ CMP** El Z 111 El Residential ECU - Calculator** ❑ ❑ El If any El Water fixtures Water/sewer Service D ❑ Disconnect Applications *Permit Application Packet must be filled out entirely or your submission will not be accepted. **CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss. REQUIRED 24"x36" PLANS Note: Sheets must be in the following order. Existing plans required for all additions &alterations. Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Cover Sheet Survey 111 Fire Area Sheet El .y f Updated 3/9/22 Page 2 of 5 05/10/2023 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Site Plan El El El El El CREMP/RREMP ;- Plan ❑ ❑ ❑ ❑ ❑ Floor Plans: Existing & Proposed ❑ ❑ ❑ Z ❑ ❑ Reflected Ceiling Plans ❑ ❑ ❑ El Lighting Plan w/ spec sheet(s) ❑ ❑ ❑ El Occupancy/ Means of Egress ❑ ❑ Plans Separation/Fire Resistance Plans ❑ I I ❑ El ❑ Fire Resistant Assembly Listed ❑ ❑ ❑ ❑ Installation Details Accessibility Plans &Details ❑ ❑ ❑ El Roof Plan Elevations/ Height ❑ ❑ ❑ ❑ ❑ Sections ❑ ❑ ❑ ❑✓ II Details O 111 Z widaLlid Fireplace Details ❑ ❑ ❑ ❑ RECEIVED Updated 3/9/22 Page 3 of 5 05/10/2023 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Schedules ❑ ❑ ❑ Excavation/ Earth Retention El Plans Civil Plans *dhcussng directlyrin ❑ ❑ ❑ ❑ with Engineering Electrical Plans ❑ ❑ ❑ a Kitchen Plans ❑ ❑ ❑ ❑ Mechanical Plans ❑ ❑ ❑ Plumbing Isometics/ El ❑ ❑ Flatomrtric Structural Plans ❑ ❑ ❑ 111 ADDITIONAL NOTES and/or REQUIREMENTS RECEIV ' D Updated 3/9/22 Page 4 of 5 05/10/2023 ASPEN BUILDING DEPARTMENT PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED: Digitally signed by Jim Pomeroy Jim Pomeroy DN C=US E=jim pomept.,CNtyofaspePomeron oomy,O=City of Aspen,OU=Building Dept.,CN=Jim CITY STAFF NAME: Date:2023.03.3014:30:31-06'00' DATE: 3/30/23 PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A LENGTHIER BUILDING REVIEW PROCESS: PERMIT APPLICANT NAME: DATE: RECEIVED Updated 3/9/22 Page 5 of 5 05/10/2023 ASPEN BUILDING DEPARTMENT