Loading...
HomeMy WebLinkAboutMaster Permit.520 E Hyman Ave.0025-2023-BCOM (10) Reviewed by Engineering 05/31/2023 9:14:49 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen.The review and approval by the City is offered only to assist the applicants understanding of the applicable Engineering requirements."The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. RECEIVED 05/10/2023 ASPEN BUILDING DEPARTMENT 4.0 Project Implementation Hours of Construction: Construction hours shall be limited to 7:30am—5:30pm Monday through Friday and 9:00am—5:00pm on Saturday. No construction is permitted on Sundays or holidays as identified by the CMP Manual. Prior to the start of permit activity the project will provide fencing six feet (6') in height and constructed out of chain-link fence with mesh windscreens (visual barriers)for all exterior work. The contractor is aware of all trees within the work area and will provide tree protection in coordination with, and as directed by the City Parks Department. 5.0 Site and Right of Way Management By signing this document,the contractor ensures that there is adequate staging area onsite for all construction trailers,job materials storage, portable restrooms,waste management and recycling containers. If a portion of the ROW is needed the contractor will submit for a temporary encroachment permit. Loose job material storage is not allowed in ROW under any circumstances. The project will maintain continuous emergency vehicle access, on and around site, including but not limited to police,fire, and ambulance services. All required construction parking shall be provided onsite or the contractor will properly lease parking spaces from the COA Parking Department. Contractor will provide recycling onsite for both conventional and construction related materials. 6.0 Traffic Control By signing this document the contractor ensures that the project does not impact roadways or pedestrian walkways. No traffic control plan is needed. The project requires no special circumstances for deliveries. Traffic control required for deliveries must be fully coordinated with the City of Aspen Engineering Department. Roads will not be closed under any circumstances, unless granted permission from the City of Aspen Engineering Department. 7.0 Pedestrian Protection The project maintains all pedestrian walkways including all ADA requirements. 8.0 Sediment and Erosion Control Best Management Practices will be installed which will prevent any erosion and sediment transport offsite. RECEIVED 05/10/2023 ASPEN BUILDING DEPARTMENT r� CITY OF ASPEN lithe project is located in the Smuggler Mountain Superfund Site a Superfund Site soil removal permit has been submitted. 9.0 FUGITIVE DUST CONTROL A Fugitive Dust Control Plan is in place if applicable. 10.0 EMISSIONS All vehicles and equipment used on site will be properly maintained such that the engines will function within manufacture's standards or parameters. 11.0 NOISE SUPPRESSION The project will adhere to all noise requirements. Noise limits are 70 decibels (dB) at the property line during the summer on season. Projects located on the Mall will be limited to 70 decibels (dB) at the property line during the winter on season. All other times projects will be limited to 80 decibels(80dB) at the property line. If the project requires a sound fence to stay within the noise limits this form is not applicable and the project shall submit a full CMP with a Noise Suppression Plan.The minimum requirements for a non- modeled noise suppression plan are a 14-foot tall fence of noise dampening material surrounding the construction site. 12.0 ENFORCEMENT A City Construction Mitigation Officer will complete random site visits to determine if the project is following approved Plan and City requirements. SIGNATURE I acknowledge that all requirements listed above as well as within the COA Construction Management Plan Requirements Manual will be met on the project site. Contractor acknowledges that failure to abide by this affidavit will result in red tags on the project and loss of participation in the program Signature: Printed Name: A&L Construction, Lior Lilah Date: vet /p [-( I 2-62".3 RECEIVED 05/10/2023 ASPEN BUILDING DEPARTMENT