HomeMy WebLinkAboutFile Documents.501 Dean St.0019-2022-BCOM (4) pOSS ARCHITECTURE + PLANNING
605 EAST MAIN STREET ASPEN, COLORADO 81611
(t) 970/925-4755 (f) 970/920-2950 MEMORANDUM
TO: Linzhi Douglass
City of Aspen Zoning Department
CC: Sydney Fallon; Denis Murray; Rob Morey;Alfred Lafave; Les Rosenstein
FROM: Marc Winkler
Bill Poss and Associates Architecture and Planning, P.C.
DATE: August 26, 2022
RE: Response to Building Department Comments ❑ ENCLOSURE
501 East Dean Street
0019.2022.BCOM
Dear Linzhi
Thank you for your review and the opportunity to respond to your comments. Please find responses to
your comments for 501 E Dean St—0019.2022.BCOM below in blue.
1. A.904 Assemblies—Ceilings:Provide spec sheet for new grid ceiling
—Manufacturer's installation manual and verify sprinkler replacement
The new ceiling grid scope has been value engineered to only include replacement of the ceiling tiles,
not the ceiling grid. The tiles are to be cut to accommodate the existing fire sprinklers, without
alteration to the fire suppression system. The ceiling tile submittal is included in the revised Materials
PDF: 30.Materials Fire Smoke 501 E Dean.20220826.pdf. The ceiling assembly, on sheet A.904, is
revised to demonstrate the ceiling grid structure as "existing to remain", as well as the fire
suppression sprinklers. The architectural assemblies sheet is included in the uploaded PDF:
90.Architectural Plans 501 E Dean.20220826.pdf.
2. A.1002—Door Schedule: City of Aspen, not Pitkin County
Thank you for catching this error. The agency in the Door Schedule Notes is corrected to "City of
Aspen". The revised sheet is included in the uploaded PDF: 90.Architectural Plans 501 E
Dean.20220826.pdf.
3. Interior Lighting ComCheck
The interior lighting has been further developed. The lighting cutsheet set: 30.Interior Lighting
Cutsheets 501 E Dean.20220826.pdf is updated with the current project specifications. The
ComCheck incorporates the current information from the specifications; this is uploaded: 30.Interior
Lighting ComCheck 501 E Dean.20220826.pdf. The current lighting tags pair with the interior RCPs,
in the set: 90.Interior Plans 501 E Dean.20220826.pdf, and electrical plans: 90.Electrical Plans 501
E Dean.20220826.pdf
4. Additional comments
The Fenestration U-Factor Documents have been updated with the glazing information from the
current and approved door submittal. The Entry Automated Bi-Part Doors L1 A & L1 B are now
Guardian Glass. This specification is uploaded in the PDF: 30.Fenestration U-Factor Documents 501
E Dean.20220826.pdf
RECEIVED
08/29/2022
ASPEN
BUILDING DEPARTMENT
pOSS ARCHITECTURE + PLANNING
The permit comments response submission includes the following documents:
30.Building Round 1 Comments 501 E Dean.20220826
30.Fenestration U-Factor Documents 501 E Dean.20220826
30.Interior Lighting ComCheck 501 E Dean.20220826
30.Interior Lighting Cutsheets 501 E Dean.20220826
30.Materials Fire Smoke 501 E Dean.20220826
90.Architectural Plans 501 E Dean.20220826
90.Electrical Plans 501 E Dean.20220826
90.Interior Plans 501 E Dean.20220826
If there is additional information required, please do not hesitate to contact me: (970) 925-4755 /
MWinkler@BillPoss.com
Respectfully submitted,
Marc Winkler
Poss Architecture+Planning