HomeMy WebLinkAboutFile Documents.501 Dean St.0019-2022-BCOM (5) pOSS ARCHITECTURE + PLANNING 605 EAST MAIN STREET ASPEN, COLORADO 81611 (t) 970/925-4755 (f) 970/920-2950 MEMORANDUM TO: Linzhi Douglass City of Aspen Zoning Department CC: Sydney Fallon; Denis Murray; Rob Morey;Alfred Lafave; Les Rosenstein FROM: Marc Winkler Bill Poss and Associates Architecture and Planning, P.C. DATE: September 7, 2022 RE: Response#2 to Building Department Comments ❑ ENCLOSURE 501 East Dean Street 0019-2022-BCOM Dear Linzhi Thank you for your review and the opportunity to respond to your comments. Please find responses to your comments for 501 E Dean St—0019-2022-BCOM below in blue. 1. Your ComCheck is still incorrect. Many of the fixtures in the audit do not match your interior plans and the fixture wattages are incorrect. The previous plans did have some areas with an additional design background and some of the luminaire tags were in conflict. 2. There was no sign of(E)DNLT.• (E)DNLT or(E) COVE: (E) COVE on the plan or cut sheets. Plans have been revised to show only the correct tags, which correspond with the luminaire schedule, specification sheets, and compliance documents. (E) was used on our plans to denote existing lighting that is to remain. We have added some additional call-outs on the plan and compliance documents to clarify this. Specification sheets are not available for existing lighting however we are using the transformer wattage of the existing luminaires in our compliance calculations. 3. Additionally, please specify the area categories more clearly for accurate floor area. It appears the sheets you are installing lights are "main entry," "owner's lobby level 2" and "guest corridors" so providing the area for these specific areas would be recommended. Area categories for each area have been clarified and associated room names and numbers were added to correspond with the plans. 4. Lastly.please include the owner and agent and sign the compliance statement on your next ComCheck. For clarification on what is needed,please directly reach out to Denis, (970) 429-2761. Owner information is now included and compliance documents are signed by the engineer. RECEIVED 09/12/2022 ASPEN BUILDING DEPARTMENT pOSS ARCHITECTURE + PLANNING Linzhi Douglass and Denis Murray via Alfred Lafave: 5. Did we hit the trigger? The form asks how much is being altered...if a certain amount...the whole building needs to comply. Compliance documents now show exactly which areas are included in the scope of work and document the amount of lighting being replaced in each space. Where less than 10% of the lighting is not replaced, these areas are noted as exempt per Section C503 Alterations. New lighting systems that are apart of the alterations comply with all sections of C405. 6. Spaces need to match. (language for reference) Area categories are included with specific room names to clarify exactly which space is included in the alterations and the specific compliance for each area. 7. One corridor is listed at 9,000 sgft? Electrical plans show a typical guest corridor for renovation, however all guest corridors are included in the project. Each separate guest corridor space is listed with the associated renovations and corresponds to scope noted on the architectural and interior design drawings. The permit comments response submission includes the following documents: 30.Interior Lighting ComCheck 501 E Dean.20220907.pdf 90.Electrical Plans 501 E Dean.20220907.pdf If there is additional information required, please do not hesitate to contact me: (970) 925-4755 / MWinkler@BillPoss.com Respectfully submitted, Marc Winkler Poss Architecture+Planning RECEIVED 09/12/2022 ASPEN BUILDING DEPARTMENT