TO: Linzhi Douglass
City of Aspen Zoning Department
CC: Sydney Fallon; Denis Murray; Rob Morey;Alfred Lafave; Les Rosenstein
FROM: Marc Winkler
Bill Poss and Associates Architecture and Planning, P.C.
DATE: October 28, 2022
RE: Response#3 to Building Department Comments ❑ ENCLOSURE
501 East Dean Street
0019-2022-BCOM
Dear Linzhi
Thank you for your review and the opportunity to respond to your comments. Please find responses to
your comments for 501 E Dean St—0019-2022-BCOM below in blue.
The ComCheck exceeds the scope. You've only provided plans for three areas (main level entry, owner's
lobby, and guest corridor L1-East). If you are adding lights to corridors on level 1-5, we need a plan for
each of those clearly showing location of new lights
Thank you for helping me to better understand this aspect of the ComCheck. The electrical plans now
include every corridor and each fixture is depicted in the common areas.
Still missing light spec sheets (e.g.for all "L"fixtures)
L1,L2, and L3 fixtures are now included in the light specifications package. These lights are ETL listed.
Not all lights have NRTL listing provided
Please pardon the missing NRTL information. Each luminaire in the package now demonstrates UL or
ETL listing,both are National Recognized Testing Laboratories(NRTL).
You cannot use the light fixtures F3 or F8 because their overall depth exceeds 4", which is projected too
far off the wall per 2015 IBC 1003.3.3
Thank you for alerting me to this code requirement. F3 and F8 will be custom fixtures, not to exceed 4"
in depth. Shop drawings, demonstrating this 4"maximum, are now included in the luminaire package.
Are light fixtures F2 and F23 the same fixture? The spec sheets are the same product
Yes, you are correct, F2 and F23 are the same fixture, just in different locations. F23 has been
consolidated into F2.
The above are just a handful of items I found wrong with the ComCheck. Although tREC DYE D
improvement from the first ComCheck submitted, it is still not review-ready. We will need an accurate
10/31/2022
ASPEN
BUILDING DEPARTMENT
pOSS ARCHITECTURE + PLANNING
ComCheck with an entire new spec package that includes every light fixture you will be replacing and
accurate wattage info clearly delineated on the spec sheet(s)for all non-residential lights.
F14 is a sconce included in this submission. There will be two instances of F14 in the non-residential
area,both in the Sales Office. F14 does not project beyond 4"in depth and is ETL listed.
Additionally, the U-factor fenestration you provided for the entrance door with a U-factor of 1.04 is not
up to code. Per 2015 IECC Table C402.4, entrance doors must have a U-factor of 0.77 or better and
fixed fenestration must have a U-factor of at least 0.29. If the doors and windows are not NFRC labeled,
please provide documentation per the City of Aspen Fenestration U-factor policy (https://avanan.url-
protection.com/vl/url?o=https%3A//www.aspen.gov/DocumentCenter/View/6199/Fenestration-U-
Factor-Policy-Revision-
&g=MDY2OGQ1MmZiOWUOOTRjNw==&h=NWI0MzQ5NzhmMTU5MTc3Y2Q3NWNkMTQ2NDI2M
WEwM2JkODYwNzg4OTE4N2Y5NDQ5MGJlYjgzYj UyOWFjNDgzNg==&p=YXAzOmNpdHlvZmFzcGV
uOmE6bzpmZjRkZjEyZjdlNGNiNjE5NTA0M2 UzMTgzOTcwNGFmYTp2MTpwOkY=).
The U-factor information is updated: 30.Fenestration U-Factor Documents 501 E Dean.20221028.pdf
The first page is the City of Aspen U-factor policy and acceptable methods. The project team has selected
the 3rd method to identify NFRC credentials and U-factor compliance. Please reference the following
manufacturers and test facilities documentation for policy conformance.
Additional Clarifications:
1) In an RFI, the architecture team was asked to redesign the entry handrails to use the existing embed
locations. You will see the updated design, very much in line with the existing handrails design,
throughout the set,but most specifically on"Railings Clarifications"sheets A.610,A.611, and A.612.
2) Another clarification picked up in the aforementioned sheets are the gallery side railings under the
porte cochere. These railings are to be included in the scope of permitted work.
3) I received a fire suppression submittal on Friday, September 30t''. This is to address the only
replacements of sprinkler heads in the scope of the project, at the Owner's Lobby and Reception ceilings.
The fire sprinkler plan is included in this response: 30.Fire Suppression Documents 501 E
Dean.20221028.pdf
The next review will be the 4th round. We will require for you to meet virtually with us to go over the
issues with your ComCheck before submitting new documents. We'll decide at that point whether we will
expedite your next round of reviews due to the delays that have already occurred.
The whole RLN team sincerely appreciates you—Linzhi, Sydney, Justin, and Denis helping us get to a
permit ready submission together. We also wish that the initial submission had been more accurate to
mitigate the back-and-fourth.Again,we thank you for your reviews and opportunities to respond.
RECEIVED
10/31/2022
ASPEN
BUILDING DEPARTMENT
pOSS ARCHITECTURE + PLANNING
The permit comments response submission includes the following documents:
30.Fenestration U-Factor Documents 501 E Dean.20221028.pdf
30.Fire Suppression Documents 501 E Dean.20221028.pdf
30.Interior Lighting ComCheck 501 E Dean.20221028.pdf
30.Interior Lighting Cutsheets 501 E Dean.20221028.pdf
90.Architectural Plans 501 E Dean.20221028.pdf
90.Electrical Plans 501 E Dean.20221028.pdf
If there is additional information required, please do not hesitate to contact me: (970) 925-4755 /
MWinkler@BillPoss.com
Respectfully submitted,
Marc Winkler
Poss Architecture+Planning