Loading...
HomeMy WebLinkAboutFile Documents.501 Dean St.0019-2022-BCOM (7) pOSS ARCHITECTURE + PLANNING 605 EAST MAIN STREET ASPEN, COLORADO 81611 (t) 970/925-4755 (f) 970/920-2950 MEMORANDUM TO: Linzhi Douglass City of Aspen Zoning Department CC: Sydney Fallon; Denis Murray; Rob Morey;Alfred Lafave; Les Rosenstein FROM: Marc Winkler Bill Poss and Associates Architecture and Planning, P.C. DATE: November 14, 2022 RE: Response#4 to Building Department Comments ❑ ENCLOSURE 501 East Dean Street 0019-2022-BCOM Dear Linzhi Thank you for your review and the opportunity to respond to your comments. Please find responses to your comments for 501 E Dean St—0019-2022-BCOM below in blue. I have completed my review and have found the following list of things that are still incorrect. Please revise the electrical plan, luminaire schedule, and the lighting spec sheet(s) to match. Please notify me when the modified documents have been uploaded to SalesForce and I will pick it back up for a final review before signing off ENTRY LVL 1 WITH STAIR: F8 watts are lOW on the lighting spec sheet and comcheck, and the luminaire schedule says 20W The F8 spec sheet is revised (annotated for manufacturer supplied wattage restriction labels) to 2x 10W lamps for a 20W fixture total. The spec sheet now matches the ComCheck and Luminaire Schedule. RECEPTION:LI only shows 1 fixture on the electrical plan, but the comcheck says there are 4 This was an issue of tagging the light fixtures, pardon the confusion this may have caused. Each light fixture is now individually tagged. Please note that 4 of the 8 L1 fixtures are in the vestibule and the remaining 4 are over the stair, shown on the L2 "Owner's Lobby"plan: E7-01.E.1 OWNER'S LOBBY: F13A has a fixture wattage of 35W on the comcheck, but the light spec sheet and luminaire schedule say 14W The F13A is revised on the ComCheck to 14W,consistent with the spec sheet and luminaire schedule. OWNER'S LOBBY: F13B has a fixture wattage of 25W on the comcheck, but the light spec sheet and luminaire schedule say l0W The F13B is revised on the ComCheck to 10W, consistent with the spec sheet and luminaire schedule. �/ OWNER'S LOBBY. L2 watts are not consistent with luminaire schedule, comcheck, or ligh� �11 E 0 11/16/2022 ASPEN BUILDING DEPARTMENT pOSS ARCHITECTURE + PLANNING The L2 linear light wattage is being approached differently for this response. This is an LED tape that is cut to size in the field. For the purpose of ComCheck, Luminaire Schedule, and spec sheet we have opted for the maximum allowable wattage of the driver, 96W. This will allow a maximum of 48 linear feet of LED tape(2W* 48' =96W). This"not to exceed"annotation is now on the spec sheet. OWNER'S LOBBY: L3 watts are not consistent. The luminaire schedule says 2W, and the comcheck and lighting spec sheet says 20W The L3 linear light wattage is being approached differently for this response. This is an LED tape that is cut to size in the field. For the purpose of ComCheck, Luminaire Schedule, and spec sheet we have opted for the maximum allowable wattage of the driver, 96W. This will allow a maximum of 48 linear feet of LED tape(2W* 48' =96W). This"not to exceed"annotation is now on the spec sheet. SALES OFFICE: F14 only has one fixture on the electrical plans, but says 2 on the comcheck and wattages on the lighting spec sheet say 20W and the comcheck and luminaire schedule say 34W This was an issue of tagging the light fixtures, pardon the confusion this may have caused. Each light fixture is now individually tagged. CORRIDOR EAST LVL 1:F22 has 5 fixtures, but the comcheck says 4 CORRIDOR EAST LVL 1: F22 on the ComCheck is revised to 5 fixtures,to align with the plan. CORRIDOR EAST LVL 2:F20 has 10 fixtures, comcheck says 9 CORRIDOR EAST LVL 2: F20 on the ComCheck is revised to 10 fixtures,to align with the plan. CORRIDOR EAST LVL 2:F21 has 8 fixtures, comcheck says 6 CORRIDOR EAST LVL 2: F21 on the ComCheck is revised to 8 fixtures,to align with the plan. CORRIDOR EAST LVL 3:F20 has 11 fixtures, comcheck says 10 CORRIDOR EAST LVL 3: F20 on the ComCheck is revised to 11 fixtures,to align with the plan. CORRIDOR EAST LVL 3:F21 has 9 fixtures, comcheck says 7 CORRIDOR EAST LVL 3: F21 on the ComCheck is revised to 9 fixtures,to align with the plan. CORRIDOR EAST LVL 4:F20 has 13 fixtures, comcheck says 12 CORRIDOR EAST LVL 4: F20 on the ComCheck is revised to 13 fixtures,to align with the plan. CORRIDOR EAST LVL 5:F22 has 7 fixtures, comcheck says 6 CORRIDOR EAST LVL 5: F22 on the ComCheck is revised to 7 fixtures,to align with thRECEIVED 11/16/2022 ASPEN BUILDING DEPARTMENT pOSS ARCHITECTURE + PLANNING The whole RLN team sincerely appreciates you—Linzhi, Sydney, Justin, and Denis helping us get to a permit ready submission together. We also wish that the initial submission had been more accurate to mitigate the back-and-fourth.Again,we thank you for your reviews and opportunities to respond. The permit comments response submission includes the following documents: 30.Interior Lighting ComCheck 501 E Dean.20221114.pdf 30.Interior Lighting Cutsheets 501 E Dean.20221114.pdf 90.Electrical Plans 501 E Dean.20221114.pdf If there is additional information required, please do not hesitate to contact me: (970) 925-4755 / MWinkler@BillPoss.com Respectfully submitted, Marc Winkler Poss Architecture+Planning RECEIVED 11/16/2022 ASPEN BUILDING DEPARTMENT