(t) 970/925-4755 (f) 970/920-2950 MEMORANDUM
TO: Linzhi Douglass
City of Aspen Zoning Department
CC: Sydney Fallon; Denis Murray; Rob Morey;Alfred Lafave; Les Rosenstein
FROM: Marc Winkler
Bill Poss and Associates Architecture and Planning, P.C.
DATE: November 14, 2022
RE: Response#4 to Building Department Comments ❑ ENCLOSURE
501 East Dean Street
0019-2022-BCOM
Dear Linzhi
Thank you for your review and the opportunity to respond to your comments. Please find responses to
your comments for 501 E Dean St—0019-2022-BCOM below in blue.
I have completed my review and have found the following list of things that are still incorrect. Please
revise the electrical plan, luminaire schedule, and the lighting spec sheet(s) to match. Please notify me
when the modified documents have been uploaded to SalesForce and I will pick it back up for a final
review before signing off
ENTRY LVL 1 WITH STAIR: F8 watts are lOW on the lighting spec sheet and comcheck, and the
luminaire schedule says 20W
The F8 spec sheet is revised (annotated for manufacturer supplied wattage restriction labels) to 2x 10W
lamps for a 20W fixture total. The spec sheet now matches the ComCheck and Luminaire Schedule.
RECEPTION:LI only shows 1 fixture on the electrical plan, but the comcheck says there are 4
This was an issue of tagging the light fixtures, pardon the confusion this may have caused. Each light
fixture is now individually tagged. Please note that 4 of the 8 L1 fixtures are in the vestibule and the
remaining 4 are over the stair, shown on the L2 "Owner's Lobby"plan: E7-01.E.1
OWNER'S LOBBY: F13A has a fixture wattage of 35W on the comcheck, but the light spec sheet and
luminaire schedule say 14W
The F13A is revised on the ComCheck to 14W,consistent with the spec sheet and luminaire schedule.
OWNER'S LOBBY: F13B has a fixture wattage of 25W on the comcheck, but the light spec sheet and
luminaire schedule say l0W
The F13B is revised on the ComCheck to 10W, consistent with the spec sheet and luminaire schedule. �/
OWNER'S LOBBY. L2 watts are not consistent with luminaire schedule, comcheck, or ligh� �11 E 0
11/16/2022
ASPEN
BUILDING DEPARTMENT
pOSS ARCHITECTURE + PLANNING
The L2 linear light wattage is being approached differently for this response. This is an LED tape that is
cut to size in the field. For the purpose of ComCheck, Luminaire Schedule, and spec sheet we have opted
for the maximum allowable wattage of the driver, 96W. This will allow a maximum of 48 linear feet of
LED tape(2W* 48' =96W). This"not to exceed"annotation is now on the spec sheet.
OWNER'S LOBBY: L3 watts are not consistent. The luminaire schedule says 2W, and the comcheck and
lighting spec sheet says 20W
The L3 linear light wattage is being approached differently for this response. This is an LED tape that is
cut to size in the field. For the purpose of ComCheck, Luminaire Schedule, and spec sheet we have opted
for the maximum allowable wattage of the driver, 96W. This will allow a maximum of 48 linear feet of
LED tape(2W* 48' =96W). This"not to exceed"annotation is now on the spec sheet.
SALES OFFICE: F14 only has one fixture on the electrical plans, but says 2 on the comcheck and
wattages on the lighting spec sheet say 20W and the comcheck and luminaire schedule say 34W
This was an issue of tagging the light fixtures, pardon the confusion this may have caused. Each light
fixture is now individually tagged.
CORRIDOR EAST LVL 1:F22 has 5 fixtures, but the comcheck says 4
CORRIDOR EAST LVL 1: F22 on the ComCheck is revised to 5 fixtures,to align with the plan.
CORRIDOR EAST LVL 2:F20 has 10 fixtures, comcheck says 9
CORRIDOR EAST LVL 2: F20 on the ComCheck is revised to 10 fixtures,to align with the plan.
CORRIDOR EAST LVL 2:F21 has 8 fixtures, comcheck says 6
CORRIDOR EAST LVL 2: F21 on the ComCheck is revised to 8 fixtures,to align with the plan.
CORRIDOR EAST LVL 3:F20 has 11 fixtures, comcheck says 10
CORRIDOR EAST LVL 3: F20 on the ComCheck is revised to 11 fixtures,to align with the plan.
CORRIDOR EAST LVL 3:F21 has 9 fixtures, comcheck says 7
CORRIDOR EAST LVL 3: F21 on the ComCheck is revised to 9 fixtures,to align with the plan.
CORRIDOR EAST LVL 4:F20 has 13 fixtures, comcheck says 12
CORRIDOR EAST LVL 4: F20 on the ComCheck is revised to 13 fixtures,to align with the plan.
CORRIDOR EAST LVL 5:F22 has 7 fixtures, comcheck says 6
CORRIDOR EAST LVL 5: F22 on the ComCheck is revised to 7 fixtures,to align with thRECEIVED
11/16/2022
ASPEN
BUILDING DEPARTMENT
pOSS ARCHITECTURE + PLANNING
The whole RLN team sincerely appreciates you—Linzhi, Sydney, Justin, and Denis helping us get to a
permit ready submission together. We also wish that the initial submission had been more accurate to
mitigate the back-and-fourth.Again,we thank you for your reviews and opportunities to respond.
The permit comments response submission includes the following documents:
30.Interior Lighting ComCheck 501 E Dean.20221114.pdf
30.Interior Lighting Cutsheets 501 E Dean.20221114.pdf
90.Electrical Plans 501 E Dean.20221114.pdf
If there is additional information required, please do not hesitate to contact me: (970) 925-4755 /
MWinkler@BillPoss.com
Respectfully submitted,
Marc Winkler
Poss Architecture+Planning