A COMcheck Software Version 4.1.5.1 A B C D EO(�(�
0 Fixture Per Lamp/Ballast Lamps/ #of Fixture (CXD) COMcheck Software Version 4.1.5.1 J J
-/ Fixture Fixtures Watt.
V Interior Lighting Compliance Certificate L2,12,Other, 1 r2 20 20 f Inspection Checklist ARCHITECTURE 1 +PLANNING
L3:L3:Other: 1 28 28
Energy Code:2015 IECC
Total Proposed Watts= 4973
Requirements:100.0%were addressed directly in the COMcheck software
Project Information Interior Lighting PASSES Text in the"Comments/Assumptions"column is provided by the user in the COMcheck Requirements screen.For each
Energy Code: 2015 IECC requirement,the user certifies that a code requirement will be met and how that is documented.or that an exception
Project Title: RESIDENCES AT LITTLE NELL Interior Lighting Compliance Statement is being claimed.Where compliance is itemized in a separate table,a reference to that table is provided.
Project Type: AlterationCompliance Statement:The proposed interior lighting alteration project represented in this document is consistent with the _ la _
building plans,specifications.and other calculations submitted with this permit application.The proposed interior lighting Section
D systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.5.1 and to comply with any # Plan Review Complies? Comments/Assumptions
applicable mandatory requirements listed in the Inspection Checklist. &Req.ID
Construction Site: Owner/Agent: Designer/Contractor C103.2 Plans,specifications,and/or QComplies Requirement will be met.
501 DEAN STREET IMEG Corp [PRO calculations provide all information QDoes Not
ASPEN GREENWOOD VILLAGE Name-Title Signature Date with which compliance can be ONot Observable
81611 determined for the interior lighting
Allowed Interior Lighting Power and electrical systems and equipment ONot Applicable cotorsoo nw
and document where exceptions to
A B C D the standard are claimed.Information III iTr/9t51l ss
Ill 911/920 MO
Area Category Floor Area Allowed Allowed Watts provided should include interior
(M) Wens I R2 (B X C) lighting power calculations,wattage of
bulbs and ballasts,transformers and
1-Convention Center:Audience/Seating Area 665 0.82 545 control devices.
2-Common Space Types:Corndor!Transition>=8ft wide 2562 0.66 1691 Additional Comments/Assumptions:
Specify the 3-Common Space Types:Lobby-General 3223 0.90 2901
convention center? Total Allowed Watts= 5137 RESIDENCES AT THE LITTLE
Does it have another proposed Interior Lighting Power
NELL INTERIOR REMODEL
name on the plans?
A B C D E
Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) 1
— Fixture Fixtures Watt.
Convention Center:Audience/Seatina Area(665 sq.tt.l 501 DEAN STREET
GR-711-LT:GR-711-LT:Other V 60 60< Missing light spec sheet I ASPEN,CO 81611
GR-710-LT:GR-710-LT:Other. 4 2 12 12-24
GR-709-LT:GR-709 LT:Other. 12 12
GR-708-LT:GR-708-LT:Other 120 360
Common Space Tveos:Coeidor/Transition>=8 ft wide(2562 sq.ft.)
F22:F22:Other: 40 200
F21:F21:Other 40 200
L1:L1:Other 44-18 17 289
COR-702-LT:COR-702-LT:Other. 11.13 120 4220-
Is iht
F23:F23:Other: f 120 240
F8:F8:Oher so Soo< Missing light spec sheet
F4:F4:Other. 60 360
F5:F5:Other. 16 48
F6:F6:Other. 32 64
F7:F7:Other . 40 ROTTET STUDIO
F3:F3:Other. 60 120< Customize overall depth not to exceed 4"-not allowable at 9.25"
C F2:F2:Other. t✓ 489-600 48e-600 ARCHITECTURE AND DESIGN
F1:F1:Other. V 8 1s< (Which Wattage? I
Common Space Tvees:Lobbv-General(3223 so.ft.)
F11:F11:Other: d 60 480 808 TRAVIS STREET#100,HOUSTON,TX
F10:F10:Other: 24 144� 77002
FX:FX:Other 120 120____ Missing light spec sheet
G� T:713.221.1830
F9:F9:Other. V 60 80 tewv.rottetstudio.com
I l l High Impact(Tier 1) 12!Medium Impact(Ter 2) 13 I Low Impact(Der 3) I •I mEG
Project Title: RESIDENCES AT LITTLE NELL Report date:0220/22 Project Title: RESIDENCES AT LITTLE NELL Report date:02/20/22 Project Title: RESIDENCES AT LITTLE NELL Report date:02/20/22
Data filename:\\filesvective\Projects\2022\22000596.00\Design\ElectricaNittle_nell_comcheck.cck Page 1 of 6 Data filename:\\files\Active\Projects\2022/22000596.00\Design\Electrical\little_nell_comcheck.cck Page 2 of 6 Data filename:6filesvective\Pmjects\2022\22000596.00\Design\ElectricaNittle_nell_comcheck.cck Page 3 of 6
7600 E.ORCHARD ROAD,SUITE 250-S
GREENWOOD VILLAGE,CO 80111-2539
303.796.6000 FX:720.501.6713
www.imegcorp.com#22000596.00
O
Section Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions # Final inspection Complies? Comments/Assumptions
&Req.ID pe pies. pions
C405.2.1 Lighting controls installed to uniformly DComplies Requirement will be met. &Req.ID _„_
[EL15]1 reduce the lighting load by at least QDoes Not C303.3, Furnished O&M instructions for QComplies Requirement will be met.
50%. C408.2.5. systems and equipment to the Oboes Not
ONet Observable 2 building owner or designated
ONot Applicable [FI17P representative. ONot Observable
•
C405.2.1 Occupancy sensors installed in QComplies Requirement will be met. ONot Applicable
[EL18P required spaces. ODoes Not C405.4.1 Interior Installed lamp and fixture QComplies See the Interior lighting fixture schedule for values.
• QNot Observable [FI181' lighting power is consistent with what ODoes Not
' ONot Applicable is shown on the approved lighting ONot Observable
• plans,demonstrating proposed watts
C405.2.1, Independent lighting controls installed QComplies Requirement will be met. are less than or equal to allowed ONot Applicable
C405.2.2. per approved lighting plans and all ODoes Not watts.
3 manual controls readily accessible and ONot Observable C408.2.5. Furnished as-bullt drawings for QComplies Requirement will be met.
B [EL23]2 visible to occupants. ONot Applicable 1 :electric power systems within 90 days QDoes Not
(FI16]5 'of system acceptance. ONot Observable
C405.2.2. Automatic controls to shut off all QComplies Requirement will be met. ONot Applicable
1 building lighting installed in all ODoes Not
[EL22]2 buildings. ONot Observable C406.3 Lighting systems have been tested to QComplies Requirement will be met.
[FI33], ensure proper calibration.adjustment,ODoes Not
ONot Applicable programming,and operation.
C405.2.3 Daylight zones provided with QComplies Exception:Requirement does not apply. ONot Observable
[EL16P individual controls that control the ODoes Not QNot Applicable
lights independent of general area ONot Observable Additional Comments/Assumptions:
lighting.
ONot Applicable
C405.2.3, Primary sidelighted areas are QComplies Exception:Requirement does not apply.
No DATE REVISION/ISSUE
C405.2.3. equipped with required lighting ODoes Not
1, controls. ONot Observable ,.11�I'
C405.2.3.
2 ONot Applicable
[EL20P
C405.2.3. Enclosed spaces with daylight area DComplles Exception:Requirement does not apply.
C405.2.3. under skylights and rooftop monitors Oboes Not
— 1, are equipped with required lighting :Not Observable
C405.2.3. controls.
3 ONot Applicable
[EL21]'
C405.2.4 Separate lighting control devices for QComplies Requirement will be met.
[EL4l5 specific uses installed per approved ODoes Not
lighting plans. QNot Observable
ONot Applicable
C405.2.4 Additional interior lighting power QComplies Requirement will he met.
[ELBIt allowed for special functions per the ODoes Not
approved lighting plans and is QNot Observable
automatically controlled and PROJECT NUMBER: 2200596.00
ONot Applicable
separated from general lighting. pp cable
•
C405.3 Exit signs do not exceed 5 watts per QComplies Requirement will he met. DRAWN BY: TJD&SDP
[EL6F face. ODoes Not CHECKED BY: MRZ
ONot Observable SCALE: AS NOTED
ONot Applicable rlv36.,rap am'5OMences,,cel.xwe,_IOwwe.00_ub.N.r_c.m
A Additional Comments/Assumptions:
COMPLIANCE DOCUMENTS
M EG T60D ORCHARD RDADESUITE 2 0.5
1 High Impact(Tier 1) 12!Medium Impact(Tier 2) 13 I Low Impact(Tier 3) GREENWOO FAX:VIL 12 AGG.s,CO 2,011 v255e
I 1 I High Impact(Tier 1) 12'Medium Impact(Tier 2) 13'Low Impact(Tier 3) I .,,,,,..imesoor. w
Project Title: RESIDENCES AT LITTLE NELL Report date:02/20/22 PROJECT e auweuetue.ee
Project Title: RESIDENCES AT LITTLE NELL Report date:02/20/22 Project Title: RESIDENCES AT LITTLE NELL Report
Data filename:Wiles\Active\Projects\2022\22000596.00\Design\Elecmcahlittie nail comcheck.cck Page 4 of 6 I po date:02/20/22 -
Datafilename:\\filest Active\Projectst2022U2000596.00\Design\Electricalgittle_nell_comcheck.cek Page 5of 6 Data filename:\\filesVktive\Projects\2022\22000596.00\Design\TEl Page 6of 6 DEGCORP RAWING RESERVES THE PROPRIETARY THEREON INCLUDING
T THIS
C�Qve Or1
0 THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR G
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS W R,EN
APPROVAL AND PARTICIPATION OF MG CORP. CL2022 NEC CORP.
D REFERENCE SCALE Iaecael 1 ALL NPUINGSHEDWOKOF AND WRITTEN THEEARCHITECTRANNDHMERNIOTBBEDURE ;EIVED
— ---. I DISCLOSED WRHOUT THE PRIOR WAITrEN CONSENT OE THE RACH
e ROTTEr STUDIO
5 I 4 3 2 1 03/14/2022
ASPEN