Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.501 Dean St.0019-2022-BCOM (26)
� R.A. NELSON /I\ BUILDING MOUNTAIN COMMUNITIES RLN Renovation Aspen, CO CONSTRUCTION MANAGEMENT PLAN TABLE OF CONTENTS 1.0 GENERAL 1.1 PURPOSE 1.2 APPLICABILITY 1.3 DEFINITIONS AND TERMS 1.4 REFERENCES 2.0 PROJECT INTRODUCTION 2.1 DISTURBANCE AREA 2.2 LOCATION 2.3 DESCRIPTION 3.0 PROJECT DOCUMENTATION 3.1 PERMITS/OTHER DOCUMENTS 3.2 PUBLIC NOTIFICATION 3.3 PROJECT SIGN 3.4 CONTACT DESIGNATION 4.0 PROJECT IMPLEMENATION 4.1 DATES OF CONSTRUCTION 4.2 HOURS OF CONSTRUCTION 4.3 SEQUENCE(PHASING)OF CONSTRUCTION 4.4 ADJOINING PROPERTY OWNERS 4.5 PROJECT FENCING 4.6 PUBLIC HEALTH AND WELFARE 4.7 NATURAL ENVIRONMENT 5.0 PARKING MANAGEMENT 5.1 PARKING MANGEMENT FORM 5.2 EMERGENCY VEHICLE ACCESS AND ORDINANCE 35 5.3 CONSTRUCTION PARKING DETAILS 5.4 STAGING AREAS 5.5 CONSTRUCTION TRAILER,MATERIALS STORAGE,AND WASTE MANAGEMENT 6.0 TRAFFIC CONTROL 6.1 GENERAL 6.2 HAUL ROUTES 6.3 ONSITE VEHICLE LIMITATIONS 6.4 DELIVERY REQUIREMENTS 6.5 TRAFFIC CONTROL PLAN 7.0 PEDESTRIAN PROTECTION RECEIVED 1 03/14/2022 ASPEN BUILDING DEPARTMENT � R.A. NELSON /I\ BUILDING MOUNTAIN COMMUNITIES 7.1 GENERAL 8.0 SEDIMENT AND EROSION CONTROL 8.1 REQUIREMENTS 8.2 SMUGGLER MOUNTIAN RESTRICTIONS 9.0 FUGITIVE DUST CONTROL 9.1 FUGITIVE DUST CONTROL PLAN 9.2 REQUIREMENTS 10.0 EMISSIONS 10.1 GENERAL 10.2 EMISSIONS FROM DIESEL POWERED ENGINES 11.0 NOISE SUPRESSION 11.1 GENERAL 11.2 NOISE SUPPRESSION PLAN 11.3 REQUIREMENTS 11.4 SPECIFIC RESTRICTIONS RELATED TO MANUFACTURING ON SITE 12.0 ENFORCEMENT 12.1 CONSTRUCTION MITIGATION OFFICER 12.2 CORRECTIVE ACTION 12.3 INSPECTION REPORTS APPENDICES A—Required Project Sign B—Site Management Plan C—Erosion Control Plan D—Noise Suppression Plan, Techniques and Equipment E—Project Schedule F—Stormwater Management Plan G—City of Aspen Ordinance 35 H—Filler Hydrant Permit Exhibit 1 CMP Plan Certification 1.0 GENERAL 1.1 PURPOSE RECEIVED 2 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES The purpose of this Construction Management Plan Manual is to provide a consistent policy under which certain physical aspects of construction management will be implemented on the RLN Renovation Project. The approved Construction Management Plan will be kept onsite. 1.2 APPLICABILITY This construction Management Plan shall govern the construction of RLN Renovation Aspen. 1.3 DEFINITIONS AND TERMS Construction Management Plan —A Construction Management Plan is a combination of diagrams, documents, drawings, and specifications that clearly define the steps that will be taken to demonstrate how the impacts to the community will be minimized. How the impacts associated with any construction project will be managed. Herein described as "Plan" throughout the remainder of this policy. Construction Mitigation Officer—An appointed employee of the City of Aspen whose charge is to ensure that all aspects of a Construction Management Plan are followed, and to further ensure that the impacts associated with construction activities within the City of Aspen are effectively managed and impacts associated with those projects are the least necessary to accomplish the project. Disturbance Area —A portion of land where topsoil or native soils have been removed for purposes of construction (development). Best Management Practices (BMP's) — Schedules of activities, prohibitions of practices, maintenance procedures, and other management practices to prevent or reduce the pollution of waters of the state. BMP's also include treatment requirements, operating procedures, and practices to control site runoff, spillage or leaks, waste disposal, or drainage from material storage. Tree Dripline and Protection Zone - Use the longest branch of the tree as a radius from the center of the tree and make a circle. The circle is then defined as the dripline and thus is the tree protection zone. Final Stabilization — Uniform vegetative cover has been established with a density of at least 70 percent of pre-disturbed levels. 1.4 CMP Submission Certification -Kris Myers Submission Certification is included as Exhibit 1. 1.5 REFERENCES A. City of Aspen Construction and Mitigation Standards for Work in the Public Rights-of-Way RECEIVED 3 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES B. City of Aspen Municipal Code Titles 8.56,13,21,26,28 and 29 C. City of Aspen Ordinance 35 D. Manual on Uniform Traffic Control Devices for Streets and Highways — Most Recent Addition E. Colorado Department of Public Safety General Permit Part IB F. Colorado Department of Transportation M&S construction standards G. Colorado Department of Public Health and Environment—Air Pollution Control Division 2.0 PROJECT LOCATION 2.1 DISTURBANCE AREA The total SF of soil disturbance is 0 sf or 0 acres. RA Nelson will not operate outside of the limits of disturbance without the prior consent of the property owner involved. RA Nelson will be responsible for protecting existing conditions outside the limit of disturbance from damage. Any damage to the existing areas outside the limit of disturbance will, at a minimum, be restored to a state equal to its pre-construction state. 2.2 LOCATION The Little Nell Residences are located at 501 E. Dean Street. The project is located in the Town of Aspen inside the core of town. The project map is shown on the Site Management Plan Appendix B. 2.3 DESCRIPTION Remodeling Units 308,407,500,402,501,502,600,403/404,410,409/408 corridors, entry, check-in desk, ski storage, office, and owner's lounge. Public Areas and Units will be receiving new flooring, paint, wall coverings, and replacement of all light fixtures. Windows will be replaced in the owner's lounge area to increase sound ratings for this area from the outdoor deck. There will be no exterior excavations or soil disturbance on the exterior of the building. 3.0 PROJECT DOCUMENTATION 3.1 PERMITS /OTHER DOCUMENTS RA Nelson will maintain all applicable local, state and federal licenses and permits that apply to this project. The following permits will be attached: Temporary Sign permit, Filler Hydrant permit. 3.2 PUBLIC NOTIFICATION The majority of the work is occurring on the interior of the building re-modeling existing corridors and units. There will be some windows and doors replaced on the gondola side of the building that will have minimal impact on the exterior of the building. All deliveries, dumpsters, and material storage will occur at the REC EIVED 4 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES existing loading dock in the building and material lay down or storage will occur in the existing parking garage of the building. There will be minimal disturbance to the surrounding properties or public during the re-model. RAN will post the required public notifications per the City of Aspen guidelines prior and during the project occurrence. 3.3 PROJECT SIGN A project sign will be posted that includes items shown in Appendix A- Required Construction Sign. The sign will be posted in a location where it is readable from the street and will meet the City Municipal Code 26.510.030B4. RA Nelson will obtain all permits as required by the City of Aspen for project signage. 3.4 CONTACT DESIGNATION Owner Representative- Alfred LaFave (310) 487-3871 RA Nelson Project Manager—TBD RA Nelson Site Superintendent- TBD State Certified Safety Officer- Molly Rabin (970) 331-4335 State Certified Traffic Control Officer- Al Traffic Control (970) 876 - 0738 Erosion Control Representative- N/A Aspen Fire Department— (970) 925-2690 ( non emergency ) Aspen Police Department— (970) 920-5400 ( non emergency ) Roaring Fork Transit Authority— (970) 920-1905 Aspen Valley School District— (970) 925-3760 CoA Consolidated Sanitation District— (970) 925 - 3601 CoA Water Department— (970) 920 - 5110 Aspen Valley Hospital - (970) 925-1120 Emergency Contact Info— 911 Holy Cross Energy— (970) 945-5491 4.0 PROJECT IMPLEMENTATION 4.1 DATES OF CONSTRUCTION The plan is to start fall renovation construction in the condos, guest rooms, and ski locker/office in September 22'. The Fall 22' work will be completed in December 22'. Corridor areas, Main Lobby Desk& Owners Lounge, First Floor Entry, and Remining Condos will start Spring 23' in April during the Spring building shutdown. Spring work will be completed in August 23'. See Appendix E — Detailed Construction Schedule. 4.2 HOURS OF CONSTRUCTION Hours of construction will be adhered to per the City of Aspen regulations listed in the following and any other applicable City of Aspen websites: RECEIVED 5 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES https://www.cityofaspen.com/DocumentCenter/View/507/Construction-Mitigation- Plan-Manual-PDF Construction hours shall be limited to 7:30am — 5:30pm Monday through Friday and 9am — 5pm on Saturday. No construction is permitted on Sundays, 4th of July day and/or weekend if it falls on a Friday or Monday, Memorial Day and Labor Day weekends, Thanksgiving Day, Christmas Day, New Year's Day. During Presidents Day: • Projects located in the Central Resort Area (CRA) are not permitted to work on any exterior elements, however interior work may be permitted with prior approval. • Projects outside the CRA will be permitted to work. During the Christmas week (12/26-12/31): • Projects located in the Central Resort Area (CRA) are not permitted to work on any exterior elements, however interior work may be permitted with prior approval. • Projects outside the CRA will be permitted to work. During Holiday Season: • Holiday Season is defined as the days of the week leading up to Christmas until New Year's Day. Refer to Appendix I for Holiday Season dates. • Projects located in the Core are not permitted to work on any exterior elements, however interior work will be permitted. During the Food & Wine Festival in June (Friday through Saturday): • Projects located in the Central Resort Area (CRA) are not permitted to work, projects outside the CRA will be permitted to work. The CRA and Core areas are defined in Appendix E. Specific indoor activities during restricted periods may be permitted with approval from the City of Aspen Engineering Department; specific conditions will be applied to each project separately. During the off-season 24 hour a day interior work may be permitted within the CRA, the applicant must present a work plan to the City of Aspen Engineering Department and the plan must be approved prior to working outside of the normal construction hours. Additional restrictions on construction hours and encroachments will be applied for Aspen Special Events. Examples of events that will require additional restrictions include the USA Pro Cycling Challenge and the Farmer's Market. Additional restrictions on construction hours will also be applied based on the ErEIVED 6 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES project's specific impacts on adjoining properties. This includes limiting work during sales events (for a maximum of two sales events per year), maintaining site lines to these businesses, and providing signage on the construction site advertising the adjacent business. For example, if an adjoining business has an event (such as a semiannual sale) the project will accommodate this adjoining business to ensure the construction activities do no adversely affect that business's event. 4.3 SEQUENCE (PHASING) OF CONSTRUCTION Please refer to the attached Exhibit E Detailed Schedule for sequencing and phasing of construction. R.A. Nelson also acknowledges the Holiday Schedules for the City of Aspen. R.A. Nelson will adhere to the job-site closures enforced by the City of Aspen. 4.5 PROJECT FENCING All Site Management will occur in the existing parking garage of the building that has a garage door that is closed unless needed for entry or exit. No job-site fencing will be necessary due to no exterior work. All dumpsters will be located in the garage and moved to the exterior when the trash removal company arrives. Construction team will utilize existing employee bathrooms during the construction. Access will be through the underground parking garage and elevators. 4.6 PUBLIC HEALTH AND WELFARE RA Nelson requires all subcontractors to conform with the site specific Safety Health and Management Plan. 4.7 NATURAL ENVIRONMENT There will be no exterior work impacting Storm Water Run-off. All Subcontractors will be instructed to follow Environmental procedures on this project to ensure compliance with federal, state and local requirements for construction site stormwater run-off. Site clearing and excavation will be conducted in a manner to reduce the impact on local ecosystems. RA Nelson will work closely with the City of Aspen Parks Department to facilitate the construction of the adjacent community parks areas. 5.0 PARKING MANAGEMENT 5.1 PARKING MANAGEMENT FORM RA Nelson encourages use of car-pooling and careful staging of subcontractors as a means to eliminate impacts upon the site and due to the limited parking opportunities at the jobsite. Parking will be utilized in the parking garage of the building during construction. 5.2 EMERGENCY VEHICLE ACCESS AND ORDINANCE 35 RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES RA Nelson will maintain continuous emergency vehicle access, on and around the site, including but not limited to police, fire, and ambulance services. Emergency access will be followed per City of Aspen Ordinance 35, See Appendix G. 5.4 STAGING AREAS All Staging will occur in the existing parking garage of the building. Staging of trucks will not be allowed on public ROW, and will not block access to neighboring properties. 5.5 RIGHT OF WAY LIMITATIONS There will be no ROW work areas for this project. 5.6 SITE PAN Google Earth picture of existing building is identified in Appendix B. No Exterior site work will take place. 5.7 WASTE MANAGEMENT No Construction Trailers will be utilized for this project, material storage will occur in the existing parking garage of the building along with 3 yd. dumpsters that will be moved to the exterior only during trash pick-up. No portable restrooms will be utilized and existing employee bathrooms will be utilized during construction. R.A. Nelson will adhere to the City of Aspen waste management requirements. Site will have a bear proof trash container for food waste, if needed. All waste will be located in the garage area that is not open to the exterior for animal access. 6.0 TRAFFIC CONTROL 6.1 GENERAL Certified traffic control personnel shall be used by RA Nelson if necessary. All traffic control personnel shall be equipped with a radio and appropriate flagging/signage equipment. 6.2 HAUL ROUTES Construction related traffic to the RLN Jobsite will flow from Main Street to turning right on South Aspen Street and then left on E. Durant Ave. Traffic will turn right S. Galena St. and then enter through the RLN Parking garage. Exit from the project will be the same way they entered the project. 6.3 ONSITE VEHICLE LIMITATIONS Maximum vehicle weights and sizes will follow the City of Aspen management plan requirements. 6.4 DELIVERY REQUIREMENTS RECEIVED 8 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES Traffic control required for deliveries must be fully coordinated with the City of Aspen Engineering Department. All deliveries must be scheduled through RA Nelson Superintendent with a (48) hour notice. Any unscheduled deliveries may be turned away. Deliveries will only be allowed through the main loading dock and Parking Garage during COA working hours. If trucks arrive early, they will be required to park and wait down valley at a future designated location until their designated delivery time. Delivery vehicles and all other onsite vehicles are not allowed to idle for more than five (5) minutes, with the exception of generators or PTO type operations and will be required to comply with City of Aspen Municipal Code (13.08.110). 6.5 TRAFFIC CONTROL PLAN The contractor and its subcontractors shall follow the guidelines set forth in the Colorado Manual of Uniform Traffic Control Devices for Streets and Highways (MUTCD), specifically Chapter 6C (Temporary Traffic Control Elements). The site access does not interfere with a school bus stop or school walk route. 7.0 PEDESTRIAN PROTECTION 7.1 GENERAL All construction will occur on the interior of the Hotel. Pedestrian traffic will not be allowed in the public areas during this construction. All Condos under construction will have access cut off to the public and doors locked. Temporary signage, traffic cones and orange fencing will be used to direct both pedestrian and vehicle traffic if required. Pedestrian Safety devices shall follow the requirements of city code 21.04.060, MUTCD chapter 6D, the Americans with Disability Act, and IBC Chapter 33. The site will be secured and locked during non-working hours and trespassers will be subject to prosecution for trespassing. 8.0 SEDIMENT AND EROSION CONTROL 8.1 REQUIREMENTS There will be no exterior work or excavation work during this construction project. No Storm Water Management Plan or Project Specific Erosion Control Plan will be required due to no soil disturbance on the project and Interior work only. All hazardous materials will be disposed of or treated as required per the manufacturer's recommendations. No Concrete wash areas will be provided for concrete trucks and pumps, and masonry operations due to no concrete is being poured on the project. RECEIVED 9 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES No Vehicle Tracking Control Pads (VTC)will be utilized due to no exterior construction occurring. Dewatering activities, if required, will require a permit from the State of Colorado Discharge Permit System (CDPS). This permit will be applied for 30 days prior to anticipated discharge. 9.0 FUGITIVE DUST CONTROL 9.1 FUGITIVE DUST CONTROL PLAN There will be no exterior work occurring on this project, but RAN will follow the below requirements if Dust Control Measures are required. RA Nelson will follow the dust control measures as outlined below. The scope of work does not meet the requirements for a State of Colorado Fugitive Dust Control (APEN) permit and is not required per the State of Colorado. There will be no exterior work occurring on the project. 9.2 REQUIREMENTS The following processes will be implemented to help minimize the impact of dust and debris during the construction process: A Filler Hydrant permit will be obtained from the City of Aspen Water Department and water will be obtained from one of the approved filler hydrant locations as shown in Appendix H of this document. Trucks entering and exiting the site will be required to cover loads onsite to help mitigate dust and debris migration Vehicle speeds on site will be restricted to15 MPH on construction access roads to help minimize dust pollution. Construction equipment and vehicles will be restricted to temporary access roads and staging areas unless required to be off of these roads for construction related activity. Shuttling and Carpooling plans will be will be utilized to eliminate unnecessary travel on temporary roads within the jobsite. Access roads will include a gravel base to minimize dust from construction equipment traffic on these roads. These roads will be maintained with watering truck as required, to mitigate dust a result of these temp roads. See attached Site Management Plan located in Attachment B. Ground cover measures shall be installed in staging and entrances to prevent dust and soil tracking. This will include temporary gravel material that will be removed at the end of the construction phase as needed or when a temporary staging area is no longer required. Material stockpiles heights will be kept to a minimum practicable heights and gentle slopes. Material stockpiles will use water misting/sprays as appropriate RECEIVED 10 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES Stockpiling of materials will be located away from the project boundary when feasible and downwind of sensitive areas to help minimize dust pollution. A wheel washing station and/or anti-tracking material (gravel) will be laid at the entrance/exit from the construction site as necessary. The tracking pad will construction will be reviewed with the engineering department for approval. Laborers and pressure washers will be utilized to clean truck and equipment tires when leaving the site when needed.. A street sweeper will be utilized to keep the existing roads, up to and outside of the construction fence, clean from construction debris, mud or other undesirable materials, resulting from the Hotel Aspen construction activities. Cleaning of existing roads inside the site boundary will be carried out daily; however frequency will increase if necessary. It is important to recognize that this needs to be monitored consistently throughout the day, in light of site operations and weather conditions. All trucks will exit through the provided wheel washing station and/or anti-tracking material (gravel), which is located at the exit of the site. The street sweeping operation will include all of the pavement areas as necessary. 10.0 EMISSIONS 10.1 GENERAL All subcontractors will be required to verify that all vehicles meet the City of Aspen Emissions requirements. Any vehicle that does not meet the requirements will be asked to leave until verification that they have improved the vehicles emissions to standards. 10.2 EMISSIONS FROM DIESEL POWERED ENGINES RA Nelson will enforce that emissions from diesel engines operated within the City of Aspen shall be of a shade or density no darker than 40% opacity, except for starting motion no longer than 10 seconds or for stationary operation not exceeding 10 seconds. 11.0 NOISE SUPRESSION 11.1 GENERAL Every reasonable effort will be made to minimize the noise impact of construction activities. Noise limits for construction activities is 70 decibels during the summer on season (6/1-Labor Day), 80 decibels all other times. All construction equipment shall be adequately muffled and maintained to minimize project noise. 11.2 NOISE SUPPRESSION PLAN See Appendix D for the Noise Suppression Plan. The plan includes information on noise blocking methods, techniques, and common equipment and activities that require noise suppression. l l RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES 11.3 REQUIREMENTS FOR ACTIVITIES EXCEEDING 80 DECIBELS 1. Any work producing noise levels over 70-80 decibels is not permitted to commence until after 9:00 am and is not permitted on Saturdays. That includes but not limited to the use of compressors, generators,jackhammers, power equipment, nail guns, drilling machinery, earth moving equipment and similar loud construction activities. This does not restrict quiet work inside and outside that does not require a power source, including a battery, on Saturday. 2. RA Nelson will notify neighbors within two hundred fifty (300) feet of the project informing them of the kinds of equipment, expected noise levels and durations of loud work. Including the variation of noise levels during a typical construction days may be helpful. Such notification must be in writing and be done seven (7) days prior to the starting time of the project. Communication with neighbors can prevent complaints from arising, and resolve concerns before there is a problem. RA Nelson will provide a phone number where the foreman can be reached prior to the start of the job. 3. Equipment will be operated in accordance with manufacturer's specifications and with all standard manufacturers' mufflers and noise-reducing equipment in use and in properly operating condition. 4. Notices will be posted to inform workers, including sub-contractors, about the basic noise requirements, as well as specific noise restrictions, to the project. 5. Noise barriers will be installed around all equipment/activities specified in Table 1 of Appendix D. Noise barriers not only significantly reduce construction noise, but they also provide an extra benefit of"hiding" the noise producing sources, thus increasing a neighbor's tolerance. Additional equipment requiring Noise Suppression that will be used on site , to be added to the City of Aspen Table 1, include a rock crusher and soil screener. 6. Portable loud equipment including generators, compressors, and cement mixers will be moved to different sides of the property to reduce impacts on individual neighbors. 7. The use of radios on the site are not allowed. 11.4 SPECIFIC RESTRICTIONS RELATED TO MANUFACTURING ON SITE We do not anticipate any manufacturing on-site at this time. 12.0 ENFORCEMENT 12.1 CITY CONSTRUCTION MITIGATION OFFICER The City Construction Mitigation Officer shall be assigned to the RLN Renovation construction project. The City Construction Mitigation Officer will complete random site visits to determine if the project is following approved Plan and City requirements. The officer is not intended to take the place of a City of Aspen building inspector. RECEIVED 12 03/14/2022 ASPEN BUILDING DEPARTMENT R.A. NELSON BUILDING MOUNTAIN COMMUNITIES 12.2 CORRECTIVE ACTION The City of Aspen will enforce construction mitigation corrections as follows: 1. The first corrective action is a verbal warning and explanation of the violation with a timeframe for completion. 2. The second corrective action is a written warning or correction notice with timeframe for compliance. 3. Third and final notice is a "Stop Work Order" (red tag). If a stop work order is issued, no more work can be completed until the violation is corrected. Failure to correct violations and/or any threat to public safety could subject the owner, contractor or both to a fine of$1000 a day as determined by the municipal court. 12.3 INSPECTION REPORTS The Construction Mitigation Officer will complete construction inspection reports. All reports are public and will be kept in the City Engineering Asset Management Department. RECEIVED 13 03/14/2022 ASPEN BUILDING DEPARTMENT RLN Renovation Building Permit # General Contractor: R. A. Nelson LLC General Contractor Contact: TBD (Site Superintendent) Contact Phone #: TBD Emergency Phone #: TBD 24 Hour Emergency Contact #: TBD Owner: Residences at Little Nell Architect: Bill Poss and Associates Architecture and Planning, P.C. Real Estate Agent Agent Contact Info RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT r„A4 REBUILDING MOUNTAIN COMMUNITIES RLN Renovation Aspen, CO CONSTRUCTION MANAGEMENT PLAN Appendix B Site Management Plan (No Exterior Work will take place. All material storage, parking, and dumpsters will be in the existing parking garage. Employee bathrooms will be utilized no Temp Restrooms. Existing Loading dock will be utilized for deliveries) RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT 2/22/22,4:28 PM Google Earth -------41. -, _ ,. , . ' v .,r IN J li nN ,: — ''-- -- •1 V . - •1 - , ! .. . _ � . + ' alift„,i aft. . *4- ' 1. iii , • , -- , . • a . -......, $. , •.�: _ IN ,r, .....-,4, , ii . .,....,_ ••ii •1 -'1, 10,,, ir -.--44* 4, Er , .... 4,r,L,,ok ' f,t r741 4,4/_' ! :y- .:wart w• <,y• rt .,• . ' */1 r gI I ka. ar j• . i)fi iIi4 _ t. r.. • J v. i r -.a. - _ , , C`‘i . ,:,''. • 411111iiiiir • :� •s lit N. to, • '4 ' i * !►,ti - 4 ,\ 7 , L ,21„, ' fro ifligit 4. a. . P N. ilir • - 4 Ilir l' lit Or 1 D Google Earth a. amera: 2,929 m 39°11'10"N 106°49'06"V' ;,z 1 c, , 2 t https://earth.google.com/web/@39.18637677,-106.81858409,2419.2295819a,509.43923018d,35y,-Oh,Ot,Or BUILDING DEL llit�NT R.A. NELSON �/\ BUILDING MOUNTAIN COMMUNITIES RLN Renovation Aspen, CO CONSTRUCTION MANAGEMENT PLAN Appendix C Erosion Control Plan 1. This project is an interior re-model only that will require no Erosion Control Mitigation on the exterior due to no dirt work will take place on the exterior of the Building. RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT r(,-; R.A. N ELSON BUILDING MOUNTAIN COMMUNITIES RLN Renovation Aspen, CO CONSTRUCTION MANAGEMENT PLAN Appendix D Noise Suppression Plan (Refer to Section 11 in the CMP) RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT City of Aspen Construction Noise Suppression Plan As the General Contractor for this construction project, I hereby agree to the following restrictions and will provide the necessary noise suppression (outlined below), such that it will lesson the impact to the properties within 300 feet of the project located at . I understand that if any construction activities exceed 80 decibels and are not covered by this document I will contact the City of Aspen Environmental Health Department to design a specific noise suppression plan for those activities. Signature Print name On-site Contact Phone# Many activities on construction sites are noisy. Although some noise may be unavoidable, it can often be controlled using improved work practices. Builders should make all reasonable efforts to minimize noise. Noise Suppression plans are required for all construction projects where activities will generate noise that exceeds 80 decibels. Section 18.04.050(A)(2)(d) Hours of operation All construction activity is limited to the following days and times: Monday thru Friday Saturday Sunday 7:30 am to 5:30 pm 9:00 am to 5:00 pm No construction work is allowed Constructions activities producing noise greater than 80 decibels are limited to the following days and times: Monday thru Friday 9:00 am to 5:00 pm Work that is over 80 decibels which by law requires a noise suppression plan will not be allowed for Saturday work that includes but not limited to the use of compressors, generators, jackhammers, power equipment, nail guns, drilling machinery, earth moving equipment and similar loud construction activities. This does not restrict quiet work inside and outside that does not require a power source, including a battery, on Saturday. Construction activity is not allowed during all federal holidays. Due to the congestion in Aspen when town is completely full, noise suppression plans will not be approved for the following dates: Christmas Week (December 25 through Jan. 1), Food and Wine Week in June (Friday thru Sunday), 4th of July day and/or weekend if it falls on a Friday or Monday, and Labor Day weekend. RECEIVED Revised 01/09/2013 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT Specific noise suppression requirements for all activities exceeding 80 decibels at a construction site include: 1. Notify neighbors within two hundred fifty (300)feet of the project informing them of the kinds of equipment, expected noise levels and durations of loud work. Including the variation of noise levels during a typical construction days may be helpful. Such notification must be in writing and be done seven (7) days prior to the starting time of the project. Communication with neighbors can prevent complaints from arising, and resolve concerns before there is a problem. Provide a phone number where the foreman can be reached prior to the start of the job. 2. Operate equipment in accordance with manufacturer's specifications and with all standard manufacturers' mufflers and noise-reducing equipment in use and in properly operating condition. 3. Post notices to inform workers, including sub-contractors, about the basic noise requirements, as well as specific noise restrictions, to the project. 4. Install noise barriers around all equipment/activities specified in Table 1: TYPICAL CONSTRUCTION EQUIPMENT REQUIRING NOISE SUPPRESSION. Noise barriers not only significantly reduce construction noise, but they also provide an extra benefit of"hiding" the noise producing sources, thus increasing a neighbor's tolerance. (See also the attached list of noise blocking methods for details on approved noise barriers.) 5. Move portable loud equipment including generators, compressors, and cement mixers to different sides of the property to reduce impacts on individual neighbors. What can you do about construction noise? • The use of radios on the site before 8:00 am are not allowed: remind laborers and sub- contractors. • Noise suppression plans will not allow noisy machines such as brick cutters or jackhammers to be operated before 9.00 am. • Noisy equipment such as cement mixers should be placed on the site to maximize the distance from neighboring houses and/or rotate location so as to not impact just one neighbor. Noise levels drop quickly with distance from the source. • All equipment should be properly maintained, with special attention to mufflers and other noise control devices. • Between work periods, builders are required by city ordinance to shut down machines such as backhoes, bobcats, loaders and generators. • When dropping materials from a height—for example, into or out of a truck, or when loading or unloading scaffolding, noise suppression plans require a chute or side baffles. • All vehicular movements to and from the site must only be made during the scheduled normal working hours. This includes off-site noise that is associated with a specific project such as staging of concrete trucks. RECEIVED Revised 01/09/2013 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT TABLE 1: NOISE CONSTRUCTION EQUIPMENT REQUIRING NOISE SUPPRESSION PLANS Equipment Category Auger Drill Rig Backhoe Chain Saw Clam Shovel Compressor(air) Concrete Mixer Concrete Pump Concrete Saw Crane (mobile or stationary) Dozer Drill Rig Excavator Front End Loader Generator(more than 25 KVA) Gradall Grader Horizontal Hydraulic Boring Jack Impact Pile Driver(diesel or drop) Impact Wrench Jackhammer* Mounted Impact Hammer(hoe ram) Paver Pneumatic Tools Rock Drill Scraper Scarifier Slurry Machine Vibratory Pile Driver RECEIVED Revised O 1/09/2013 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT Noise Blocking Methods Contractors shall require all subcontractors and vendors to use: • Quieter vs. Louder equipment • "Residential" grade combustion engine exhaust silencers • Electrical vs. pneumatic hand power tools: All pneumatic tools operated in the City of Aspen must be fitted with an effective silencer on their air exhaust port. • Hydraulic vs. air powered rock drills • "Silenced"pile drivers vs. Diesel pile drivers In general, noise reduction equipment and materials may include, but not be limited to: 1. Shields, shrouds, or intake and exhaust mufflers. 2. Noise-deadening material to line hoppers, conveyor transfer points, storage bins, or chutes. 3. Noise barriers using materials consistent with the Temporary Noise Barrier Materials Section. 4. Noise curtains 5. Plywood with concrete blankets at the height of the equipment and that it surrounds the activity such that it directs noise up more than out from the property. 6. Portable three sided enclosures made out of plywood to move with the activity such as jack hammering. 7. Internal combustion engines are to be fitted with a suitable muffler in good repair. Specific Equipment: Generators: The local power grid shall be used wherever feasible to limit generator noise. No generators larger than 25 KVA shall be used and, where a generator is necessary, it shall have maximum noise muffling capability. Backup Alarms: All equipment with backup alarms operated by the Contractor, vendors, suppliers, and subcontractors on the construction site shall be equipped with either audible self-adjusting ambient-sensitive backup alarms or manually- adjustable alarms. The ambient-sensitive alarms shall automatically adjust to a maximum of 5 dBA over the surrounding background noise levels. The manually-adjustable alarms shall be set at the lowest setting required to be audible above the surrounding noise. Installation and use of the alarms shall be consistent with the performance requirements of the current revisions of Society of Automotive Engineering (SAE)J994, J1446, and OSHA regulations. Compressors: The unit with the lowest noise rating which meets the requirements of the job should be used where work is conducted in the City of Aspen, installed with mufflers and/or enclosed in a noise barrier. RECEIVED Revised O 1/09/2013 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT Jackhammer: All jackhammers and pavement breakers used on the construction site shall have exhaust systems and mufflers that have been recommended by the manufacturer as having the lowest associated noise and shall be enclosed with shields or acoustical barrier enclosures. Concrete crushers or pavement saws: Pre-augur pile holes to reduce the duration of impact or vibratory pile driving and tie to local power grid to reduce the use of generators and shall be enclosed with shields or acoustical barrier enclosures. Pneumatic hand power tools: All pneumatic tools operated in the City of Aspen must be fitted with an effective silencer on their air exhaust port. Temporary Noise Barrier Materials: Temporary barriers shall be constructed of 3/4-inch Medium Density Overlay(MDO)plywood sheeting, or other material of equivalent utility and appearance having a surface weight of 2 pounds per square foot or greater. The temporary barriers shall be lined on one side with glass fiber, mineral wool, or other similar noise curtain type noise-absorbing material at least 2-inches. The materials used for temporary barriers shall be sufficient to last through the duration of the construction project, and shall be maintained in good repair. Prefabricated acoustic barriers are available from various vendors. An equivalent barrier design can be submitted in lieu of the plywood barrier described above. Impact Equipment: Impact noise is noise produced from impact or devices with discernible separation in sound pressure maxima. Examples for impact equipment include,but are not limited to; blasting, chisel drops, mounted impact hammers (hoe ram), and impact pile drivers. Impact equipment is the loudest and most intrusive to the neighboring property. The City of Aspen requires that this type activity have the strictest mitigation requirements and requires a customized noise suppression plan specific to the site. General contractors must contact the City of Aspen Environmental Health Department for an application at 970-920-5039. Noise Control • Replace worn, loose, or unbalanced machine parts that cause vibration. • Keep machine parts well lubricated to reduce friction. • Acoustical enclosures and barriers around generators • Sound absorbing material and vibration isolation systems on hand tools • Quiet work practices -use rubber mallets to erect and dismantle formwork. RECEIVED Revised O 1/09/2013 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT Noise Controls for Construction Equipment (Schneider et al., 1995) 'Equipment 'Noise Controls 'Pile Driver 'Enclosure, muffler Stone saw cutting Noise control pad with water 'Handheld impact drills Reduction of reflected sound Circular saw blades 15°tooth angle, new tooth configuration, slotted saw blades, iscoelastic damping _ 'Pneumatic tools Muffler avement breaker/Rock Muffler, enclosure of cylinder case and front head,moil damping drill 'Portable air compressor Muffler, acoustic enclosures Bulldozer Bulldozer Cab-liner material, enclosure, sound absorption in canopy, sealing of all openings Wheeled loader 'Absorption of sound cooling air route Vibratory roller 'Flexible mounting for pump compartment Joint Cutter Anti-vibration mounting fixtures RECEIVED Revised O 1/09/2013 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT r(,-; R.A. N ELSON BUILDING MOUNTAIN COMMUNITIES RLN Renovation Aspen, CO CONSTRUCTION MANAGEMENT PLAN Appendix E Project Schedule RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT f. RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:14 PM WLNMG WCUYIAh L9.orrovnr1 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMI J HI A ISIOINIDIJIFIMIA M JIJI A ISIOINIDIJ 13 4 25115 6,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130 29 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 12Q 111 I 1 i Milestones 293d 5124/2022 8/11/2023 ,Milestones 2 Re-install furniture in 200&01,202&3,204&5, 5/24/2022 5/24/2022* II Re-install furniture in 200&01,202&3,204&5,309&10 311&12,304&5,306&7 309&10311&12,304&5,306&7 3 RLN Fall season Closure 10/7/2022* 10/7/2022 III RLN Fall season Closure 4 RLN Fall season re-opening 11/22/2022 11/22/2022* II RLN Fall season reopening 5 Fall furniture Move out for wood floors 1017/2022* 10/7/2022 49 SS I♦Fall furniture Move out for wood floors 6 Wood Floor Start Fall 2022 10/7/2022 10/7/2022 43 17d II Wood Floor Start Fall 2022 7 Wood floor finish Fall 2022 11/23/2022 11/23/2022 68 Il Wood floor finish Fall 2022 8 Furniture Move in late,402,501,502,409&8 12/16/2022 12/16/2022 79 II Furniture Move in late,402,501,502,409&5 9 Construction Condo Start Fall 2022 9/9/2022 9/9/2022 43 SS a Construction Condo Start Fall 2022 10 Costruction condo Finish Fall 2022 12/22/2022 12/22/2022 354 FF,479 FF II Costruction condo Knish Fall 2022 11 RLN Spring Season Closure 4/14/2023* 4/14/2023 II RLN Spring Season aosure 12 RLN Spring Season Re-opening 6/16/2023 6/16/2023* II RLN Spring Season Reopening 13 Construction Condo Start Spring 2023 4/4/2023 4/4/2023 45 SS III Construction Condo Start Spring 2023 14 Construction Condo Finish Fall 2023 7/12/2023 7/12/2023 684 SS III Construction Condo Finish Fall 2023 15 Guestroom Furniture Move out 10/6/2022 10/6/2022 687 SS III Guestroom Furniture Move out 16 Guestroom Furniture Move in 11/22/2022 11/22/2022 759 II Guestroom Furniture Move in 17 Start Guestrooms 10/13/2022 10/13/2022 687 II Start Guestrooms 18 Complete Guestrooms 11/28/2022 11/28/2022 760 a Complete Guestrooms 19 Start first floor entry corridor 4/13/2023 4/13/2023 105 II Start first floor entry corridor 20 Complete First floor entry Corridor 6/16/2023 6/16/2023 121 II Complete Rrst floor entry Corridor 21 Start Corridors Spring 2023 4/4/2023 4/4/2023 45 SS II Start Corridors Spring 2023 22 Complete Corridors Spring 2023 5/31/2023 5/31/2023 206 SS II Complete Corridors Spring 2023 23 Start Main Lobby Desk&Owners Lounge 4/7/2023 4/7/2023 815 SS,833 SS II Start Main Lobby Desk&Owners Lounge 24 Complete Main Lobby Desk&Owners Lounge 7/25/2023 7/25/2023 831 SS,855 SS II Complete Main Lobby Desk&Owners Lounge 25 Start Ski Locker&Office 9/9/2022 9/9/2022 763 SS II Start Ski Locker&Orfce 26 Complete Ski Locker&Office 12/1/2022 12/1/2022 781,805 II Complete Ski Locker&Office 27 Substantial Completion 7/14/2023 7/14/2023 684 II Substantial Completion 28 Final Completion 8/11/2023 8/11/2023 858 II Final Completion Preconstruction 234d 9/13/2021 9/6/2022 i Preconstruction 30 •ocuments&Pricing 234d 911312021I 9/612022 i Documents&Pricing 31 DD pricing to owner for VE review options 10d 9/13/2021 9/24/2021 32 DD pricing to owner for VE review options 32 CD pricing submiited for approval 30d 9/27/2021 11/11/2021 31 33 -CD pricing submitted for approval 33 Final CD Drawing Completion 60d 11/12/2021 2/18/2022 32 34 -Rnal CD Drawing Completion 34 City of Aspen plan review&permit 6m 1.2w 2/21/2022 9/2/2022 33 35 City of Aspen plan review&permit 42,35 Permit Issuance 1d 9/6/2022 9/6/2022 34 211 SS.808357 SS, I Permit Issuance 36 121 ubmittals&Long Lead Items CONSTRUCTION 454d 9/13/2021 8111120 RECEIVED 38 023 E MOBIL zAnoN r I r g Site Setup Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 1 of 23 0 3/14/2022 ASPEN BUILDING DEPARTMENT f. RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM IULIYMG YCMMIA? L'J.0IY.010,1i 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDHIFIMIAIMI J HI A I S 10 I N I D I J I F I M I A M JIJI A ISIOINIDIJ 13 4 25115 6,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130 2Q 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 i 40 Mobilize on site(Spring 2022) 1d 4/1/2022* 4/1/2022 41 I Mobilize on site(Spring 2022) 41 Secure areas for construction 2d 4/4/2022 4/5/2022 40 I Secure areas for construction 42 Mobilize on site(Fall 2022) 1d 9/8/2022 9/8/2022 35 43,687 18d I Mobilize on site(Fall 2022) 43 Secure areas for construction 2d 9/9/2022 9/12/2022 42 763 SS,9 SS,783 SS, I Secure areas for construction 4916d,617d,81 15d 44 Mobilize on site(Sping 2023) 1d 4/10/2023* 4/10/2023 45 I Mobilize on site(Spiny 2023) 833 SS,815,562 SS 45 Secure areas for construction 2d 4/4/2023* 4/6/2023 44 1d,105,483 SS 1d,21 I Secure areas for construction SS,13 SS 46 III WOOD FLOORS Wood Floors 44d 10/412022 1211512022 III Wood Floors 308 15d 10/612022 1012712022 ^308 49 Remove owner FFE items and storage items 3d 10/6/2022 10/10/2022 43 16d 50,55,5 SS Q Remove owner FFE items and storage items 50 Install protection&remove appliance 2d 10/11/2022 10/13/2022 49 51 I Install protection&remove appliance 51 Demo Wood floors 3d 10/14/2022 10/18/2022 50 52 9 Demo Wood floors 52 Install new wood floor 5d 10/19/2022 10/25/2022 51 53,57 ®Install new wood floor 53 Final clean unit for review 2d 10/26/2022 10/27/2022 52 I Anal clean unit for review 407 17d 1011112022 111412022 ^407 55 Install protection&remove appliance 2d 10/11/2022 10/13/2022 49 56,60 I Install protection&remove appliance 56 Demo Wood floors 3d 10/14/2022 10/18/2022 55 57 A Demo Wood floors 57 Install new wood floor 5d 10/26/2022 11/1/2022 52,56 58,62 ®Install new wood floor 58 Final clean unit for review 2d 11/3/2022 11/4/2022 57 I Anal clean unit for review 500 20d 1011412022 1111412022 ^500 60 Install protection&remove appliance 2d 10/14/2022 10/17/2022 55 61,65 I Install protection&remove appliance 61 Demo Wood floors 3d 10/18/2022 10/20/2022 60 62 9 Demo Wood floors 62 Install new wood floor 5d 11/3/2022 11/10/2022 57,61 63,67 ®Install new wood floor 63 Final clean unit for review 2d 11/11/2022 11/14/2022 62 I Anal clean unit for review 402 23d 10118/2022 1112212022 ^402 65 Install protection&remove appliance 2d 10/18/2022 10/19/2022 60 66,70 I Install protection&remove appliance 66 Demo Wood floors 3d 10/20/2022 10/24/2022 65 67 9 Demo Wood floors 67 Install new wood floor 5d 11/11/2022 11/18/2022 62,66 68,72 ®Install new wood floor 68 Final clean unit for review 2d 11/21/2022 11/22/2022 67 7 I Anal clean unit for review 501 26d 1012012022 121112022 ^501 70 Install protection&remove appliance 2d 10/20/2022 10/21/2022 65 71,75 I Install protection&remove appliance 71 Demo Wood floors 3d 10/24/2022 10/26/2022 70 72 9 Demo Wood noors 72 Install new wood floor 5d 11/21/2022 11/29/2022 67,71 73,77 SS 4d 0 Install new wood floor 73 Final clean unit for review 2d 11/30/2022 12/1/2022 72 I Final clean unit for review 502 32d 1012412022 1211512022 ^502 75 Install protection&remove appliance 2d 10/24/2022 10/25/2022 70 76 I Install protection&remove appliance 76 Demo Wood floors 3d 10/26/2022 10/28/2022 75 77 9 Demo Wood floors A RECEIVED 77 Install new wood floor 5d 11/29/2022 12/5/2022 72 SS 4d,76 78 15 Install new wood floor Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 2 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT Q'tRA NELSON Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM WALING WLVNIAM C'YWJNo il(e 2021 1 2022 1 2023 Line Name Duration Start Finish Predecessors Successors S i O I N I D HIFI M 1 A i M 1 J I J I A ISIOINIDIJIFIMIA M J I J I A ISIOINIDIJ 13 4 25,115 6,127117 7,128121,111 2 123 13 4, 125 15 5, 126 17 17 129 19 9, 130 20 13 3, 24 115,15 25117, 7 2$118, 9 3Q 124111 11 i 78 Final clean unit for review 2d 12/6/2022 12/8/2022 77 79 I Final clean unit for review 79 Install FFE items to unit 4d 12/9/2022 12/15/2022 78 8 9 Install FFE items to una 600 15d 101412022 1012612022 ^600 81 Remove owner FFE items and storage items 3d 10/4/2022 10/7/2022 43 15d 82,87 Q Remove owner FFE items and storage items 82 Install protection&remove appliance 2d 10/10/2022 10/11/2022 81 83 I Install protection&remove appliance 83 Demo Wood floors 3d 10/13/2022 10/17/2022 82 84 1 Demo Wood floors 84 Install new wood floor 5d 10/18/2022 10/24/2022 83 85,89 5 Install new wood floor 85 Final clean unit for review 2d 10/25/2022 10/26/2022 84 I Final clean unit for review 4031404 17d 1011012022 111312022 ^403/404 87 Install protection&remove appliance 2d 10/10/2022 10/11/2022 81 88,92 I Install protection&remove appliance 88 Demo Wood floors 3d 10/13/2022 10/17/2022 87 89 1 Demo Wood floors 89 Install new wood floor 5d 10/25/2022 10/31/2022 84,88 90,94 ®Install new wood floor 90 Final clean unit for review 2d 11/1/2022 11/3/2022 89 I Final clean unit for review 410 20d 10/1312022 1111112022 11410 92 Install protection&remove appliance 2d 10/13/2022 10/14/2022 87 93,97 I Install protection&remove appliance 93 Demo Wood floors 3d 10/17/2022 10/19/2022 92 94 a Demo Wood floors 94 Install new wood floor 5d 11/1/2022 11/8/2022 93,89 95,99 5 Install new wood floor 95 Final clean unit for review 2d 11/10/2022 11/11/2022 94 I Final clean unit for review 4091408 27d 1011712022 1112912022 ^409/40B 97 Install protection&remove appliance 2d 10/17/2022 10/18/2022 92 98 I Install protection&remove appliance 98 Demo Wood floors 3d 10/19/2022 10/21/2022 97 99 1 Demo Wood floors 99 Install new wood floor 5d 11/10/2022 11/17/2022 94,98 100 IN Install new wood floor 100 Final clean unit for review 2d 11/18/2022 11/21/2022 99 101 I Final clean unit for review 101 Install FFE items to unit 4d 11/22/2022 11/29/2022 100 p Install FFE items to una 102 9w 4d 41712023 16/19/2023 i 1 coRRmooRs Cooridors(Phase 2) r ^Cooddors(Phase 2) 1st Floor Entry Corridor S(Phase 2) 47d 417/2023 611512023 ^1st floor Entry Condor S(Phase 2) 105 Protect existing flooring 3d 4/7/2023 4/11/2023 45 106,123,19 9 Protect existing flooring 106 Demo existing stone wall 1d 4/13/2023 4/13/2023 105 107 I Demo existing stone wall 107 Demo existing mirror 1d 4/14/2023 4/14/2023 106 108 I Demo existing mirror 108 Remove existing wall Coverings&Leather 3d 4/17/2023 4/19/2023 107 109 I Remove existing wall Coverings&Leather panels panels 109 Remove ceiling fixtures 2d 4/20/2023 4/21/2023 108 110 I Remove ceiling Mures 110 Remove existing gas lit fixtures and patch 2d 4/24/2023 4/25/2023 109 111 I Remove existing gas lit fixtures and patch 111 Install wood paneling as noted on plan 5d 4/26/2023 5/2/2023 110 112 I Install wood paneling as noted on plan 112 Install new stone surround 5d 5/4/2023 5/10/2023 111 113 0 Install new stone surround 113 Install new wood panelling around door 5d 5/11/2023 5/17/2023 112 114 I Install new wood panelling around door 114 Paint ceilings,crown&walls where required 5d 5/18/2023 5/24/2023 113 115 9 Paint ceilings,crown&walls where required 115 install New ceiling fixtures 2d 5/25/2023 5/26/2023 114 116 0 install New ceiling fixtures RE 1.?EIVE 116 install new wall sconces 2d 5/30/2023 5/31/2023 115 117 0 install new wall sconces Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 3 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT rAl RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM 14J1t114G YCVtiIAh L9YwrMlli 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDHIFIMIAIMI J HI A IS 10 I N I D I J I F I M I A M J HI I A ISIOINIDIJ 13 4 25115 6 127117 7 128121,111 2 123 13 4 125 15 5 126 17 17 128 19 9 130 29 13 3 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 I 117 Install new exterior rails as noted at Foyer 3d 6/1/2023 6/5/2023 116 118 I Install new exterior rails as noted at Foyer 118 Final Clean Hallway 1d 6/6/2023 6/6/2023 117 120,119 I Anal Clean Hallway 119 RAN Assemble and Complete Punchlist 4d 6/7/2023 6/12/2023 118 120 I RAN Assemble and Complete Punchlist 120 Owner review&final approval 1d 6/13/2023 6/13/2023 118,119 121 I Owner review&final approval 121 City of Aspen Final review&approval by 2d 6/14/2023 6/15/2023 120 20 I City of Aspen Final review&approval by floor. floor. 1st Floor Corridors S(Phase 2) 34d 411312023 611/2023 illi 1st Floor Corridors 5(Phase 2) 123 Remove existing Carpet flooring 3d 4/13/2023 4/17/2023 105 124,137 a Remove existing Carpet Flooring 124 Remove existing wall Coverings 3d 4/18/2023 4/20/2023 123 125 SS 2d 9 Remove existing wall Covedngs 125 Remove ceiling fixtures 2d 4/20/2023 4/21/2023 124 SS 2d 126 0 Remove ceiling fixtures 126 Paint ceilings&walls where required 3d 4/24/2023 4/26/2023 125 127 8 Paint ceilings&walls where required 127 install New ceiling fixtures 2d 4/27/2023 4/28/2023 126 128 0 install New ceiling fixtures 128 install New Carpet Flooring 4d 5/1/2023 5/5/2023 127 129 I install New Carpet Booing 129 Remove existing wall scoces 2d 5/8/2023 5/9/2023 128 130 SS I Remove existing wall scores 130 Install New wallpaper 8d 5/8/2023 5/17/2023 129 SS 131 ©Install New wallpaper 131 install new wall sconces 2d 5/18/2023 5/19/2023 130 132 0 install new wall sconces 132 Final Clean Hallway 1d 5/22/2023 5/22/2023 131 134,133 I final Clean Hallway 133 RAN Assemble and Complete Punchlist 4d 5/23/2023 5/26/2023 132 134 I RAN Assemble and Complete Punchlist 134 Owner review&final approval 1d 5/30/2023 5/30/2023 132,133 135 I Owner review&final approval 135 City of Aspen Final review&approval by 2d 5/31/2023 6/1/2023 134 I City of Aspen Anal review&approval by floor. floor. 2nd Floor Corridors S(Phase 2) 34d 411812023 61612023 ^2nd Boor Corridors S(Phase 2) 137 Remove existing Carpet flooring 3d 4/18/2023 4/20/2023 123 138,152 9 Remove existing Carpet fioonng 138 Remove existing wall Coverings 3d 4/21/2023 4/25/2023 137 139 SS 2d a Remove existing wall Coverings 139 Remove ceiling fixtures 2d 4/25/2023 4/26/2023 138 SS 2d 140 0 Remove ceiling fixtures 140 Paint ceilings&walls where required 3d 4/27/2023 5/1/2023 139 141 8 Paint ceilings&walls where required 141 install New ceiling fixtures 2d 5/2/2023 5/4/2023 140 142 0 install New ceiling fixtures 142 install New Carpet Flooring 4d 5/5/2023 5/10/2023 141 143 I install New Carpet Flooring 143 Remove existing wall scoces 2d 5/11/2023 5/12/2023 142 144 SS 0 Remove existing wall scoces 144 Install New wallpaper 8d 5/11/2023 5/22/2023 143 SS 145 ©Install New wallpaper 145 install new wall sconces 2d 5/23/2023 5/24/2023 144 146 0 install new wall sconces 146 Final Clean Hallway 1d 5/25/2023 5/25/2023 145 148,147 I Final Clean Hallway 147 RAN Assemble and Complete Punchlist 4d 5/26/2023 6/1/2023 146 148 I RAN Assemble and Complete Punchlist 148 Owner review&final approval 1d 6/2/2023 6/2/2023 146,147 149 I Owner review&final approval 149 City of Aspen Final review&approval by 2d 6/5/2023 6/6/2023 148 I City of Aspen Final review&approval by floor. floor. Cooridors(Phase 3) 40d 412112023 611912023 ^Cooridors(Phase 3) 3rd Floor Corridors S(Phase 3 34d 412112023 6/9/2023 IIII 3rd floor Corridors S(Phase 3 152 Remove existing Carpet flooring 3d 4/21/2023 4/25/2023 137 153,166 a Remove existing Carpet flooring 153 Remove existing wall Coverings 3d 4/26/2023 4/28/2023 152 154 SS 2d a Repave existing wall Covedngs 154 Remove ceiling fixtures 2d 4/28/2023 5/1/2023 153 SS 2d 155 0 Remove ceiling fixtures RECEIVED155 Paint ceilings&walls where required 3d 5/2/2023 5/5/2023 154 156 8 Paint ceilings&walls where required 1 Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 4 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT f. RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM IULCIMfi YG491AM C9vrrovntS 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMI J HI A I S I O I N I D I J I F I M I A M JIJI A ISIOINIDIJ 13 4 25115 6,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130 29 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 i 156 install New ceiling fixtures 2d 5/8/2023 5/9/2023 155 157 0 install New ceiling fixtures 157 install New Carpet Flooring 4d 5/10/2023 5/15/2023 156 158 I install New Carpet Rooting 158 Remove existing wall scoces 2d 5/16/2023 5/17/2023 157 159 SS 0 Remove existing wall scoces 159 Install New wallpaper 8d 5/16/2023 5/25/2023 158 SS 160 ©Install New wallpaper 160 install new wall sconces 2d 5/26/2023 5/30/2023 159 161 0 install new wall sconces 161 Final Clean Hallway 1d 5/31/2023 5/31/2023 160 163,162 I Anal Clean Hallway 162 RAN Assemble and Complete Punchlist 4d 6/1/2023 6/6/2023 161 163 I RAN Assemble and Complete Punchlist 163 Owner review&final approval 1d 6/7/2023 6/7/2023 161,162 164 I Owner review&final approval 164 City of Aspen Final review&approval by 2d 6/8/2023 6/9/2023 163 floor. I City of Aspen final review&approval by floor. 4th Floor Corridors S(Phase 3) 34d 412612023 611412023 114th Floor Corridors S(Phase 3) 166 Remove existing Carpet flooring 3d 4/26/2023 4/28/2023 152 167,180 0 Remove existing Carpet floodng 167 Remove existing wall Coverings 3d 5/1/2023 5/4/2023 166 168 SS 2d a Remove existing wall Coverings 168 Remove ceiling fixtures 2d 5/4/2023 5/5/2023 167 SS 2d 169 0 Remove ceiling factures 169 Paint ceilings&walls where required 3d 5/8/2023 5/10/2023 168 170 8 Paint ceilings&walls where required 170 install New ceiling fixtures 2d 5/11/2023 5/12/2023 169 171 0 install New ceiling fixtures 171 install New Carpet Flooring 4d 5/15/2023 5/18/2023 170 172 I install New Carpet Flooring 172 Remove existing wall scoces 2d 5/19/2023 5/22/2023 171 173 SS 0 Remove existing wall scoces 173 Install New wallpaper 8d 5/19/2023 5/31/2023 172 SS 174 ©Install New wallpaper 174 install new wall sconces 2d 6/1/2023 6/2/2023 173 175 0 install new wall sconces 175 Final Clean Hallway 1d 6/5/2023 6/5/2023 174 177,176 I Rnal Clean Hallway 176 RAN Assemble and Complete Punchlist 4d 6/6/2023 6/9/2023 175 177 I RAN Assemble and Complete Punchlist 177 Owner review&final approval 1d 6/12/2023 6/12/2023 175,176 178 I Owner review&final approval 178 City of Aspen Final review&approval by 2d 6/13/2023 6/14/2023 177 I City of Aspen Final review&approval by floor. floor. 5th Floor Corridors S(Phase 3) 34d 51112023 611912023 ^5th Floor Corridors 5(Phase 3) 180 Remove existing Carpet flooring 3d 5/1/2023 5/4/2023 166 181,194 9 Remove existing Carpet flooring 181 Remove existing wall Coverings 3d 5/5/2023 5/9/2023 180 182 SS 2d B Remove existing wall Coverings 182 Remove ceiling fixtures 2d 5/9/2023 5/10/2023 181 SS 2d 183 0 Remove ceiling figures 183 Paint ceilings&walls where required 3d 5/11/2023 5/15/2023 182 184 8 Paint ceilings&walls where required 184 install New ceiling fixtures 2d 5/16/2023 5/17/2023 183 185 0 install New ceiling fixtures 185 install New Carpet Flooring 4d 5/18/2023 5/23/2023 184 186 I install New Carpet Rooting 186 Remove existing wall scoces 2d 5/24/2023 5/25/2023 185 187 SS 0 Remove existing wall scoces 187 Install New wallpaper 8d 5/24/2023 6/5/2023 186 SS 188 ©Install New wallpaper 188 install new wall sconces 2d 6/6/2023 6/7/2023 187 189 I install new wall sconces 189 Final Clean Hallway 1d 6/8/2023 6/8/2023 188 191,190 I Anal Clean Hallway 190 RAN Assemble and Complete Punchlist 4d 6/9/2023 6/14/2023 189 191 I RAN Assemble and Complete Punchlist 191 Owner review&final approval 1d 6/15/2023 6/15/2023 189,190 192 I Owner review&final approval 192 City of Aspen Final review&approval by 2d 6/16/2023 6/19/2023 191 floor. I City of Aspen final review&approval by floor. 6th&7th Floor Corridors S(Phase 3) 20d 51512023 61212023 116th&7th Floor Condors S(PhasR F r. Vir El) 9 ti 194 Remove existing Carpet flooring 1d 5/5/2023 5/5/2023 180 195 I Remove existing Carpet flooring 195 Remove existing wall Coverings 1d 5/8/2023 5/8/2023 194 196 SS 2d I Remove existing wall Coverings Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 5 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT f. RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM 14JLt1NG YLVMIAP•C'YwJM'nIS 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMIJIJI A ISIOINIDIJIFIMIA M JIJI A ISIOINIDIJ 13 4 25115 6,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130 20 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 i 196 Remove ceiling fixtures Id 5/10/2023 5/10/2023 195 SS 2d 197 I Remove ceiling fixtures 197 Paint ceilings&walls where required 2d 5/11/2023 5/12/2023 196 198 O Paint ceilings&walls where required 198 install New ceiling fixtures 1d 5/15/2023 5/15/2023 197 199 I install New ceiling fixtures 199 install New Carpet Flooring 1d 5/16/2023 5/16/2023 198 200 I install New Carpet Flooring 200 Remove existing wall scoces 1d 5/17/2023 5/17/2023 199 201 SS I Remove existing wall stag 201 Install New wallpaper 2d 5/17/2023 5/18/2023 200 SS 202 0 Install New wallpaper 202 install new wall sconces 1d 5/19/2023 5/19/2023 201 203 I install new wall sconces 203 Final Clean Hallway 1d 5/22/2023 5/22/2023 202 205,204 I Anal Clean Hallway 204 RAN Assemble and Complete Punchlist 4d 5/23/2023 5/26/2023 203 205 I RAN Assemble and Complete Punchlist 205 Owner review&final approval 1d 5/30/2023 5/30/2023 203,204 206 I Owner review&final approval 206 City of Aspen Final review&approval by 3d 5/31/2023 6/2/2023 205 22 SS I City of Aspen Anal review&approval by floor. floor. 207 iNDO UNIT REMODELS 86w 4d 9/13/2021 7114/2023 1 CONDO UNIT REMODELS • • .. . - ^Condo Units(Phase 2) Level 2 Condo Units(Phase 2) 916/20 - 12121121 ^Level 2 Condo Units(Phase 2) 210 Condo 208/209 38d 9/6/2022 11/1/2022 ^Condo 208/209 211 Remove owner FFE items and storage 2d 9/6/2022 9/8/2022 35 SS 212,232 0 Remove owner FFE items and storage items items 212 Install protection where required 2d 9/9/2022 9/12/2022 211 213 I Install protection where required 213 Demo Carpet 1d 9/13/2022 9/13/2022 212 214 SS I Demo carpet 214 Remove cabinet for re-use later 1d 9/13/2022 9/13/2022 213 SS 215 I Remove cabinet for re-use later 215 Demo Countertops&stone splash& 2d 9/14/2022 9/15/2022 214 216 SS I Demo Countertops&stone splash&template new one template new one 216 Remove&make safe lighting as indicated 2d 9/14/2022 9/15/2022 215 SS 217 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 217 Install floor protection 1d 9/16/2022 9/16/2022 216 219,218 I Install floor protection 218 Rough in for Fireplace TV 5d 9/19/2022 9/23/2022 217 223 1 Rough in for Replace N 219 Install new countertops and splash 3d 9/19/2022 9/21/2022 217 220 SS I Install new countertops and splash 220 Install new leather panels @ kitchen bar 2d 9/19/2022 9/20/2022 219 SS 221 I Install new leather panels @ kitchen bar area area 221 Install Wallcoverings 2d 9/21/2022 9/22/2022 220 222 0 Install Wallcovenngs 222 Re-install kitchen cabinet&crown 1d 9/23/2022 9/23/2022 221 223 SS I Re-install Idtchen cabinet&crown 223 Install new wall paint throughout 7d 9/26/2022 10/4/2022 222 SS,218 224 ©Install new wall paint throughout 224 Install new light fixtures 3d 10/6/2022 10/10/2022 223 225 9 Install new light fixtures 225 Install shower light 1d 10/11/2022 10/11/2022 224 226 I Install shower light 226 Install New Carpet 2d 10/13/2022 10/14/2022 225 227 I Install New Carpet 227 Final clean unit for review 3d 10/17/2022 10/19/2022 226 228 I Final clean unit for review 228 Owner review&completion items 1d 10/20/2022 10/20/2022 227 229 I Owner review&completion items 229 Complete Owner Punchlist 5d 10/21/2022 10/27/2022 228 230 I Complete Owner Punchlist 230 Install FFE items to unit 3d 10/28/2022 11/1/2022 229 0 Install FFE items to unit 231 do 210 1211 '/9/2022 11/11/2022 III Condo 210/211 Remove owner FFE items nd storage I RECEIVED 232 2d 9/9/2022 9/12/2022 211 233,253 0 Remove owner FFE items and storage items items 233 Install protection where required 2d 9/13/2022 9/14/2022 232 234 Install protection where required Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 6 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT p,,,) RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM 1i/ult.&YGV91Ah Gavrrovnt: 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMI J HI A ISIOINIDIJIFIMIA M JIJI A ISIOINIDIJ 13 4 25115 6,127117 7 128121,111 2 123 13 4, 125 15 5, 14 17 17 128 19 9, 130 2Q 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 i 234 Demo Carpet 1d 9/15/2022 9/15/2022 233 235 SS I Demo carpet 235 Remove cabinet for re-use later 1d 9/15/2022 9/15/2022 234 SS 236 I Remove cabinet for re-use later 236 Demo Countertops&stone splash& 2d 9/16/2022 9/19/2022 235 237 SS I Demo Countertops&stone splash&template new one template new one 237 Remove&make safe lighting as indicated 2d 9/16/2022 9/19/2022 236 SS 238 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 238 Install floor protection 1d 9/20/2022 9/20/2022 237 240,239 I Install floor protection 239 Rough in for fireplace TV 5d 9/21/2022 9/27/2022 238 244 1 Rough in for fireplace N 240 Install new countertops and splash 3d 9/21/2022 9/23/2022 238 241 SS I Install new countertops and splash 241 Install new leather panels @ kitchen bar 2d 9/21/2022 9/22/2022 240 SS 242 I Install new leather panels @ kitchen bar area area 242 Install Wallcoverings 2d 9/23/2022 9/26/2022 241 243 0 Install Wallcovedngs 243 Re-install kitchen cabinet&crown 1d 9/27/2022 9/27/2022 242 244 4d I Re-install kitchen cabinet&crown 244 Install new wall paint throughout 7d 10/4/2022 10/14/2022 2434d,239 245 ©Install new wall paint throughout 245 Install new light fixtures 3d 10/17/2022 10/19/2022 244 246 0 Install new light fxtures 246 Install shower light 1d 10/20/2022 10/20/2022 245 247 I Install shower light 247 Install New Carpet 2d 10/21/2022 10/24/2022 246 248 I Install New Carpet 248 Final clean unit for review 3d 10/25/2022 10/27/2022 247 249 I Final clean unt for review 249 Owner review&completion items 1d 10/28/2022 10/28/2022 248 250 I Owner review&completion items 250 Complete Owner Punchlist 5d 10/31/2022 1117/2022 249 251 I Complete Owner Punchlist 251 Install FFE items to unit 3d 11/8/2022 11/11/2022 250 0 Install FFE items to unit 252 45d 9/13/2022 11/21/2022 II Condo 212 253 Remove owner FFE items and storage 2d 9/13/2022 9/14/2022 232 254,274 0 Remove owner FFE items and storage items items 254 Install protection where required 2d 9/15/2022 9/16/2022 253 255 I Install protection where required 255 Demo Carpet 3d 9/19/2022 9/21/2022 254 256 a Demo Carpet 256 Remove cabinet for re-use later 1d 9/22/2022 9/22/2022 255 257 I Remove cabinet for re-use later 257 Demo Countertops&stone splash& 2d 9/23/2022 9/26/2022 256 258 SS I Dena Countertops&stone splash&template new one template new one 258 Remove&make safe lighting as indicated 2d 9/23/2022 9/26/2022 257 SS 259 0 Remove&make safe lighting as indicated on plans(owner) on plans(Owner) 259 Install floor protection 1d 9/27/2022 9/27/2022 258 261,260 I Install floor protection 260 Rough in for fireplace TV 5d 9/28/2022 10/4/2022 259 265 1 Rough in for freplace IV 261 Install new countertops and splash 3d 9/28/2022 9/30/2022 259 262 SS I Install new countertops and splash 262 III Install new leather panels @ kitchen bar 2d 9/28/2022 9/29/2022 261 SS 263 I Install new leather panels @ kitchen bar area area 263 Install Wallcoverings 2d 9/30/2022 10/3/2022 262 264 0 Install Wallcovedngs 264 Re-install kitchen cabinet&crown 1d 10/4/2022 10/4/2022 263 265 4d I Re-install kitchen cabinet&crown 265 Install new wall paint throughout 7d 10/13/2022 10/21/2022 264 4d,260 266 SS 7d ©Install new wall paint throughout 266 Install new light fixtures 3d 10/24/2022 10/26/2022 265 SS 7d 267 0 Install new light fixtures 267 Install shower light 1d 10/27/2022 10/27/2022 266 268 I Install shower light 268 Install New Carpet 2d 10/28/2022 10/31/2022 267 269 I Install New Carpet 269 Final clean unit for review 3d 11/1/2022 11//2022 268 270I Anal clean unt for review 270 Owner review&completion items 1d 1117/2022 1117/2022 269 2711 Own I Owner review&completion GemsRECEIVE') 271 Complete Owner Punchlist 5d 11/8/2022 11/15/2022 270 272 I Complete Owner Punchlist I I Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 7 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT p.) RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM P. WILLING YLVYI^r L;fY WJM0,li 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDHIFIMIAIMI J HI A ISIOINIDIJIFIMIA M JIJI A ISIOINIDIJ 13 4 251156,127i17 7,128121,111 2 i23 13 4, i25 15 5, 126 17 17 i28 199, 130 2Q 13 3, 24 115,i5 2Q 117, 7 2$118, 9 3Qi24i1111 i 272 Install FFE items to unit 3d 11/17/2022 11/21/2022 271 Q Install FFE items to unit 273 do 202/203 47d 9/15/2022 11/29/2022 ^condo 202/203 274 Remove owner FFE items and storage 2d 9/15/2022 9/16/2022 253 275,294 0 Remove owner FFE items and storage items items 275 Install protection where required 2d 9/19/2022 9/20/2022 274 276 I Install protection where required 276 Demo Carpet 1d 9/21/2022 9/21/2022 275 277 SS I Demo Carpet 277 Remove cabinet for re-use later 1d 9/21/2022 9/21/2022 276 SS 278 I Remove cabinet for re-use later 278 Demo Countertops&stone splash& 2d 9/22/2022 9/23/2022 277 279 SS I Demo Countertops&stone splash&template new one template new one 279 Remove&make safe lighting as indicated 2d 9/22/2022 9/23/2022 278 SS 280 I Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 280 Install floor protection 1d 9/26/2022 9/26/2022 279 281 I Install floor protection 281 Install new countertops and splash 3d 9/27/2022 9/29/2022 280 282 SS I Install new countertops and splash 282 Install new leather panels @ kitchen bar 2d 9/27/2022 9/28/2022 281 SS 283 I Install new leather panels®kitchen bar area area 283 Install Wallcoverings 2d 9/29/2022 9/30/2022 282 284 0 Install Wallcovedngs 284 Re-install kitchen cabinet&crown 1d 10/3/2022 10/3/2022 283 285 9d I Re-install kitchen cabinet&crown 285 Install new wall paint throughout 7d 10/19/2022 10/27/2022 284 9d 286 ©Install new wall paint throughout 286 Install new light fixtures 3d 10/28/2022 11/1/2022 285 287 g Install new light futures 287 Install shower light 1d 11/3/2022 11/3/2022 286 288 I Install shower light 288 Install New Carpet 2d 11/4/2022 11/7/2022 287 289 I Install New Carpet 289 Final clean unit for review 3d 11/8/2022 11/11/2022 288 290 I Final clean unit for review 290 Owner review&completion items 1d 11/14/2022 11/14/2022 289 291 I Owner review&completion items 291 Complete Owner Punchlist 5d 11/15/2022 11/22/2022 290 292 I compete Owner Punchlist 292 Install FFE items to unit 3d 11/23/2022 11/29/2022 291 0 Install FFE items to unit 293 do 200/201 49d 9/19/2022 12/5/2022 11111 II II Condo 200/201 294 Remove owner FFE items and storage 2d 9/19/2022 9/20/2022 274 295,315 0 Remove owner FFE items and storage items items 295 Install protection where required 2d 9/21/2022 9/22/2022 294 296 I Install protection where required 296 Demo Carpet 3d 9/23/2022 9/27/2022 295 297 SS B Demo carnet 297 Remove cabinet for re-use later 1d 9/23/2022 9/23/2022 296 SS 298 I Remove cabinet for re-use later 298 Demo Countertops&stone splash& 2d 9/26/2022 9/27/2022 297 299 SS I Demo Countertops&stone splash&template new one template new one 299 i Remove&make safe lighting as indicated 2d 9/26/2022 9/27/2022 298 SS 300 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 300 Install floor protection 1d 9/28/2022 9/28/2022 299 302,301 I Install floor protection 301 Rough in for fireplace TV 5d 9/29/2022 10/6/2022 300 306 I Rough in for fireplace N 302 Install new countertops and splash 3d 9/29/2022 10/3/2022 300 303 SS I Install new countertops and splash 303 Install new leather panels @ kitchen bar 2d 9/29/2022 9/30/2022 302 SS 304 I Install new leather panels®Idtchen bar area area 304 Install Wallcoverings 2d 10/3/2022 10/4/2022 303 305 0 Install Wallcoverings 305 Re-install kitchen cabinet&crown 1d 10/6/2022 10/6/2022 304 306 12d I Re-install kitchen cabinet&crown 306 Install new wall paint throughout 7d 10/26/2022 11/4/2022 305 12d,301 307 ©Install new wall paint throughout 307 Install new light fixtures 3d 1117/2022 11/10/2022 306 308 g Install new light fixtures RECEIVED 308 Install shower light 1d 11/11/2022 11/11/2022 307 309 I Install shower light Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 8 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT s. RA NELSON Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM WILLING VLVYIAPI COVF ThirIII. 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDHIFIMIAIMI J HI A ISIOINIDIJIFIMIA M JIJI A ISIOINIDIJ 13 4 251156,127i17 7,I28121,111 2 i23 13 4, i25 15 5, 126 17 17 i28 199, 130 2Q 13 3, 24 i15,15 2Q 117, 7 2$118, 9 3Qi24i1111 i 309 Install New Carpet 2d 11/14/2022 11/15/2022 308 310 0 Install New Carpet 310 Final clean unit for review 3d 11/17/2022 11/21/2022 309 311 I Final clean unit for review 311 Owner review&completion items 1d 11/22/2022 11/22/2022 310 312 I Owner review&completion items 312 Complete Owner Punchlist 5d 11/23/2022 12/1/2022 311 313 I Compete Owner Punchlist 313 Install FFE items to unit 2d 12/2/2022 12/5/2022 312 V Install FFE items to unit 314 Condo 204/205 T 52d 9/21/2022 12/13/2022 II Condo 204/205 315 Remove owner FFE items and storage 2d 9/21/2022 9/22/2022 294 316,336 I Remove owner FIE items and storage items items 316 Install protection where required 2d 9/23/2022 9/26/2022 315 317 I Install protection where required 317 Demo Carpet 1d 9/27/2022 9/27/2022 316 318 SS I Demo Carnet 318 Remove cabinet for re-use later 1d 9/27/2022 9/27/2022 317 SS 319 I Remove cabinet for re-use later 319 Demo Countertops&stone splash& 2d 9/28/2022 9/29/2022 318 320 SS I Dena Countertops&stone splash&template new one template new one 320 Remove&make safe lighting as indicated 2d 9/28/2022 9/29/2022 319 SS 321 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 321 Install floor protection 1d 9/30/2022 9/30/2022 320 323,322 I Install floor protection 322 Rough in for fireplace TV 5d 10/3/2022 10/10/2022 321 327 1 Rough in for fireplace N 323 Install new countertops and splash 3d 10/3/2022 10/6/2022 321 324 SS I Install new countertops and splash 324 Install new leather panels @ kitchen bar 2d 10/3/2022 10/4/2022 323 SS 325 I Install new leather panels @ kitchen bar area area 325 Install Wallcoverings 2d 10/6/2022 10/7/2022 324 326 0 Install Wallcoverings 326 Re-install kitchen cabinet&crown ld 10/10/2022 10/10/2022 325 327 14d I Re-install Idtchen cabinet&crown 327 Install new wall paint throughout 7d 11/1/2022 11/11/2022 326 14d,322 328 SS 7d ©Install new wall paint throughout 328 Install new light fixtures 3d 11/14/2022 11/17/2022 327 SS 7d 329 g Install new light fixtures 329 Install shower light 1d 11/18/2022 11/18/2022 328 330 I Install shower light 330 Install New Carpet 2d 11/21/2022 11/22/2022 329 331 0 Install New Carpet 331 Final clean unit for review 3d 11/23/2022 11/29/2022 330 332 I Anal clean unt for review 332 Owner review&completion items 1d 11/30/2022 11/30/2022 331 333 I Owner review&completion items 333 Complete Owner Punchlist 5d 12/1/2022 12/8/2022 332 334 I Complete Owner Punchlist 334 Install FFE items to unit 3d 12/9/2022 12/13/2022 333 0 Install FIE items to unit 335 do 206/207 55d 9/23/2022 12/21/2022 ^Condo 206/207 336 Remove owner FFE items and storage 2d 9/23/2022 9/26/2022 315 337 0 Remove owner FFE items and storage items items 337 Install protection where required 2d 9/27/2022 9/28/2022 336 338 I Install protection where required 338 Demo Carpet 1d 9/29/2022 9/29/2022 337 339 SS I Dena Carpet 339 Remove cabinet for re-use later 1d 9/29/2022 9/29/2022 338 SS 340 I Remove cabinet for re-use later 340 Demo Countertops&stone splash& 2d 9/30/2022 10/3/2022 339 341 SS I Dena Countertops&stone splash&template new one template new one 341 Remove&make safe lighting as indicated 2d 9/30/2022 10/3/2022 340 SS 342 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 342 Install floor protection 1d 10/4/2022 10/4/2022 341 343 I Install floor protection 343 Install new countertops and splash 3d 10/6/2022 10/10/2022 342 344 SS I Install new countertops and splash Install new leather panels @ kitchen bar 344 area 2d 10/6/2022 1017/2022 343 SS 345 I Install new leather panels @ kitchen bar area 345 Install Wallcoverings 2d 10/10/2022 10/11/2022 344 346 0 Install Wallcoverings RECEIVE') Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 9 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT p.) RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM WLMNG YG491AM C9Y WJMrnli 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMI J HI A ISIOINIDIJIFIMIA M J i J I A ISIOINIDIJ 13 4 251156,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130 2Q 13 3, 24 115,15 2Q 117, 7 23 i 18, 9 3Q 124111 11 i 346 Re-install kitchen cabinet&crown 1d 10/13/2022 10/13/2022 345 347 17d I Re-install kitchen cabinet&crown 347 Install new wall paint throughout 7d 11/10/2022 11/21/2022 346 17d 348 SS 7d ©Install new wall paint throughout 348 Install new light fixtures 3d 11/22/2022 11/28/2022 347 SS 7d 349 O Install new light fixtures 349 Install shower light 1d 11/29/2022 11/29/2022 348 350 I Install shower light 350 Install New Carpet 2d 11/30/2022 12/1/2022 349 351 0 Install New Carpet 351 Final clean unit for review 3d 12/2/2022 12/6/2022 350 352 I Foal clean unk for review 352 Owner review&completion items 1d 12/8/2022 12/8/2022 351 353 I Owner review&completion items 353 Complete Owner Punchlist 5d 12/9/2022 12/16/2022 352 354 I Complete Owner Punchlist 354 Install FFE items to unit 3d 12/19/2022 12/21/2022 353 10 FF 0 Install FFE items to unit Level 3 Condo Units(Phase 2) 57d 9/612022 12/512022 ^Level 3 Condo Units(Phase 2) 356 Condo 309&310 F 38d 9/6/2022 11/1/2022 ^Condo 309&310 F 357 Remove owner FFE items and storage 2d 9/6/2022 9/8/2022 35 SS 358,378 0 Remove owner FFE items and storage items items 358 Install protection where required 2d 9/9/2022 9/12/2022 357 359 I Install protection where required 359 Demo Carpet 1d 9/13/2022 9/13/2022 358 360 SS I Demo Carpet 360 Remove cabinet for re-use later 1d 9/13/2022 9/13/2022 359 SS 361 I Repave cabinet for re-use later 361 Demo Countertops&stone splash& 2d 9/14/2022 9/15/2022 360 362 SS I Demo Countertops&stone splash&template new one template new one 362 Remove&make safe lighting as indicated 2d 9/14/2022 9/15/2022 361 SS 363 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 363 Install floor protection 1d 9/16/2022 9/16/2022 362 365,364 I Install floor protection 364 ROugh in for fireplace TV 5d 9/19/2022 9/23/2022 363 369 1 ROugh in for freplace N 365 Install new countertops and splash 3d 9/19/2022 9/21/2022 363 366 SS I Install new countertops and splash 366 Install new leather panels @ kitchen bar 2d 9/19/2022 9/20/2022 365 SS 367 I Install new leather panels @ kitchen bar area area 367 Install Wallcoverings 2d 9/21/2022 9/22/2022 366 368 0 Install Wallcoverings 368 Re-install kitchen cabinet&crown 1d 9/23/2022 9/23/2022 367 369 SS I Re-install Idtchen cabinet&crown 369 Install new wall paint throughout 7d 9/26/2022 10/4/2022 368 SS,364 370 SS 7d ©Install new wall paint throughout 370 Install new light fixtures 3d 10/6/2022 10/10/2022 369 SS 7d 371 9 Install new light fixtures 371 Install shower light 1d 10/11/2022 10/11/2022 370 372 I Install shower light 372 Install New Carpet 2d 10/13/2022 10/14/2022 371 373 I Install New Carpet 373 Final clean unit for review 3d 10/17/2022 10/19/2022 372 374 I Final clean unit for review 374 Owner review&completion items 1d 10/20/2022 10/20/2022 373 375 I Owner review&completion items 375 Complete Owner Punchlist 5d 10/21/2022 10/27/2022 374 376 1 Complete Owner Punchlist 376 Install FFE items to unit 3d 10/28/2022 11/1/2022 375 Q Install FFE items to unit 377 ndo 312&311 F 42d 9/9/2022 11/11/2022 •Condo 312&311 F 378 Remove owner FFE items and storage 2d 9/9/2022 9/12/2022 357 379,399 0 Repave owner FFE items and storage items items 379 Install protection where required 2d 9/13/2022 9/14/2022 378 380 I Install protection where required 380 Demo Carpet 1d 9/15/2022 9/15/2022 379 381 SS I Demo carpet 381 Remove cabinet for re-use later 1d 9/15/2022 9/15/2022 380 SS 382 I Remove cabinet for re-use later Demo Countertops&stone splash& RECEIVE') 382 2d 9/16/2022 9/19/2022 381 383 SS 0 Demo Countertops&stone splash&template new one template new one 383 Remove&make safe lighting as indicated 2d 9/16/2022 9/19/2022 382 SS 384 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) I I Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 10 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT f. RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM WILLING WLVNIAh L9YWJNVnl1 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDHIFIMIAIMI J HI A IS 10 I N I D I J I F I M I A M J HI I A ISIOINIDIJ 13 4 251156,127117 7,128121,111 2 123 13 4, 125 15 5, 126 17 17 129 19 9, 130 20 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 i 384 Install floor protection 1d 9/20/2022 9/20/2022 383 386,385 I Install floor protection 385 ROugh in for fireplace TV 5d 9/21/2022 9/27/2022 384 390 I Rough in for fireplace TV 386 Install new countertops and splash 3d 9/21/2022 9/23/2022 384 387 SS 'Install new countertops and splash 387 Install new leather panels @ kitchen bar 2d 9/21/2022 9/22/2022 386 SS 388 I Install new leather panels @ kitchen bar area area 388 Install Wallcoverings 2d 9/23/2022 9/26/2022 387 389 8 Install Wallcovedngs 389 Re-install kitchen cabinet&crown 1d 9/27/2022 9/27/2022 388 390 4d I Re-install kitchen cabinet&crown 390 Install new wall paint throughout 7d 10/4/2022 10/14/2022 389 4d,385 391 SS 7d ©Install new wall paint throughout 391 Install new light fixtures 3d 10/17/2022 10/19/2022 390 SS 7d 392 0 Install new light fixtures 392 Install shower light 1d 10/20/2022 10/20/2022 391 393 I Install shower light 393 Install New Carpet 2d 10/21/2022 10/24/2022 392 394 I Install New Carpet 394 Final clean unit for review 3d 10/25/2022 10/27/2022 393 395 I Anal clean unt for review 395 Owner review&completion items 1d 10/28/2022 10/28/2022 394 396 I Owner review&completion items 396 Complete Owner Punchlist 5d 10/31/2022 11/7/2022 395 397 I Complete Owner Punchlist 397 Install FFE items to unit 3d 11/8/2022 11/11/2022 396 O Install FFE items to unit 398 Condo 313 lir 45d 9/13/2022 11/21/2022111 1 Condo 313 399 Remove owner FFE items and storage 2d 9/13/2022 9/14/2022 378 400,420 Q Remove owner FFE items and storage items items 400 Install protection where required 2d 9/15/2022 9/16/2022 399 401 I Install protection where required 401 Demo Carpet 1d 9/19/2022 9/19/2022 400 402 SS I Demo Carnet 402 Remove cabinet for re-use later 1d 9/19/2022 9/19/2022 401 SS 403 I Remove cabinet for re-use later 403 Demo Countertops&stone splash& 2d 9/20/2022 9/21/2022 402 404 SS I Demo Countertops&stone splash&template new one template new one 404 Remove&make safe lighting as indicated 2d 9/20/2022 9/21/2022 403 SS 405 9 Remove&make safe lighting as indicated on plans(tamer) on plans(Owner) 405 Install floor protection 1d 9/22/2022 9/22/2022 404 407,406 I Install floor protection 406 Rough in for fireplace TV 5d 9/23/2022 9/29/2022 405 411 I Rough in for fireplace TV 407 Install new countertops and splash 3d 9/23/2022 9/27/2022 405 408 SS I Install new countertops and splash 408 Install new leather panels @ kitchen bar 2d 9/23/2022 9/26/2022 407 SS 409 I Install new leather panels @ kitchen bar area area 409 Install Wallcoverings 2d 9/27/2022 9/28/2022 408 410 0 Install Wallcoverings 410 Re-install kitchen cabinet&crown 1d 9/29/2022 9/29/2022 409 411 7d I Re-install kitchen cabinet&crown 411 Install new wall paint throughout 7d 10/13/2022 10/21/2022 410 7d,406 412 SS 7d ©Install new wall paint throughout 412 Install new light fixtures 3d 10/24/2022 10/26/2022 411 SS 7d 413 0 Install new light fixtures 413 Install shower light 1d 10/27/2022 10/27/2022 412 414 I Install shower light 414 Install New Carpet 2d 10/28/2022 10/31/2022 413 415 I Install New Carpet 415 Final clean unit for review 3d 11/1/2022 11/4/2022 414 416 I Final clean unit for review 416 Owner review&completion items 1d 1117/2022 1117/2022 415 417 I Owner review&completion items 417 Complete Owner Punchlist 5d 11/8/2022 11/15/2022 416 418 I Complete Owner Punchlist 418 Install FFE items to unit 3d 11/17/2022 11/21/2022 417 Q Install FFE items to unit 419 do 302/303 W 37d 9/15/2022 11/10/2022 .11M ^Condo 302/303 Remove owner FFE items nd storage I RECEIVED 420 2d 9/15/2022 9/16/2022 399 421,440 Q Remove owner FFE items and storage items items 421 Install protection where required 2d 9/19/2022 9/20/2022 420 422 Install protection where required Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 11 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT rAl RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM ivatimfi YGV91AI Wvrrovnt: 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDHIFIMIAIMI J HI A IS 10 I N I D I J I F I M I A M J HI I A ISIOINIDIJ 13 4 251156,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130?Q 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 12Q 111 I 1 i 422 Demo Carpet 1d 9/21/2022 9/21/2022 421 423 SS I Demo carnet 423 Remove cabinet for re-use later 1d 9/21/2022 9/21/2022 422 SS 424 I Remove cabinet for re-use later 424 Demo Countertops&stone splash& 2d 9/22/2022 9/23/2022 423 425 SS I Demo Countertops&stone splash&template new one template new one 425 Remove&make safe lighting as indicated 2d 9/22/2022 9/23/2022 424 SS 426 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 426 Install floor protection 1d 9/26/2022 9/26/2022 425 427 I Install floor protection 427 Install new countertops and splash 3d 9/27/2022 9/29/2022 426 428 SS I Install new countertops and splash 428 Install new leather panels @ kitchen bar 2d 9/27/2022 9/28/2022 427 SS 429 I Install new leather panels @ kitchen bar area area 429 Install Wallcoverings 2d 9/29/2022 9/30/2022 428 430 0 Install Wallcovenngs 430 Re-install kitchen cabinet&crown 1d 10/3/2022 10/3/2022 429 431 SS I Re-install Idtchen cabinet&crown 431 Install new wall paint throughout 7d 10/3/2022 10/13/2022 430 SS 432 SS 7d I:1 Install new wall paint throughout 432 Install new light fixtures 3d 10/14/2022 10/18/2022 431 SS 7d 433 0 Install new light factures 433 Install shower light 1d 10/19/2022 10/19/2022 432 434 I Install shower light 434 Install New Carpet 2d 10/20/2022 10/21/2022 433 435 I Install New Carpet 435 Final clean unit for review 3d 10/24/2022 10/26/2022 434 436 I Real clean unit for review 436 Owner review&completion items 1d 10/27/2022 10/27/2022 435 437 I Owner review&completion items 437 Complete Owner Punchlist 5d 10/28/2022 11/4/2022 436 438 1 Complete Owner Punchlist 438 Install FFE items to unit 3d 11/7/2022 11/10/2022 437 Q Install FFE items to unit 439 do 304/305 45d 9/19/2022 11/29/2022 _iiiII Condo 304/305 440 Remove owner FFE items and storage 2d 9/19/2022 9/20/2022 420 441,460 I Remove owner FFE items and storage items items 441 Install protection where required 2d 9/21/2022 9/22/2022 440 442 I Install protection where required 442 Demo Carpet 1d 9/23/2022 9/23/2022 441 443 SS I Demo Carpet 443 Remove cabinet for re-use later 1d 9/23/2022 9/23/2022 442 SS 444 I Remove cabinet for re-use later Demo Countertops&stone splash& 2d 9/26/2022 9/27/2022 443 445 SS I Demo Countertops&stone splash&template new one template new one 445 Remove&make safe lighting as indicated 2d 9/26/2022 9/27/2022 444 SS 446 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 446 Install floor protection 1d 9/28/2022 9/28/2022 445 447 I Install floor protection 447 Install new countertops and splash 3d 9/29/2022 10/3/2022 446 448 SS I Install new countertops and splash 448 Install new leather panels @ kitchen bar 2d 9/29/2022 9/30/2022 447 SS 449 I Install new leather panels @ Idtchen bar area area 449 Install Wallcoverings 2d 10/3/2022 10/4/2022 448 450 0 Install Wallcoverings 450 Re-install kitchen cabinet&crown 1d 10/6/2022 10/6/2022 449 451 7d I Re-install kitchen cabinet&crown 451 Install new wall paint throughout 7d 10/19/2022 10/27/2022 450 7d 452 SS 7d ©Install new wall paint throughout 452 Install new light fixtures 3d 10/28/2022 11/1/2022 451 SS 7d 453 9 Install new light factures 453 Install shower light 1d 11/3/2022 11/3/2022 452 454 I Install shower light 454 Install New Carpet 2d 11/4/2022 1117/2022 453 455 I Install New Carpet 455 Final clean unit for review 3d 11/8/2022 11/11/2022 454 456 I Real clean unit for review 456 Owner review&completion items 1d 11/14/2022 11/14/2022 455 457 I Owner review&completion items 457 Complete Owner Punchlist 5d 11/15/2022 11/22/2022 456 458 1 Complete Owner Punchlist 458 Install FFE items to unit 3d 11/23/2022 11/29/2022 457 0 Install F items to unit RECEIVE') 459 do 306/307 47d 9/21/2022 12/5/20221. ^Condo 306/307 Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 12 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT rAl RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:15 PM WLi114G YCVtiIAh L9YkwMla4i 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMI JIJI A ISIOINIDIJIFIMIA M JIJI A ISIOINIDIJ 13 4 25115 6 127117 7 128121,111 2 123 13 4 125 15 5 126 17 17 128 15 9 130 2Q 13 3 24 115,15 2Q 117, 7 29118, 9 3Q 124111 I 1 I 460 Remove owner FFE items and storage 2d 9/21/2022 9/22/2022 440 461 D Remove owner FFE items and storage items items 461 Install protection where required 2d 9/23/2022 9/26/2022 460 462 I Install protection where rewired 462 Demo Carpet 1d 9/27/2022 9/27/2022 461 463 SS I Demo Carpet 463 Remove cabinet for re-use later 1d 9/27/2022 9/27/2022 462 SS 464 I Remove caNnet for re-use later 464 Demo Countertops&stone splash& 2d 9/28/2022 9/29/2022 463 465 SS I Demo Countertops&stone splash&template new one template new one 465 Remove&make safe lighting as indicated 2d 9/28/2022 9/29/2022 464 SS 466 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 466 Install floor protection 1d 9/30/2022 9/30/2022 465 468,467 I Install floor protection 467 Rough in for fireplace TV 5d 10/3/2022 10/10/2022 466 472 1 Rough in for fireplace TV 468 Install new countertops and splash 3d 10/3/2022 10/6/2022 466 469 SS I Install new countertops and splash 469 Install new leather panels @ kitchen bar 2d 10/3/2022 10/4/2022 468 SS 470 I Install new leather panels @ kitchen bar area area 470 Install Wallcoverings 2d 10/6/2022 10/7/2022 469 471 0 Install Wallcoverings 471 Re-install kitchen cabinet&crown 1d 10/10/2022 10/10/2022 470 472 10d I Re-install Idtchen cabinet&crown 472 Install new wall paint throughout 7d 10/26/2022 11/4/2022 471 10d,467 473 SS 7d ©Install new wall paint throughout 473 Install new light fixtures 3d 1117/2022 11/10/2022 472 SS 7d 474 g Install new light futures 474 Install shower light 1d 11/11/2022 11/11/2022 473 475 I Install shower light 475 Install New Carpet 2d 11/14/2022 11/15/2022 474 476 I Install New Carpet 476 Final clean unit for review 3d 11/17/2022 11/21/2022 475 477 I Final clean unit for review 477 Owner review&completion items 1d 11/22/2022 11/22/2022 476 478 I Owner review&completion items 478 Complete Owner Punchlist 5d 11/23/2022 12/1/2022 477 479 I Complete Owner Punchlist 479 Install FFE items to unit 2d 12/2/2022 12/5/2022 478 10 FF 0 Install FFE items to unit Condo Units(Phase 3) 434d 9/1312021 711412023 i Condo Units(Phase 3) Level 3 Condo Units(Phase 3) 38d 416/2023 611/2023 OII Level 3 Condo Units(Phase 3) 482 Condo 308S 38d 4/6/2023 6/1/2023 ^Condo 308S 483 Remove owner FFE items and storage 5d 4/6/2023 4/13/2023 45 SS 1d 484,504 0 Remove owner FFE items and storage items items 484 Install protection where required 2d 4/14/2023 4/17/2023 483 485 I Install protection where required 485 Demo Carpet 1d 4/18/2023 4/18/2023 484 486 I Demo Carpet 486 Remove cabinet for re-use later 1d 4/19/2023 4/19/2023 485 487 I Remove cabinet for re-use later 487 Demo Countertops&stone splash& 2d 4/20/2023 4/21/2023 486 488 SS I Demo Countertops&stone splash&template new one template new one 488 Remove&make safe lighting as indicated 2d 4/20/2023 4/21/2023 487 SS 489 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 489 Install floor protection 1d 4/24/2023 4/24/2023 488 490 I Install Floor protection 490 Install new countertops and splash 3d 4/25/2023 4/27/2023 489 491 SS I Install new countertops and splash 491 Install new leather panels @ kitchen bar 2d 4/25/2023 4/26/2023 490 SS 492 I Install new leather panels @ kitchen bar area area 492 Install Wallcoverings 2d 4/27/2023 4/28/2023 491 493 0 Install Wallcoverings 493 Re-install kitchen cabinet&crown 1d 5/1/2023 5/1/2023 492 494 SS I Re-install Idtchen cabinet&crown 494 Install new wall paint throughout 7d 5/1/2023 5/10/2023 493 SS 495 SS 7d ©Install new wall paint throughout 495 Install new light fixtures 3d 5/11/2023 5/15/2023 494 SS 7d 496 g Install new light fixtures 496 Install shower light 1d 5/16/2023 5/16/2023 495 497 I Install shower light RECEIVE') Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 13 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT s. RA NELSON Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM WILLING WLVYIA PI C•DVM11 rAli 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMI J HI A I S 10 I N I D I J I F I M I A M JIJI A ISIOINIDIJ 13 4 25115 6,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130 20 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 i 497 Install New Carpet 2d 5/17/2023 5/18/2023 496 498 I Install New Carpet 498 Final clean unit for review 2d 5/19/2023 5/22/2023 497 499 I Mnal clean unit for review 499 Owner review&completion items 1d 5/23/2023 5/23/2023 498 500 I Owner review&completion items 500 Complete Owner Punchlist 3d 5/24/2023 5/26/2023 499 501 I Complete Owner Punchlist 501 Install FFE items to unit 3d 5/30/2023 6/1/2023 500 Q Install FFE items to unit Level 4 Condo Units(Phase 3) 419d 911312021 612212023 1 Level 4 Condo Units(Phase 3) 503 do 407S 34d 4/14/2023 6/2/2023 ^Condo 4015 504 Install protection where required 2d 4/14/2023 4/17/2023 483 505,523 I Install protection where rewired 505 Demo Carpet 1d 4/18/2023 4/18/2023 504 506 I Demo Carpet 506 Remove cabinet for re-use later 1d 4/19/2023 4/19/2023 505 507 I Remove cabinet for reuse later 507 Demo Countertops&stone splash& 2d 4/20/2023 4/21/2023 506 508 SS I Demo Countertops&stone splash&template new one template new one 508 Remove&make safe lighting as indicated 2d 4/20/2023 4/21/2023 507 SS 509 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 509 Install floor protection 1d 4/24/2023 4/24/2023 508 510 I Install floor protection 510 Install new countertops and splash 3d 4/25/2023 4/27/2023 509 511 SS I Install new countertops and splash 511 Install new leather panels @ kitchen bar 2d 4/25/2023 4/26/2023 510 SS 512 I Install new leather panels @ kitchen bar area area 512 Install Wallcoverings 2d 4/27/2023 4/28/2023 511 513 0 Install Wallcoverings 513 Re-install kitchen cabinet&crown 1d 5/1/2023 5/1/2023 512 514 I Re-install kitchen cabinet&crown 514 Install new wall paint throughout 7d 5/2/2023 5/11/2023 513 515 SS 7d,534 ©Install new wall paint throughout 515 Install new light fixtures 3d 5/12/2023 5/16/2023 514 SS 7d 516 I Install new light fixtures 516 Install shower light 1d 5/17/2023 5/17/2023 515 517 I Install shower light 517 Install New Carpet 2d 5/18/2023 5/19/2023 516 518 I Install New Carpet 518 Final clean unit for review 2d 5/22/2023 5/23/2023 517 519 I Mnal clean unit for review 519 Owner review&completion items 1d 5/24/2023 5/24/2023 518 520 I Owner review&completion items 520 Complete Owner Punchlist 3d 5/25/2023 5/30/2023 519 521 I Complete Owner Punchlist 521 Install FFE items to unit 3d 5/31/2023 6/2/2023 520 Q Install FFE items to unit 522 do 402S 39d 4/18/2023 6/13/2023 As NMI ^Condo 4025 523 Install protection where required 2d 4/18/2023 4/19/2023 504 524,543 I Install protection where required 524 Demo Carpet 1d 4/20/2023 4/20/2023 523 525 I Demo Carpet 525 Remove cabinet for re-use later 1d 4/21/2023 4/21/2023 524 526 I Remove cabinet for re-use later 526 Demo Countertops&stone splash& 2d 4/24/2023 4/25/2023 525 527 SS I Demo Countertops&stone splash&template new one template new one 527 Remove&make safe lighting as indicated 2d 4/24/2023 4/25/2023 526 SS 528 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 528 Install floor protection 1d 4/26/2023 4/26/2023 527 530,529 I Install floor protection 529 Move TV wall mount 3d 4/27/2023 5/1/2023 528 534 I Move 1V wall mount 530 Install new countertops and splash 3d 4/27/2023 5/1/2023 528 531 SS I Install new countertops and splash 531 Install new leather panels @ kitchen bar 2d 4/27/2023 4/28/2023 530 SS 532 I Install new leather panels @ kitchen bar area area 532 Install Wallcoverings 2d 5/1/2023 5/2/2023 531 533 B Install Wallcovedngs 533 Re-install kitchen cabinet&crown 1d 5/4/2023 5/4/2023 532 534 SS I Re-install kitchen cabinet&crown RE 533 I VIEI) 534 Install new wall paint throughout 7d 5/12/2023 5/22/2023 529514, 535 SS 7d,553 ©Install new wall paint throughout I I Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 14 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT f. RA NELSON Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM WILLING WLVNIAM L9YWJ1/0n1i 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMI J J I A ISIOINIDIJIFIMIA M JIJI A ISIOINIDIJ 13 4 25115 6,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130 20 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 i 535 Install new light fixtures 3d 5/23/2023 5/25/2023 534 SS 7d 536 0 Install new light fixtures 536 Install shower light 1d 5/26/2023 5/26/2023 535 537 I Install shower light 537 Install New Carpet 2d 5/30/2023 5/31/2023 536 538 O Install New Carpet 538 Final clean unit for review 2d 6/1/2023 6/2/2023 537 539 I Final clean unit for review 539 Owner review&completion items 1d 6/5/2023 6/5/2023 538 540 I Owner review&completion items 540 Complete Owner Punchlist 3d 6/6/2023 6/8/2023 539 541 I Complete Owner Punchlist 541 Install FFE items to unit 3d 6/9/2023 6/13/2023 540 I Install FFE items to unit 542 do 403/404S IMP W 44d 4/20/2023 6/22/2023 II Condo 403/404S 543 Install protection where required 2d 4/20/2023 4/21/2023 523 544 I Install protection where required 544 Demo Carpet 1d 4/24/2023 4/24/2023 543 545 I Demo Carpet 545 Remove cabinet for re-use later 1d 4/25/2023 4/25/2023 544 546 I Remove cabinet for re-use later 546 Demo Countertops&stone splash& 2d 4/26/2023 4/27/2023 545 547 SS I Demo countertops&stone splash&template new one template new one 547 Remove&make safe lighting as indicated 2d 4/26/2023 4/27/2023 546 SS 548 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 548 Install floor protection 1d 4/28/2023 4/28/2023 547 549 I Install floor protection 549 Install new countertops and splash 3d 5/1/2023 5/4/2023 548 550 SS I Install new countertops and splash 550 Install new leather panels @ kitchen bar 2d 5/1/2023 5/2/2023 549 SS 551 I Install new leather panels®kitchen bar area area 551 Install Wallcoverings 2d 5/4/2023 5/5/2023 550 552 0 Install Wallcoverings 552 Re-install kitchen cabinet&crown 1d 5/8/2023 5/8/2023 551 553 SS I Re-install kitchen cabinet&crown 553 Install new wall paint throughout 7d 5/23/2023 6/1/2023 552 SS,534 554 SS 7d ©Install new wall paint throughout 554 Install new light fixtures 3d 6/2/2023 6/6/2023 553 SS 7d 555 0 Install new light fixtures 555 Install shower light 1d 6/7/2023 6/7/2023 554 556 I Install shower light 556 Install New Carpet 2d 6/8/2023 6/9/2023 555 557 I Install New Carpet 557 Final clean unit for review 2d 6/12/2023 6/13/2023 556 558 I Final clean unit for review 558 Owner review&completion items 1d 6/14/2023 6/14/2023 557 559 I Owner review&completion items 559 Complete Owner Punchlist 3d 6/15/2023 6/19/2023 558 560 I Complete Owner Punchlist 560 Install FFE items to unit 3d 6/20/2023 6/22/2023 559 Q Install FFE items to unit 561 Condo 410S 39d 4/6/2023 6/2/202311111 WI 1 Condo 410S 562 Remove owner FFE items and storage 5d 4/6/2023 4/13/2023 45 SS 1d 563,583 I Remove owner FFE items and storage items items 563 Install protection where required 2d 4/14/2023 4/17/2023 562 564 I Install protection where required 564 Demo Carpet 1d 4/18/2023 4/18/2023 563 565 I Demo carpet 565 Remove cabinet for re-use later 1d 4/19/2023 4/19/2023 564 566 I Remove cabinet for re-use later 566 Demo Countertops&stone splash& 2d 4/20/2023 4/21/2023 565 567 SS I Dena Countertops&stone splash&template new one template new one 567 Remove&make safe lighting as indicated 2d 4/20/2023 4/21/2023 566 SS 568 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 568 Install floor protection 1d 4/24/2023 4/24/2023 567 570,569 I Install floor protection 569 Rough in for Fireplace TV 5d 4/25/2023 5/1/2023 568 574 1 Rough in for Replace TV 570 Install new countertops and splash 3d 4/25/2023 4/27/2023 568 571 SS I Install new countertops and splash Install new leather panels @ kitchen bar /� r 571 area 2d 4/25/2023 4/26/2023 570 SS 572 I Install new leather panels @ kitchen bar areR E �s� VI) 572 Install Wallcoverings 2d 4/27/2023 4/28/2023 571 573 0 Install Wallcoverings Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 15 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT p.) RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM WLMNG YG491AM C9Y WJIVtCi 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMIJIJI A ISIOINIDIJIFIMIA M JIJI A ISIOINIDIJ 13 4 25115 6,127117 7,128121,111 2 123 13 4, 125 15 5, 126 17 17 129 19 9, 130 29 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 i 573 Re-install kitchen cabinet&crown 1d 5/1/2023 5/1/2023 572 574 SS I Re-install kitchen cabinet&crown 574 Install new wall paint throughout 7d 5/2/2023 5/11/2023 573 SS,569 575 SS 7d,594 ©Install new wall paint throughout 575 Install new light fixtures 3d 5/12/2023 5/16/2023 574 SS 7d 576 g Install new light fixtures 576 Install shower light 1d 5/17/2023 5/17/2023 575 577 I Install shower light 577 Install New Carpet 2d 5/18/2023 5/19/2023 576 578 0 Install New Carpet 578 Final clean unit for review 2d 5/22/2023 5/23/2023 577 579 I Anal clean unit for review 579 Owner review&completion items 1d 5/24/2023 5/24/2023 578 580 I Owner review&completion items 580 Complete Owner Punchlist 3d 5/25/2023 5/30/2023 579 581 I Complete Owner Punchlist 581 Install FFE items to unit 3d 5/31/2023 6/2/2023 580 0 Install FFE items to unit 582 do 409/408S 41 d 4/14/2023 6/13/2023 ^Condo 409/4085 583 Install protection where required 2d 4/14/2023 4/17/2023 562 584,606 I Install protection where required 584 Demo Carpet 1d 4/18/2023 4/18/2023 583 585 I Demo Carpet 585 Remove cabinet for re-use later 1d 4/19/2023 4/19/2023 584 586 I Remove cabinet for re-use later 586 Demo Countertops&stone splash& 2d 4/20/2023 4/21/2023 585 587 SS I Demo Countertops&stone splash&template new one template new one 587 Remove&make safe lighting as indicated 2d 4/20/2023 4/21/2023 586 SS 588 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 588 Install floor protection 1d 4/24/2023 4/24/2023 587 590,589 I Install floor protection 589 Rough in for fireplace TV 5d 4/25/2023 5/1/2023 588 594 I Rough in for fireplace TV 590 Install new countertops and splash 3d 4/25/2023 4/27/2023 588 591 SS 'Install new countertops and splash 591 Install new leather panels @ kitchen bar 2d 4/25/2023 4/26/2023 590 SS 592 I Install new leather panels 6 kitchen bar area area 592 Install Wallcoverings 2d 4/27/2023 4/28/2023 591 593 0 Install Walicoverings 593 Re-install kitchen cabinet&crown 1d 5/1/2023 5/1/2023 592 594 SS I Re-install kitchen cabinet&crown 594 Install new wall paint throughout 7d 5/12/2023 5/22/2023 593 589574, 595 SS 7d ©Install new wall paint throughout 595 Install new light fixtures 3d 5/23/2023 5/25/2023 594 SS 7d 596 0 Install new light futures 596 Install shower light 1d 5/26/2023 5/26/2023 595 597 I Install shower light 597 Install New Carpet 2d 5/30/2023 5/31/2023 596 598 0 Install New Carpet 598 Final clean unit for review 2d 6/1/2023 6/2/2023 597 599 I Final clean unit for review 599 Owner review&completion items 1d 6/5/2023 6/5/2023 598 600 I Owner review&completion items 600 Complete Owner Punchlist 3d 6/6/2023 6/8/2023 599 601 I Complete Owner Punchlist 601 Install FFE items to unit 3d 6/9/2023 6/13/2023 600 Q Install FFE items to unit 602 5d 9/13/2021 9/17/2021 floes 603 Minor updates required for this unit 5d 9/13/2021 9/17/2021 I Minor updates required for this unit Level 5 Condo Units(Phase 3) 52d 411812023 613012023 11 Level 5 condo Units(Phase 3) 605 Condo 500S 34d 4/18/2023 6/6/2023 I1 Condo sots 606 Install protection where required 2d 4/18/2023 4/19/2023 583 607,626 I Install protection where required 607 Demo Carpet 1d 4/20/2023 4/20/2023 606 608 I Demo Carpet 608 Remove cabinet for re-use later 1d 4/21/2023 4/21/2023 607 609 I Remove cabinet for re-use later Demo Countertops&stone splash& 609 2d 4/24/2023 4/25/2023 608 610 SS I Demo Countertops&stone splash&template new one template new one EC E INE D Remove&make safe lighting as indicated 610 2d 4/24/2023 4/25/2023 609 SS 611 I Remove&make safe lighting as indicated on a R on plans(Owner) Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 16 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT f. RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM WILLING WLVNIAh L IV Th'r,l1 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDHIFIMIAIMI J HI A IS 10 I N I D I J I F I M I A M J HI I A ISIOINIDIJ 13 4 25115 6,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130 29 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 12Q 111 I 1 i 611 Install floor protection 1d 4/26/2023 4/26/2023 610 613,612 I Install floor protection 612 Rough in fireplace TV 5d 4/27/2023 5/4/2023 611 617 I Rough in fireplace N 613 Install new countertops and splash 3d 4/27/2023 5/1/2023 611 614 SS I Install new countertops and splash 614 Install new leather panels @ kitchen bar 2d 4/27/2023 4/28/2023 613 SS 615 I Install new leather panels®kitchen bar area area 615 Install Wallcoverings 2d 5/1/2023 5/2/2023 614 616 B Install Wallcovenngs 616 Re-install kitchen cabinet&crown 1d 5/4/2023 5/4/2023 615 617 SS I Re-install kitchen cabinet&crown 617 Install new wall paint throughout 9d 5/5/2023 5/17/2023 616 SS,612 618 SS 7d,636 Q Install new wall paint throughout 618 Install new light fixtures 3d 5/16/2023 5/18/2023 617 SS 7d 619 0 Install new light fixtures 619 Install shower light 1d 5/19/2023 5/19/2023 618 620 I Install shower light 620 Install New Carpet 2d 5/22/2023 5/23/2023 619 621 I Install New Carpet 621 Final clean unit for review 2d 5/24/2023 5/25/2023 620 622 I Final clean unit for review 622 Owner review&completion items 1d 5/26/2023 5/26/2023 621 623 I Owner review&completion items 623 Complete Owner Punchlist 3d 5/30/2023 6/1/2023 622 624 I Complete Owner Punchlist 624 Install FFE items to unit 3d 6/2/2023 6/6/2023 623 0 Install FFE items to unt 625 Condo 501 S 41d 4/20/2023 6/19/2023 = '111.11 II Condo 5015 626 Install protection where required 2d 4/20/2023 4/21/2023 606 627,645 I Install protection where rewired 627 Demo Carpet 1d 4/24/2023 4/24/2023 626 628 I Dena Carpet 628 Remove cabinet for re-use later 1d 4/25/2023 4/25/2023 627 629 I Remove cabinet for re-use later 629 Demo Countertops&stone splash& 2d 4/26/2023 4/27/2023 628 630 SS I Demo Countertops&stone splash&template new one template new one 630 Remove&make safe lighting as indicated 2d 4/26/2023 4/27/2023 629 SS 631 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 631 Install floor protection 1d 4/28/2023 4/28/2023 630 632 I Install floor protection 632 Install new countertops and splash 3d 5/1/2023 5/4/2023 631 633 SS I Install new countertops and splash 633 Install new leather panels @ kitchen bar 2d 5/1/2023 5/2/2023 632 SS 634 I Install new leather panels®kitchen bar area area 634 Install Wallcoverings 2d 5/4/2023 5/5/2023 633 635 0 Install Wallcoverings 635 Re-install kitchen cabinet&crown 1d 5/8/2023 5/8/2023 634 636 SS I Re-install kitchen cabinet&crown 636 Install new wall paint throughout 9d 5/18/2023 5/31/2023 635 SS,617 637 SS 7d,656 Q Install new wall paint throughout 637 Install new light fixtures 3d 5/30/2023 6/1/2023 636 SS 7d 638 g Install new light fixtures 638 Install shower light 1d 6/2/2023 6/2/2023 637 639 I Install shower light 639 Install New Carpet 2d 6/5/2023 6/6/2023 638 640 I Install New Carpet 640 Final clean unit for review 2d 6/7/2023 6/8/2023 639 641 I Rnal clean unt for review 641 Owner review&completion items 1d 6/9/2023 6/9/2023 640 642 I Owner review&completion items 642 Complete Owner Punchlist 3d 6/12/2023 6/14/2023 641 643 I Complete Owner Punchlist 643 Install FFE items to unit 3d 6/15/2023 6/19/2023 642 0 Install FFE items to unit 644 Condo 502 S 48d 4/24/2023 6/30/2023 II Condo 502 s 645 Install protection where required 2d 4/24/2023 4/25/2023 626 646,666 I Install protection where required 646 Demo Carpet 1d 4/26/2023 4/26/2023 645 647 I Demo Carpet 647 Remove cabinet for re-use later 1d 4/27/2023 4/27/2023 646 648 I Remove cabinet for re-use later Demo Countertops&stone splash& _� �1 I I(E I\/E D 648 2d 4/28/2023 5/1/2023 647 649 SS Demo Countertops&stone splash&tempt(Me r template new one ■�N Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 17 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT rAl RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM W111MG YCVtiIAP L9YMMJMItili 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMI J HI A ISIOINIDIJIFIMIA M JIJI A ISIOINIDIJ 13 4 25115 6 127117 7 128121,111 2 123 13 4 125 15 5 126 17 17 128 19 9 130 2Q 13 3 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 I 649 Remove&make safe lighting as indicated 2d 4/28/2023 5/1/2023 648 SS 650 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 650 Install floor protection 1d 5/2/2023 5/2/2023 649 652,651 I Install floor protection 651 Move TV wall mount 3d 5/4/2023 5/8/2023 650 656 I Move Tv wall mount 652 Install new countertops and splash 3d 5/4/2023 5/8/2023 650 653 SS I Install new countertops and splash 653 Install new leather panels @ kitchen bar 2d 5/4/2023 5/5/2023 652 SS 654 I Install new leather panels®kitchen bar area area 654 Install Wallcoverings 2d 5/8/2023 5/9/2023 653 655 0 Install Wallcoverings 655 Re-install kitchen cabinet&crown 1d 5/10/2023 5/10/2023 654 656 SS I Re-install Mtchen cabinet&crown 656 Install new wall paint throughout 9d 6/1/2023 6/13/2023 655 65,636, 657 SS 7d,677 ID Install new wall paint throughout 657 Install new light fixtures 3d 6/12/2023 6/14/2023 656 SS 7d 658 0 Install new light fixtures 658 Install shower light 1d 6/15/2023 6/15/2023 657 659 I Install shower light 659 Install New Carpet 2d 6/16/2023 6/19/2023 658 660 I Install New Carpet 660 Final clean unit for review 2d 6/20/2023 6/21/2023 659 661 I tonal clean unit for review 661 Owner review&completion items 1d 6/22/2023 6/22/2023 660 662 I Owner review&completion items 662 Complete Owner Punchlist 3d 6/23/2023 6/27/2023 661 663 I Complete Owner Punchlist 663 Install FFE items to unit 3d 6/28/2023 6/30/2023 662 Q Install FIT items to unit Level 6 Condo Units(Phase 3) 55d 412612023 711412023 11 Level 6 Condo Units(Phase 3) 665 Condo 600 S 55d 4/26/2023 7/14/2023 II Condo 600 6 666 Install protection where required 2d 4/26/2023 4/27/2023 645 667 I Install protection where required 667 Demo Carpet 1d 4/28/2023 4/28/2023 666 668 I Demo Carpet 668 Remove cabinet for re-use later 1d 5/1/2023 5/1/2023 667 669 I Remove cabinet for re-use later 669 Demo Countertops&stone splash& 2d 5/2/2023 5/4/2023 668 670 SS I Demo Countertops&stone splash&template new one template new one 670 Remove&make safe lighting as indicated 2d 5/2/2023 5/4/2023 669 SS 671 0 Remove&make safe lighting as indicated on plans(Owner) on plans(Owner) 671 Install floor protection 1d 5/5/2023 5/5/2023 670 673,672 I Install floor protection 672 Move TV wall mount 3d 5/8/2023 5/10/2023 671 677 I Move 1V wall mount 673 Install new countertops and splash 3d 5/8/2023 5/10/2023 671 674 SS I Install new countertops and splash 674 Install new leather panels @ kitchen bar 2d 5/8/2023 5/9/2023 673 SS 675 I Install new leather panels®Idtchen bar area area 675 Install Wallcoverings 2d 5/10/2023 5/11/2023 674 676 B Install Wallcovedngs 676 Re-install kitchen cabinet&crown 1d 5/12/2023 5/12/2023 675 677 SS I Re-install kitchen cabinet&crown 677 1 Install new wall paint throughout 9d 6/14/2023 6/26/2023 676 672656, 678 SS 7d ®Install new wall paint throughout 678 Install new light fixtures 3d 6/23/2023 6/27/2023 677 SS 7d 679 I Install new light fixtures 679 Install shower light 1d 6/28/2023 6/28/2023 678 680 I Install shower light 680 Install New Carpet 2d 6/29/2023 6/30/2023 679 681 I Install New Carpet 681 Final clean unit for review 2d 7/3/2023 7/5/2023 680 682 I Fnal clean unit for review 682 Owner review&completion items 1d 7/6/2023 7/6/2023 681 683 I Owner review&completion items 683 Complete Owner Punchlist 3d 7/7/2023 7/11/2023 682 684 I Complete Owner Punchlist 684 Install FFE items to unit 3d 7/1212023 7/14/2023 683 27,857,14 SS 'Install FFE items to uni � 685 i1 Guestroom 100 S 19d 101612022 11/312022 II Gues&oom1006 Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 18 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT f. RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM WLNMG YLVMIA I•L9MI4JMOC. 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMIJ HI A I S I O I N I D I J I F I M I A M J I J I A ISIOINIDIJ 13 4 251156,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 15 9, 130 20 13 3, 24 115,15 2Q 117, 7 29118, 9 3Q 124111 I 1 i 687 Remove owner FFE items and storage items 4d 10/6/2022 10/11/2022 42 18d 688,17,697,15 SS 0 Remove owner FFE items and storage items 688 Remove&make safe lighting as indicated on 1d 10/13/2022 10/13/2022 687 689 I Remove&make safe lighting as indicated on plans plans 689 Install floor protection 1d 10/14/2022 10/14/2022 688 690 I Install floor protection 690 Install new wall paint throughout 2d 10/17/2022 10/18/2022 689 691 8 Install new wall paint throughout 691 Install new Wallpaper 2d 10/19/2022 10/20/2022 690 692 8 Install new Wallpaper 692 Install new light fixtures 2d 10/21/2022 10/24/2022 691 693 0 Install new light fixtures 693 Final clean unit for review 2d 10/25/2022 10/26/2022 692 695,694 I Final clean unit for review 694 RAN Assemble and Complete Punchlist 4d 10/27/2022 11/1/2022 693 695 I RAN Assemble and Complete Punchlist 695 Owner review and turn over. 1 d 11/3/2022 11/3/2022 693,694 I Owner review and tum over. Guestroom 101 S 1011312022 1113/2022 n Guestroom 101S 697 Remove&make safe lighting as indicated on 1d 10/13/2022 10/13/2022 687 698,706 I Remove&make safe lighting as indicated on plans plans 698 Install floor protection 1d 10/14/2022 10/14/2022 697 699 I Install floor protection 699 Install new wall paint throughout 2d 10/17/2022 10/18/2022 698 700 0 Install new wall paint throughout 700 Install new Wallpaper 2d 10/19/2022 10/20/2022 699 701 8 Install new Wallpaper 701 Install new light fixtures 2d 10/21/2022 10/24/2022 700 702 0 Install new light futures 702 Final clean unit for review 2d 10/25/2022 10/26/2022 701 704,703 I Final clean unit for review 703 RAN Assemble and Complete Punchlist 4d 10/27/2022 11/1/2022 702 704 I RAN Assemble and Complete Punchlist 704 Owner review and turn over. 1d 11/3/2022 11/3/2022 702,703 I Owner review and tum over. Guestroom 102 S liblo 1011412022 111412022 ^Guestroom 1025 706 Remove&make safe lighting as indicated on 1d 10/14/2022 10/14/2022 697 707,715 I Remove&make safe lighting as indicated on plans plans 707 Install floor protection 1d 10/17/2022 10/17/2022 706 708 I Install floor protection 708 Install new wall paint throughout 2d 10/18/2022 10/19/2022 707 709 8 Install new wall paint throughout 709 Install new Wallpaper 2d 10/20/2022 10/21/2022 708 710 0 Install new Wallpaper 710 Install new light fixtures 2d 10/24/2022 10/25/2022 709 711 9 Install new light futures 711 Final clean unit for review 2d 10/26/2022 10/27/2022 710 713,712 I Final clean unit for review 712 RAN Assemble and Complete Punchlist 4d 10/28/2022 11/3/2022 711 713 I RAN Assemble and Complete Punchlist 713 Owner review and turn over. 1 d 11/4/2022 11/4/2022 711,712 I Owner review and tum over. Guestroom 103 S 15d 1011712022 111712022 ^Guestroom 1035 715 Remove&make safe lighting as indicated on 1d 10/17/2022 10/17/2022 706 716,724 I Remove&make safe lighting as indicated on plans plans 716 Install floor protection 1d 10/18/2022 10/18/2022 715 717 I Install floor protection 717 Install new wall paint throughout 2d 10/19/2022 10/20/2022 716 718 8 Install new wall paint throughout 718 Install new Wallpaper 2d 10/21/2022 10/24/2022 717 719 0 Install new Wallpaper 719 Install new light fixtures 2d 10/25/2022 10/26/2022 718 720 0 Install new light futures 720 Final clean unit for review 2d 10/27/2022 10/28/2022 719 722,721 I Final clean unit for review 721 RAN Assemble and Complete Punchlist 4d 10/31/2022 11/4/2022 720 722 I RAN Assemble and Complete Punchlist 722 Owner review and turn over. 1d 11/7/2022 11/7/2022 720,721 I Owner review and tum over. Guestroom 104 S 1011812022 111812022 ^Guestroom 1g45 RemoveRE &make safe lighting as indicated on 724 Remove1d 10/18/2022 10/18/2022 715 725,733 I Remove&make safe lighting as indicated on plans Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 19 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT Q'tRA NELSON Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM WILLING WLVNIAH CQVM14 a,li 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDHIFIMIAIMI J HI A I S I O I N I D I J I F I M I A M JIJI A ISIOINIDIJ 13 4 251156,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 15 9, 130 29 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 I 1 i 725 Install floor protection 1d 10/19/2022 10/19/2022 724 726 I Install floor protection 726 Install new wall paint throughout 2d 10/20/2022 10/21/2022 725 727 0 Install new wall paint throughout 727 Install new Wallpaper 2d 10/24/2022 10/25/2022 726 728 8 Install new Wallpaper 728 Install new light fixtures 2d 10/26/2022 10/27/2022 727 729 &Install new light fixtures 729 Final clean unit for review 2d 10/28/2022 10/31/2022 728 731,730 I Final clean unit for review 730 RAN Assemble and Complete Punchlist 4d 11/1/2022 11/7/2022 729 731 I RAN Assemble and Complete Punchlist 731 Owner review and tum over. 1 d 11/8/2022 11/8/2022 729,730 I Owner review and tum over. Guestroom 105 S 15d 10119/2022 1111012022 n Guestroom 105 S 733 Remove&make safe lighting as indicated on 1d 10/19/2022 10/19/2022 724 734,742 I Remove&make safe lighting as indicated on plans plans 734 Install floor protection 1d 10/20/2022 10/20/2022 733 735 I Install floor protection 735 Install new wall paint throughout 2d 10/21/2022 10/24/2022 734 736 0 Install new wall paint throughout 736 Install new Wallpaper 2d 10/25/2022 10/26/2022 735 737 8 Install new Wallpaper 737 Install new light fixtures 2d 10/27/2022 10/28/2022 736 738 0 Install new light fixtures 738 Final clean unit for review 2d 10/31/2022 11/1/2022 737 740,739 I Final clean unit for review 739 RAN Assemble and Complete Punchlist 4d 11/3/2022 11/8/2022 738 740 I RAN Assemble and Complete Punchlist 740 Owner review and turn over. 1d 11/10/2022 11/10/2022 738,739 I Owner review and turn over. Guestroom 106 S mlii6 1012012022 11111/2022 ^Guestroom 106 S 742 Remove&make safe lighting as indicated on 1d 10/20/2022 10/20/2022 733 743,751 I Remove&make safe lighting as indicated on plans plans 743 Install floor protection 1d 10/21/2022 10/21/2022 742 744 I Install floor protection 744 Install new wall paint throughout 2d 10/24/2022 10/25/2022 743 745 8 Install new wall paint throughout 745 Install new Wallpaper 2d 10/26/2022 10/27/2022 744 746 8 Install new Wallpaper 746 Install new light fixtures 2d 10/28/2022 10/31/2022 745 747 0 Install new light futures 747 Final clean unit for review 2d 11/1/2022 11/3/2022 746 749,748 I Final clean unit for review 748 RAN Assemble and Complete Punchlist 4d 11/4/2022 11/10/2022 747 749 I RAN Assemble and Complete Punchlist 749 Owner review and turn over. 1d 11/11/2022 11/11/2022 747,748 I Owner review and turn over. Guestroom 107 S 21d 10121/2022 1112312022 11 Guestroom 1075 751 Remove&make safe lighting as indicated on 1d 10/21/2022 10/21/2022 742 752 I Reneve&make safe lighting as indicated on plans plans 752 Install floor protection 1d 10/24/2022 10/24/2022 751 753 I Install Floor protection 753 Install new wall paint throughout 2d 10/25/2022 10/26/2022 752 754 8 Install new wall paint throughout 754 Install new Wallpaper 2d 10/27/2022 10/28/2022 753 755 0 Install new Wallpaper 755 Install new light fixtures 2d 10/31/2022 11/1/2022 754 756 &Install new light futures 756 Final clean unit for review 2d 11/3/2022 11/4/2022 755 758,757 I Anal clean unit for review 757 RAN Assemble and Complete Punchlist 4d 11/7/2022 11/11/2022 756 758 I RAN Assemble and Complete Punchlist 758 Owner review and turn over. 1d 11/14/2022 11/14/2022 756,757 759 I Owner review and turn over. 759 Install FFE items to unit 4d 11/15/2022 11/21/2022 758 760,16 0 Install FFE items to unit 760 City of Aspen final Approval all guestrooms 2d 11/22/2022 i 11/23/2022 759 18 I Oty of Aspen final Approval all guesbooms 761 2 1113012022 ^SKI LOCKER ROOM/SIG CONCIERGE Ski Locker Room(Phase 2) 42d 919120. ^Ski Locker Room(Phase 2) RECEIVED 763 Remove owner FFE items and storage items 2d 9/9/2022 9/12/2022 43 SS 764,25 SS 0 Reneve owner FFE items and storage item Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 20 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT s. RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM LULLING MCV4IA1,,CQMPOJPRI 1. 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDIJIFIMIAIMI J HI A IS 10 I N I D I J I F I M I A M J HI I A ISIOINIDIJ 13 4 251156,127117 7 128121,111 2 123 13 4, 125 15 5, 126 17 17 128 19 9, 130 29 13 3, 24 115,15 2Q 117, 7 2$118, 9 3Q 124111 11 i 764 Remove&make safe lighting as noted on 1 d 9/13/2022 9/13/2022 763 765 I Remove&make safe lighting as noted on plans plans 765 Demo Carpet 2d 9/14/2022 9/15/2022 764 766 SS 9 Demo Carpet 766 Remove Ski boot dryers 2d 9/14/2022 9/15/2022 765 SS 767 I Remove Ski hoot dryers 767 Demo existing wall finishes as noted on plans 1d 9/16/2022 9/16/2022 766 768 I Demo existing wall finishes as noted on plans 768 Remove existing ceiling tiles 2d 9/19/2022 9/20/2022 767 769 V Remove existing ceiling tiles 769 Prime Paint 3d 9/21/2022 9/23/2022 768 770 8 Prime Paint 770 Install new wains coat wall finishes with 2d 9/26/2022 9/27/2022 769 771 I Install new wains coat wall finishes with Leather finish Leather finish 771 Final paint walls&ceilings 2d 9/28/2022 9/29/2022 770 772 I Final paint walls&ceilings 772 Install new wallcoverings 2d 9/30/2022 10/3/2022 771 773 I Install new wallcoverings 773 Install new ceiling tiles 2d 10/4/2022 10/6/2022 772 774 I Install new ceiling tiles 774 Install new light fixtures and grills&trim out 2d 10/7/2022 10/10/2022 773 775 &Install new light fixtures and grills&trim out 775 Install New Carpet 2d 10/11/2022 10/13/2022 774 776 I Install New Carpet 776 Final clean unit for review 3d 10/14/2022 10/18/2022 775 779,777 I Final clean unit for review 777 RAN Assemble Punchlist 4d 10/19/2022 10/24/2022 776 778 I RAN Assemble Punchlist 778 RAN Complete Punchlist 6d 10/25/2022 11/1/2022 777 779 I RAN Complete Punchlist 779 Owner review and turn over. 1d 11/3/2022 11/3/2022 776,778 780 I Owner review and turn over. 780 Install FFE items 3d 11/4/2022 11/8/2022 779 781 0 Install FFE items 781 City of Aspen Final approval 2d 11/10/2022 11/11/2022 780 26 I OW of Aspen Rnal approval Sales Office Phase 2) 91912022 1113012022 II sales Office Phase 2) 783 Remove owner FFE items and storage items 2d 9/9/2022 9/12/2022 43 SS 784 0 Remove owner FFE items and storage items 784 Remove&make safe lighting as noted on 1d 9/13/2022 9/13/2022 783 785 I Remove&make safe lighting as noted on plans plans 785 Demo Carpet 2d 9/14/2022 9/15/2022 784 786 9 Demo Carpet 786 Demo existing ceiling&save crown as noted 2d 9/16/2022 9/19/2022 785 787 I Demo existing ceiling&save crown as noted on drawings on drawings 787 Demo existing wall finishes as noted on plans 2d 9/20/2022 9/21/2022 786 788 I Demo existing wall finishes as noted on plans 788 Frame new ceiling to max allowable height 1d 9/22/2022 9/22/2022 787 789 I Frame new ceiling to max allowaSe height 789 Install new ceiling framing 2d 9/23/2022 9/26/2022 788 790 0 Install new ceiling framing 790 Install new ceiling MEP items 5d 9/27/2022 10/3/2022 789 791 ,Install new ceiling MEP items 791 Sheetrock new ceiling 2d 10/4/2022 10/6/2022 790 792 0 Sheetrock new ceiling 792 T&B new ceiling 5d 10/7/2022 10/14/2022 791 793 ❑T&B new ceiling 793 re-install existing crown 1d 10/17/2022 10/17/2022 792 794 I re-install existing crown 794 Prime Paint new ceiling 1d 10/18/2022 10/18/2022 793 795 I Prime Paint new ceiling 795 Install new wains coat wall finishes with 5d 10/19/2022 10/25/2022 794 796 In Install new veins mat wall finishes with Leather finish Leather finish 796 Final paint walls&ceilings 2d 10/26/2022 10/27/2022 795 797 I Rnal paint walls&ceilings 797 Install new wallcoverings 2d 10/28/2022 10/31/2022 796 798 I Install new wallcoverings 798 Install new light fixtures and grills&trim out 2d 11/1/2022 11/3/2022 797 799 SS 0 Install new light fixtures and grills&tiim out 799 Install New Carpet 2d 11/1/2022 11/3/2022 798 SS 800 I Install New Carpet RECEIVE') Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 21 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT f. RA NELSON Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM WILLING YLVNIAH C'YWJN'r,li 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors SIOINIDHIFIMIAIMI J HI A IS i 0 1 N I D I J I F I M l A M J HI I A ISIOINIDIJ 13 4 251156,127i17 7,I28121,I11 2 i23 13 4, i25 15 5, 14 17 17 i28 159, 130 2Q 13 3, 24 115,15 2Q 117, 7 23 118, 9 3Qi24i1111 i 800 Final clean unit for reiew 3d 11/4/2022 11/8/2022 799 803,801 I Anal clean unit for reiew 801 RAN Assemble Punchlist 2d 11/10/2022 11/11/2022 800 802 2d I RAN Assemble Punchlist 802 RAN Complete Punchlist 2d 11/17/2022 11/18/2022 801 2d 803 I RAN Complete Punchlist 803 Owner review and tum over. 1d 11/21/2022 11/21/2022 800,802 804 I Owner review and turn over. 804 Install FFE items 3d 11/22/2022 11/28/2022 803 805 V Install FFE items 805 City of Aspen Final approval 2d 1112912022 11/30/2022 804 26 I Oty of Aspen Anal approval 806 - ,LOBBY&SKI LOCKER 41w 3d 918/2022 71261 i ,MAIN LOBBY&SKI LOCKER • ement ^Entry door&lounge door repacement 808 Demo Lounge exterior stone&windows 6d 9/8/2022 9/15/2022 35 809,811 ®Dena Lounge exterior stone&windows 809 Install new Lounge windows,door& 7d 9/16/2022 9/26/2022 808 810 Install new Lounge windows,door&waterproofing waterproofing assemblies ❑ g p oofng assemblies 810 Install new Lounge exterior finishes at dr and 10d 9/27/2022 10/11/2022 809 In Install new Lounge exterior finishes at dr and windows windows 811 Demo existing Entry doom&surround 4d 9/16/2022 9/21/2022 808 812 ®Demo existing Entry doors&surround 812 Install new Entry sliding glass doors&patch 8d 9/22/2022 10/3/2022 811 813 ❑Install new Entry sliding glass doors&patch 813 Install Entry temp finishes to entry door 5d 10/4/2022 10/11/2022 812 A Install Entry temp finishes to entry door Lobby Desk(Phase 3) 56d 417/2023 6/2812023 11 Lobby Desk(Phase 3) 815 Remove owner FFE items and storage items 2d 4/7/2023 4/10/2023 45 816,23 SS V Remove owner FFE items and storage items 816 Demo Carpet 2d 4/11/2023 4/13/2023 815 817 9 Dena Carpet 817 Demo reception desk 1d 4/14/2023 4/14/2023 816 818 I Demo reception desk 818 Demo existing wall finishes as noted on plans 1d 4/17/2023 4/17/2023 817 819 I Dena existing wall finishes as noted on plans 819 Remove&make safe lighting as indicated on 1d 4/18/2023 4/18/2023 818 820 I Remove&make safe lighting as indicated on plans plans 820 Install new wall finishes behind desk and doom 7d 4/19/2023 4/27/2023 819 821 1d ®Install new wall finishes behind desk and doors 821 Install new reception desk 3d 5/1/2023 5/4/2023 820 1d 822 I Install new reception desk 822 Install new reception desk countertop 2d 5/5/2023 5/8/2023 821 823 I Install new reception desk countertop 823 Install new wall paint as noted on plans 6d 5/9/2023 5/16/2023 822 824 1d ©Install new wall paint as noted on plans 824 Install new light fixtures 2d 5/18/2023 5/19/2023 823 1d 825 I Install new light fixtures 825 Install New Carpet 2d 5/22/2023 5/23/2023 824 826 I Install New Carpet 826 Final clean unit for reiew 2d 5/24/2023 5/25/2023 825 827 Id I Final clean unit for reiew 827 RAN Assemble Punchlist 6d 5/30/2023 6/6/2023 826 Id 828 2d ,RAN Assemble Punchlist 828 RAN Assemble Punchlist 8d 6/9/2023 6/20/2023 827 2d 829 .RAN Assemble Punchlist 829 Owner review and tum over. 1d 6/21/2023 6/21/2023 828 830 I Owner review and tum over. 830 Install FFE items 3d 6/22/2023 6/26/2023 829 831 Q Install FFE items 831 City of Aspen Final approval 2d 6/27/2023 6/28/2023 830 24 SS I City of Aspen Final approval Owners Lounge(Phase 3) 41312023 712612023 ^Owners Lounge(Phase 3) 833 Remove owner FFE items and storage items 2d 4/3/2023* 4/4/2023 45 SS 834,23 SS I Remove owner FFE items and storage items 834 Demo Carpet 2d 4/6/2023 4/7/2023 833 835 9 Dena Carpet 835 Demo Ceiling 4d 4/10/2023 4/14/2023 834 836 I Demo Ceiling �� 836 Demo existing leather panels 4d 4/17/2023 4/20/2023 835 837 SS 2d I Demo existing leather panels V E') Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 22 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT f. RA N E L SO N Residence at Little Nell Rev. date: 2/22/2022 5:26:16 PM WLt1MG 4C4MIAM C9Y4J14,1Ci 2021 I 2022 I 2023 Line Name Duration Start Finish Predecessors Successors S I 0 N I D J F M A I M I J1 J Al S 01 1 N I D J I F 1 MIA M J I J A I S 0 N I D I J 13 4 25 i16,1 271 17 7,1 281 21,i11 i23 13 4, i25 15 5, 1 6 17 i7 i28 1Q 9, 1 30 20 13 3, 24 i15,1 5 26 i17, 7 2$i18, 9 3Q1 2Qi11 0 837 Demo existing Millwork as noted on plans 3d 4/19/2023 4/21/2023 836 SS 2d 838 I Demo existing Millwork as noted on plans 838 Remove&make safe lighting as indicated on 2d 4/24/2023 4/25/2023 837 839 0 Remove&make safe lighting as indicated on plans plans 839 Frame new ceiling&Chandelier BLK 4d 4/26/2023 5/1/2023 838 840 0 Frame new ceiling&Chandelier BLK 840 Install new MEP items 6d 5/2/2023 5/10/2023 839 841 •Install new MEP items 841 Sheetrock new Ceiling 3d 5/11/2023 5/15/2023 840 842 Q Sheetrock new Ceiling 842 Tape&Bed new ceiling 5d 5/16/2023 5/22/2023 841 843 2d 0 Tape&Bed new ceiling 843 Prime Paint new ceiling and Faux Joints 4d 5/25/2023 5/31/2023 842 2d 844 2d 0 Prime Paint new ceiling and Faux Joints 844 Install new Millwork 3d 6/5/2023 6/7/2023 843 2d 845 0 Install new Millwork 845 Install new millwork countertop 2d 6/8/2023 6/9/2023 844 846 I Install new millwork countertop 846 Install new mirrors 2d 6/12/2023 6/13/2023 845 847 0 Install new mirrors 847 Install new wall paint as noted on plans 6d 6/14/2023 6/21/2023 846 848 ©Install new wall paint as noted on plans 848 Install new light fixtures 2d 6/22/2023 6/23/2023 847 849 0 Install new light fixtures 849 Install New Carpet 2d 6/26/2023 6/27/2023 848 850 0 Install New Carpet 850 Final clean unit for review 2d 6/28/2023 6/29/2023 849 853,851 I Final clean unit for review 851 RAN Assemble Punchlist 3d 6/30/2023 7/5/2023 850 852 2d I RAN Assemble Punchlist 852 RAN Complete Punchlist 5d 7/10/2023 7/14/2023 851 2d 853 2d I RAN Complete Punchlist 853 Owner review and turn over. 1d 7/19/2023 7/19/2023 850,852 2d 854 I Owner review and turn over. 854 Install FFE items 3d 7/20/2023 7/24/2023 853 855 0 Install HT item 855 City of Aspen Final approval 2d 7/25/2023 7/26/2023 854 24 SS I City of Aspen Final approval 856 til. 20d 711712023 811112023 Il aose out 857 Submit final billing 15d 7/1712023 8/412023 684 858 SS ®Submit final billing 858 Submit close out documents 20d 7/17/2023 8/11/2023 857 SS 28 ®Submit close out documents Responsibility,CSI Division :::00 00 00-RA Nelson 00 00 00-Owner ''•'''02 40 00-Demolition ;{■;;09 64 00-Wood Flooring i`i`'s`'s`'s`i 26 05 00-Electrical 22 05 00-Plumbing _06 42 00-Millwork .ma 04 20 00-Masonry r J 09 9100-Paint _09 68 00-Carpet _09 30 00-Tile _10 05 00-Specialties 09 29 00-Drywall 23 00 00-HVAC/Plumbing 1111 08 40 00-Storefront RECEIVED Milestone Appearances 0 Diamond Job#: 00001 Data Date:9/13/2021 Bar Chart View Filter:None Page 23 of 23 0 3/14/2 0 2 2 ASPEN BUILDING DEPARTMENT r R.A. N ELSON �� BUILDING MOUNTAIN COMMUNITIES RLN Renovation Aspen, CO CONSTRUCTION MANAGEMENT PLAN Appendix F Stormwater Management Plan Refer to Section 8 of the CMP plan RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT r R.A. N ELSON �� BUILDING MOUNTAIN COMMUNITIES RLN Renovation Aspen, CO CONSTRUCTION MANAGEMENT PLAN Appendix G City Aspenof Ordinance 35 RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT ORDINANCE NO.35 (SERIES OF 2002) AN EMERGENCY ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ASPEN,COLORADO,TO AMEND SECTION 11.04 OF THE MUNICIPAL CODE OF THE CITY OF.ASPEN-'FIRE PREVENTION AND'PROTECTION AND TO AMEND SECTION 24.16 OF THE MUNICIPAL CODE Off'THE CITE,'OF ASPEN-:RESIDENTIAL PARKING PERMXT SYSTEM.FOR THE PURPOSE OF IMPLEMENTING NEW REGULATIONS ENSURING THE SAFETY OF CONSTRUCTION SITES. WHEREAS;'the City Council of the City of Aspen directed the Community Development Director and the Chief Building Official of the Community Development Department to propose amendments to the Municipal Code to improve fire protection for construction sites and improve emergency access and parking for construction sites;and, WHEREAS, the amendments requested relate to Section 11.04.030, Fire Prevention and Protection - Amendments, and to Section 24.16, Residential Parking • Permit System, of the.Aspen Municipal Code;arid, WHEREAS, pursuant to Section 1.04.060, amendments to the Municipal Code may be approved by City Council by adoption of an Ordinance;and, WHEREAS, the Chief Building Official, the Community Development Director, and the Aspen Fire Marshal recommend adoption of the amendments,as described herein, to the afore mentioned sections for the purpose of protecting the public health, welfare, and safety;and, WHEREAS, City Council.reviewed and considered the recommendations of the Chief Building Official, the Community Development Director, the Aspen Fire Marshal, and members of the public during a duly noticed public hearing;and, WHEREAS, the City Council finds that the amendments, as hereinafter described, meet or exceed all applicable standards and that the approval.,is consistent with the goals and elements of the Aspen Area Community Plani;and, WHEREAS, the City Council finds that this Ordinance furthers and is necessary for the promotion of public health, safety, and welfare and should be adopted as an Emergency Ordinance pursuant to Section 4.11 of the City Charter. NOW, THEREFORE, BE IT ORDAINED BY THE CTIY COUNCIL OF'ICE CITY OF ASPEN,COLORADO,THAT: Section 1: Section 24.16 of the Municipal Code of the City of Aspen Colorado, which section defines, describes, authorizes; and regulates the on-street parking permit program within the City of Aspen shall hereby be amended by adding a section related to requirements for construction staging areas, construction parking areas, and emmergency access areas for construction sites within the City of Aspen which said section shall read as follows: RECEIVED Ordinance No. 35, Series of 2002 0 3/14/2 0 2 2 Pagel ASPEN BUILDING DEPARTMENT 24.16.240 Construction Staging Area, Parking, and Emergency Vehicle Access Management Plan To ensure proper public health, welfare, and safety, the City of Aspen requires approval of job site plans describing construction staging area(s), location and number of construction--related vehicles, and ensuring proper emergency vehicle access for construction projects within.the City of Aspen. These plans are required for all residential construction or remodelingof 1,500 square feet,or more, for any construction or remodeling involving multi-family buildings (three Or more units), or for any construction or remodeling involving commercial buildings. All other construction activity shall be considered exempt from these provisions. The construction project shall be issued street parking permits for the expected duration of the project for a fee. Parking permits issued, Pursuant to an approved Construction Staging Area, Parking, and Emergency Vehicle Access Management Plan, shall permit the all-day on-street parking of construction related vehicles within the specified construction parking area for the duration of the construction project. Construction vehicles parked outside of the approved area or after the • specified construction duration shall be considered in violation. The Chief Building Official shall require submission of a Construction Staging Area, Parking, and Emergency Vehicle Access Management Plan with submission of building permit documents. A building permit shall not be issued until such plan has been reviewed and approved by the Chief Building Official, All construction staging and construction parking shall be confined to the areas defined in the approved plan for the job site. Workers shall be encouraged to carpool. Emergency access, as described in the approved plan for the job site, shall at no time be blocked. A stop work order may be issued upon non- compliance. Section 2: Section 11.04,030 of the Municipal Code of the City of Aspen, Colorado, which • Section defines, describes, and authorizes the regulations fOr fire prevention and protection Within the City of Aspeii shall hereby be amended by adding a section related to requirements for construction projects within the City of Aspen and the use of temporary heating systems which said section shall read as follows: (ii) The following shall be added to Section 8203.2.1.2: To ensure proper public health, welfare, and safety,the City of Aspen requires any construction site using fuels to generate temporary heat fOr the purpose of • conditioning space during the process of construction shall be equipped with: 1. Signaling devices capable of detecting dangerous levels of heat and/or • smoke and capable of notifying a qualified party with responsibility to monitor the site and respond to the alania and take appropriate •actions• • E�'EIVED Ordinance No. 35, Series of2002 0 3/14/2 0 2 2 Page 2 ASPEN BUILDING DEPARTMENT • 2. As an alternate, an approved fie watch plan and schedule may be • substituted for the alarm requirement; 3. Associated supply lines shall be protected from flame or heat impingement resulting in failure of the appliance or supply hoses resulting in free flow of volatile fuel into the atmosphere and/or fire situation; 4. A free flow shutoff value shall be required on. all propane tanks • supplying temporary heat systems;or, 5. Any other plan acceptable to the Fire Marshal. • Prior to the.installation of any temporary heating device(s), the system equipment check list, prepared and maintained by the Fire Marshal, shall be submitted and approved by the Fire Marshal's Office. It shall be the responsibility of the contractor to notify the Fire Marshal prior to the activation of any temporary heating device. The principal contractor. or home owner-builder shall submit a statement acknowledging and agreeing to the terms of this section with submission of building permit documents. A stop work order may be issued upon non- compliance with provisions of this section. (jj) Section 16 of the Appendix II-A of the Uniform Fire Code is amended as follows: Section 3: This Ordinance is adopted as an emergency ordinance, pursuant to Section 4.11 of the City Charter, and shall be effective November 1, 2002 and apply to all currently permitted and active construction projects within the City of Aspen thereafter. Section 4: This Ordinance shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or aanended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 5: If any section, subsection, sentence, clause, phrase, or portion of this Ordinance is for any reason. held invalid or unconstitutional in a court of competent jurisdiction,such portion shall be deemed a separate, distinct and Independent provision and shall not affect the validity of the remaining portions thereof Section 6: A public hearing on the Ordinance shall be held on the 15th day of October, 2002,at 5:00 p.m. in the City Council Chambers,Aspen City Hall, AspenColoradO, fifteen(15) days prior to which hearing a public notice of the same was published in a newspaper of general circulation within the City of Aspen. RECEIVED Ordinance No. 35, Series of 2002 0 3/14/2 0 2 2 Page 3 • ASPEN BUILDING DEPARTMENT INTRODUCED,READ AND ORDERED PUBLISHED as provided by law, by the City Council ofthe City of Aspen on the 231'1 day of September,2002. Attest: . Kathryn S oeh, ity Clerk elen K.Klan d, or }TALLY,adopted,passed and approved.this .1 day of 0 2002. Attests Kathryn :' oeh,City Clerk Helen K.Kla ;' d, or Approved as to form: tton y • • RECEIVED Ordinance No. 35, Series of 2002 0 3/14/2 0 2 2 Page 4 ASPEN BUILDING DEPARTMENT r(,-; R.A. N ELSON BUILDING MOUNTAIN COMMUNITIES RLN Renovation Aspen, CO CONSTRUCTION MANAGEMENT PLAN Filler Hydrant Permit No Filler Hydrant will be needed due to no exterior work is occurring on the existing building RECEIVED 03/14/2022 ASPEN BUILDING DEPARTMENT 5/6/2019 EXHIBIT 1-KRIS MYERS CMP Submission Certification 1.4 Home / Submission Confirmed :0,4fr, " 15 Print and Summary CITY OF PEN City of Aspen Engineering Construction Management Plan #0000000161 I On May 6,2019 6:22 pm Overview First Name Kris Myers Introduction > Last Name R.A. Nelson Paperwork > Site and ROW > Email kmyers@ranelson.com Noise Suppression > Phone 970-309-4749 Additional Requirements IP Address 50.198.209.134 Course Review Score 105.0 out of 105.0(100.0%) Final Exam Obtained Passed Designation You passed!Your Certificate is attached. Please print and submit with your CMP. Completion 7 minutes,20 seconds Time Administrator Processing Remarks User Account Guest http://cmpaspen.com/submission- Link confirmed/? id=51fd1738e74856cRE EIV "D 2022 Section 1/4 cmpaspen.com/submission-confirmed/?id=51fd 1738e74856c8d2fd591d5780027d BUILDING DEPAftfN�ENT 5/6/2019 Submission Confirmed—City of Aspen Engineering Correct answers are worth 5 points. I� O True 4,pN. ' (Score 0) , Once a CMP is approved,the site is / exempt from any 0 False new or changed O (Score 5) regulations added to the CMP CITY OF n Score 5/5 Obtained/Total Overview a.Make contractors O jump through hoops (Score 0) Introduction > Paperwork > b.Have a document stating how the Site and ROW > O construction site will mitigate its effect on the neighborhood Noise Suppression > (Score 5) Additional Requirements c. Make it more The City requires a O difficult to do Course Review CMP in order to: construction (Score 0) Final Exam d. Have a document that allows the contractor do O whatever it takes to complete the construction (Score 0) U Score 5/5 Obtained/Total The best a.The contractor must description of the O do what the City tells City's enforcement him, no matter what policy for CMP (Score 0) issues is: O b.The City will always give a ve F EIVED and a cor i before issuiny3714/2022 cmpaspen.com/submission-confirmed/?id=51 fd 1738e74856c8d2fd591 d5780027d ASPEN 21 BUILDING DEPARTMENT 5/6/2019 Submission Confirmed—City of Aspen Engineering tag (Score 0) 0000' i, c.The City will work with the contractor to 01111 fix any issues,but may O issue a verbal warning, correction notice,or red tag when • appropriate. (Score 5) CITY OF ASPEN d.The City will automatically side O with neighbors in any Overview dispute (Score 0) Introduction > Score 5/5 Paperwork > Obtained/Total Site and ROW > Section 2/4 Noise Suppression > To Calculate Add all square Additional Requirements disturbance area, footage,interior and you must: exterior,that will be physically disturbed by Course Review O' construction activities, even if it is to be Final Exam revegetated after construction (Score 5) Add all square footage,interior and O exterior,that will be finished with impervious materials (Score 0) Add all square footage O within the footprint of the house (Score 0) O Add all square footage of the neighborhood that will be disturbed by any p isEIVED or fumes ro e constructionr6is/14/2 0 2 2 (Score 0) V 3 cmpaspen.com/submission-confirmed/?id=51fd 1738e74856c8d2fd591d5780027d ASPEN 1 BUILDING DEPARTMENT 5/6/2019 Submission Confirmed—City of Aspen Engineering U Score 5/5 Obtained/Total 4 ,,;AI ilk ` O Be as short as possible 11111 1 (Score 0) IProvide an overview of the construction project including CITY F AS PEN background i information,proposed development type and O general information, the proposed effect on Overview public utilities and the extent of excavation Introduction > and method of The Project stabilization Paperwork > Description should employed. be: (Score 5) Site and ROW > Include the contact Noise Suppression > information (Score 0) Additional Requirements Be at least 600 words Course Review and detail the 0 structural engineering of the building Final Exam (Score 0) U Score 5/5 Obtained/Total Public Notification Notifying all neighbors includes: within 300'of the construction site no less than 10 days prior O to the start of construction with a project description and schedule (Score 0) Updating the O neighborhood on a monthly basis (Score 0)RECEIVED O Posting aprOe3t,t r4/2O22 in a visible location cmpaspen.com/submission-confirmed/?id=51 fd 1738e74856c8d2fd591 d5780027d ASPEN 4 1' BUILDING DEPAR1'M NT 5/6/2019 Submission Confirmed—City of Aspen Engineering (Score 0) ' O All of the above 4P•is (Score 5) 4v•FA.11111 ► ' a U Score 5/5 Obtained/Total 1111 O 7 AM — 5 PM Mon-Sat (Score 0) CITY OF ASPEN 7 AM — 5 PM Mon-Fri, O 9-5 Sat Overview (Score 0) The Allowable Introduction > O 9-5 Mon-Sun Construction hours (Score 0) are: Paperwork > 7:30 AM-5:30 PM Site and ROW > 0 Mon-Fri,9-5 Sat (Score 5) Noise Suppression > U Score 5/5 Additional Requirements Obtained/Total Course Review O True (Score 0) Final Exam The work hours are completely non- 0 False flexible (Score 5) U Score 5/5 Obtained/Total • True Some holiday no (Score 5) work days are in effect throughout the entire City, O False while some depend (Score 0) on where the construction site is located U Score 5/5 Obtained/Total When working near 0 Must mai`o• other businesses,a lines or p o`' @(` • --j construction site: signage shovariv)h�4/2 0 2 2 neighboring cmpaspen.com/submission-confirmed/?id=51fd 1738e74856c8d2fd591d5780027d ASPEN 1 BUILDING DEPARTM2ENT 5/6/2019 Submission Confirmed—City of Aspen Engineering businesses are still open (Score 5) Is allowed to 01111 completely block access to neighboring businesses as long as access is open from the other side (Score 0) CITY OF ASPEN Can work 24 hrs/day without City approval O if neighboring Overview businesses are dosed for offseason Introduction > (Score 0) Paperwork > Should schedule large deliveries during the Site and ROW > O neighboring businesses'large sale events Noise Suppression > (Score 0) Additional Requirements U Score 5/5 Obtained/Total Course Review Final Exam Which sentence Construction fence best describes must be at least 6' construction 0 high chain link with a fencing as required mesh windscreen. by the CMP? (Score 0) An approved sound O fence can be used in lieu of chain link fence (Score 0) Depending on construction activities, O a fence may not have to fully enclose the entire property (Score 0) O All of the above (Score 5)RECEIVED U Score 03/1A/2022 cmpaspen.com/submission-confirmed/?id=51fd 1738e74856c8d2fd591d5780027d ASPEN 6/12 BUILDING DEPARTMENT 5/6/2019 Submission Confirmed—City of Aspen Engineering Obtained/Total ' Section 3/4 0000 4, N., Ir O True You must provide a (Score 5) copy of all necessary drawings with the CMP False submittal even if O (Score 0) the drawings are CITY OF ASPEN already in set.the mainpermit U Score 5/5 Obtained/Total Overview Clearly marked O property line Introduction > (Score 0) Paperwork > Construction and/or O sound fence line with Site and ROW > access points (Score 0) Noise Suppression > Which of these All neighbors within Additional Requirements items is not 300'names and necessary on a general site plan: addresses Course Review (Score 5) Final Exam Delivery, material O storage,and parking areas (Score 0) U Score 5/5 Obtained/Total If you have a site Turn in one site plan where the location that shows the first of key elements 0 stage of the such as access construction points,storage (Score 0) areas,and site offices will change throughout the Turn in a site plan for construction O each week of the process you should: construction (Score 0) RECEIVED Turn in a site plan to cover each g®r3r/l14/2 0 2 2 phase of the cmpaspen.com/submission-confirmed/?id=51 fd 1738e74856c8d2fd591 d5780027d ASPEN 71 BUILDING DEPARTMENT 5/6/2019 Submission Confirmed—City of Aspen Engineering construction (Score 5) 0000' i. Don't turn in a site plan because it will 11111 kill always be changing (Score 0) • a Score Obtained/Total 5/5 CCITY OF ASPEN Any time construction activity will block any O part of a street, Overview sidewalk,or alley (Score 0) Introduction > Any time materials Paperwork > 0 will be stored in City ROW (Score 0) Site and ROW > When is a Temporary Right of Noise Suppression > Way Encroachment Any time traffic flow, needed? vehicular or 0 pedestrian,will be Additional Requirements effected by construction activity Course Review (Score 0) Final Exam All of the above (Score 5) U Score 5/5 Obtained/Total When must you Any time you will have depict the extent of any soil stabilization excavation and (e.g.micropiles,soil detail any method ® nails,layback etc...)as of stabilization to part of your be employed in construction process your CMP? (Score 5) Any time you will have large piles of dirt O onsite for more than 2 weeks (Score 0)RECEIVED O Any time yoQ3l/t 4/2022 re-vegetating over Y cmpaspen.com/submission-confirmed/?id=51fd 1738e74856c8d2fd591d5780027d ASPEN 8/12 BUILDING DEPARTMENT 5/6/2019 Submission Confirmed—City of Aspen Engineering an acre (Score 0) '� 4-41„,N Any time you will be � 0 storing dirt in the 1 Right of Way 1111 ' (Score 0) go, a Score U Obtained/Total 5/5 CITY OF ASPEN Section4/4 Overview 0 True (Score 0) Introduction > All construction sites are required to O False Paperwork > have 24 hr noise (Score 5) monitoring. Site and ROW > U Score 5/5 Obtained/Total Noise Suppression > 0 65 db all year long Additional Requirements (Score 0) Course Review 70 db in the summer throughout the city,70 Final Exam ® db in the winter on the Malt,80 db all other times Which statement (Score 5) best describes the noise limits for construction in 70 db in the summer, Aspen? 0 80 db all other times (Score 0) 0 80 db all year long (Score 0) U Score 5/5 Obtained/Total A construction site Any neighbor within is required to have 0 300'requests it a sound (Score 0)R_CE I\1E D engineer/consultant model the site and specify noise ® Any type of 0i3frue4/2 0 2 2 mitigation earth stabilization will cmpaspen.com/submission-confirmed/?id=51fd1738e74856c8d2fd591d5780027d ASPEN 1 BUILDING DEPARTMENT 5/6/2019 Submission Confirmed—City of Aspen Engineering measures to keep be performed the noise below the (Score 5) allowable limit when: ,'' : There are 3 or more 140 O houses within 300'of the site 11111 , ' (Score 0) gl Over 400 square ft of O the site will be disturbed CITY OF ASPEN (Score0) Score 5/5 Overview Obtained/Total Introduction > All measurements will be taken with a Paperwork > O decibel reader on a "Slow"response using Site and ROW > the"A"weighting scale (Score 0) Noise Suppression > All measurements are Additional Requirements taken property the ken operty line of the construction site Course Review (Score 0) Which statement Final Exam about construction At a project inside a site noise multi-unit building, measurement is not noise measurements true: 0 will be taken from the wall,ceiling,or floor of neighboring units. (Score 0) All measurements are taken from the 2nd 0 floor of a neighboring house (Score 5) U Score 5/5 Obtained/Total Which of the 0 Manufacturing following activities Ei E statements about excess of s.�► Manufacturing require an Extended Onsite are true: 03/14/2 022 cmpaspen.com/submission-confirmed/?id=51fd1738e74856c8d2fd591d5780027d ASPEN 0/12 BUILDING DEPARTMENT 5/6/2019 Submission Confirmed—City of Aspen Engineering Impact Permit (Score 0) ,, ' Cutting. stone is an No O example of Manufacturing Onsite 11111 ' (Score 0) IIAll manufacturing O activities are limited to a 90 day duration CITY OF ASPEN (Score 0) O All of the above Overview (Score 5) Introduction > Score 5/5 Obtained/Total Paperwork > Certificate Site and ROW > Information Noise Suppression > Name r Kris Myers Additional Requirements Company Name R.A. Nelson Course Review Final Exam • kmyers@ranelson.com Email Address �/ Phone Number o 970 309 4749 iga PRINT CITY OF ASPEN 130 S.Galena Street Aspen, Co E'( EIVED Phone:970.920.5000 Email:Email for Info 03/14/2 022 cmpaspen.com/submission-confirmed/?id=51 fd 1738e74856c8d2fd591 d5780027d ASPEN,1 1 BUILDING DEPARTMENT 5/6/2019 Submission Confirmed-City of Aspen Engineering 41' - Copyright 2019 City of Aspen Engineering I All Rights °11Reserved I Powered by Vick+Co 1►1► ► � 41 a do 1 1101 CITY OF ASPEN Overview Introduction > Paperwork > Site and ROW > Noise Suppression > Additional Requirements Course Review Final Exam RECEIVED 03/14/2022 cmpaspen.com/submission-confirmed/?id=51fd 1738e74856c8d2fd591d5780027d BUILDING PE 2/12ENT