HomeMy WebLinkAboutresolution.council.059-24RESOLUTION 4059 (Series of 2024) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CHANGE ORDER TO THE CONTRACT BETWEEN THE CITY OF ASPEN AND GOULD CONSTRUCTION, INC. AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CHANGE ORDER ON BEHALF OF THE CITY OF ASPEN, COLORADO, WHEREAS, there has been submitted to the City Council a change order for to the original contract for construction of the Maroon Creek Multi Use Trail between the City of Aspen and Gould Construction, Inc., a true and accurate copy of which is attached hereto as Exhibit "A"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves a change order for construction for the Maroon Creek Multi Use Trail, between the City of Aspen and Gould Construction, Inc., a copy of which is annexed hereto and incorporated herein and does hereby authorize the City Manager to execute said change order on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 14th day May, 2024. Torre, Mayor I, Nicole Henning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, May 14th, 2024. Nicole Henning, City Clerk DocuSign Envelope ID: 78559069-003E-4EB3-AD16-A7840F6B14D3 �W $\�l✓li n, =�®Wry�Document G731 ® 2019 Change Order, Construction Manager as Adviser Edition PROJECT: (name and address) City of Aspen- Maroon Creels Multi -Use Trai I Project 42022-234 OWNER: (name and address) City of Aspen 427 Rio Grande Place Aspen, CO 81611 CONTRACTOR: (name and address) Gould Construction, Inc. P.O. Box 130 Glenwood Springs, CO 81602 CONTRACT INFORMATION: Contract For: General Construction CHANGE ORDER INFORMATION: Change Order Number: 004 Date: March 14, 2023 Date: May 6, 2024 ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) Engineer- Otalc Phil Vaughan Construction Management, Inc. 371 Centennial Parkway, Suite 210 1038 County Road 323 Louisville, CO 80027 Rifle, CO 81650 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description tV the change and, if applicable, attaclr or reference specific e,v ibits. Also include agreed «purr adjrrstmerrts attributable to executed Construction Change Directives.) Addition of Stormtivater System Improvements to the Project Scope identified by the City of Aspen during the permitting phase. Additional Project Design revisions from July 2023 100% Design Drawings to February 2024 Pernit Review Revised drawings. Please see attached the 4/14/24 Gould Construction, Iris. change order proposal. The original Guaranteed Maximum Price was $ 5,890,666.20 Net change by previously authorized Change Orders $-29,516.81 The Guaranteed Maximum Price prior to this Change Order was $ 5,861,149.39 The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 318,827.27 The new Guaranteed Maximum Price including this Change Order will be $ 6,179,976.66 The Contract Time will be increased by Twenty-six (26) days. The Contractor's Work stroll be substantially complete on November 27, 2024. Project Start Date: April 18, 2024. Substantial Completion Date prior to execution of Change Order #14 was October 275 2024. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Conshuction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. AIA Document G731 - 2019 (formerly G701 T"'CMa—1992). Copyright ©1992 and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 11:36:45 ET on 05/06/2024 under Order No.2114456543 which expires on 09/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents° Terrns of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (3139ADA50) 1 DocuSign Envelope ID: 78559069-003E-4EO3-AD16�A784OF6O14D3 Engineer- Siguahu'e not requited _ Signature not required ARCMITEC T (Firm name) CONSTRUCTION MANAGER (Firer name) SIGNATURE PRINTED NAME AND I I I LE DATE: SIGNATURE DRINTED NAME AND TITLE 51�IL� DATE: SIGNATURE PRINTED NAME AND TITLE DATE: by: OV�iV FJ �FiY1'r0 EE1942B... City Manager P�Ij�T�E9�111� �ND1�l � I�$ : 08 AM PDT DATE: AIA Document G731 — 2019 (formerly G701 T'•'CMa — 1992). Copyright ©1992 and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced � at 11:36:45 ET on 05/06/2024 under Order No.2114456543 which expires on 09/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA50) DocuSign Envelope ID: 78559069-003E-4EB3-AD16-A7840F6B14D3 Permit Review= February Gould Construction, Units Unit Cost CostExtension Remove Ground Sign Reset Mailbox @ ARC am I Reset Fiber• • 1uit T&M Extent of •unknown Reset Fence (Along Proivate Property) $ 23,386wO8 :Landscape Boulder (Special) • `, • .. 20,795*32 :DrainageConcrete Drainage Crossing Structure r4l F� - 110,228984 =,Concrete .• for Utility Duct :. i •• • i:: •1 Direct20,277,50 •st Subtotal 252037437 General Conditions Fee 10%$ 25,203*74 • • • Construction Fee '� :. TOTAL . •