WHEREAS, there has been submitted to the City Council a contract change
order for construction management and advisor services on Mill St Bridge
Maintenance, between the City of Aspen and PVCMI , a true and accurate copy of
which is attached hereto as Exhibit "A";
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ASPEN, COLORADO,
That the City Council of the City of Aspen hereby approves that change
order between the City of Aspen and PVCMI, a copy of which is annexed hereto
and incorporated herein, and does hereby authorize the City Manager to execute
said agreement on behalf of the City of Aspen.
INTRODUCED, READ AND ADOPTED by the City Council of the City of
Aspen on the 24"' day of September 2024.
Torre, Mayor
I, Nicole Henning, duly appointed and acting City Clerk do certify that the
foregoing is a true and accurate copy of that resolution adopted by the City Council
of the City of Aspen, Colorado, at a meeting held, September 24th, 2024.
Nicole Henning, (0ty Clerk
Docusign Envelope ID: F6ADAA32-6C20-4465-8BC9-DF567A09457B
Change Order Form Revision 1 / 19120,24
r6ON R 4 10
ITY OF ASPEN
General Information
Vendor Phil Vaughan Construction Management Inc.
Change Order Number
Date of Issuance
Project Name
Project Number
Project Completion Date
Project Manager
COA Account Code
Project Information
Description Of Service
As needed contract no. 2020-008-002
01
Mill St Bridge Maintenance
2024-356 Phil v. contract
RESO 2020-023
51689 51691
October 31, 2024
Jack Danneberg/PJ Murray
As —Needed
2020-00�-02
Construction coordination along with construction management,
oversight and inspections and preparation of reports for Mill
Street Bridge Project.
Paae 1 of 3
Docusign Envelope ID: F6ADAA32-6C20-4465-8BC9-DF567A09457B
Description Of Change
Order
Contract Information
Change Order Form Revision 1/19/2024
Work on 9/9/24 uncovered significant structural issues that
were previously unknown and hidden beneath layers of concrete
and asphalt which require emergency repairs.
Key findings:
• The previous concrete overlay or top layer on the bridge deck
has failed in several areas.
• Severe degradation of reinforcing rebar has been found in
multiple locations —some areas show only discoloration where
rebar has corroded away.
• Steel reinforcement is no longer viable in critical sections,
affecting the structural integrity of the bridge.
• This bridge functions as a single unit, so failure in one part
compromises the entire structure.
• The structure is deteriorating from the outside in, with
exposure to elements causing ongoing damage.
Acting now will stabilize the bridge at its current state by
repairing damaged reinforcement and sealing the bridge
elements.
This change order covers construction coordination along with
construction management, oversight and inspections and
preparation of the critical repairs scope of work, such as:
1. Repair concrete bridge deck at North sidewalk and South
sidewalk.
2. Install epoxy coating of sidewalks at North and South side of
bridge. $25,000.00 Lump sum. Includes labor, equipment,
sandblasting and epoxy.
3. Functionality of 1 way traffic control to accommodate the
work.
Estimated costs of the construction management and advisory
services is $54,567.00 and $8,189.55 (15%) for contingency. This
estimate reflects a comprehensive view of the current situation.
Once additional layers are removed, we will have a clearer
picture of the full scope therefore this change order will be
executed on a Time and Materials (T&M) basis.
Original Contract Amount $54,567.00
Previous Change Order(s) $
Page 2 of 3
Docusign Envelope ID: F6ADAA32-6C20-4465-8BC9-DF567A09457B
Change Order Amount
It Over $100k Change
Order To Be Presented To
Council For Approval)
Final Contract Arnount
(Including All Change
Orders)
Revised Completion Date
Signature
1. Contractor (Required)
2. Project Manager
(Required)
3. Department Head
(Required)
4. Procurement Officer
(Required)
5. City Attorney (Required
Based On Value Of
Thresholds)
6. City Manager (Required
Based On Value Of
Thresholds)
7. IT Department (ALL
Software/Opp/web-
based)
$62,786.55
$109,134.00
9/13/24
Signed by:
�6 v" .
282564B976E547C...
Signed by:
—0249534A2294428.6.
—DocuSfgned by:
p 4z v
—466F766D8A5B4E6.11
Signed by:
,�a�Mt,S �• fiM
432FOA40A55C4BD...
DocuSigned by:
S" 06 L05:p, i +
2DA4D214EE1942B...
Change Order Form Revision 1 / I Y/2024
Original contract, if applicable all other change orders, and vendor quote for requested
change order must be attached to this document.
For additional information: See Procurement Policy
Paae3of3
Docusign Envelope ID: F6ADAA32�6C20-4465-8BC9-DF567A09457B
j�;l
CITY OFASPEN
Project Information
Project Name
Project Number
As Needed Contract Number
Project Manager
Department
Estimated Cost
Budgeted Amount
Rates match Quote
Project Description
Give clear description of the
project, wort: to be done, or
items purchased
Approval
Procurement Officer:
Mill St Bridge Maintenance
51689 51691
j 2020-008�002
Jack Danneberg/PJ Murray
Engineering Department
$54,567.00
Concrete Replacement
Bridge Maintenance
Concrete Join] Maintenance
Emergency Repair
ar Pveent Preservation
Concrete Replacement
Bridge Maintenance
Concrete Joint Maintenance
Emergency Repair
Pavement Preservation
® YES El
Work Order As Needed
$ 60,000
$ 102,500
$ 38,603
$ 52,625
$ 3,482
(000.327681200057210051689)
(0004327081200.57210.40007)
(000.327681200.572106401 17)
(0009327081200957210.40101)
(000.327.81200.57210.51691)
NO, explain why
Construction coordination along witll�
construction management, oversight and inspections and
preparation of reports for Mill Street Bridge Project.
*quote attached with Cost break down details:
DocuSigned by:
466F766D8A5B4E6..,
9/12/2024 19:23:05�AM MDT
*As Needed Contracts cannot be used for Capital Projects'
Page 1 of 2
Docusign Envelope ID: F6ADAA32-6C20-4465-8BC9-DF567A09457B
Page 2 of 2
Work Order As Needed
Docusign Envelope ID: F6ADAA32-6C20-4465-8BC9-DF567A09457B
Phil Vaughan Construction Management, Inc.
1038 County Road 323
Rifle, CO 81650
Phone: (970) 625-5350
Fax: (970) 6254522
Email: phil(a,,pvcmi.com
Website: www.pvcmi.com
August 13, 2024
Trish Aragon, P.E.- City Engineer
Jack Danneberg, P.E. CFM- Civil Engineer -Project Manager III
City of Aspen Engineering Dept.
427 Rio Grande Place
Aspen, CO 81611
Sent via email: trish.aragon(2,aspen.gov
j ack.danneberg@aspen.gov
Dear Trish and Jack,
As per your request, please find below a proposal for Construction Manager as Advisor Services
for the City of Aspen Mill Street Bridge
PVCMI has an executed professional services contract with the City of Aspen for As -needed
construction manager as advisor services- City of Aspen Resolution 2020-008-02 with the
contract beginning April 1, 2020. End date of contract term: April 1, 2025 as per the executed
Contract Renewal.
Please find below the services discussed, with estimated hours noted for each item.
1. Pre -Construction coordination services including the following:
a. Schedule and conduct the pre -construction meeting with the City of Aspen, G.A.
Western and Frontier Paving.
b. Receipt and review of the Contractor submittal schedule
c. Review of project submittals, comment and recommend approval by the City of
Aspen
Estimated hours: 30
Page 1 of 3
Docusign Envelope ID: F6ADAA32-6C20-4465-8BC9-DF567A09457B
2. Field Observation and attendance at weekly meetings while on -site.
6 week construction duration. September 3, 2024 through October 11, 2024
6 working weeks.
5 days per week.
30 working days x 16 hours per day= 480 estimated hours. Includes round-trip travel
from Rifle to Aspen.
30 working days= 30 trips. 30 trips x 156 miles= 4,680 miles
Total estimated mileage: 4,680 miles x $0.65/mile= $3,042.00
3. Final walk-through to verify punchlist completion and project closeout. Review of pay
applications from both contractors.
Estimated hours: 25
Total Estimated Hours: 535 hours @ $95/hr.=
Total Estimated Mileage: 4,680 miles x $0.65/mile=
Total Estimated Copies:
Estimated Total Services:
Additional services/clarifications:
$50,825.00
$3,042.00
$700.00
$54,567.00
a. If night work is conducted, a hotel room will be added to the invoicing. A hotel room has
not been included in the attached proposal.
We propose to provide services on an hourly basis as per the attached PVCMI 2024 Fee
Schedule.
Thank you for the opportunity to serve you. Please contact me if you have questions.
Sincerely,
Philip B.
President
Phil Vaughan Construction Management, Inc.
Page 2 of 3
Docusign Envelope ID: F6ADAA32-6C20-4465-8BC9-DF567A09457B
- • I • Estimation
Aeetings/Discussions
.,onstruction Managemen
cheduling
ravel
•• ••- ••
op _
•
i 10010m MOM
a e / • Binding
olor PlotsIIIIIIa scans
siz
-
lash Drives. 8GB
'►• 11 •
)st of expense plus 15%
4uleach
w each
11 - •
'► 11.4./each
)st of expense plus
Page 3 of 3