HomeMy WebLinkAboutMaster Permit.34 Westview Dr.0056.2018 (3).ARBK Field Plan Set Must Be Printed In Color .,.
PERMIT NUMBER:0056.2018.ARBK MASTER PERMIT: DATE:3/21/2018 -.w---
COMMUNITY DEVELOPMENT DEPARTMENT
1111 ) .
BUILDING PERMIT APPLICATION Riu Cur o5 A
•
PROPERTY INFORMATION CITY
ADDRF5534 WesMew Drive UNIT. PARCEL ION pssrm OF ASPEN The City of Aspen
8 2 TSII Knolwooud eubdvision
LOT BLOCK ORSUBresideON PERMIT NO,.
DESCRIPTIDN OF Demolition°ferarrorea residence and new construction pfasingle family residence. 00562018.ARBK
WDRK INDETAIL „ - . These plans must be kept at the
OWNER building site or inspection
WESTVIEW LLC
NAMEONrAR Joseph Spears CELL g]0-544-0856 3 EMAIL jwapM1@s2architecW.mn delays may occur.Construction
ADDRESSshall conform to these plans.All
OWNER NAME James end Koval CELL 312-963-5667_ EMAIL
\ 34 WESTVIEW DRIVE changes shall be approved by
PROJECT DETAILS PARCE•L ID the building official.
PROTECT 220p0o9 273718122001 Use of Building Class of Work Fixture Counts Equipment Checklist
VALUATION 0 CommericalToilets,Bidets
p New _Forced Air/Gravity onSystems
H
0 Multi-Familyeatntub
W RK AREA 4,469.330Addition Wall,suspended,or Unit Heaters
0 Single Family 0 Alteration / Lavatory(Wash Basin) —Gas Log
SEPARATE PERMITS ARE
UNIT SQ FT 4,4a9.33 0 Mixed-Use 0 Repair Shower Gas Appliancew REQUIRED FOR ELECTRICAL,
Kitchen Sink l+Disposal3 PLUMBING,MECHANICAL,OR
ATM' 0 ❑IF R Dishwasher ZAppliance vats
ISQ FTI 14,5]0 El Tenant Finish Laundry Bar,Utility Sink_Heat,Refrig,cooling,or
Wader
Will there be O Demolition clothes Washer Absorption wit FIRE SPRINKLER WORK
cnPE WORK 9,5. any roof/wall 0 Change Order—Floor sink i_Boilea(includes vent)
penetrations? 0 Floor Drain _Air Handling Unit
NEW se rn ❑.Yes =Water—Shower eater(Pan Req) Cooling systems
'NOTICE:This permit becomes null and Ventilation Fans
SO FT OF ROOMS "n 0 No void if work or construction euThoreed —If Gas Outlets
WITH UTILITY WORK not days,or _Water Treatment Range Hood
Flora within use d .of Gas System Outlets
�abandoned for a periodf construction or work s of 18800 daysetnded r —Other Snowmelt Syaem Sq Ft
Details Vale DefinitionsC an
y time after work is commenced .,
Project Term Valuation:Coot of project as defined in Valuation vet.
Sq Ft of Work Area:Total square footage of area undergoinging change or reconfiguration.
Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. APPROVALS PC-KH
Lot Sire:Total surveyed square footage of property. THE GOO.A•m,
Sq Ft of Landscape Work:Square footage of disturbed exterior area. Reviewing Review RevleWe Date
New Sq Ft:Total added square footage for additions to net livable or net leasble space. Depanment Required Ininalsr Approved To obtain sign off from the Engineering Department on the
Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Zoning x BN 9/21/18 Certificate of Occupancy(CO)the following requirements must be met.
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES HPC Minor Drainage Reviews
PIan Check 25,691.25 Permit Fee 25,525.00 Parks Impact 11.939.21 I Building X NT 10/17/13 •All Areas must be landscaped or stabilized per the approved plan.
b
Energy Code 5.929.7, REMP 0 School Ded. 11,00 p Fe x, NT 10/17/13 •All temporary eo ron sin i control t l devices plans including swales.
must e removed.. led
Zoning(50%) Plan Check TDM Impact 1,336.31 Engineering X ]d 9/2£3_,18 Major Drainage Reviews:
3,969.25(Hourly) CMP 10/_2 •All Minor(see above)review criteria must be met.
Engineering Revew 30,743.01 Zoning(Hourly) Ped.Amenity 0 `X ik •Submit an as-built survey of all drainage features on the property.
CMP(50%) Engineering Housing Cash in Lieu °mECo.n.o Utilities X GradingDrainage signedy•Submit a Gradin and Certificate b the Engineerof Record.
2,391.45 (Hourly) iC5itf Water X Sw 10/:7 •Submit a video(in DVD formal)of any connections made to the City's
X Parks Review 557.10 Zoning(SO%) 3,464.25 Stormwater Stormwaterinfrastructure that shows that the connection is clean and in good working condition.
1 1,879.992,391.4522,oso x ar q/�2 •Submit an Operations and Maintenance Plan Agreement signed by the Owner.
Utility Review CMP(50%) City Use Tax Sanitation X3/2' g Way including gutter,
Other Electrical County Use Tax 5,500 pm Right of Wa is includin sidewalk,curb and tter and other
1/ Env.Health x
�l�,r/ Plumbing GIS 500
appurtenances muff be complete
_ Mechanical Sanitation Parks X Dr 9/20/1f
w�°°.•° J After all required documents have been submitted,a final inspection from
M,• 17,57o Lot Area Landscape RM
,,,,,i.°77—a,, Efficiency X the Engineering Department can be requested at 920-5050.
\ .°.�,....b m R-15B Zone District DAM 10/18/$ NOTE,These are one there requirements of the Engineering
A rOVed y q Department.
PP Other departments may have additional requirements for obtaining a CO.
Deed Restricted To Issue 'Ir'Ad R�,1'�
" PLANS LOCATION BB#934-310-979 Census Code Issuance �.q
"•_ — --F #of Dwellings
s' .• • - I CITY OF ASPENAagu,t]n1] 130 S.GALENA ST I ASPEN, CO 81611
1-m r SPECIAL INSPECTION REQUIRED'
_°, "' • City of Aspen-'1reePlantingSpecifiaeons .•�, 7131LDINGDEPARTMENT FIRE
-Structural steel welding:Field&Shop
Tree protection fencing is required at the driplines of all trees shown. 1 PERMIT NUMBER: ADDRESS:
- - -----_-- ---- p y anchors
bolting SPRINKLERS
-Epoxy anchors
There is NO activityallowed within this fenced area,Including,but not COMMUNITY DEVELOPMENT DEPARTMENTIll -Intumescent paint REQUIRED
limited to:digging,storage of material,equipment,machinery,foot or -Spray applied fire resistive materials 1111 vehicle traffic. BUILDING DESCRIPTION FORM-IRC& IBC Colorado Department of Public Health and Environment
THE Orc or Asew -Permanent micropiles
Please contact the City Forester or his designee at 920.5120 for an Air Pollution Control Division-Indoor Environment Program-Asbestos/IAQ Air Unit SMOKE ALARMS AND
Inspection of this fencing Prior to any activity. BUILDING CODE INFORMATION 4300 Cherry Creek Drive South,APCD-IE-Bt CARBON MONOXIDE
0 2015 RCDenver,Colorado 80246-1530 Special inspection is required per 2015 IBC
performya< yin pro ❑2015 IBC 0 Other(Please Explain) section 1704.inspector to verifythat copyof DETECTORS REQUIRED
If the need arises to an activity the tree protection area,please Code Editions As Adopted and Amended Phone: 33-6923100-Fax: 303-782-0278 Py
contact the City Forester and you will be given specific instructions as to ( P 1 (AS Adopted and Amended) E-mail:asbestos@state.eo.us agreement for inspection program to be on THROUGHOUT DWELLING
how to proceed to minimize impacts to the tree root zone. w the job site prior topeNorwingany
UNIT PER CITY OF ASPEN
"`°^"""°"°•°"7.7:::C - ,F:., °...= '°" Fire Sprinkler System I Existing?9 rvo I Required?I eo I Type 0 NFPA 13 0 NFPA 13 R M NFPA 13 D DEMOLITION APPROVAL NOTICE inspections.A copy of all Special Inspector^"'°°^`"'•'""°°'°°°"°^^° MUNICIPALn CODE 8.15
field reports to be on the job site for p W �`
Type Of Construction❑VA IM VB❑IV❑IIIA ❑1116❑IIA❑IIB❑IA❑IB Fire Alarms Installed ['Yes No
-aect to Colorado Air Quality Control Commission Regulation inspectors'review if requested.Failure to p dyk2h7/1tILs_...
r_ �, ," „°k Required Special Inspections 0High-Strength Bolting 0 Epoxy Anchors 0 Structual Steel Welding No.8,Part B,adopted December 21,2007,and effective January 30,2008 and the Colorado Air comply may result in denial of inspection.
{rwJi 0 Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other Pollution Prevention and Control Act C.R.S.(25-7-101 and 25-7-501'etseq).This notice signifies ZONING
"TrSy •- `ne"°`"°""°" that the structure was inspected for asbestos,luminous exit signs(containing radioactive material),
Energy Code Compliance ❑Prescriptive Table
J ?�, �'` O RESCheck UA Alternative 0 COMCheck UA Alternative and Ozone-Depleting Refrigerants and the demolition contractor has properly notified the
Colorado Department of Public Health and Environment pursuant to Regulation No.8,Part B. —inumeggHTING
w'. Exterior Energy Use Total Approved On-Site Snowmelt 1548 Spa 0 Pool 0 MUST COMPLY WITH
(Existing+New) As a contractor,you may be subject to other demolition licenses and permits,depending on the
Building Type/ I 0 A 0 B 0 F— 0 E ❑R— requirements of the county and municipality in which the work is being performed. The Colorado THE CITY OF ASPEN LIGHTING CODE
Occupancy Grou I ®One Family ❑Two Family SECTION 26.575.150
..' ` - µ°°a. p Y p B ❑B(A<50) ❑H ❑M OS
_ R Department of Public Health and Environment,Air Pollution Control Division,strongly suggests
�`�'`-- hs. C ❑I ❑U C 0 Townhouse that you check with county and municipal authorities in order to determine any other local
i6101— GROSS SOFT:6334 building/permitting requirements that must be met.
City of tree Protection Zone UNIT DESCRIPTION AS PROPOSED
ryo pen- •ap1000-ZO. r
#Stories Above Grade 1 #Stories Below Grade 1 ADU BUILDING DESCRIPTION Please note that certain asbestos-containing materials(ACM)may remain in the structure
the following criteria must also be met with construction: during demolition.Therefore,any demolition debris left behind after the completion of post-
Attached Garage Detached Garage Car ort Is there an ADU? 0 Yes demolition site cleanupmayconstitute a"reason to know of asbestos-contaminated soil"at
➢A construction fence must be erected along the entire dripline g g p
Parking Spaces r Parking Spaces a Parking Spaces o ®No the site, to the requirements of Section 5.5 of the Solid Waste Regulations 6 CCR External Energy Use Approved
all trees on site and any tree canopy from neighboring property. #Living Rooms subject q g
(This will serve as the treeprotection zone(TPZ).This fence is to41 1007-2,Part 1).
( ) #Bedrooms #Full Baths Deck Area #Kitchens Q RREMP ❑ CREMP
be constructed in such a manner that the area inside the dripline is #Full Baths THE ORIGINAL APPROVAL NOTICE MUST BE POSTED ON SITE AT ALL TIMES.
protected.AN INSPECTION OF THIS FENCE MUST BE #3/4 Baths 3 #1/2 Baths 1 #3/4 Baths PERMIT#:0056.2018.ARBK DATE:6/13/18
PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION I #1/2 Baths Immediately notify the Asbestos/IAQ Unit of project modifications by far(number above)or e-mail -
IACTIVITIESBEGIN.PLEASE ARRANGE THIS INSPECTION #Kitchens 1 #Wood Fireplaces o #Bedrooms _ (address above)and the appropriate counTy health department by fax.Project modifrcalonsinclude SNOWMELT: 1548
WITH BEN CARLSEN AT 429-2034. #Other Rooms(List) changes in the scope of work or the scheduled work dates,eta
➢No materials maybe stored in the TPZ,includingbut not limited #Gas Appliances 2 #Gas Logs o POOL: 0
This demolition approval notice is valid beginning 10/24/2018. SPA: 0
to,construction backfill,construction traffic,or any other BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) The actual scheduled work dates are from 10/24/2018 through 10282018.
'construction materials. Approval issued on:10/102018 LS3.0,M-121
S.No excavation,gradingOr trenching mayoccur within the TPZ 'Basement(3)Bedrooms,Den,(3)Bathrooms,Mechanical,Crawl,Exercise REMP SHEET:
9 Record number:142348 Fee Paid:S60.00 MINIMUM BOILER AFUE: 95%
without the consent of the City of Aspen Forester or his designee. Notice Number:18P16788D Check number:1485
IS.No parking of vehicles or equipment may occur in the TPZ. Main Level Master Bedroom,Master Bath,Master Closet,Living/Kitchen/Dining,Laundry,Mud,Powder,Garage,Entry OFFSET: PV:27 360W panels
➢No dumping of anywasteproducts mayoccur in the TPZ. For the location specified below:
P 9 Asbestos Building Inspector.
S.Any roots cut during excavation shall be pruned with sharp N/A Koval residence
2nd Floor Jim Baker REVIEWED BY: NT
loppers/pruners back to the soil line.The roots will further be Cerifrcatiow No.: 13437 SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S.
'protected by burlap draped over the side of the excavation 34 Westview Dr. All nowmeit systems shall meet the following:
covering the exposed roots.This burlap shall be kept moist until 3rd Floor N/A Aspen -Any potions In the Right of Way must be on a separate zone.A ROW
the excavation is backfilled. Pit, lda County Inspection Date: 09272018 permit and Permanent EncroachmentLicense are required.
-R10 Insulation shall be Installed under the area to be snow melted or R5
i➢Pruningtoprovideclearanceforconstructionactivitiesshallonly' Additional N/A mfwabonshall b¢moaned under and al the slab edges,(ommaruo11
This notice has been issued to: Series 2011)
be done under the direction of an edarborist.ou Key Elements Construction -Automatic controls installed for system foul off when pavement
S.Site inspections shall be performed on a weekly basis,to ensure RECEIVED -Automaureisabove50"Fand no precipitation is falling.ementECC
225 Main St.Spite 304 py
/ Sec.matic 8 5 small cthe above listed conditions are met. NT f 1� )
Reviwed By: Date:10/11/18 n -s on Carbondale,CO 81623 Issued by:TS Uk y t
-Automatic or manual controls installed for system shut o8when outdoor
➢Any unapproved improvements or activities outside of those / / 'tit/
p temperature is above 40"F(20091ECC Sec 403 8 8 503.2.4.5)
approved within this permit will be subject to mitigation in the form I CITY OFASPENA¢gnaoan 130 S.GALENA ST ASPEN,CO81611� /ZZ/ -Inspection by testing hydrostatically at1%times max system desig
of restoration. , '2O, pressure,but not less than100ps for 15mnutes.(20091MCSec.
S.This permit must be posted on site during the construction BUILDING DEPARTMENT (ytg,,
'process. — — — — — — ifi t
Field Plan Set Must Be Printed In Color
ASPEN LINE GRADE VERIFICATION FORM
REScheck Software Version 4.6.5 Gross Area Bayley Cont. Verification of Building Location by Building Contractor
g Assembly or U-Factor UAAlk
Perimeter
m70 R Value R Value
Com
pliance Certificate BASEMENT FLOOR: 0 15.0 0.744 52
Insulation depth:z.r For Building and Permit Information,please refer to our website at: \-
Floor over Outside(S-1):All-Wood Joist/Truss:Over Outside Air 101 49.0 0.0 0.021 2 THE CITY OF ASPEN http://www.aspenpitkin.com/depts/41/
Crawl Wall(W-2+W-5):Solid Concrete or Masonry 490 0.0 15.0 0.058 26
Wall height:5.8' The Cityof Aspen
Project Koval Residence Depth below grade:2.5' Exemption P
Insulation deem:ss' A City verification of building location is not needed when the project creates less the 200 square feet of new floor area.
Energy Code: 2015 IECC Compliance Statement:The proposed building design described here is consistent with the building plans,specifications,and other These plans must be kept at the
Aspen,Aspen,Colorado calculations submitted with the permit application.The proposed building has been designed to meet the 20151ECC requirements in
Construction Type: Single-family REScheck Version 4.6.5 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. PART A: Complete and Submit as part of the Building Permit Application building site or inspection
Project Type: New Construction /
David Denio,PE ✓ nivv/ 7/27/18 delays may occur.Construction
Conditioned Floor Area: 5,115 ft2 o Building/Job Addressor Location: 34 Westview Dr. Aspen,CO 81611
Glazing Area 51k Name-Title Signature Date o Your Name(Person Completing Part A):Joseph Spears,NAshall conform to these plans.All
Climate Zone: 7 (9922 HDD) o Your Company: S2 Architects changes shall be approved by
Permit Date: p y� the building official.
Permit Number: o Plans must show horizontal dimensions that`tie'the building to the property boundary.
Are building ties shown? (circle one) es 'No'
Construction Site: Owner/Agent: Designer/Contractor: o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans.What is the
34 Westview Dr TBM=8138.33' SEPARATE PERMITS ARE
Aspen,CO 81611 elevation of this benchmark?
0 If the garage is located within 10 feat;roadway or sidewalk,provide spot elevation on the on the roadway or sidewalk. REQUIRED FOR ELECTRICAL,
Is a spot elevation shown? 'Yes' �(o' 'N/A' PLUMBING,MECHANICAL,OR
Compliance:Passes using UAtrade-off FIRE SPRINKLER WORK
Compliance:3.294 genes Than Code Maximum UA:985 Your IA:953 o Provide the equation comparing site(surveyed)elevation to structure/architectural plan elevation:
o"gym.trade-off rules.
(i.e.,100'first floor elev=7962.50') 100'-3"=8142.0'
IThe 96 Better t DOES NOT provide an estl aeeofenergy reflects
relativcompliance
to a minimumcoae homey
Envelope Assemblies PART B:Completeprior to first Foundation Inspection,by a licensed surveyor or an individual prequalified by the City
Gross Area Cavity Cont.
Assemblyo R-Value R-Value u-Facmr rA o Do field measured building ties to property match building ties shown on the plan? (circle one):`Yes' `No'
Perimeter
Ceiling(R-1):Flat Ceiling or Scissor Truss 3,262 49.0 0.0 0.026 85 o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved
EAST WALL W-2:Solid Concrete or Masonry:lnterior Insulation 234 24.0 6.0 0.042 ] building plans.
East Windows(in W-2):Metal Frame with Thermal Break:Single Pane 79 0.320 25 o What is the field measured elevation of top of foundation wall relative to the site bench mark?
EAST WALL W-3:Wood Frame,16"o.c 191 27.0 6.0 0.037 7 o According to the building plans,what was the design elevation for the same place on the foundation wall?
EAST WALL W-4:Wood Frame,16"o.c. 229 27.0 6.0 0.037 7
East Windows On W-4):Metal Frame with Thermal Break:Single Pane 35 0.320 11 a Was the elevation of the building adjusted in field? (circle one): `Yes' `NO'
NORTH WALL W-1:Solid Concrete or Masonry 668 24.0 10.0 0.033 22 o If yes,why?
Wall height:10.0'
Depth below grade:5.5' The undersigned qualified individual certifies that the information in Part B is accurate-
Insulation depth:10.0.
NORTH WALL W-2:Solid Concrete or Masonry:lnterior Insulation 266 24.0 6.0 0.042 7 Signature: Date:
North Windows(In W-2):Metal Frame with Thermal Break:Single Pane 92 0.320 29
NORTH WALL W-3:Wood Frame,16"o.c. 972 27.0 6.0 0.037 11 Printed Name: _ _ Contact ph.#:
North Windows(In W-3):Metal Frame with Thermal Break:Single Pane 511 0.320 164
Company:
GARAGE DOOR:Solid 160 0.270 43
SOUTH WALL W-3:Wood Frame,16"o.c. 1,781 27.0 6.0 0.037 19
South Windows(In W-3):Metal Frame with Thermal Break:Single Pane 1,276 0.320 408 RECEIVED
WEST WALL W-3:Wood Frame,16"o.c. 334 27.0 6.0 0.037 10 RECEIVED
West Windows(In W-3):Metal Frame with Thermal Break:Single Pane 55 RECEIVED Project Title:Koval Residence Report doe/471V2t@18
Data filename:Z:\Shared\Projects\Current Projects\18001.00-34 Westview Drive\Calculations\Energy Page 2 of 2 U /2018
Project Title Koval Residence Report d09/2 71818 Calcs\18001 RESCHECK-updates.rck ASPEN Webpage: http://www.aspenpitkin.cow/pdfs/depts/41Ainegradeverificationform.pdf Ree
Data filename:ZCShared\Projects\Current Projects\18001.00-34 Westview Drive\Calculations\Energy Page 1 of 2 BUILDING DEPARTMENT ASPEN
Calcs\18001 RESCHECK-updates.rck ASPEN
BUILDING DEPARTMENT
BUILDING DEPARTMENT
5. Provide Final Inspection Report.The special inspector shall submit a written final
AC report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
nnomredam B. Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the Approval Approval poet review of the fabricator's written
SPECIAL INSPECTION AND TESTING AGREEMENT owner 2. A I of fabrkamr.q l shall be based u
responsible for employing special-inspection services.The special inspectoMagency shall procedural and quality control manuals and periodic auditing of fabrication practices by
permitPP project specialp g p not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In an approved special m
To applicants of o'ect requiring inspection and testing per Section 1704 of the case of an owner\contractor,the special ins ter\a encshall be employed as s specified bythe inspection agency.
International Building Code(IBC). p pec g y p
building official. 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator
shall submit certificate of compliance to the building official stating that the work was
Project Address: 34 Westview Dr. Aspen Permit Number: 0066.2018.ARBK C. Engineer or Architect of Record Responsibilities performed in accordance with the approved construction docummu.
BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the G. Building Department Responsibilities
owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing 1. Prepare special inspection program.The engineer or architect of record shall list the
Schedule,includingthe required acknowledgments.A traction conference with theparties items for which special inspection is required;and shall indicate any items for which the I. Approve special.iospecnoo program.The building department shall a Il
IBC or the building official approves periodic inspection and the frequency of such lal in mrs and special-inspection g approve equate gmen pre-cons ea
involved maybe required to review the special-inspection requirements and procedures. spec spa spa spec ton requirements.
inspections.
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the 2. Enforce special impectfon.Work requiring special inspection and the building
projects for which they provide special inspections.Special inspectors shall be approved by the building 2. Respond to field discrepancies.The engineer or architect of record shall respond to m an inspector shall monitor the performance of special inspors.H:SHer approval,in
department to performing duties.Special inspectors shall submit their qualifications and are uncorrected field discrepancies in design,material,or workmanship observed by the ddition to that of the special ieapedar,must be obtained prior to placement of concrete,
p prior pre gany peel p qua special inspector. covering of structural steel,or other similar materials.
subject to personal interviews for pre-qualification.Special inspectors shall display approved
identification,as stipulated by the building official,when performing the function of special inspector. 3. Review inspection reports.The building official should review special-inspection
3. Review shop drawings and submit design changes.The engineer or architect of record progress and final reports.
Special inspection and testing shall meet the minimum requirements of the International Building Code shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information,shall submit to the building official 4. Perform final in The building Section 1704.The following conditions are also applicable: and to the special-inspection a ere documentation of an verbally authorized wer'tia.. g official should perform theta inspection and
agency writteny v y au approval for project[IBC Sec.I09.3.1]after the final special-inspection report has been
A. Duties and Responsibilities of the Special Inspector deviations from the approved construction documents,and shall submit revised reviewed and approved.
documents for building official approval as required.
1. Signify presence at job site.Special inspectors should notify contractor personnel of prpjga Address: 34 Westview Dr.Aspen Permit Number: 0066.2018.ARBK
their presence and responsibilities at the job site.If required by the building official,they D. Contractor Responsibilities
shall sign in on the appropriate form posted with the building permit. 1. Notify the special inspector.The contractor is responsible for notifying the special
ACKNOWLEDGMENTS
2. Observe assigned work.The special inspector shall observe assigned work for inspector or agency regarding individual inspections for items listed on the attached
conformance with the building department approved(stamped)design drawings, schedule and as noted on the building department approved plans.Adequate notice shall I have read and agree to y with the conditions of this agreement.
specifications,and applicable workmanship provisions of the International Building be provided so the special inspector has time to become familiar with the project.
•
Code.Architecbengineer-reviewed shop drawings maybe used only as an aid to S alSignature: tot Name Drc C
inspection. 2. Provide access to approved plans.The contractor is responsible for providing the G /
special inspector access to approved plans.
For continuous special-inspection,the special inspector shall be on site at all times Own. Signature: Printed
3. Retain special inspection records.Upon request,the contractor is also responsible for
observing the work requiring special inspection.Periodic inspections,if any,must have retaining, p p p y p p
prior approval based on a separate written plan reviewed and approved by the building at the site,all special inspection records completed b the special inspector. Westview,LLC Margo Koval 3/15/18
department and the engineer or architect of record. E. Inspection of Fabricators Engineer/Architect: Signature. Primed Name: Date:
3. Report nonconforming items.The special inspector shall bring nonconforming items to ii1. Fabrication of structural assemblies and members.Where fabrication of structuralal S2 Architects / / Joseph Spears,AIA 3/14/18
the s note
attention of the contractor and all such items in the daily report.If load-bearing members and assemblies is being performed on the premises of a
any itemtem is not resolved in a timely manner or is about to be incorporated in the work,the Contractor St Printed Name: Due:
special inspector shall immediately notify the building department by telephone or in fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated S/�/��,�,,-�
person,notify the engineer or architect,and post a discrepancy notice. items. Key_Elements Construction !%"7' e - Kent Bumgamer 3/)S/I V
Approved 2. Fabrication and implementation procedures.The special inspector shall verify that A ved Fabricator: Si Printed Name. Derr.I r
4. Provide timely reports.The special inspector shall complete written inspection reports the fabricator maintains detailed fabrication and quality control procedures that provide a /
for each inspection visit and provide the reports on etimely basis determined bythe basis for inspection control of the workmanship and the fabricator's ability to conform to M y(A4 eC6 G fl t /e 0////a
building official.The special inspector or inspection agency shall furnish these reports construction documents and reference standards.The special inspectorshall 0
directly to the building official,engineer or architect of record,and others as designated,
approvedpecia uire
[IBC Sec.1704.1.2]These reports should be organized on a daily format and maybe review the procedures for completeness and adequacy relative to code requirements for Inspected Fabricator S' Primed Name: Date:
submitted weekly at the option of the building official.These reports should include: fabricator's scope of work.
a. Description of daily inspections and tests made with applicable locations, F. Approved Fabricator Responsibilities
b. Listing of nonconforming items, pproveSI Printed Name. Due:
c. Report on how nonconforming items were resolved or unresolved as � Nick Thompson 10/10/18
applicable, 1. Fabrication exempt inspections.Special inspections are not required where work is P / ___ yY'�I/t ,`
d. Itemized changes authorized by the architect,engineer,and building offi' done on the premise of a fabricator registered and approved to perform such work �'u,( y� ,f
not included in nonconforming items. RECEIVED without special inspection. RECEIVED 3 RECEIVED °-1Zl
1 08/22/2018 2 08/22/2018 08/22/2018 ni /?OI8l1It
ASPEN BUILDINGDEPARTMENT ASPEN ASPEN °kt V
BUILDING DEPARTMENT BUILDING DEPARTMENT