Loading...
HomeMy WebLinkAboutFile Documents.950 Cemetery Ln.0152.2019 (16).ARBK 1.1 To: Nick Thompson, City of Aspen Community Development From: Chris Beebe, Kim Raymond Architects Re: 950 Cemetery Lane Building Permit Resubmittal (Permit#0072-2018 ARBK) November 12th, 2018 Hello Nick— In addition to addressing your initial comments, here are the design changes that we've presented in the resubmittal: • The main roof will remain as existing, extended to reach the new north wall (replacing the canted wall for the Living, Dining and Kitchen, as was originally proposed). Re: A1.5 (Roof Plan), and A3.0—A3.3 (Building Elevations). • The roof above the Entry, Entry Stair and Landing will be replaced by a flat roof. Re: A1.5 (Roof Plan) • The hot tub and deck extension of the existing deck off the Living Room has been deleted. Re: A1.4 (Main Floor Plan — Proposed) • A portion of the proposed rear deck has been deleted to fit within the setback. Re: A1.4 (Main Floor Plan — Proposed) and Z-004 (Site Plan - Existing and Proposed) • The rear deck stair has been reconfigured to accommodate the deletion of deck to fit within the setback. Re: A1.4 (Main Floor Plan — Proposed) and Z-004 (Site Plan - Existing and Proposed) • We propose to drop the lower level slab approximately 14". Re: A1.3 (Lower Level Floor Plan — Proposed) • A second window and window well were added to the north wall of the Lower Level. Re: A1.3 (Lower Level Floor Plan — Proposed) • The windows and doors in the Living, Dining and Kitchen were rearranged. Re: A1.4 (Main Floor Plan — Proposed) and A3.0—A3.3 (Building Elevations).0 • The existing Entry porch roof has been replaced Re: A1.5 (Roof Plan), and A3.0—A3.3 (Building Elevations). 12/10/18 Please contact me directly if you have any questions. ASPEN BUILDING DEPARTMENT Best Regards— Chris (970) 379-4214 Kim Raymond Architects, Inc. 418 E. Cooper Ave., Aspen, CO 81611 (970) 925-2252