Page:A 0.3 FIRE AREA
File Name: plans.pdf Revise the fire area plans to not
Subject: PlanCheck include the eave overhangs.
Author: nickt Only include outdoor covered
Pr". Color: • areas if they are usable areas
W such as a covered porch.
'f d -
Page:A 1.3 LEVEL PLAN-PROPOSED
in File Name: plans.pdf Provide a wall section at the new
i thermal envelope at the utility
.II • Subject: PlanCheck
■ —,.I Author: nickt room addition. Indicate the
, ;II i_______- following:
iij'lll_II :� + i,-� Color: • g
-Insulation matching REScheck.
-1 i 1 = -Flashing/waterproofing.
-Show the air sealing strategy.
Note locations that require
caulking, sealing,taping, etc.
Note which components are
included in the air barrier such
as spray foam, gypsum,
housewrap, and/or exterior
insulation.
Page:A 1.4 PLAN-PROPOSED
File Name: plans.pdf Provide a wall section at the new
Subject: PlanCheck thermal envelope at the
Author: nickt straightened living room wall.
Color: • Indicate the following:
®• :° -Insulation matching REScheck.
'Lab . ' -Flashing/waterproofing.
_r -.. to -Show the air sealing strategy.
ik. Note locations that require
, , caulking, sealing,taping, etc.
Note which components are
included in the air barrier such
as spray foam, gypsum,
housewrap, and/or exterior
insulation.
Page:A 1.4 PLAN PROPOSED Detail and dimension the guard
File Name: plans.pdf at the hot tub. Guard must
Subject: PlanCheck
Author: nickt extend a minimum of 18"above
Color: • the top of the hot tub edge
4 o 04° a ° 9 ° unless the edge is 18"or
�li  greater, in which case the guard
u®*)' g
o4 * lI must be 36"measured from the
top of the hot tub. Per City
•slain ii3O 0 =a Policy.
RECEIVED
10/19/2018
ASPEN
BUILDING DEPARTMENT
_;,^; Page:A 1.4 PLAN-PROPOSED
® File Name: plans.pdf If any walls that are shared with
: = Subject: PlanCheck the other unit are to be
0
Author: nickt disturbed, provide a listed 1 hour
- Color: • fire and STC 45 rated assembly
per 2015 IRC R302.3 and
appendix K.
°��----- Page:A 1.4 PLAN-PROPOSED
71HollFile Name: plans.pdfMechanicals show the garage
Subject: PlanCheckbeing heated. Provide a door to
Ilv_ ` ! ? Author: nickt complete the thermal envelope.
I'�'I F^' Also update the elevation view.
� gg ` \-4:I1 Color: •
MI 1 r
nnn
el o @ o
Page:A 5.0 DETAILS REScheck calls for R-56
_ a = a File Name: plans.pdf
. III Subject: PlanCheck insulation in the new roof.
_---. 2 Revise to match.
j Author: nickt
lE .�
Color: •
vs
oEw = oo.
ACV
i.m
..u—. Page:A 5.1 DETAILS
File Name: plans.pdf Detail the existing hearth
Subject: PlanCheck extension condition. If it is
- _ Author: nickt altered beyond refacing the
n'- Color: • veneer, it and the fireplace must
Mbe made to be supported by
, o.. — ® non-combustible construction.
(2015 IRC R1001.9)
•-e Page: M-2 BASEMENT LEVEL HVAC PLANS
Show all new intake, exhaust,
_ 1 W File Name: plans.pdf flue, and vent outlets with
`IIIp Subject: Mech for existing but total gut
i d J. A Author: nickt dimensions to openings and
- - Color: • property lines.
RECEIVED
10/19/2018
ASPEN
BUILDING DEPARTMENT
Page: S3.1 STRUCTURAL DETAILS
File Name: plans.pdf Provide a special inspection
Subject: PlanCheck agreement form signed by the
_ Author: nickt special inspector,fabricator,
. �� Color: • owner, and contractor.
•
'-'
REScheck.950 Cemetery Lane.2018.04.pdf(2)
Page: 1 For this R-15 slab insulation to
File Name: REScheck.950 Cemetery Lane.2018.04.pdf
Subject: PlanCheck count, it must be on the side of
Author: nickt the slab, starting at the top of the
slab, then extend down for a
l Coor: •
t� depth of 4'or to the inside or
outside of the slab for 4'. Provide
=1== details showing the proposed
condition and have the
REScheck match it.
_=- Page: 2 Revise Rescheck to match the
=�-E„�-• _ Y File Name: REScheck.950 Cemetery Lane.2018.04.pdf fenestration specs from Windsor.
-- Subject: PlanCheck
' Author: nickt For example,there are doors
_ � _ _a Color: • with U-factors of 0.35, 0.34, and
= == -- 0.29.