Loading...
HomeMy WebLinkAboutFile Documents.950 Cemetery Ln.0152.2019 (39).ARBK CREScheck Software Version 4.6.5 .-1( Compliance Certificate Project Costanza Remodel Energy Code: 2015 IECC Location: Aspen, Colorado Construction Type: Single-family Project Type: Alteration Climate Zone: 7 (9922 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 950 Cemetery Lane Kim Raymond Mark Burggraaf Unit 1 Kim Raymond Architects, Inc. Burggraaf Associates Inc. Aspen, CO 300 E. Hyman Ave. 1404 Hawk Parkway Suite 100 Suite 218 Aspen, CO 81611 Montrose, CO 81401 (970)925-2252 (970) 240-5990 kim@kimraymondarchitects.com m.burggraaf@bai-eng.biz Compliance: Passes using prescriptive requirements for alteration projects ' ` 1'� P ?`.�. 01/16/2019 ..r) FORODDitailAPLIANCE Envelope Assemblies nickt Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Floor 1: Slab-On-Grade:Heated 31 15.0 0.655 20 Insulation depth: 4.0' Comment: Entry Floor 2: Slab-On-Grade:Heated 79 15.0 0.655 52 Insulation depth: 4.0' Comment: Garage Floor 3:All-Wood Joist/Truss:Over Unconditioned Space 215 38.0 0.0 0.026 6 Comment: Kitchen Floor 4:All-Wood Joist/Truss:Over Unconditioned Space 206 38.0 0.0 0.026 5 Comment: Master Bedroom Floor 5:All-Wood Joist/Truss:Over Unconditioned Space 50 38.0 0.0 0.026 1 Comment: Master Bath Ceiling 1: Cathedral Ceiling 60 39.0 10.0 0.021 1 Comment: Bedroom 1 Ceiling 2: Cathedral Ceiling 76 39.0 10.0 0.021 2 Comment: Entry Ceiling 3: Cathedral Ceiling 419 39.0 10.0 0.021 9 Comment: Garage Ceiling 4: Cathedral Ceiling 302 39.0 10.0 0.021 6 Comment: Living, Dining, Kitchen-new Ceiling 5: Cathedral Ceiling 810 39.0 10.0 0.021 17 Comment: Living, Dining, Kitchen-existing Ceiling 6: Cathedral Ceiling 50 39.0 10.0 0.021 1 E Comment: Powder Room Ec,' Project Title: Costanza Remodel Report R date: 09/24�NV/18 D Data filename: Z:\Workfiles\2018\8014\8014_RESCHECK 09-24-18.rck 1 Oapt 59'21018 ASPEN BUILDING DEPARTMENT Gross Area Assembly or Cavity Cont. U-Factor UA Perimeter R-Value R-Value Ceiling 7:Cathedral Ceiling 37 39.0 10.0 0.021 1 Comment: Master Bedroom-new Ceiling 8: Cathedral Ceiling 213 39.0 10.0 0.021 4 Comment: Master Bedroom-existing Ceiling 9: Cathedral Ceiling 124 39.0 10.0 0.021 3 Comment: Master Bath Basement Wall 1: Solid Concrete or Masonry --- --- Wall height: 10.0' Depth below grade:9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Window W06: Wood Frame:Double Pane with Low-E 25 0.320 8 Comment: Family Room Basement Wall 2: Solid Concrete or Masonry --- --- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Basement Wall 3: Solid Concrete or Masonry --- --- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Window W05: Wood Frame:Double Pane with Low-E 25 0.320 8 Comment: Bedroom 2 Basement Wall 4: Solid Concrete or Masonry --- -- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Basement Wall 5: Solid Concrete or Masonry --- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Basement Wall 6: Solid Concrete or Masonry --- --- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Basement Wall 7: Solid Concrete or Masonry --- --- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Window W03: Wood Frame:Double Pane with Low-E 20 0.320 6 Comment: Bedroom 1 Window W02: Wood Frame:Double Pane with Low-E 20 0.320 6 Comment: Bedroom 1 Basement Wall 8: Solid Concrete or Masonry --- --- -_ --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Basement Wall 9: Solid Concrete or Masonry --_ -_ __ __ Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation knrr%rIVED Project Title: Costanza Remodel Report date: 09/24/18 Data filename: Z:\Workfiles\2018\8014\8014_RESCHECK 09-24-18.rck 10019 0)18 ASPEN BUILDING DEPARTMENT Gross Area Assembly or Cavity Cont. U-Factor UA Perimeter R-Value R-Value Basement Wall 10: Solid Concrete or Masonry -- --- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Door 1: Solid 15 0.300 5 Comment: New Utility Room Basement Wall 11: Solid Concrete or Masonry -- --- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Basement Wall 12: Solid Concrete or Masonry --- --- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Basement Wall 13: Solid Concrete or Masonry --- --- -- --- --- Wall height: 10.0' Depth below grade: 9.0' Insulation depth: 10.0' Exemption: Framing cavity filled with insulation Wall 14: Wood Frame, 16"o.c. 71 21.0 5.0 0.043 2 Comment: Entry Window 23: Wood Frame:Double Pane with Low-E 10 0.320 3 Comment: Entry Door 03:Glass 24 0.320 8 Comment: Entry Wall 15:Wood Frame, 16"o.c. 80 21.0 5.0 0.043 2 Comment: Entry Window 11:Wood Frame:Double Pane with Low-E 25 0.320 8 Comment: Entry Wall 16:Wood Frame, 16"o.c. 55 21.0 5.0 0.043 2 Comment: Entry Wall 17:Wood Frame, 16" o.c. 77 21.0 5.0 0.043 3 Comment: Entry Wall 18:Wood Frame, 16"o.c. 192 21.0 5.0 0.043 8 Comment: Garage Wall 19:Wood Frame, 16" o.c. 150 21.0 5.0 0.043 6 Comment: Garage Wall 20:Wood Frame, 16" o.c. 192 21.0 5.0 0.043 7 Comment: Garage Door DG1: Solid 20 0.300 6 Comment: Garage Wall 21: Wood Frame, 16"o.c. 177 21.0 5.0 0.043 2 Comment: Garage Door 01: Solid 60 0.125 8 Comment: Garage Door 02: Solid 60 0.125 8 Comment: Garage Wall 22:Wood Frame, 16" o.c. 33 21.0 5.0 0.043 1 Comment: Living Room Wall 23:Wood Frame, 16" o.c. 258 21.0 5.0 0.043 5 Comment: Living Room Window W37:Wood Frame:Double Pane with Low-E 6 0.320 2 Comment: Living Room Door 06: Glass 126 0.320 40 Comment: Living Room Wall Wood Frame, 16"o.c. 150 21.0 5.0 0.043 � �� Comment: Living Room 9!ag/ Project Title: Costanza Remodel Report date: 09/24/18 Data filename: Z:\Workfiles\2018\8014\8014_RESCHECK 09-24-18.rck 1OPf1A9'fal18 ASPEN BUILDING DEPARTMENT Gross Area Cavity Cont. Assembly or U-Factor UA Perimeter R-Value R-Value Window W27:Wood Frame:Double Pane with Low-E 34 0.320 11 Comment: Living Room Window W34: Wood Frame:Double Pane with Low-E 7 0.320 2 Comment: Living Room Window W35: Wood Frame:Double Pane with Low-E 7 0.320 2 Comment: Living Room Window W36: Wood Frame:Double Pane with Low-E 6 0.320 2 Comment: Living Room Wall 25: Wood Frame, 16" o.c. 114 21.0 5.0 0.043 5 Comment: Living Room Wall 26:Wood Frame, 16"o.c. 123 21.0 5.0 0.043 3 Comment: Dining Window W26: Wood Frame:Double Pane with Low-E 42 0.320 13 Comment: Dining Wall 27:Wood Frame, 16" o.c. 20 21.0 5.0 0.043 1 Comment: Dining Wall 28:Wood Frame, 16"o.c. 160 21.0 5.0 0.043 5 Comment: Kitchen Window W25:Wood Frame:Double Pane with Low-E 20 0.320 6 Comment: Kitchen Window W31: Wood Frame:Double Pane with Low-E 6 0.320 2 Comment: Kitchen Window W32:Wood Frame:Double Pane with Low-E 8 0.320 3 Comment: Kitchen Window W33: Wood Frame:Double Pane with Low-E 8 0.320 3 Comment: Kitchen Wall 29:Wood Frame, 16" o.c. 172 21.0 5.0 0.043 4 Comment: Kitchen Window W24: Wood Frame:Double Pane with Low-E 20 0.320 6 Comment: Kitchen Window W23: Wood Frame:Double Pane with Low-E 13 0.320 4 Comment: Kitchen Door 06:Wood Frame:Double Pane with Low-E 40 0.320 13 Comment: Kitchen Window W30: Wood Frame:Double Pane with Low-E 6 0.320 2 Comment: Kitchen Wall 30:Wood Frame, 16"o.c. 128 21.0 5.0 0.043 4 Comment: Kitchen Window W19: Wood Frame:Double Pane with Low-E 12 0.320 4 Comment: Kitchen Window W20: Wood Frame:Double Pane with Low-E 12 0.320 4 Comment: Kitchen Window W22:Wood Frame:Double Pane with Low-E 14 0.320 4 Comment: Kitchen Wall 31:Wood Frame, 16"o.c. 25 21.0 5.0 0.043 1 Comment: Powder Room Window W16: Wood Frame:Double Pane with Low-E 10 0.320 3 Comment: Powder Room Wall 32:Wood Frame, 16"o.c. 36 21.0 5.0 0.043 1 Comment: Master Bedroom Window W12: Wood Frame:Double Pane with Low-E 10 0.320 3 Comment: Master Bedroom Wall 33:Wood Frame, 16"o.c. 203 21.0 5.0 0.043 9 Comment: Master Bedroom Wall 34:Wood Frame, 16"o.c. 59 21.0 5.0 0.043 1 Comment: Master Bedroom Window W13:Wood Frame:Double Pane with Low-E 13 3 r,1'41ED Comment: Master Bedroom Project Title: Costanza Remodel Report date: 09/24/18 Data filename: Z:\Workfiles\2018\8014\8014_RESCHECK 09-24-18.rck 183,91591F2t18 ASPEN BUILDING DEPARTMENT Gross Area Cavity Cont. Assembly or U-Factor UA Perimeter R-Value R-Value Window W14:Wood Frame:Double Pane with Low-E 13 0.320 4 Comment: Master Bedroom Wall 35:Wood Frame, 16" o.c. 58 21.0 5.0 0.043 2 Comment: Master Bath Window 21:Wood Frame:Double Pane with Low-E 10 0.320 3 Comment: Master Bath Wall 36:Wood Frame, 16" o.c. 73 21.0 5.0 0.043 2 Comment: Master Bath Window W16: Wood Frame:Double Pane with Low-E 6 0.320 2 Comment: Master Bath Window W15: Wood Frame:Double Pane with Low-E 25 0.320 8 Comment: Master Bath _ ..�....„`\ Compliance Statement: The proposed building design described here i ••L' ' ,�3L.-.i.,1 y ilding plans, specifications, and other calculations submitted with the permit application.The proposed buil.;; -� thy';. ''4 meet the 2015 IECC requirements in REScheck Version 4.6.5 and to comply with the mandatory requirem:;; r -: ,^ ,'' n , -ction Checklist. i Le. A 4## Mark Burggraaf, P.E. i : b /?1//f�r Name-Title Signat •; Da Project Notes: '��� ="�y:•• •.. 114,0 RF "1-1"/ED Project Title: Costanza Remodel Report date: 09/24/18 Data filename: Z:\Workfiles\2018\8014\8014_RESCHECK 09-24-18.rck 1 001 95424)1 8 ASPEN BUILDING DEPARTMENT