Loading...
HomeMy WebLinkAboutChange Order.1015 Waters Ave.0204.2019 (4).ARBK 0204-2019-ARBK_BuildingComment2 1015 Building Response 1-20-20.pdf(2) "W zC� II { ` m-- Subject: PlanCheck Pt I I r Page:A-204 EAST ELEVATION You still have a portion of O walkway on the east elevation z Author:justinh s P Color: • that has 4 risers, requiring a File Name: 1015 Building Response 1-20-20.pdf handrail. Either provide a handrail or revise to eliminate the requirement for one. Be sure to update both the architectural set and landscape set. Inez Subject: PlanCheck L' Page:A-UU^NOWMELT PLAN•50St DETAILS Provide a detail specific to the A-7 Author:justinh snowmelted permeable pavers, Color: • I cannot find the one you File Name: 1015 Building Response 1-20-20.pdf reference in the comment letter that was supplied by COA • engineering. You will need more than 2"of insulation beneath the insulation to get an R10 weighted average once holes are put in the insulation in order for it to drain. Detail the hole pattern and call out the new insulation thickness to show you are still achieving an average of R10. The attached snowmelt calculator spreadsheet should help to calculate a compliant hole pattern.