HomeMy WebLinkAboutChange Order.1015 Waters Ave.0204.2019 (4).ARBK 0204-2019-ARBK_BuildingComment2
1015 Building Response 1-20-20.pdf(2)
"W zC� II { ` m-- Subject: PlanCheck
Pt I I r Page:A-204 EAST ELEVATION You still have a portion of
O
walkway on the east elevation
z
Author:justinh
s P Color: • that has 4 risers, requiring a
File Name: 1015 Building Response 1-20-20.pdf handrail. Either provide a
handrail or revise to eliminate
the requirement for one. Be
sure to update both the
architectural set and landscape
set.
Inez Subject: PlanCheck
L' Page:A-UU^NOWMELT PLAN•50St DETAILS Provide a detail specific to the
A-7 Author:justinh snowmelted permeable pavers,
Color: • I cannot find the one you
File Name: 1015 Building Response 1-20-20.pdf reference in the comment letter
that was supplied by COA
• engineering. You will need more
than 2"of insulation beneath the
insulation to get an R10
weighted average once holes
are put in the insulation in order
for it to drain. Detail the hole
pattern and call out the new
insulation thickness to show you
are still achieving an average of
R10. The attached snowmelt
calculator spreadsheet should
help to calculate a compliant
hole pattern.