Loading...
HomeMy WebLinkAboutMaster Permit.1015 Waters Ave.0204.2019 (3).ARBK 0076-2018-ARBK_BuildingComment2 17. 1015 Waters Additonal Special Inspection Signature Round 1.pdf(1) ---_ _ Subject: PlanCheck 1 You still need the signature of =Er Page Label: 3 Author:justinh your inspected fabricator for the — :� -- File Name: 17. 1015 Waters Additional Special field welds shown in the Inspection Signature Round 1.pdf structural plan. Myers'signature 4- Hf ,,. :° as an approved fabricator only Color: • ==' Response: See attached# 17.1 Special covers them for welding done = - withing their shop.You do not Inspection Signature page Round 2 for the need to resubmit all sheets,just - � � inspection fabricator for field welds in the one with an inspected Documents#17.1 Special Signature Page fabricator's signature. Signed. B-Building.PlanSet.1015Waters.2019.1.Roundl.pdf(4) Subject: PlanCheck ,/ / Page Label: £CH-V ROOF&ROOF DECK•50PLAN This exhaust location appears to be within 10'of the outdoor air Author:justinh shown on m File Name: B-Building.PlanSet.1015Waters.2019.1.Roundl°pd planks e(I can't say foechanica certain las the air intake is not shown on the Color: •Ewa elevations and this exhaust is . not shown on the mechanical Response: See A-204 East Elevation Round plan). Please revise or clearly 2 for location of Garage Intake and Boiler demonstrate that you will have Exhaust. the required 10'of separation between the exhaust and intake. The 10'separation is not required if the supply intake is 3' or more below the exhaust termination,this may be the simplest solution. Subject: PlanCheck ✓ Page Label: 14"x 5.5" Concrete Border(Install to Provide these structural designs manufacturers specifications.) Permeable Pavers you reference here, they are not _= Author:justinh currently in your structural set. _ _ File Name: B-Building.PlanSet.1015Waters.2019.1.Roundl.pd Any retaining wall 48"or more in f height(measured from top of Color: • Response: See L-5 Landscape wall to bottom of footing) ° Construction Details Round 2 for requires structural design. Structural Engineering Details for the Landscape Walls. Subject: PlanCheck ✓ Page Label:A-003 GROSS& FIRE•50FLOOR The open to below area for the tiloiioiE9n Ir, AREA•50CALCULATIONS upper level should not be Author:justinh counted towards your gross area 7E1 File Name: B-Building.PlanSet.1015Waters.2019.1.Round1.pd and the entry on the main level f should be included (I'm l Color: • measuring 2216 lower level, 2180 main level and 1614 upper ra we Response: See A-003 Fire&Gross Area Calcs for a total of 6010 SF). Please Round 2 for corrections. revise your diagrams to have the proper areas shaded. RECEIVED 05/08/2019 ASPEN BUILDING DEPARTMENT u Subject: PlanCheck Page Label:A-101 MAIN ENTRY LEVEL•50FLOOR PLAN Where is the master bedroom 1 fireplace being exhausted? Author:justinh i �° w„ only see the living room exhaust \ o File Name: B-Building.PlanSet.1015Waters.2019.1.Roundl.pd shown on the roof plan and no ee°ge.,e°,aa> f msee e!lying Color: • fireplace exhausts are shown on belev< area�Please a,„a°sa ° Response: See A-101 Main floor Plan Round 2 and the elevations. Please be sure 12 BEDROOM' °" m „« „„ you are showing both. tl o I V A-203 South Elevation Round 2 for location of it, fireplace exhaust and air intake. Please see Page ° I 58 of the install Manual (attached)for#8.1 DaVinci Fireplace Clearances Round 2. M-1 0076-2018.ARBK_BuildingComment.BCE_Response_1.pdf(1) W7. Subject: PlanCheck Please provide the ventilation �P.. F.. Page Label: 11 --- = Author:justinh calculation referenced in these um =.= responses, I could not locate --_ v................................................ File Name: M-1 -= - ~=- r- them in the resubmittal package. 0076-2018.ARBK_BuildingComment.BCE_Response_1.pdf Color: • =—.. - Response: Please see the# 16.1 and 16.2 Mechanical Ventilation Calculations Round 2 submitted by the Mechanical Engineer in Documents. RECEIVE 05/08/2019 ASPEN BUILDING DEPARTMENT