HomeMy WebLinkAboutMaster Permit.1015 Waters Ave.0204.2019 (3).ARBK 0076-2018-ARBK_BuildingComment2
17. 1015 Waters Additonal Special Inspection Signature Round 1.pdf(1)
---_ _ Subject: PlanCheck 1 You still need the signature of
=Er Page Label: 3
Author:justinh your inspected fabricator for the
— :� -- File Name: 17. 1015 Waters Additional Special field welds shown in the
Inspection Signature Round 1.pdf structural plan. Myers'signature
4- Hf ,,. :° as an approved fabricator only
Color: •
==' Response: See attached# 17.1 Special covers them for welding done
= - withing their shop.You do not
Inspection Signature page Round 2 for the need to resubmit all sheets,just
- � � inspection fabricator for field welds in the one with an inspected
Documents#17.1 Special Signature Page fabricator's signature.
Signed.
B-Building.PlanSet.1015Waters.2019.1.Roundl.pdf(4)
Subject: PlanCheck ,/
/ Page Label: £CH-V ROOF&ROOF DECK•50PLAN This exhaust location appears to
be within 10'of the outdoor air
Author:justinh
shown on m
File Name: B-Building.PlanSet.1015Waters.2019.1.Roundl°pd planks e(I can't say foechanica certain las
the air intake is not shown on the
Color: •Ewa
elevations and this exhaust is
. not shown on the mechanical
Response: See A-204 East Elevation Round plan). Please revise or clearly
2 for location of Garage Intake and Boiler demonstrate that you will have
Exhaust. the required 10'of separation
between the exhaust and intake.
The 10'separation is not
required if the supply intake is 3'
or more below the exhaust
termination,this may be the
simplest solution.
Subject: PlanCheck ✓
Page Label: 14"x 5.5" Concrete Border(Install to Provide these structural designs
manufacturers specifications.) Permeable Pavers you reference here, they are not
_= Author:justinh currently in your structural set.
_ _ File Name: B-Building.PlanSet.1015Waters.2019.1.Roundl.pd Any retaining wall 48"or more in
f height(measured from top of
Color: • Response: See L-5 Landscape wall to bottom of footing)
° Construction Details Round 2 for requires structural design.
Structural Engineering Details for the
Landscape Walls.
Subject: PlanCheck ✓
Page Label:A-003 GROSS& FIRE•50FLOOR The open to below area for the
tiloiioiE9n Ir, AREA•50CALCULATIONS upper level should not be
Author:justinh counted towards your gross area
7E1 File Name: B-Building.PlanSet.1015Waters.2019.1.Round1.pd and the entry on the main level
f should be included (I'm
l Color: • measuring 2216 lower level,
2180 main level and 1614 upper
ra we Response: See A-003 Fire&Gross Area Calcs for a total of 6010 SF). Please
Round 2 for corrections. revise your diagrams to have the
proper areas shaded.
RECEIVED
05/08/2019
ASPEN
BUILDING DEPARTMENT
u Subject: PlanCheck
Page Label:A-101 MAIN ENTRY LEVEL•50FLOOR PLAN Where is the master bedroom
1 fireplace being exhausted?
Author:justinh
i �° w„ only see the living room exhaust
\ o File Name: B-Building.PlanSet.1015Waters.2019.1.Roundl.pd shown on the roof plan and no
ee°ge.,e°,aa> f
msee
e!lying
Color: • fireplace exhausts are shown on
belev<
area�Please a,„a°sa
° Response: See A-101 Main floor Plan Round 2 and the elevations. Please be sure
12 BEDROOM' °" m „« „„ you are showing both.
tl o I V A-203 South Elevation Round 2 for location of
it, fireplace exhaust and air intake. Please see Page
° I 58 of the install Manual (attached)for#8.1 DaVinci
Fireplace Clearances Round 2.
M-1 0076-2018.ARBK_BuildingComment.BCE_Response_1.pdf(1)
W7. Subject: PlanCheck Please provide the ventilation
�P.. F.. Page Label: 11
--- = Author:justinh calculation referenced in these
um =.= responses, I could not locate
--_ v................................................ File Name: M-1
-= - ~=- r- them in the resubmittal package.
0076-2018.ARBK_BuildingComment.BCE_Response_1.pdf
Color: •
=—.. - Response: Please see the# 16.1 and 16.2 Mechanical Ventilation Calculations Round 2
submitted by the Mechanical Engineer in Documents.
RECEIVE
05/08/2019
ASPEN
BUILDING DEPARTMENT