Loading...
HomeMy WebLinkAboutChange Order.1015 Waters Ave.0007-2021-BCHO (2) 0007-2021 -BCOM_1015 Waters_BuildingCommentl 90.1015 Waters.0O3.pdf(5) t�,o I Subject: PlanCheck Identify whether this new Ii ���_ I Page: 5 _,INmechanical space is conditioned �; Author:justinh or not and if it is show how it FRE Color: ■ ' File Name: 90.1015 Waters.0O3.pdf meets the thermal envelope requirements of the 2015 IECC. p. This new space is not conditioned and $ °" is accessed from the floor hatch Provide a detail reference for the _ 4 wall and ceiling assemblies of ?-4 shown. It is non-livable mech. space the new mechanical space. / I /A/ ' p Subject: PlanCheck Page: 5 V Update the mechanical and 71 _q q7 T 1structural plans to reflect these Author:justinh Color: • changes. Currently neither set I� _� File Name: 90.1015 Waters.0O3.pdf reflects the removal of the _ r _ ii!,71, I elevator or this new mechanical �Ii This is beingdone perspace. 4, _.; my -! ' conversation w/ Justin to update all Be sure to update the balanced :-rilmz,4w, _ ; plans accordingly. I have a letter ventilation calculation in the from the structural engineer submitted mechanical set as the balanced system relied upon continuously for the elevator removal and the running exhaust fans in the mech. drawings have been submitted bathrooms to balance the OA - and updated to reflect the new supply air. - _,_ 1 — ;powder. r •• Page: 6 The bubbled area does not • �NL1.� � -�— g iTmil - Author:justinh correspond to the location shown for new mechanical ��,NAG., _ Color: • 1� E �'m space per the grid lines on the i� `]� File Name: 90.1015 Waters.0O3.pdf lower level plan. You are also 1u. ■i It is a cantilevered condition so the showing concrete foundation 7 - N walls do not allign. We reviewed this wall in areas where it is not a shown on the lower level plan. " with an overlay and the drawings are Revise so that the layout and accurate as shown. location of all walls is shown consistently throughout all relevant plan sets. Provide a class A roof assembly if the new mechanical space has it's own exposed roof. I..' Po".' II'. - ' v Subject: PlanCheck sill / I Page: 7 V If this planter is serving as the --� a Author:justinh required guard then it must be at MP 1' least 36"tall. ll / =9e Color: ■ File Name: 90.1015 Waters.0O3.pdf 4.�111- „ems - - ;/I �EMER The planter is not serving as the guard `M ,�% I as it is not req. due to height above 1_z J 0 grade being less than 30" between grade and patio surface RECEIVED 04/29/2021 ASPEN BUILDING DEPARTMENT Subject: PlanCheck Page: 7 Remove bubbling not specific to Remove bubbling not specifclo this change order. The only ite change dint. se°nlv Author:justinh %ems bubbled in these sets shoultl be the changes matle items bubbled in these sets with this change order. Color: • File Name: 90.1015 Waters.0O3.pdf should be the changes made O ® O with this change order. the black noted bubbles as II show previously 16'-I I• approved change orders. This is acceptable per conversation with Justin RECEIVED 04/29/2021 ASPEN BUILDING DEPARTMENT