Loading...
HomeMy WebLinkAboutFile Documents.1015 Waters Ave.0204.2019.ARBK • U CHANGE ORDER II SCOPE DESCRIPTION 10/12/2020 Project: 1015 Waters Avenue Subject: Change Order Work Scope To: Staff of City of Aspen Office Community Development By: Michael Edinger The work scope in Change order II can generally be described as interior adjustments to non- structural, non-loading bearing walls. There is no added Floor Area, or adjustment to existing floor area calculations. There are not changes to roof heights,window sizes or locations, or any exterior modifications. There are not structural changes required in order to move the walls as shown. Specifically the follow areas have been impacted and are bubbled in the floor plans for ease of reference. Lower Level: 1. The bunkroom dimensions and bunkroom bathroom layout has changed. 2. A powder was added adjacent to Bedroom #5 Main Level: 1. The powder room location has changed on the main level Upper Level: 2. A new kitchen orientation was designed. All existing structure remains as originally designed. Alius Design Corps LLC By: Michael Edinger, its President RECEIVED 11/13/2020 ALIUS DESIGN CORPS LLC I ASPEN,CO 1719.331.9211 IMICHAEL@ALIUSDC.COM ASPEN BUILDING DEPARTMENT