CHANGE ORDER II SCOPE DESCRIPTION
10/12/2020
Project: 1015 Waters Avenue
Subject: Change Order Work Scope
To: Staff of City of Aspen Office Community Development
By: Michael Edinger
The work scope in Change order II can generally be described as interior adjustments to non-
structural, non-loading bearing walls. There is no added Floor Area, or adjustment to existing
floor area calculations. There are not changes to roof heights,window sizes or locations, or any
exterior modifications. There are not structural changes required in order to move the walls as
shown.
Specifically the follow areas have been impacted and are bubbled in the floor plans for ease of
reference.
Lower Level:
1. The bunkroom dimensions and bunkroom bathroom layout has changed.
2. A powder was added adjacent to Bedroom #5
Main Level:
1. The powder room location has changed on the main level
Upper Level:
2. A new kitchen orientation was designed. All existing structure remains as originally
designed.
Alius Design Corps LLC
By: Michael Edinger, its President
RECEIVED
11/13/2020
ALIUS DESIGN CORPS LLC I ASPEN,CO 1719.331.9211 IMICHAEL@ALIUSDC.COM ASPEN