Loading...
HomeMy WebLinkAboutMaster Permit.1015 Waters Ave.0204.2019 (6).ARBK GRETCHEN GREENWOOD ARCHITECT, INC. 210 South Galena Street Suite 30 Aspen CO. 81611 0: 970-925-4502 E-mail:ggreenwood@ggaaspen.com • April 15, 2019 Secure Site with Construction Fencing Begin Demo of garage • April 15-30 Obtain Parking permits for work in the right of way April 18—30 • April 18-30 Begin Abandonment of utilities in the transplant and receiver areas • May 1 Begin Preparing tree for Removal • May 1-Stake location of transplant location; get approval from project team and CoA • May 6-10 Remove permitted trees and remove stumps/root plates (likely a 2-3 day project but depends upon underground root systems • May 13 -16 Prepare receiver hole and install anchoring system for root ball (2-3 days) • May 17 Dig and move the tree, secure anchoring systems (1 day) • May 18 Provide after care per transplanting report • Maintenance plan as outlined in Tree Removal Plan for three-year period. egigoCITY OF ASPEN 04/12/2019 COMPPERMIT NO. 0076.2018.ARBK `OM n � OWNER HEMMING EVELYN F TRUST ADDRESS 1015 WATERS AVE PARCEL ID 2737182002