Loading...
HomeMy WebLinkAboutMaster Permit.1015 Waters Ave.0204.2019 (24).ARBK C-Civil Engineering.1015Waters.2018.4.pdf(10) �• Page: Cl �w� Show meter location. �A� .m,�: File Name: C-Civil Engineering.1015Waters.2018.4.pdf 1Liii Meter location is intended to be within the building mechanical room.1���/1 A note has been added on Sheet Cl to indicate this. IrkiQom, �2:�.„., SCALE: 1"'= 10 Page: Cl File Name: C-Civil Engineering.1015Waters.2018.4.pdf A maintenance and access easement must be provided for the ditch on property.The Ali-l ae � ' easement must be 10ft from rt .. e .e , , center line of ditch. No structural lt- infrastructure can be within 10ft of center line of ditch. `'; Ditch easement has been provided. Architecture and site plan have been �_;, "" redesigned to conform. This is shown through out the plans. Page: C2 Profile 1 is incorrectly labeled File Name: C-Civil Engineering.1015Waters.2018.4.pdf and should reference Detail F. o+oo 786' ...,... M lasigiraz O is M,a The label has been correct on Sheet C2 as Detail F. il MIME 7954 11111111111111 PROFILE-1 Page: C2 Soils report recommends File Name: C-Civil Engineering.1015Waters.2018.4.pdf foundation drains. Please show Soils report on plans. recommends foundation drains. Please show on plans. Foundation drain routing has been shown on Sheet C2 with a drywell TAILS PER for the foundation drains added as Detail L. .HITFOT RECEIVE ) 05/08/2019 ASPEN BUILDING DEPARTMENT Page: C2 General Notes section not File Name: C-Civil Engineering.1015Waters.2018.4.pdf legible. Please revise. General Notes section snot legible.Please in®m I=e07,revise. The sheet has been remade and the notes are legible. s®rOaCI �mt me1l_.i�r Im❑mmmm 78E nt®EI N®NCL u m i i i i i u rC SEED® IDnniiiid❑Cmgy,Et®101Sll C2 l nm11,11,1 rrn In,Imi carrfmmn ,,, Page: C2 How will the southern swale be File Name: C-Civil Engineering.1015Waters.2018.4.pdf STACKED ROCK wA E conveyed through retaining wall shown. How will the southern Swale be conveyed a through retaining wall b it shown. HEX. SLOPE GRADE� , o n The stacked rock retaining wall and detail have been removed. �\w The swale is shown with uninterrupted conveyance. Erat iz Page: C4 File Name: C-Civil Engineering.1015Waters.2018.4.pdf Permeable paver detail does not comply with the URMP spec. See Figure 8.31 in the URMP for [aw- guidance on appropriate 'i r k> ' permeable paver cross section. 4-77- r� • Permeable paver detail has been revised on Sheet C4 to be _ ml congruent with the URMP, Page: C4 Media should be 70%sand and File Name: C-Civil Engineering.1015Waters.2018.4.pdf 30%combination topsoil and organic matter, per the URMP. Media should be 70%sand and 30%combination topsoil and organic matter,per the URMP. ,1 The Bio-Retention detail on Sheet C4 has been revised to be 1e t congruent with the URMP. 85%PSAM c-33 SAND 15%PEAT DRUM MIXED BIO-RE1 Page: C4 Is work being proposed on the File Name: C-Civil Engineering.1015Waters.2018.4.pdf ditch? i—tg" No work is being proposed on the ditch. The detail has been removed. RECEIVEt 05/08/2019 ASPEN BUILDING DEPARTMENT Page: C5 File Name: C-Civil Engineering.1015Waters.2018.4.pdf Please re incorporate these figures on sheet C5. They are p illegible. RECEIVED V/E Please re-incorporate these figures on sheet C5.They are illegible. A1V n O 1 n The figures have been re-incorporated on Sheet C5. They are d G 7 — in the drainage report, too. I'll,. ASPEN Y'' BUILDING DEPARTMENT