HomeMy WebLinkAboutMaster Permit.1015 Waters Ave.0204.2019 (28).ARBK Markup Summary
C-Civil_Engineering.Plan Set.1015Waters.2019.1.Roundl.pdf(1)
Page: 2
Author:jackd A maintenance and access
Date: 2/28/2019 3:21:14 PM easement must be provided for
File Name: C Civil_Engineering.Plan the ditch on property.The
se��° Set.1015Waters.2019.1.Round l.pdf easement must be 10ft from
center line of ditch. No structural
A draft of a maintenance and access easement submitted infrastructure can be within 10ft
/ k ` M to the Engineering Dept. (Jack Danneberg)on 11-18-18. of center line of ditch.
;r�l}4► . 0% We are waiting for a review of the draft by the city. It is attached
gfu here again.
*A note has been added to C2.
G-Shoring_Engineering.Plan Set.1015Waters.2019.1.Roundl.pdf(2)
Page: 2
Author:jackd No Structural Infrastructure,
Date: 2/28/2019 2:32:39 PM including micropiles, is allowed
File Name: G-Shoring_Engineering.Plan within 10ft of the center line of
t rig
„.a Set.1015Waters.2019.1.Roundl.pdf the ditch.
L�����+ gyp All Structure including the micropiles are outside of the 10'ditch setback. a revised shoring plan
cliwr+l is being re-submitted and attached.
.,...,..... m„..... ...._m,-,....a.., ,.. Page:4
u.., ,....e,A,..,.'w, w,.m, Author:jackd Add a note stating that
Date: 2/28/2019 3:07:23 PM movement readings from the
"° 'm°' "'''''"'_.._.._ File Name: G-Shoring_Engineering.Plan movement monitoring plan shall
o, n.d^9•pmw•m°„•m.�A Set.1015Waters.2019.1.Round l.pdf be made available to the City
m: °�^°°°°m�•� °b,° ° E ^ °•,„ Engineering Department if
m°„m^` ` �a°°u° °` requested.The Engineering
Department shall be notified if
movement is detected outside
acceptable thresholds.
See 4.12 in the Shoring Drawing notes for an added note stating that movement readings will
be made available to the city Engineering Department.
RECEIVED
05/08/2019
ASPEN
BUILDING DEPARTMENT