Loading...
HomeMy WebLinkAboutMaster Permit.1015 Waters Ave.0204.2019 (29).ARBK CITY OF ASPEN WATER UTIL] t DEVELOPMENT REVIEW FEE ECU CALCULATION WORKSHEET FOR REMOD DATE: MARCH 12, 2018 PERMIT # NAME: EVELYN F. HEMMING TRUST ACCT. # ADDRESS: 1015 WATERS AVE. NUMBER OF NUMBER OF EXISTING FIXTURES ECU EXISTING ECU TO BE FIXTURE RATE FIXTURES* COUNT REMOVED (A) (B) BEDROOM 0.10 4 0.4 4 tub/shwr,toilet,lay=1st Bath 0.36 1 0.36 1 tub/shwr,toilet,lay=2nd Bath 0.24 1 0.24 1 TOILETS/URINALS/BIDETS 0.05 3 0.15 3 LAV 0.02 3 0.06 3 TUB/SHOWER 0.05 0 0 0 TUB ONLY 0.05 0 0 0 TUB OVERSIZED 0.02 0 0 0 WHIRLPOOL UPGRADE 0.05 0 0 0 SHOWER STALL 0.05 3 0.15 3 STEAM ROOM/SHOWER 0.08 0 0 0 STEAM SHOWER UPGRADE 0.03 0 0 0 KITCHEN 0.25 1 0.25 1 DISHWASHER 0.10 1 0.1 1 DISPOSAL 0.05 1 0.05 1 ADD KITCHEN SINK/POT FILLER 0.05 1 0.05 1 KITCHEN/EFF. 0.15 0 0 1 BAR/HAND SINK 0.05 0 0 1 ICE MACHINE 0.05 0 0 1 WASHER 0.10 1 0.1 1 RECEIVED 05/08/2019 ASPEN BUILDING DEPARTMENT LNDRY/UTIL. SINK/DOG WASH 0.05 0 0 0 1st HOSE BIB 0.20 1 0.2 1 2nd HOSE BIB 0.10 1 0.1 1 ADD HOSE BIB 0.05 0 0 0 HOT TUB/@100 GAL 0.02 1 0.02 1 ADD LANDSCAPE/ 100 SQ FT 0.01 0 0 0 POOL/ 1000 GAL/YEAR ROUND 0.02 0 0 0 TOTAL ECU COUNT 2.23 INCREASE IN ECU COUNT DUE TO REMODEL 0.64 TOTAL DEVELOPMENT REVIEW FEE *Note: If the number of existing fixtures that you provide in column A differs from the number in the Utilities Depart numbers during its review of your permit. As a result these fees may change. RECEIVED 05/08/2019 ASPEN BUILDING DEPARTMENT [TY EL TOTAL PROPOSED NUMBER NUMBER OF ECU COUNT OF NEW WATER FOR FIXTURES FIXTURES REMODEL (C) (D) 5 5 0.5 1 1 0.36 1 1 0.24 8 8 0.4 8 8 0.16 0 0 0 1 1 0.05 1 1 0.02 1 1 0.05 5 5 0.25 1 1 0.08 1 1 0.03 0 0 2 2 0.2 1 1 0.05 1 1 0.05 0 -1 -0.15 2 1 0.05 1 0 0 1 1 0.1 RECEIVED 05/08/2019 ASPEN BUILDING DEPARTMENT 1 1 0.05 1 1 0.2 1 1 0.1 1 1 0.05 1 1 0.02 1 1 0.01 0 0 0 2.87 $756.35 ment's records, the Department will revise those RECEIVED 05/08/2019 ASPEN BUILDING DEPARTMENT