HomeMy WebLinkAboutChange Order.1015 Waters Ave.0007-2021-BCHO (3) Berson
Structural
j Engineering
April 6, 2021
Mr. Chris Hendrickson
Hendrickson Construction, Inc.
602 East Cooper, Suite 201
Aspen, CO. 81611
05/05/2021 ji•al
RE: 1015 Waters Elevator FORCOMCOMPLIANCE
justinh
Dear Mr. Hendrickson:
Regarding the subject residential project, we understand that the elevator has been deleted
from the architectural design. We further understand that the elevator pit and it's foundation
were built per the construction documents. The foundation as designed is adequate to carry
the associated structural loads. Walls and in fill floor framing can be added as necessary
without affecting the original structural design.
Please do not hesitate to call our office for any additional questions.
Sincer ly,
,,�^ ✓�� ORE
Landon Anderson, P.E. 0 4,ENT,q,�,�`9/
Anderson Structural Engineering, Inc. VO N p�
35435 z
-iNAAt
-%
412
‘()
4r48Y \rle-1
O� Q�p�
823 Grand Avenue, Suite 340 • Glenwood Springs, CO 81601
(970) 984-0320 • email: landon@anderson-structural.com Q�