HomeMy WebLinkAboutFile Documents.1015 Waters Ave.0204.2019 (8).ARBK ,ADDRESS:1015 WATERS AVENUE PERMIT NUMBER:0076.2018.ARBK , Field Plan Set Must Be Printed In Color
DATE:4-4-18 MASTER PERMIT: PERMIT NUMBER:0076.2018.ARBK
COMMUNITY DEVELOPMENT DEPARTMENT PECTION REQUIRED: EXtern� yUseApproved
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION ��m BUILDING PERMIT CONTACT SHEET uctural steel welding:Field
X❑
trength bolting RREMP El CREMP ,)
Um PROPERTY INFORMATION rvame GRETCHEN GREENWOOD phone Milt-y40-LUOI e-mail ggreenwooafiggaaspen.com -Epoxy anchors /-
-Intumescent paint PERMIT#:0076.2018.ARBK DATE:4/15/19
*ADDRESS 1015 WATERS AVENUE ASPEN,CO.81611 urvrr# PARCEL ID 2737-182-82-002 Na,ne CHRIS HENDRICKSON phone y/U-L/4-0aLe. E-mail CnnsLWnenOn6KSonm0.0om -Spray applied fire resistive materials
SNOWMELT:989 SF The City of Aspen
loT 0 and E gLccK 41 0RA519DlvSSloN EAST ASPEN ADDITION -Permanent micropiles
C V CLT IV r TICMMK `U IIVto IVJI phone Cell Phone POOL:
OWNER NAME HEMMING EVELYN F TRUST CELL EMAIL hemming@rof.net Rome
Mailing eery state CO.311 MIDLAND AVE. ASPEN CO. 81611 Special inspection is required per 2015IBC SPA: EXEMPT I These plans must be kept at the
nacres:
NESTCONTACT Gretchen Greenwood Ceu970-948-2081 EMAIL ggreenwood@ggaaspen.com section 1704.Inspectortoverify that copyof building site or inspection
AME E-mail hemming@rof.net agreement for inspection program to be on REMP SHEET: A002
aere:: delays may occur.Construction
PROJECT DETAILS the job site prior to performing any MINIMUM BOILER AFUE: 94.4
sCBIPTION OF Name Phone Ceti Phone inspections.A co of all Special Inspector shall conform to these plans.All
WORKINerkf THE DEMOLITION OF AN EXISTING RESIDENCE AND THE CONSTRUCTION OF A 5 BEDROOM 5 AND 2-1/2 BATHS RESIDENCE p copy p p OFFSET:
TWO STORIES AB Mailing
Address city srxe zIP field reports to be on the job site for changes shall be approvedby
PROIER E-mail inspectors'review if requested.Failure to I the building official.
0000CION$2,998,185.00 Use of Building Class of Work Fixture Counts Equipment Checklist Address REVIEWED BY: uH
comply may result in denial of inspection.
Qp ❑ Commerical ❑.New O Toilets,Bidets Forced Air/GravityrSystemsUnites SNOWMELTlloxI SYSTEM 8110 meet
follT owing:
REQ's.
sWORKAREA 6,124 SQ.FT. ❑ Multi-Fami1 ❑Addition Bathtub wall,Suspended,or Unit Heaters Name GRETCHEN GREENWOOD y/u-a[o-4ouL y/U-y40-LUOI
w Lavatory Wash Basin Prone Cell Phone All snowmelt systems shall meet the following:
Single Fa y 0Alteration ✓- ry( ) Gas Log -Any portions in the Right of Way must be on a separate zone.A ROW
Shower g M2 Iles 210 SOUTH GALENA ST.#30 ASPEN CO 81611 SEPARATE PERMITS ARE
UNIT SQ FT 6,293$Q.FT. ❑ Mixed-Use ❑Re air Gas Appliancew AO�ress ,,ASPEN state ZIP permit and Permanent Encroachment License are required.
-I Kitchen Sink(+Disposal)- REQUIRED FOR ELECTRICAL,
OT SIE ❑ ❑ F R L Dishwasher ,__Appliance Vents -R10 insulation shall be installed under the area to be snow melted or
ISQ FT{6.000 sQ.FT ❑Tenant Finish , Heat,Refrig,Cooling,or E-mail ggreenwood@ggaaspen.com insulation shall be installed under and at the slab edges.Ordinance)
Laundry Bar,Utility Sink- Aeeress ( PLUMBING,MECHANICAL,OR
Dlsruaeeo Will there be ❑Demolition Telotheswasher Absorption Unit Series 2011) FIRE SPRINKLER WORK
ExrERI°RAREA4,140 SQ.FT. any roof/wall 0 Change Order Floor Sink _Boilers(includes vent) GRETCHEN GREENWOOD `UIU-`DILO-40UL `511 U-`U40-LUOI -Automatic controls installed for system shut off when pavement
penetrations? ❑ Z-Floor Drain Air Handling Unit Name Phone co,'Phone temperature is above 50°F and no precipitation Is falling.(2009 IECC
NEw50FT N/A ❑p Yes -"Water Heater(Pan Reg)-Cooling Systems I Marling 210 SOUTH GALENA ST.#30 ASPEN CO 81611 Sec.403.8&503.z4.5)
#Gas Outlets 'AM City state ZIP -Automatic or manual controls installed for t but off when outdoor
❑No Ventilation Fans system s eased luminaires installed
gpQ FTOFRirn 6,124SO.FT. Water Treatment
WRH UTLm WORK FRange Hood p-mail ggreenwood@ggaaspen.com temperature is above 40°F.(20091ECC Sec.403.8&503.2.4.5) building thermal envelope
-Other y_#of Gas System Outlets ddress -Inspection by testing hydrostatically at 1%times max system design
ZONE DISTRICT R-15 y_snowmelt System Sq Ft szn
Name CHRIS HALE MOUNTAIN CROSS ENGINEERING,INC. phone 00I V B4J 0044 Cell Phone pressure,but not less than 100psi,for 15minutes.(2009 IMC Sec. shall e sealed an -rate
1205 1 i -IECC sec R402.4.5
rn Project valuation:Cost of project as defined in Valuation affadavit. NOTICE:This permit becomes null Mgt 8261/2 GRAND AVE. GLENWOOD SPRINGS CO 81621
Z ) proje Mgt City State 21P
Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized Any recessed light fixtures
° Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. is not commenced...18o days,or E-man Chris@mountaincross-eng.com REFERENCES FROM 2015 IRC in contact with insulation
f Lot Sire:Total suroeyedsquare footage of If construction or worts is suspended or Address
property. abandoned for a period of Igo days at CV/A=crawl s ace ventilation required,sec.R408.1 Access required,R408.4 must be IC rated.
? Disturbed Exterior Area:Square footage of lot affected by permit application. x any time after work is commenced. , p g g
E New Sq Ft:Total added square footage for additions to net livable or net Ieasble space. Name ANDERSON STRUCTURAL ENGINEERING phone V/U-y04-USLU Cell Phone EE=emergency escape required sec R310.1
p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re-
APPROVALS EU=enclosed usable space under stairs shall be%"Gyp,sec R302.7
Tins 443 ELK RUN ROAD NEW CASTLE CO 21P81647
APPROVALS n�dress city state __ G/D=garage/dwelling separation,sec R302.5 and R302.6 FIRE
Reviewing Needs viewer r DMe
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Depanment Review NI Approved E- Il landon@anderson-structuraLcom STC=Sound transmission class not less than 45 at dwelling separations,app
PC KH 9/6/18 Ad"�:esz K
Permit Fee AV==tic roof andsrafter 030",30"nadooaRbove, SPRINKLERS
Plan Check 32,669 50,252.31 Parks Impact 2272.65 Zoning y, JP° v11ns HENDRICKSON CONSTRUCTION `J/V-L/4-0L34required,
Name „ono can Phone -HPC A=attic access 22"x 30", headroom above,R807.1
Zoning(50%) 2357'06 1280 UTE AVENUE SUITE 5 ASPEN CO 81611 SA=smoke alarms installed to NFPA 72 requirements,sec R314
Engineering 12,903.21 5,205.90 School Ded. a ailing q REQUIRED
Building X 3H 5/30/19 dares: city state zlP CO=carbon monoxide detector per City Ordinance 41 series 2008
zoning(50%) CMP(50%) TDM Impact Fire X +e snau E-man Chris hendricksoninc.com SG=safety glazing required,sec R308.4
s,zos.4o 3,z76.39 254.37 Engineering X an NNI0 -A,d1g.chris@hendricksoninc.com
GR=guardrails,36"min ht,4"maxo opening; at 30"dropan
Ped.Amenity g gn p g:req any point w/in 36"
Energy Code REMP D CMP X TK 4/2e/19
horizontally,sec R312
7,s37.as Water =. „a„e INSPECTIONS:The General Contractor must schedule inspections online. WFP=window fall protection-operable window<24"AFF&>72"above
Plan Check X Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. SMOKE ALARMS AND
CMP(50%) 3,276.39 Housing Cash in Lieu 23981.93 Stormwater xR torn grade:use opening control device listed to ASTM F2090,sec R312.2
(Hourly) X I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and
Zoning Sanitation X aa ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not HR=handrails 34"-38"hl,sec R311.7.8 CARBON MONOXIDE
ml
Parks Review 180 SI=Stairway illumination,sec R303.7 DETECTORS REQUIRED
(Hourly) Stormwater Env.Health presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
Engineering Parks X cn xnw.e of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the PD=protect against decay,sec R317 THROUGHOUT DWELLING
Utility Review 5,893 city use Tax REFERENCES FROM 20151MC
(Hourly) 30,430.99 Landscape ■ structure and/or project is built in compliance with all applicable codes. UNIT PER CITY OF ASPEN
pe V=bathroom and balanced whole house mechanical ventilation req.
County Use Tax 030 O( epmrenpr MUNICIPAL CODE 8.15
GIs 500 7,495.46 Efficiency % Signature Date Ordinance 40,2016
Approved yr.r,�- y'�`pY 0 Check if you area tested owner builder(single-family homes only).You must take a test and complete the owns G DE=clothes dryer exhaust,sec 504.Makeup air raga if over 200 CFM
To Issue I�A-°-° F'r (CITY USE ONLY Owner builder approved by: Date: Affidavit on le AS=access and service space for maintenance req'd,sec 306
Lot Area Deed Restricted ) pp ffjL
Census Code #of Dwellings eeas7e.3z3.::plans Location Issuance O A/n c/Z n n MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2
/r a./,r+ I CITY OF ASPENApguat2Dt7 130 S.GALENA ST I ASPEN,CO 816111 ET=exhausts terminate 3'from prop line and openings,10'from intakes,
(CITY OF ASPEN December2Dt7 130 S.GALENA ST I ASPEN, CO 811§11? A "5'P*' 501.3.1
.d • BUILDING DEPARTMENT IT=intake openings 10'from lot line&contaminant sources(vents,streets),
3UILDING DEPARTMENT 401'4
D=fasten and seal all ductwork per 603.9
REFERENCES FROM 2015 IFGC
DV=direct vent req'd,sec 303.3
,. J CA=combustion air not taken from bedrooms,bathrooms or
PERMIT NUMBER: �4:6x Coo\ sabmnrorn to: storage sec 303.3
i�`"'; o'' Parmil tornCoor t: OD=outdoor appliances must be listed for outdoor use,sec 303.6
COMMUNITY DEVELOPMENT DEPARTMENT DEMOLITION NOTIFICATION APPLICATION FORM cglprea°Dept.qr Ppmit REFERENCES FROM 20151ECC
+ �:✓. Health and Environment F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label
BUILDING DESCRIPTION FORM-IRC&IBC APPLICATION FEE MUST ACCOMPANY THIS FORM APCDdEe1
TRH cm,of nsew tie-764. INCOMPLETE APPLICATIONS WILL BE RETURNED South
Cherry Creek Drive required,Ordinance permanently
one
socc L=75%of lamps in permanently installed lights must be High effcecy,sec
BUILDING CODE INFORMATION Colorado Department (Notice will be mailed to the demolition contractor unless specified otherwise) Denver,co 80296-1530 R4g4.1
e • of Public Health Phone:903-0ez-3100
z p Fax 303-7e2.0273 SE=Continuous air barrier required;all exterior joints,cracks,and holes to be
❑p 2015 IRC ❑2015 IBC ❑2015 IEBC 0 Other(Please Explain) a and Environment Fee:$50+$5 per 1000 ft of area to be demolished=$ - Asbestos®amtew.ua q
Code Editions (As Adopted and Amended) (As Adopted and Amended) pee instruction#1 on reverse side) caulked,gasketed,sealed,table R402.4.1.1
(As Adopted REFERENCES FROM 2014 NEC
and Amended) company Nsma: Boding Name: EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26
HEr.sPP&CkPI,✓ (,rs7rzvcln.d AA, tiOU5e- 5F21)
Fire Sprinkler System l Existing?lilNp I Required?IV.'I Type ❑p NFPA 13 0 NFPA 13 R 0 NFPA 13 D Street Square footage offootprintof facility or portion of fealty to be demolished
110 ow,oust. pgrN - SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S
Type Of Construction 0 VA El VB❑IV IDIIIA 13IIIB❑IIA 13 UB 0 IA❑IB I Fire Alarms Installed 0 Yes No u city:, state: Zip code: Street a ,/
44 l,p� co row 210/5 Wa-terj' / -venue All snowmelt systems shall meet the following:
Required Special Inspections❑p High-Strength Bolting 0 Epoxy Anchors ❑p Structual Steel Welding S Tam none Fax k rn city:/'- corny z ode./ -Any portions in the Right of Way must be on a separate zone.A ROW permit
U - and Permanent Encroachment License are required.
❑Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other Project Manager Cell Phone It �„ Propose S a Proposed Completion Date
EnergyCode Compliance l7 Prescriptive Table 0Other `o Chats i61'SXlekwd (1?p )2.1145-tynea '0 tat l S/1s/(°/ -R10 insulation shall be installed under the area to be Series lted or R5 insulation
P PIcerINytM1atlha Corked AS ASIMSaBUlldNiinspecmr has Informed ma E Method/Means of Demolition: shall be installed under the slab edges.(Ordinance ll Series 2011)
❑RESCheck UA Alternative ❑COMCheck UA Alternative E about any remainingeebestoamontelning materials in the faGlityte be e
E demolished. G -Automatic controls installed for system shut off when pavement temperature is above
*racking❑Burning'0 Implosion 0 Moving 0 Other,specify:
sign 7-; Pri 50'F and no precipitation is falling.(2015 IECC R403.9 and C403.2.4.5)
Exterior Energy Use Total Approved On-Site Snowmelt989 Spa EXEMPT Pool ° f,2__r- LIGAUS //bi, (DbS r� -Automatic or manual controls installed for system shut off when outdoor temperature
(Existing+New) Landfill Rose ne B010ing Debra: 'Burning requires additional authorization-Please call(303)692-3100 end ask is above 40°F.(2015 IECC R403.9 and C403.2.3.5)
g Type/ I 0 A 0 B ❑F 0 E ❑R I ■ PIT-kl� to speak m the Open Burning Permit Coordlnamr
Buildin T e/ -Inspection by testing hydrostatically at 1.5 times max system design pressure,but not
Occupancy Grou - - - El Family 0Two Family cane bateme Contractor owners name:
p Y p B ❑B(A<50 ❑H- ❑M ❑S_ R9 ry ( ) less than 100psi,for 15 minutes.(20151MC 1208.1)
C ) ❑I- ❑U C 0 Townhouse _« pre-5+1 e f/r oime/nla I 6a r6 r. //ErNeurrb Tke cr
CDPHEA basin PP,,`�It Total Ilty of Asbea Removed I Street
' 19 PSO2 g � t ° 31/ M m�Ar 6 �F Electric vehicle charging(IRC 309.E
UNIT DESCRIPTION AS PROPOSED °B rA g g )'
a E E. Dale Rem vat Co�9PIe ea Telephone# a city: state: zip code Newlyconstructed one-or two-famil dwellings and townhouses with a dedicated attached or
Gross Area of Building:5905 Gross Area of Unit:59os '< Cj 7 LR//� o a (9/�)�/Z7-�S6Z g q jape Co d/b II detached garage shall facilitate future installation and use of electric vehicle chargers.For each
ADU BUILDING DESCRIPTION Type(e)fAeb�e/toe-Contelning Material Ra%g�a: J ° 1 Contact's Name: TBIaphOnek g g g
Occupant Load: X7ct re Gait /,(i[(//boom"( m I Gut, }IEOfil)ri(, (°I'fo )1r-o8I(b dwelling) t,a branchcircuit volt individual branch circuit Ora listed raceway too trade size'odate uture
Is there an ADU? ❑Yes individual circuit shall be installed.The raceway shall not be less than trade 1(nominal
❑No With my signature below,I certify that I possess current AHERA accreditation and state of Colorado certification as 1-inch inside diameter).The raceway shall originate at the main service or subpanel and shall
#Stories Above Grade 2 #Stories Below Grade 1 #Living Rooms- o an Asbestos Building Inspector. I also certify that I have thoroughly inspected the facility to be demolished,as listed terminate into a listed cabinet,box or other enclosure,and in close proximity to the proposed
#Kitchens in the Demolition Site block above,sampled all suspect materials,had all samples analyzed for the presence of location of the electric vehicle charger.Raceways are required to be continuous at enclosed,
Attached Garage Detached Garage Carport n asbestos by a NVLAP-accredited laboratory,and have determined that no Regulated ACM exists anywhere in the inaccessible or concealed areas and spaces.The service panel or subpanel circuit directoryshall
Parking Spaces a Parking Spaces Parking Spaces 0 #Full Baths c#3 4 Baths facility.*!also certify that I have informed the owner/operator of the facility or the demolition contractor that any provide capacity to install a 40-ampere minimum dedicated branch circuit and space(s)reserved to
#Bedrooms 5 #Full Baths 1 Deck Area 526 O asbestos-containing material allowed to stay in the facility must remain non-friable during demolition. Specify type(:) permit installation of a branch circuit overcurrent device.Electrical vehicle supply equipment shall be
#3/4 Baths a #1/2 Baths 2 #1/2 Baths N of ACM remaining,below:(check appropriate box(es)): installed in accordance with NFPA 70.20
#Bedrooms
#Kitchens 1 #Wood Fireplaces 0 #Other Rooms(List) a w ['Vinyl asbestos floor tile(VAT))❑VAT mastic❑Tar/asphalt impregnated roofin�il ings Exception:Additions and alterations to existing one-or two-f
#Gas Appliances 2 #Gas Logs 0 O ❑Spray-applied tar coatings❑Caulking['Glazing['Other,specify: constructed per the IRC are exempt from this requirement.
If spnawre8nemelekt PrinlydName. A p,py �/2019
xBUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) e AQ�CIs 27r G7�4
I
'Basement 3 BEDROOMS.3-3/4 BATHROOMS,1-1/2 BATH,MECHANICAL ROOM,LAUNDRY ROOM.MEDIA ROOM C DDaleof Ins 'n rtp xplretion D le Telephones L/ ,,I cell (1] ALL OUTDOOR LIGHTING
� �php e 3�E /Z���R 97p)Zoo S(q}u lrN�r f Fr33�/ ( p P M M T r D
I v i that I fr:geranls from air conditioning( frigea anon appliances have been properly recovered In accordance with AOCC Regulation No. MUST COMPLY WITH
Main Level 2 BEDROOMS.1 FULL BATH,1-3/4 BATH,2 CAR GARAGE,MUDROOM/ENTRY 15(for In�orlon n CFC requirements call692-3100).I furtherverify that all luminous exit signs(containing radioactive material)have been THE CITY OF ASPEN LIGHTING CODE pl�{k1h7/ 9
0'-r`° tllsposetl of in accordance with fi CCR 1007-1 subpad 3.6.4.3(far information on luminous exit sign requirements ca11303-892-3320). SECTION 26.575.150
2nd Floor LIVING ROOM,DINING ROOM,KITCHEN,1/2 BATH :p`y CHECK THE APPROPRIATE ROM
m' ❑ 6mmmgow Omer cpnsacror I El after I mole' ZONING
sipnalure: Mint Name: �
3rd Floor ROOF TOP DECK AND STAIRS - NO, f/E.JIJt/C/tSu A7
THIS Boots FOR C E U E ONLY:Postmark or Hand Delivery Date:S/CO'/ly Approved By: 5..7 Code: Initial-310❑transfer-3B0 [110111EVE.�Additional gyeaC�►CForm of Payment 8#:c tl' sgT6�°Af /4(66 permit#: Record# Date issued:
1+,F-(R.„IVF. 'Regulated asbestos-containing materials means(a)friable asbestos-containlr5 material,(b)Category I nonfvable ACM that has become frible,(c) d5/30/2019�
Category I nontrlable ACM that will be or has been subjected to sanding,grinding,cutting,or abrading or(d)Catepory II nonfriable ACM that ha�p�s,a(hrdh
Reviewed By:des Date:S/30/19 probability of becoming or has become crumbled,pulverized,or reduced to powder by the forces expected to act on the material in the cour$eldf- FeRCOLt( t NICE
11/1/11C/0113.8 demolition or r�operations regulated by this regulation. Note:Asbestos-containing sheet vinyl and linoleum must be properly
(CITY OF ASPEN,,..,2018 130 S.GALENA ST I ASPEN,CO 8s 6111 abated/removed prier to demolition. APPROVED u"'11p7� 'ustinh
A
0
BUILDINGDEPARTMEN: °""°r DATE8A/9 COME cfr R...elance `
Field Plan Set Must Be Printed In Color k.,
City of Aspen Residential Ventilation Calculator -'\''-
2015 as amended by Ordinance 00,2016
ya moats eeaaot7 Residential Ventilation Balance Calculation
..rnt,tge fooa� ,n.2ftttoftgn.n,amto not neton. Project 1015 Waters residence \ _
.,,,ion` Projeectt Number
18030 \
E.Enter the n°mua.otx.00ma Date:4/18/2019
3.75e.required continuous balanced ventilation rateAMAR..
Nom.Intake Sub-total
Qty The City of Aspen
tal,nwawmlla<Inn a,e,on.n<.,,g.adrat omdoo,wnnl,alon rat ` g.nnmg.,orton„uwlllnrea,omn w ' g. Equipment with 0.A.Intake Airflow Airflows
Floor Area(Moor) Itof Bedrooms(NM) Number of occupants Required Continuous Balanced FC-1 1 150 150
Outdoor Ventilation Rate(MI FC-2 1 150 lso These plans must be kept at the
FC-3 1 150 150 building site or inspection
5,792 sq5 5 6 77 cim delays may occur.Construction
Intake Building Totals 450 shall conform to these plans.All
alreanumberof„pprs „e,tiretlI termment aelanrea changes shall be approved by
pe tleach4M1our Outdoor Equipment with Exhaust the building official.
step=iod Nom.Exhaust Sub-total
(must operate when O.A. Qty
4.00 hrs 77 cfm Airflow Airflows
equipment is operating)
OR
EF-1 8 so 400
Desired intermittent SEPARATE PERMITS ARE
balanced omdoor
,,,,,,,,red operated
each a hour period REQUIRED FOR ELECTRICAL,
.entllatton ate Exhaust Building Totals 400
o.00nrs PLUMBING,MECHANICAL,OR
I Balance Tolerance% 12.5% I FIRE SPRINKLER WORK
qr=((0.01.Arbor)a 17.s.(Nbra 1)Il>'Se
qr= ,tilation flow rate,cubic feet per minute(cfm)
Afloor7 floor area In square feet(ft2)
Mar number of bedrooms,not less than one
Sc=0.75(system coefficient for balanced systems)
The City of Aspen has created and provided this software solely as a reference.Users should obtain assistance from a qualified
professional verify maim, mc applicability before p ,..11.The City of Aspen make,^..,press.Implied warranty
withrespect to this software or any Information contained herein.To the full eaten[permissible by law,the City of Aspen
disclaims l di risibility for any damages or losses(including,without limitation,structural damage,building defects,
financial los s,damages for loss in business projects,loss of profits or other consequential losses)arising in contract,tort or
otherwise from the use of or Inability to use this software,or from any action or decision taken as a result of using this
software.
eiVre ill
rKEiii) [f 05/29/20199/2019 FORCOUtCrMUANCE
PORCOMCO justinh
iustinh
RECEIVED RECEIVED
05/08/2019 05/08/2019
ASPEN ASPEN
BUILDING DEPARTMENT BUILDING DEPARTMENT
Bighorn Consulting EngineersIt-11 Berson
569 S.Westgate Drive,Suite#1, Grand Junction,CO 81505 Structural
Phone 970-241-8709 Fax 970-241-9514Engineering
Bighom Consulting Engineers,Inc.
ROOF DEW POINT ANALYSIS December 27,2018
April 3,2018
Pitkin County Building Department Outside air film—0.17°F*ftz*h/Btu Ms.Gretchen Greenwood
530 East Main Street Roofing Material—0.33°F*ftz*h/Btu Gretchen Greenwood&Associates
Aspen,CO 81611 5/8"plywood-0.77°F*ft2*h/Btu 210 South Galena Street,Suite 30
Joists roof framing with spray foam insulation—8"at R5.8/inch=>46.4°F*ft2*h/Btu Aspen,CO.81611
RE:New Residence.Block 41 Lot D&E(1015 Waters)Aspen,CO 81611 5/8"gypsum board—0.56°F*ftz*h/Btu
Inside air film—0.61°F*ftz*h/Btu RE:1015 Waters
Please accept this letter as a request for exemption from the ResCheck document normally
required for a residential project.
Total Roof R-Value—49°F*ft2*h/Btu Dear Ms.Greenwood:
All construction in this project meets the prescriptive code requirements of the 2015 Interior Conditions—70°F and 35%RH=>Dew Point=41°F
International Energy Conservation Code. Regarding the subject residential project,please note that floor framing for the roof level
exterior deck is designed for loading from a hot tub installation. The location has been
The new roof will meet the prescriptive value of R-49 from Table 402.1.1. R-Value at 41°F Dew Point: approximated based on plans provided by your office and is identified by Roof Deck on Roof
49 °F•ft7•h Framing Plan drawing S1.4.We have assumed and designed for a large square hot tub such as a
The new walls will meet the prescriptive value of R-21(R20 cavity insulation+R5 continuous 99°F AT x(70°F DB—41°F DP)=14.35
insulation)from Table 402.1.1. Btu Sundance tub measuring 7'-4"x 7'-4"and weighing 5100 lbs.full.
The new windows will have a fenestration u-factor equal to(or better than)the 0.28(most are This implies the dew point falls inside the spray foam insulation. Please do not hesitate to call our office for any additional questions.
0.28)factor listed in table 402.1.1.
The new glass doom and all door fenestrations will have a fenestration u-factor equal to(or Sincerely,
better than)the 0.28 factor listed in table 402.1.1.
Copies of the windows and their specifications can be forwarded to you should you want to
verify the values above. Landon Anderson,P.E.
Anderson Structural Engineering,Inc.
Please let us know if you require any further documentation or discussion regarding the above
information and the contractor,architect and I will be happy to provide it for you. •
Sincerely, p�G n%Oy�s',n_
M.Blaine Buck,P.E. s — 0�.�N``ttt 8 $a N."Y0
Vice President 0 '% v, '6W 1 3506 I
��4S eee•rae,tlf 0:ec" 6• 11
��e 4OiAbyF6�. ri 2 777 f rilIEWEi3 isv iJ `-wilek ti 33843�� 33843 �• � � Sf1t40:47 16/2019� �Z.2 ,e
1.'1.BGcH c Nvei:s 1d ' FORC sisti tife E / 7'y 04/15/2019 08/13/2018 •rig a justinh
lit • •tom fOiCD OUMFUNICE FORCOLtL(NK'IJANCE t'..... rr
t\ C1t-e — iustinh jus tinh
RECEIVED RECEIVED RECEIVED
1015 Waters Residence Aspen,Colorado-Roof Dew Point Analysis-18030 823 Grand Avenue,Suite 340•Glenwood Springs,CO 81601
02/07/2019 l�Wgb6/2018 (970)984-0320•email:landon(tpanderson-structural.com 02/07/2019
ASPEN ASPEN ASPEN
BUILDING DEPARTMENT BUILDING DEPARTMENT BUILDING DEPARTMENT
an Set Must Be Printed In Color .
5. Provide Final Inspection Report.The special inspector shall submit a written final
s�� report documenting required special inspections and correction of any discrepancies 2. Approval of fabrcator.Approval shall be based titian review of the fabricator's wotten t"-
noted in the inspections prior to the final building inspection procedural and quality control manuals and periodic auditing of fabrication practices byAO
r''r or�r s.ary SPECIAL INSPECTION AND TESTING AGREEMENT + an approved special inspection agency.
B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the \
responsible for employing special-inspection services.The special inspector\agency shall 3. Com ktIon of fabrintlon.Uponcompletion of fabrication,the approved fabricator \-
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the owner is p
International Building Code(IBC). not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In shall submit certificate of compliance to the building official slating that the work was -
case of an owner\contrador,the special inspector\agency shall be employed as speciffiiededby the performed in accordance with the approved construction documents.
Project Address: 1015 Waters Ave Permit Number: 0076.2018.ARBK building official.
C.Engineer or Architect of Record Responsibilities G. Building Department Responsibilities The City of Aspen
BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the
owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing 1. Approve special-inspection program.The building department shall approve all
Schedule,includingthere required acknowledgments. traction conference with the artier L Prepare special inspection program.The engineer or architect of record shall list the special intpen«s and special-inspection regmtemena. These plans must be kept at the
q g pre-cons p items for which special inspection is required;and shall indicate any items for which the
involved maybe required to review the special-inspection requirements and procedures. IBC or the building official approves periodic inspection and the frequency of such building site inspection
inspections. I. Fnfurce special inspection.Work requiring special inspection and the building or P
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the inspector shall monitor the performance of special inspectors.His1Her approval,in delays may occur.Construction
projects for which they provide special inspections.Special inspectors shall be approved by the building addition to that of the Special inspector,must be obtained prior to placement of concrete,
2. Respond to field iscrepnciess.Theen architect of kmancordsh respond shall conform to these plans.All
department prior to performing any duties.Special inspectors shall submit their qualifications and are uncorrected field discrepancies in design,material,or workmanship observed by the covering of structural steel,m other similar materials.
subject to personal interviews for pre-qualification.Special inspectors shall display approved changes shall be approved by
special inspector. 3. Review inspection reports.The building official should review al-in
identification,as stipulated by the building official,when performing the function of special inspector. ieR ePe g ' " 1p6 the building official.
3. Review shop drawings and submit design changes.The engineer or architect of record progress and final reports.
Special inspection and testing shall meet the minimum requirements of the International Building Code shall acknowledge and review for conformance with the construction drawings those
Section 1704.The following conditions are also applicable: 4. Perform final Inspection.The building official should perm the final impaction and
shop drawings that may detail structural infomation,shall submit to the building official approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been
and to the special-inspection agency written documentation of any verbally authorized SEPARATE PERMITS ARE
A.Duties and Responsibilities of the Special Inspector deviations from the approved construction documents,and shall submit revised reviewed and approved. REQUIRED FOR ELECTRICAL,
1. Signify presence at job site.Special inspectors should notify contractor personnel of documents for building official approval as required. PLUMBING,MECHANICAL,OR
their presence and responsibilities at the job site.If required by the building official,they D.Contractor Responsibilities Project Address: WATERS AVE.ASPFN,CO.8161
: �ermit Number: 0076.2018.ARBK FIRE SPRINKLER WORK
shall sign in on the appropriate form posted with the building pemit.
2. Observe assigned work.The special inspector shall observe assigned work for 1. Notify the special inspector.The contractor is responsible for notifying the special ACKNOWLEDGMENTS
conformance with the building sdpecial
inspector
approved(stamped)design drawings, inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans.Adequate notice shall
specifications,and applicable workmanship provisions of the International Building I have red and agree to comply with the conditions of this agreement.
Code.Architect\en d rho drawings be used only d to be provided so the special inspector has time to become familiar with the project.
grocer-reviewer p gs may y as an ar
inspection. 2. Provide access to approved plans.The contractor is responsible for din the ai too AB Snpianae. NW
pprove p ponsi providing ',
For continuous special-inspection,the special inspector shall be on site at all times special inspector access to approved plans.` /- 1
observing the work requiring special inspection.Periodic inspections,if any,must have 3, Retain special inspection records.Upon request,the contractor is also responsible for L Printed Nurc� � ��
prior approval based on a separate written plan reviewed and approved by the building Owner. iF :
department and the engineer or architect of record retaining,at the job site,all special inspection records completed by the special inspector.
GREGG HEMMING
E.Inspection of Fabricators -----3. Report nonconforming items.The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report.If Engineer/Architect, Si Printed Name: D
1. Fabrication of structural assemblies and members.Where fabrication of structural ER n a�AU ar,a
any item is not resolved in a timely manner or is about to be incorporated in the work,the load-bearing members and assemblies is being performed on the premises of a LANDON ANDERSON _ .8,44I6tatro/ 3!3-/8
special inspector shall immediately notify the building department by telephone or in fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated - --- ---- ate:
-
person,notify the engineer or architect,and post a discrepancy notice. items.
Contncsor: Signature: Printed Name: Date:
4. Provide timely reports.The special inspector shall complete written inspection reports 2. Fabrication and implementation procedures.The special inspector shall verify that Hendrickson Construction Inc. / q Chris Hendrickson 1-3-19
for each inspection visit and provide the reports on a timely basis determined by the [yL --
building official.The special inspector or inspection agency shall furnish these reports the sfabricatorinspection
maintains control
odetaif theh fabrication and anqud the fabricsrol procedures aburts that provide a
basis for inspection control of workmanship and the fabricator's ability to conform to Fabricator Si Printed Nurse; Dale:
directly to the building official,engineer or architect of record,and others as designated. approved construction documents and reference standards.The special inspector shaft Approved
[IBC Sec.1704.1.2]These reports should be organized on a daily format and may be review the procedures for completeness and adequacy relative to code requirements for submitted weekly at the option of the building official.These reports should include: __ _
fabricator's scope of work. --- ----- ----
a.Description of daily inspections and tests made with applicable locations,
b.Listing of nonconforming items, F.Approved Fabricator Responsibilities Inspected Fabricator: Sigma.: Printed Name: Date:
c.Report on how nonconforming items were resolved or unresolved as
applicable, 1. Fabrication exempt inspections.Special inspections are not required where work is - - -- -- - -- - - - ---- --
d.Itemized changes authorized by the architect,engineer,and building official if done on the premise of a fabricator registered and approved to perform such work
(crick one) Signature: Primed Name: Data
not included in nonconforming items. without special inspection. CITY OF ASPEN" �El E IVE D
1 2
PITKIN Z'O(T fY. JH Justin Hahn _ 5129119
•
3 02/07/2019
ASPEN
BUILDING DEPARTMENT
L Approval of fabricator.Approval shall be based upon review of the fabricator's written
procedural and quality comrol manuals and periodic auditing of fabrication penances by
an approved special inspection agency. L Approval of fabricator.Approval shall be based upon review of the fabricator's Mitten
procedural and quality control manuals and periodic auditing of fabricatim practices by 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written
3. Completion of fabrication.Upon completion of fabrication,the approved fabricatoran approved special inspection agency. procedural and quality control manuals and periodic auditing of fabrication practices by
an approved special inspection agency.
shall submit<enifiate of compliance to the building official sating that the work was 3. Completion of fabrication.Upon completion offahnation,the approved fabricator
construction re accordance with the approved couctiom documents. shall subrmit cenlaste of compliance to the building official semi that the work was 3. Completion of fabrication.Up
on g o rag p completion of fabrication,the approved fabricator
C. Budding Department Responsibilities performed in accordance with the approved construction documents shall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
•
I. Approve speeial-inspection program.The building department shall approve all G. Building Department ResponalDOittn
special inspectors aid spacial-inspection requirements. G. Building Department Responsibilities
1. Approve specialAnspeetloo program-The building department shall appraise all
special2. Enforce special inspection.Work requiring special inspection and the building specialc inspectors and special-inspection requirements 1. Approve special-inspection program.The building department shall approve all
inspector shall monitor the performance of special inspectors.HinWer approval,in 2. Enforce special Inspection.Work requiring special inspection and the building special inspectors and special-inspection requirements.
addition to that of the special inspector,must be obtained prior to placement of connate. inspector shall monitor the performance of special inspectors.tfis\Her approval,m
covering of structural steel,or other similar materials. addition to that of the al prier to placement of concrete.
2. Enforce special inspection.Work requiring special inspection and the building
span inspector,mart be obtained p inspector shall monitor the performance of special inspectors.His\Her approval,in
cowing of sanctum]steel,or other similar materials addition to that of the special inspector,must be obtained prior to placement of concrete,
3. Review inspection reports.The building official should review special-inspection addition
of structural steel,or other similar materials.
progress and final reports. 3. Review iespectlon reports.The building official should review special-inspection
progress and final repairs
4. Perform Foal inspection.The building official should perform the foal inspection and 3. Review inspection reports.The building official should review special-inspection
approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been 4. Perform Mai Inspection.The Wilding official should pert the final inspection and progress and final reports.
reviewed and approved. approval for a project[IBC Sec.1093.1]alter the final special-inspection report has been
mimed and approved 4. Perform final inspection.The building official should perform the final inspection and
approval fora project[IBC Sec.109.3.1]after the final special-inspection report has been
1015 WATERS AVE,ASPETLC0.8161 0076.2018.ARBK
Project mar...]. 1015 Nnmher. Address:
1015 WATERS AVE ASPEN,CO.8161 0076.2018.ARBK reviewed and approved.
�erndt 1lomber.
Project
ACKNOWLEDGMENTS Project Address: 1015 Waters Ave Permit Number: 0076.2018.ARBK
ACKNOWLEDGMENTS
I have red and agree to comply with the conditions of this agreement.
1 have read and agree to comply with the conditions of this agreement_
ACKNOWLEDGMENTS
peen Signature: .fed N Dare: gad
Z,,,a I dal Spa�1A all Signature- PnntSp Name. D+se 3-1 )6 I have read and agree to comply with the conditions of this agreement.
l 1 /✓/fL, l _aJ7//1�_
Owner Sr 'lilted // ` `� ` it/ W Special Inspection Agency: Signature: Printed Name: Date:
`-`"r C3' Owner. Signature. turd Date
GREGG HEMMING 64.144 irbnAYwG y.2.../4 GREGG tEADdD4c
Engineer/Architect: Signature: Printed Name: Dale: Printed Name Date. Owner: Signature: Printed Name Date
Fiigioea/Arebiro¢ Signaosre' Name.
ANDERSON LANDON ANDERSON
Engineer/Architect: Signature: Printed Name: Date:
Cootrarxoee Signature: Printed Name: Dater Contractor P Primed Name: Dior
CHRIS HENDRICKSON - Chris Hendrickson 03.'13.2018 CHRIS RNDRICKSON Signature( Chris Hendrickson 03/13/2018
Contractor: Signature: Printed Name: Date:
Approved Fabricator. Signature: Printed Name: Date: Agp�proved Fabrieasor. Ji�arq - Printed Name:
1 Date.
Inspected Fabricator: Signature: Printed Name: Date ImpactedFbei:Yer. Signature: PrintedNone Date Approved Fabricator: Signature: Printed Name: Date:
(circle one) Signature: Printed Name: Din: (circle one) SrOsWaa Printed Name. Date Inspected Fabricator: Signature Printed Name: Date:
JH EMT OF ASPFN� Dennis Clemons
(CITY OF
Nry: - Justin Hahn 5/2RECEIVED P COSY: JH Justin Hahn 5(29/19 Myers&Company 05/06/2019
3 02/07/2019 J acENED (circle cry OneASPt� signature: Printed Name: Date:
02/0T/2019 PITKINCOUNTY: JH Justin Hahn 5/29/19 RECEIVED
ASPEN
BUILDING DEPARTMENT ASPEN 05/08/2019
BUILDING DEPARTMENT 3
ASPEN
BUILDING DEPARTMENT