HomeMy WebLinkAboutMaster Permit.1015 Waters Ave.0204.2019 (48).ARBK 0076-2018-ARBK_BuildingCommentl A-Architecture.1015Waters.2018-4.pdf(47) Subject: PlanCheck A - You do not need to include the Page Label: 1700-V FIREAREACALCULATIONS thickness of the exterior walls in Kg m •i ¢ �. Author:justinh 1--- ii;44.s File Name: A-Architecture.1015Waters.2018-4.pdf your fire area measurements, u u `'u p this number should be the same OtA FIRE AREA as your gross building area in this instance. >0111 � 7 Subject: PlanCheck Page Label: 1700-V FIREAREACALCULATIONS The entire area under the Author:justinh carport projection counts UPPER LEVEL FIRE"REA`A"�� towards gross and fire area, File Name: A-Architecture.1015Waters.2018-4.pdf ■ please revise both drawings , ,�� � i4: .,• • accordingly. it. .41.411 [4 a S ,, °.o'4 ' o r S 3s -' Subject: PlanCheckFiza Please fill out the 2015 IECC '�•'"" Page Label: A-002 SNOWMELT PLAN &DETAILS ilj �""' Author:justinh REMP worksheet(attached),this File Name: A-Architecture.1015Waters.2018-4.pdfre form is outdated. E �W Ir.0 l a W'Es PUN ' r i j Subject: PlanCheck __ = Page Label:A-002 SNOWMELT PLAN &DETAILS Provide an accurate scale for Author:justinh this sheet, none of the drawings "SOF' measure correctly at the 1/4" File Name:A-Architecture.1015Waters.2018-4.pdf scale you've called out. It a .°,ff IpI9WATRSAVE. appears to be 3/16"scale. sIJOLLMELi DIAGRAM scale:}"•I'-O" m i Z' Subject: PlanCheck Are these partitions and/or O © i oeg Page Label:A-100 LOWER LEVEL•50FLOOR PLAN pocket doors to create a @� ,R Author:justinh tea, separate enclosure for the toilet? �a File Name: A-Architecture.1015Waters.2018-4.pdf If so please revise the MEe mechanical plan to show bath ,�a dt,e See updated mechanical plans for latest design. All -0^ exhaust in the main shower/sink n restrooms & isolated toilet rooms have been rooms in addition to the ones O:9' 7 LJ a oe �„; provided with exhaust fans. i Po shown above the toilets. When $L[_I _ - Cart toilets are placed in separate enclosures they require their own exhaust so the,shgwer l\ ,.' would require it's own exhausf1ir�' ' i.3,"r this scenario. Please make change in all applill®ctipr 19 on all levels. // // ASPEN BUILDING DEPARTMENT a , T.O. Slab is inconsistantly Subject: PlanCheck I.I i 1,�a,r,� Page Label:A-101 MAIN ENTRY LEVEI.50FLOOR PLAN O_Ij° w g shown in the various plan sets, r, m Author:justinh some show it is 100'-0", others File Name:A-Architecture.1015Waters.2018-4.pdf show it as 99'-5"if -„1 Mt' 7960.0'=100' 0"as you site plan shows. Coordinate these II elevations throughout all plan o -@ sets. i, I • mg Subject: PlanCheck i This should note should be WW, I, Page Label:A-101 MAIN ENTRY LEVEI.50FLOOR PLAN down, not up. -- P... v' Author:justinh -aII iAP iEi99"__����ej ��_ File Name: A Architecture.1015Waters.2018 4.pdf ������16 6 a•��®��rraa,,,a 00000,0 '� O Tows belbown rw II _ IMMME Subject: PlanCheck Page Label:A-101 MAIN ENTRY LEVEI.50FLOOR PLAN Show your electrical panel Author:justinh location on the floor plans File Name: A-Architecture.1015Waters.2018-4.pdf Show your electrical panel location on the floor plans iP=Mid ry Subject: PlanCheck ID AID Page Label:A-101 MAIN ENTRY LEVEI.50FLOOR PLAN Page references are incorrect, NMI please revise on all sheets. v:I!!� i' o Author:justinh © ���r. _ File Name: A-Architecture.1015Waters.2018-4.pdf .©I moll fll_ Subject: PlanCheck 4 1 Page Label: A-102 UPPER LEVEL•50FLOOR PLAN The maximum riser height Author:justinh allowed by the IRC is 7-3/4", File Name: A-Architecture.1015Waters.2018-4.pdf please revise. The maximum height allowed by the ———-IRC is 7-3/4",please - mows 16 -I 1 !mu 12" RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT � Subject: PlanCheck � Page Label:A-103 ROOF& ROOF DEC•50PLAN Author:justinh What is this note referencing? I�, File Name:A-Architecture.1015Waters.2018-4.pdf wr.� 1111111111 L-__ hm tt I — Subject: PlanCheck Page Label:A-103 ROOF& ROOF DEC•50PLAN Identify the location of the Author:justinh secondary drain discharge on a Identify the location of the floor plan or elevation. IPC1108 secondary drain discharge on a I 1 File Name: A-Architecture.1015Waters.2018-4.pdf floor plan or elevation. IPC 1108 requires secondary roof requires secondary roof I 1drainage to discharge above drainage to discharge above I 1 m grade in a conspicuous location I I grade in a conspicuous location that would normally be observed by the building occupant. I I that would normally be observed I I by the building occupant. II e Subj : PlanCheck nh aCeck Page Label:A-103 ROOF& ROOF DEC•50PLAN Show and identify all proposed J Author:justinh exhaust/venting. Currently I only I File Name: A-Architecture.1015Waters.2018-4.pdf see the fireplace venting shown. Show and identify all proposed exhaust/venting.Currently I only see the fireplace venting shown. D !;I I :1111111111■ _ ` `I z Subject: PlanCheck L —___ .I!M=� I gs Page Label:A-103 ROOF& ROOF DEC•50PLAN Snowguards should be provided 'o a. Author:justinh here as it is above an occupied �ot File Name: A-Architecture.1015Waters.2018-4.pdf deck. Ian rail I 1 1 O FLAT BUILT UP ROOF/METAL F. Subject: PlanCheck 11 ® FLAT SEAM METAL ROOF Page Label: A-201 NORTH ELEVATION #15 is not an item on the 9❑ 4"METAL FASCIA TRIM Author:justinh keynote legend, please revise. 15 10 SNOW GUARD PER R903.6 III CHIMNE PROJECTION<,G FR File Name: A-Architecture.1015Waters.2018-4.pdf BUILDING CONNECTION PER 2E O O IO ins is not an item on CI the keynote legend, please revise. TO PLATE:EL,I20'-1 I/2+ RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT O J Subject: PlanCheck © Page Label:A-201 NORTH ELEVATION What is shown here? It is not identified by any keynote and it Author:justinh does not correspond with File Name:A-Architecture.1015Waters.2018-4.pdf Ianything shown on the floor plans. nea / , Subject: PlanCheck Page Label:A-201 NORTH ELEVATION Show all venting, intakes, and ' Author:justinh exhaust terminations on your File Name: A-Architecture.1015Waters.2018-4.pdf elevations so that I may verify Show all venting,itakas,and exhanat terminadens on required clearances from your elevations so that I may verify required clearances from openings Into the building,etc.I'm seeing multiple openings into the building, etc. items in the mechanical plans that are not shown. I'm seeing multiple items in the ROOF OVER 2 LAYERS VERSA A ri:R.,IS mechanical plans that are not METR UdDERLAYMENT shown. 11 Subject: PlanCheck `fic l'IT'''''Lli:li6.,,,'''''ILI.,'',,„1:0,,,I.1,.._ Whatareyoushowingwith+I—�� PageLabel:A-202EASTELEVATION■ lam! these breaks in our shadin11,1,7210/21 ■�j Author:justinhy g' T ■�� ■ File Name: A-Architecture.1015Waters.2018 4.pdf � �IIIll�����������lIIIIIIIliilll tE'er""1 1l F Subject: PlanCheck Page Label:A-202 EASTELEVATION #15 is not referenced in your © ® Author:justinh keynote legend, please revise. 4File Name: A-Architecture.1015Waters.2018-4.pdf I 15 Subject: PlanCheck Page Label: A-202 EASTELEVATION #13 is not referenced in your Author:justinh keynote legend, please revise. 8 I File Name: A-Architecture.1015Waters.2018-4.pdf #13 is not referenced in your keynote legend,please revise. T.O.PLATE E RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT — Subject: PlanCheck Provide a wall section showing Rrwmeawan servos showing now you will accomplish me Page Label:A-301 BLDG. SECTIONA-A Author:justinh how you will accomplish the air sealing requirements of P°'5'ECC table R402 J41. sealing requirements of 2015'cateme°°^°^°"yntt^eair^.mere^°wM1ere^'e File Name:A-Architecture.1015Waters.2018-4.pdf locatetl M1reugM1out me builtling.Note locations IM1at require g.=ealag.api"g. atlar,io=,ioasbe„et,etl_erent IECC table R402.4.1.1. Indicate eetla"aetal°;ro" ""aea,e"'w"lie' "a�^"a�;e the continuity of the air barrier ana inspaoror m be anasessrnl.mesa aetail:are a new 2ot5 r is a requirement now mat visual in test See of me air barter is regmpiesof air Ma blower ttlq°meat.seems and where it is located attached examples of atr sealing Oatalls.You may use any l� memos°"em"nag°lint mem°tletaaanmpllsM1 mia throughout the building. Note requirement but a congnuous sir Berner must be clearly M1�w locations that require caulking, 10.FlKFUR EL;1104 sealing,taping, etc at transitions between different materials (such as wall to foundation,wall to roof, etc). The better detail provided the easier it will be for the contractor and inspector to be successful. These details are a new 2015 code requirement now that visual inspection of the air barrier is required in lieu of a blower door test. See the attached examples of air sealing details. You may use any method or combination of methods to accomplish this requirement but a continuous air barrier must be clearly shown. Subject: PlanCheck Page Label:A-301 BLDG. SECTIONA-A Your radon pipe and foundation Author:justinh drain are reversed, please File Name: A-Architecture.1015Waters.2018-4. df revise. ON TO.FIN CC.EL.ST'-4 3� p FIN. O. CONL .aS'- Subject: PlanCheck Page Label:A-301 BLDG. SECTIONA-A The majority of detail references Author:justinh on this sheet are incorrect, File Name: A-Architecture.1015Waters.2018-4.pdf please go through all your detail The majority of detail references tags and be sure they are on this sheet are incorrect,please go through all your detail tags and referencing the correct be sure they are referencing the .assembl correct assembly. y T.O.PLATE EL. 128'-8 3/8" 176-e 3� _ . _ _ Subject: PlanCheck Page Label:A-301 BLDG. SECTIONA-A This detail is not provided, Author:justinh please do so. File Name: A-Architecture.1015Waters.2018-4.pdf r^omeea�'nica"x ao Ib'.4' I RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT Subject: PlanCheck M==ls)_I-� Page Label:A-302 BLDG. SECTIONB-B This note is incorrect,this would I===I=! Author:justinh be required to be insulated as a fL,1 File Name:A-Architecture.1 01 5Waters.2018-4.pdf ceiling not a floor over exterior "aw»oa space. Revise your note and �i ',''..:7 F l—� reference the applicable detail. l a i d:- iA.FR RR EL:98..le . _�— Subject: PlanCheck Provide details for the garage Page Label:A-302 BLDG. SECTIONB-B IP Author:justinh ceiling and walls that show IM 1 _iiI•rl File Name: A-Architecture.1015Waters.2018-4.pdf compliant dwelling garage separation per R302.6. _ /� Reference these details on �� ��l I sections BB and CC as ",, m applicable. OBUILDING SECTION B-B SCALE:I/4".1'-0" Subject: PlanCheck Page Label:A-302 BLDG. SECTIONB-B Provide a detail showing stone Author:justinh veneer anchorage,flashing and File Name: A-Architecture.1015Waters.2018-4.pdf weepholes per 2015 IRC KEYNOTE LEGEND R703.8.2, R703.8.5 and Firl, R703.8.6 o u�� ,t 1 a. o M Subject: PlanCheck Page Label:A-302 BLDG. SECTIONB-B Please reference applicable OAuthor:justinh floor, roof, and wall details in File Name: A-Architecture.1015Waters.2018-4.pdf sections BB, CC, and DD similar to what you have done shown in °oo°gym a,re 1:°°"°•°°°"e°" °ere as88fBop• °,9� °"a. AA. Very few detail tags are ea F°.v°are eree"ma na�.ea a°u,na°°me"r of°b' provided in the last 3 sections. I Be sure you are referencing the correct details as many of the I ones shown are incorrectly referenced currently. Sub q �q q Page Label:ct: lanCheck A-303 BLDG. SEC.C-C Is this a range hood? The Author:justinh mechanical plan does not show own.,. y 'A w File Name: A-Architecture.1015Waters.2018-4.pdf any range hood provided. \ 1 w Revise one or the other for ® I° The selection of the exhaust hood and fan is outside consistency or clarify what is Bighorns scope of work. Typically residential range shown here. [ hoods are selected by the owner, architect, and or = •E contractor. Bighorn selects heating equipment that .�. can accommodate even large exhaust hoods if required (up to 1200 cfm). Contractor to verify exhaust hood airflow requirements and balance fan coil outside airflow rates accordingly. Architect& contractor to determine final termination location of exhaust. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT TO Subject: PlanCheck — — Incorrect reference for the —==E�a,a. Page Label:A-304 BLDG. SECTIOND-D Author:justinh handrail detail, please revise. ncerrect reference for File Name:A-Architecture.1015Waters.2018-4.pdf e handrail detail, please revise. 50 T.O.FIN.FLR_EL.:10m'-0 Subject: PlanCheck Page Label:A-304 BLDG. SECTIOND-D Remove this note from all plans, Author:justinh you are not actually proposing a q,Fm a.Va ^ File Name: A-Architecture.1015Waters.2018-4.pdf 1 hour wall. re "� Subject: PlanCheck Show or note the requirement for Page Label:A-401 EXTERIOR STAIRS guards along the open sides of O.FIN.FLR.EL.:II0'-31'' Author:justinh stairs to restrict the passage of I ' File Name: A-Architecture.1015Waters.2018-4.pdf a 6"sphere at the opening Show or note the formed between the guard and requirement for guards F along the open sides I stair tread/riser. of stairs to restrict the passage S"sphere at the SOUTH ELEVA' bat the opening formed stair guard and SCALE: 3/S" tread/riser. - _ Subject: PlanCheck __ ° °� This exceeds maximum allowed � 0 Page Label:A-401 EXTERIOR STAIRS 11��111111 If Author:justinh riser height, please revise. ® File Name: A Architecture.1015Waters.2018 4.pdf mil ma8 EXTERIOR STAIR PLAN kCi:i SCALE:3/B'.I'-0" o:>.a 4 Hspe Subject: PlanCheck LOTS Page Label: A-401 EXTERIOR STAIRS ar Guards must limit the passage of ■ ■ Per' cE Author:justinh a 4"sphere, a 4"opening does ;-- �re°'e File Name: A-Architecture.1015Waters.2018-4.pdf not comply with that. Please :_� ■ Xp revise to show compliance with I= — R312.1.3 Dasaage of a 727 B TUTTEI II'��. .nere,ea^oami" O:97af showmmgiencewim CIVIL 4„ I.-■ a3t2.t.3 Mountei TUB A 028 Gi —DIM 0:970-i 0:9]0-9 RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT Subject: PlanCheck Page Label:A-401 EXTERIOR STAIRS If you are using keynote Author:justinh numbers to reference items then File Name:A-Architecture.1015Waters.2018-4.pdf you must provide a legend on the applicable sheets. COO 1'LOP I OPAILM 0 TO.MARE, fc FIR RR=1n 0111 TO LAMING EL TO WOW El:113 Subject: PlanCheck Dimension this opening in your Page Label:A-402 INTERIOR STAIRS guardrail at the landing to show Author:justinh File Name: A-Architecture.1015Waters.2018-4.pdf limitations of R312.1.3.compliance with the opening omens on his � Pen n9 nYaur / guaNrs l as hoe landing mshow opening j opening limitations I ' R312.1.3. 14. 018 Subject: PlanCheck :■I', �i�= Handrails shall return to walls or �� •• Page Label:A-402 INTERIOR STAIRS = Author:justinh shall terminate in newel posts or _ •Rµ safety terminals. Please revise File Name: A Architecture.1015Waters.2018 4.pdf all stair plans/details or show 'TA m -� more detail to demonstrate compliance with R311.7.8.2. I■IIII! Subject: PlanCheck Page Label:A-403 GAS APPLIANCE•50PLAN &SPECS On the fireplace registration form &ELEVATIONS you marked that 3 new DV Author:justinh fireplaces were being installed. On the fireplace registration form you marked, File Name: A-Architecture.1015Waters.2018-4.pdf Please submit a revised form that 3 new DV fireplaces were being installed.i) Please submit a revised. GAS AP DA VINC -)nit TAi Subject: PlanCheck Page Label: A-501 ARCHITECTURALDETAILS Please remove this note as it Author:justinh does not apply to your exterior File Name: A-Architecture.1015Waters.2018-4.pdf wall. Please remove this " aoav :: or OEXX1ERIOR WGLL a SIDIkl IILJIfoieoE I RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT ®FOUIVTIQJ(TYPICAL) "-`-- �I Subject: PlanCheck Please remove this note from all Please remove a Page Label:A-501 ARCHITECTURALDETAILS note from all Author:justinh applicable details as it does not does"nolpadan'toths pertain to this project and it project and it - File Name:A-Architecture.1O15Waters.2018-4.pdf T.t ' references a code references a code edition we edition we have never .Z0gZ ...., adopted. have never adopted. INNTTERIIOR.WALL TYPICAL )-IAt 411(" -A.1 - HT Subject: PlanCheck «_ --- -- Page Label:A-501 ARCHITECTURALDETAILS Please remove all references to !lb, Ilk Author:justinh listed/tested assemblies. None >-- of your assemblies require fire File Name: A-Architecture.1O15Waters.2018-4.pdf ratings or sound ratings. 1 4 i__-_ __.1 ii, ,....======.„......... 0TYPICAL INT.WALL BASE I Subject: PlanCheck Provide documentation that your Page Label:A-501 ARCHITECTURALDETAILS roof assembly is class A(ESR Author:justinh report, UL listing, etc.) -ZI..0 5C File Name: A-Architecture.1O15Waters.2018-4.pdf Provide w� documentation that your roof assembly is """`� / class A(ESR report, UL listing,etc.) '"�`�"°m - Subject: PlanCheck F=_ __ Please revise this note, "R49 - =• Page Label:A-501 ARCHITECTURALDETAILS ._ �I1W - batt insulation spray foam" is ®J�� fz., _ Author:justinh confusing as to what you are�`.r File Name: A-Architecture.1015Waters.2018-4.pdf actually proposing. Subject: PlanCheck Page Label: A-501 ARCHITECTURALDETAILS Foundation walls are required to extend 6"or more above grade _- _ Author:justinh =� File Name: A-Architecture.1015Waters.2018-4.pdf per R404.1.6(4"if stone veneer _ is used). Revise all applicable ~ = details to show compliance with : . ti this. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT M Subject: PlanCheck O FONDATION a HEATED STONE TETA: OFan rii Page Label:A-501 ARCHITECTURALDETAILS The 2"x2"square handrail na 'e fed exceeds the perimeter allowed ,•m°,zII°w hi h Autor:justinh atyP°Ilea° fora type II handrail, please •w•p•°°•° _ File Name:A-Architecture.1015Waters.2018-4.pdf ya:emira �°d�dlyP•I revise to comply as either a type I or type II handrail. O NNDR41L O WALL Tr Sao Subject: PlanCheck Identify all windows that require Page Label:A-601 WINDOW ELEVATIONS R LEVEL I N. FLOOR Author:justinh safety glazing individually on the File Name: A-Architecture.1015Waters.2018-4.pdf window schedule. Identify all windows that require safety glazing individually on the window schedule. Subject: PlanCheck Page Label:A-601 WINDOW ELEVATIONS This example energy report Author:justinh should be removed. It is not - File Name: A-Architecture.1015Waters.2018-4.pdf specific to your window package L.EPER LEVEL FIN.FLS•R __ _ --- and it does not meet our ii i o.- ___ amended energy code ' = requirement of.28 U value. MAIN LEVEL FIN.FLOOR -- LOWER LEVEL FIN.FLOOR m == WINDOW ELEVATIONS-VIEWED FROM THE OUTSIDE SCALE:I/4.=I'NO" ELEVATIONS ENGINEER LETTER.pdf(1) m °- ;:„� ,a, " Subject: PlanCheck =.7:n7r1"1''°°�''e m Page Label: 1 All fenestration (not just windows P°° °;-:tA°ir::::;::-.7: 7.u_'°7:-.':- and glass doors)are required to Author:justinh e File Name: ENGINEER LETTER.pdf meet the .28 U value,this e ,�.,°.,°- '•°° ryaa �' i includes the garage door. Please revise this note to more clearly state that all doors will comply. M-Mechanical Engineering.1015Waters.2018.4.pdf(5) „ ',— Subject: PlanCheck, •-~mmm` =R:z 2 Calculate the equivalent length z Page Label: M1-1 - " — --w - ffi Author:justinh of the dryer exhaust and provide _ m File Name: M-Mechanical Engineering.1015Waters.2018.4.pdf a cutsheet on the proposed long _ run dryer or booster fan if it � �° z Approximate equivalent dryer exhaust length is 40'. exceeds 35'. 7i-- 72.:- L, o Updated flag note 5 to require a booster fan similar �I to fantech DEDPV-705 E RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT Subject: PlanCheck m���ts� ✓ Provide a plumbing plan with �; -- Page Label: M1-1 lit I . - isometric(or flatometric) Author:justinh „7 li File Name: M-Mechanical Engineering.1015Waters.2018.4.pdf showing which fixtures will drain �l 1111E into the lift station sump. Only Plumbing design is outside Bighorn's scope of those fixtures that cannot drain -ivj work. Sump pump on mechanical drawings was to the sewer by gravity may carried over from architectural drawings. drain to the lift station. 2015 IPC I, 1F ` 712.1 Architect to provide detail. (� MECHANICAL-LOWER LEVE Subject: PlanCheck Page Label: M1 2 Outdoor air intakes are required Author:justinh to be 10'horizontally from }_ -„ t,„,;I File Name: M-Mechanical Engineering.1015Waters.2018.4.pdf hazardous or noxious contaminant sources, carports Mel,/from ry = ri See updated mechanical plans. The intake and driveways are considered to —` m Pons end ——- was raised vertically to the next level in be a contaminant source. order to get further away from the driveway Please revise to comply with IMC 401.4. 1 N.ES: bj 4 ct. 'I.' C'ec. 1.PROVIDE ZONE DAMPERS WITH 24V ACTUATORS. Show your calculations 2.PROVIDE ZONE CONTROL BOARD. Page Label: M1-4 3.PROVIDE DIGITAL PROGRAMMABLE THERMOSTATS. Author:justinh demonstrating the balanced File Name: M-Mechanical Engineering.1015Waters.2018.4.pdf whole house ventilation system Show your calculations is sized adequately. demonstrating the balanced whole house ventilation system is sized — adequately. See attached Ventilation rate calculation.Minimum require rate is 421 CFM.Current design provides 450 CFM.Note the outside airflow rate listed on FC-3 is the max rate.FC-3 will only operate at this listed rate when the kitchen hood exhaust is operating.When the hood is not operating the rate shall reduce to 150 CFM.Fan coils shall operate continuously. Subject: PlanCheck I Page Label: M1 4 Show that your whole house Author:justinh ventilation system is balanced 1NPI within 20%as required by COA 221 File Name: M-Mechanical Engineering.1015Waters.2018.4.pdf Show that your whole house ventilation — amendments to R403.6 of the system is balanced within 20%as IECC. required by COA amendments to R403.6 of the IECC. Drawings have been updated to indicate bathroom exhaust fans will operate continuously.The previous Exhaust fan was replaced with Broan model#ZB110M.This new fan has the capability to run continuously.See provided cutsheet for additional information.House is balanced within 12.5%.See provided ventilation balance calculation sheet for IS details. r. . , 1 • 4, Subject: PlanCheck Page Label: 1 Please fill out a current 2015 Author:justinh IECC REMP worksheet as you File Name: REEMP.pdf are under the 2015 codes. RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT SPECIAL INSPECTIONS.pdf(1) :..� f�—/8 Subject: PlanCheck 3 Please also provide an° Page Label: 3 • u.. Author:justinh inspected fabricator's signature if field welding is proposed. -- File Name: SPECIAL INSPECTIONS.pdf INIOIMIM iffill SPECS.pdf(2) Subject: PlanCheck Page Label: 1 In the future please break your "^ a a "" Author:justinh specs and cutsheets into - "— �M" s ='''"''''''''s'''' File Name: SPECS.pdf multiple files for the various In the future please break your specs and pieces of equipment. It is very cutsheets into multiple files for the various pieces cumbersome to navigate a 110 of equipment.It is very cumbersome to navigate a 110 page spec package that is all one file. page spec package that is all one file. Subject: PlanCheck Page Label: 104 Provide cutsheets that actually - -- Author:justinh list your model spa, I can't File Name: SPECS.pdf accept cutsheets where your model was apparently typed on k'il s-7.7 ° --- after the fact for documentation of CEC certification and cover _°_____ _, safety rating. S-Structural Engineering.1015Waters.2018.4.pdf(2) Subject: PlanCheck Page Label: S1.1 FOUNDATION PLAN Revise all drawings e Author:justinh (architectural, civil, structural)so eir x.. at File Name: S-Structural Engineering.1015Waters.2018.4.pdf that the foundation above grade extends (4" where stone veneer is used). Per the civil grading plan the , r_. P PIP foundation TOW would be below grade here,there are other o' I — areas with same problem. Be sure all drawings are coordinated in order to comply with R404.1.6. ® o Subject: PlanCheck Please verify that the roof deck Page Label: S1.4 ROOF FRAMING PLAN .. Author:justinh framing has been sized ,,, IirTanizzLin File Name: S-Structural Engineering.1015Waters.2018.4.pdf adequately to support the — —� proposed hot tub. �' !! 1ii�lr11I ♦� T --- ® GO RECEIVED 02/07/2019 ASPEN BUILDING DEPARTMENT