HomeMy WebLinkAboutFile Documents.1001 E Cooper Ave.0039.2019 (2).ARBK DATE: MASTER PERMIT: PERMIT NUMBER:0039.2019.ARBK
•
COMMUNITY DEVELOPMENT DEPARTMENT ���p
HO
BUILDING PERMIT APPLICATION 41.
` CITY OF ASPE N
PROPERTY INFORMATION
1
ADDRESS 1001 E. Cooper Avenue UNIT#2 PARCEL ID# 273718234009
TRACT Subdivision:VILLAGER TOWNHOUSE Unit:2
LOT BLOCK OR SUBDIVISION
OWNER NAME Richard Landau Pearlstone CELL 970.948.1186 EMAIL richie@pearlstonegroup.com
BEST CONTACT Dana Ellis CELL 203-610-7633 EMAIL dana@rowlandbroughton.com
NAME
PROJECT DETAILS (READ DEFINITIONS BELOW) THISPLETIONMUSENT
COMPLETED IN ITS ENTIRETY
1
OF
WORK IN DESCRIPTION D TAIL Interior remodel and expansion into an interior courtyard.
PROJECT 450,000 Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION
❑ Commerical ❑ New 3 Toilets,Bidets Major Engineering Review
SQFTOF ❑■ Multi-Family 0 Addition 1 Bathtub •Projects involving less than 50%
BUILDING
GEA 1490 0 Single Family ❑■ Alteration 3 Lavatory(Wash Basin) hardscape area and work affecting
W0 Mixed-Use 0 Repair 3 Shower 75%or greater of unit sq ft
1490 3Kitchen Sink(+Disposal) •Projects involving greater than
UNIT SQFT 0 0 IFFR 1 Dishwasher 50%hardscape area and work
LOT SIZE 0 Tenant Finish Laundry Bar,Utility Sink affecting 50%or greater of unit
12,000
(SQ FT) Will there be ❑ Demolition Clothes Washer sq ft
503FTOFSOIL 20 SF any roof/wall 0 Change Order _Floor Sink •Projects involving 1,000+sq ft of
DI TURBANCE penetrations? 0 Floor Drain soil disturbance area
❑■ Yes i Water Heater(Pan Req)
NEW SQ FT 271 SF 0 No 2 #Gas Outlets Water Efficient Landscaping
Water Treatment •Projects that trigger a major
BUILDING Other engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
or construction authorized is not commenced within No Change affecting 50%or more
HARDSCAPE 28 SF 180 days,or if construction or work is suspended or alterations e ngross square footage
AREA abandoned for a period of 180 days at any time after g q g
ZONE R/MF work is commenced.
DISTRICT •. i
Project Valuation:Cost of project as defined in Valuation Affadavit.
Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
0 Unit Sq Ft:Gross square footage, not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved
w Building Footprint:Grade floor square footage of the permitted structure. PC X LL
0 Hardscape Area:Square footage of impervious lot surface. -
Zone District:Underlying zone district of permitted parcel. Zoning x sv o6/03/2019
HPC
Building X TF 5/21/2019
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire X TF 5/21/2019
Building 7653.75 Building 11775.00 Parks Impact 931 .95 Engineering
Review Permit Fee CMP X TK 3/7/2019
Engineering Zoning 1043.00 School Lands g067.14 Water
Review Review(50%) Dedication Stormwater
Zoning 1043.00 CMP(50%) 797.15 TDM Impact 104.31 Sanitation x PM 3/15/2019
Review(50%)
Energy Code REMP Pedestrian Env. Health
Review 1766.25 Payment Amenity Parks
CMP(50%) 797.15 GIS Housing Cash in Lieu 10,277.97 Landscape
Parks Review City Use 3675.00 Water Tap Efficiency DAM G/4/19
Tax Approved
County Use To Issue
Utility Review 1125.00 Sanitation
Tax
Issuance
( CITY OF ASPEN January v2/l—'61
130 S. GALENA ST ASPEN, CO 81611
1001 East Cooper Ave, Unit 6
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET THE CIFYOFASPE •
FOR PLAN REVIEW QUESTIONS
Name Dana Ellis Phone U •-. E-mail
FOR INSPECTION QUESTIONS
Name Jay Dewire Phone E-mail • •
OWNER
Name Phone Cell Phone V'•
Mailing Address PO Box 1860
City p Aspen state CO ZIP 81612
E-mail Address richie@pearlstonegroup.com
OWNER'S AUTHORIZED AGENT
Alison A •le
Name 9 Y Phone � Cell Phone
Mailing 234 E. Hopkins Ave Aspen CO 81611
Address City State ZIP
E-mail Address alison.agley@rowlandbroughton.com
APPLICATION BEST CONTACT
Name Alison Agley Phone Cell Phone ' '
Mailing 500 E Main St Aspen CO 81611
Address City State ZIP
E-mail Address alison.agley@rowlandbroughton.com
ARCHITECT OR DESIGNER OF RECORD
Name Sarah Broughton Phone • Cell Phone
Mailing 234 E. Hopkins Avenue Aspen CO 81611
Address City State ZIP
E-mail Address sarah@rowlandbroughton.com
CIVIL ENGINEER OF RECORD
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
STRUCTUAL ENGINEER OF RECORD
•
Name Brett McElvain-KL&A Phone Cell Phone
Mailing
Address City State ZIP
E-mail Address bmcelvain@klaa.com
GENERAL CONTRACTOR
Name Jay Dewire-Viking Construction Phone Cell Phone
Mailing
Address City State ZIP
E-mail Address aspenviking@gmail.com
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
Contractor
g ntreryJ Dewire Date 2/16/19au
ng El Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/buiIddinga �av�t.
(CITY USE ONLY) Owner builder approved by: Date: Affidavit on file
Q2251,9
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO/81611J
BUILDING DEPARTMENT
1001 E Cooper Ave, Unit 6
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST THECnorASPL,
LAND USE QUESTIONS
If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
ElPart of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District
❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high
non-unit space water mark
❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure
❑ Work involves exterior of structure Changes to elevator or stair configuration
ElChanging the number of residential units Changes to the use of existing structure or space
❑ Changes to number or location of
onsite parking
replacing but count
ADDITIONAL SCOPE OF WORK QUESTIONS stays the same
Does your permit involve any of the following?
❑ Exterior lighting added or changed ❑ Work involves exterior wall penetrations
ElWork involves roof penetrations ❑ Work involves digging or excavation
Work adds, removes, or changes ❑ Work involves restaurant or food service
plumbing fixtures
ElDisturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys
12 months
❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines
❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries
dripline of a tree
•
RECEIVE
1,9
( CITY OF ASPEN
_August130 S. GALENA ST I ASPEN, CO/81611j
t l
BUILDING DEPARTMENT
PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC THEGr,,OrASPEN
BUILDING CODE INFORMATION
❑ 2015 IRC ❑■ 2015 IBC 0 2015 IEBC 0 Other (Please Explain)
Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted
and Amended)
Fire Sprinkler System I Existing? 0No I Required? ONeo, I Type 0 NFPA 13 ❑ NFPA 13 R 0 NFPA 13 D
Type Of Construction ❑ VA ■❑ VB❑ IV 0 IIIA ❑ IIIB ❑ IIA 0 IIB 0 IA 0 IB Fire Alarms Installed ■❑ Yes No
Required Special Inspections 0 High-Strength Bolting 0 Epoxy Anchors ❑ Structual Steel Welding
❑ Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other NA
Energy Code Compliance I] Prescriptive Table 0 Other
❑ RESCheck UA Alternative 0 COMCheck UA Alternative
Exterior Energy Use Total Approved On-Site Snowmelt° Spa° Pool °
(Existing + New)
Building Type/ I 0 A 0 B ❑ F ❑ E ❑■ R 2 I ❑ One Family 0 Two Family
Occupancy Group g ❑ B (A<50) ❑ H_ ❑M ❑ S_ R
C ❑ I ❑ U C 0 Townhouse
UNIT DESCRIPTION AS PROPOSED
Gross Area of Building: ° Gross Area of Unit: 1445sgft ADU BUILDING DESCRIPTION
Occupant Load:
Is there an ADU? 0 Yes
III No
# Stories Above Grade 2 # Stories Below Grade ° # Living Rooms
Attached Garage Detached Garage Carport # Kitchens
Parking Spaces Parking Spaces Parking Spaces # Full Baths
# Bedrooms 3 # Full Baths 1 Deck Area ° # 3/4 Baths
# 1/2 Baths
# 3/4 Baths 2 # 1/2 Baths ° # Bedrooms
# Kitchens 1 #Wood Fireplaces ° #Other Rooms (List)
# Gas Appliances 1 # Gas Logs 1
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement
Main Level (2)bedrooms,(2)baths,laundry,and closet
2nd Floor Kitchen,Living room,master bedroom,master bath,master closet
3rd Floor
Additional
Reviewed By: Date:
( CITY OF ASPEN January 2018 130 S. GALENA ST I ASPEN, CO�81611
J
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM THE O1YOFASPEN
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
ADDRESS ` bO I • O 0?..c/ a UNIT# PARCEL ID#
I, the property owner, certify as follows: (pick one)
0 This property is not subject to a homeowners association or other form of private covenant.
This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
® This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
see page 2
I understand the City of Aspe does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or hom owner association rules or bylaws. I understand that this document is a public
document.
Owner Signature Date l P / /
Owner Printed Name •t -M i L---
efilizzgroa6
OR
Owner's Attorney Signature Date
Owner's Attorney Printed Name
I a, i \/1 II ,li
j CITY OF ASPENJanuary2018 130 S. GALENA ST I ASPEN, 81 ?
ASHEN
BUILDING DEPARTMENT
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT il 1100
HOMEOWNER ASSOCIATION COMPLIANCE FORM mECITYOFASPEN
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
ADDRESS 10 0 -. Coot' r UNIT# Z PARCEL ID# 2 13-7 I )L?j L oci
I,the property owner, certify as follows: (pick one)
❑ This property is not subject to a homeowners association or other form of private covenant.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
/ {. This property is subject to a homeowners association or private covenant and the improvements
roposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature �at%ewite &e�a, Date 12/10/2018
Owner Printed Name Katherine Beckley HOA representative's
signature for approval
OR
Owner's Attorney Signature Date
Owner's Attorney Printed Name
19
( CITY OF ASPEN January2018 130 S. GALENA ST I ASPEN, CU 81611j
BUILDING DEPARTMEm
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT THEC,,CTASPE
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuation is underestimated on the application,the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: Date:
Owner Printed Name:
or,
Authorized Agent Signature: Date:2019-02-15
Authorized Agent Printed Name: alison foto agley
RECEIVE
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO/81611j
t l
BUILDING DEPARTMENT
ADDRESS: 1001 E. Cooper Avenue- Unit 2 PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST THE CITY OF ASPEN
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban
on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
1 Yes❑ No
Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel -examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes❑ No
Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel -examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean. This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
I hereby certify that the above information is true and complete.
Owner Richie Pearlstone Phone #
Applicant (print name) Dana Ellis Phone #970-429-8707
Applicant Signature ° ` Date 2/13/2019
pp g 1 � .
Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you have�lqu stioris
about asbestos, interpreting your test results, or other matters.
CITY OF ASPEN August Zola 6 1 1 c
130 S. GALENA ST � ASPEN, CO 8,1611�
PERMIT NUMBER: ADDRESS: 1001 g Coo pe,r 51 titt
COMMUNITY DEVELOPMENT DEPARTMENT
14k
ZONING COMPLIANCE VERIFICATION POLICY TuEcn„oFARE\
•
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
Y
I (contractor name) b'2_,(-0 l r e understand this policy. I agree that this project will
comply with the zoning itns affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoning limitations.
Contractor Signature: /�
I c�
Date: 2113/ I -1
i
RED'E lVE `
n,,,c,?0,0,
CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 81611J
BUILDING DEPARTMENT