Loading...
HomeMy WebLinkAboutFile Documents.1001 E Cooper Ave.0039.2019 (2).ARBK DATE: MASTER PERMIT: PERMIT NUMBER:0039.2019.ARBK • COMMUNITY DEVELOPMENT DEPARTMENT ���p HO BUILDING PERMIT APPLICATION 41. ` CITY OF ASPE N PROPERTY INFORMATION 1 ADDRESS 1001 E. Cooper Avenue UNIT#2 PARCEL ID# 273718234009 TRACT Subdivision:VILLAGER TOWNHOUSE Unit:2 LOT BLOCK OR SUBDIVISION OWNER NAME Richard Landau Pearlstone CELL 970.948.1186 EMAIL richie@pearlstonegroup.com BEST CONTACT Dana Ellis CELL 203-610-7633 EMAIL dana@rowlandbroughton.com NAME PROJECT DETAILS (READ DEFINITIONS BELOW) THISPLETIONMUSENT COMPLETED IN ITS ENTIRETY 1 OF WORK IN DESCRIPTION D TAIL Interior remodel and expansion into an interior courtyard. PROJECT 450,000 Use of Building Class of Work Fixture Counts Important Review Triggers VALUATION ❑ Commerical ❑ New 3 Toilets,Bidets Major Engineering Review SQFTOF ❑■ Multi-Family 0 Addition 1 Bathtub •Projects involving less than 50% BUILDING GEA 1490 0 Single Family ❑■ Alteration 3 Lavatory(Wash Basin) hardscape area and work affecting W0 Mixed-Use 0 Repair 3 Shower 75%or greater of unit sq ft 1490 3Kitchen Sink(+Disposal) •Projects involving greater than UNIT SQFT 0 0 IFFR 1 Dishwasher 50%hardscape area and work LOT SIZE 0 Tenant Finish Laundry Bar,Utility Sink affecting 50%or greater of unit 12,000 (SQ FT) Will there be ❑ Demolition Clothes Washer sq ft 503FTOFSOIL 20 SF any roof/wall 0 Change Order _Floor Sink •Projects involving 1,000+sq ft of DI TURBANCE penetrations? 0 Floor Drain soil disturbance area ❑■ Yes i Water Heater(Pan Req) NEW SQ FT 271 SF 0 No 2 #Gas Outlets Water Efficient Landscaping Water Treatment •Projects that trigger a major BUILDING Other engineering review FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior or construction authorized is not commenced within No Change affecting 50%or more HARDSCAPE 28 SF 180 days,or if construction or work is suspended or alterations e ngross square footage AREA abandoned for a period of 180 days at any time after g q g ZONE R/MF work is commenced. DISTRICT •. i Project Valuation:Cost of project as defined in Valuation Affadavit. Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. 0 Unit Sq Ft:Gross square footage, not FAR,of permitted unit. H Lot Size:Total surveyed square footage of property. APPROVALS Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved w Building Footprint:Grade floor square footage of the permitted structure. PC X LL 0 Hardscape Area:Square footage of impervious lot surface. - Zone District:Underlying zone district of permitted parcel. Zoning x sv o6/03/2019 HPC Building X TF 5/21/2019 SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire X TF 5/21/2019 Building 7653.75 Building 11775.00 Parks Impact 931 .95 Engineering Review Permit Fee CMP X TK 3/7/2019 Engineering Zoning 1043.00 School Lands g067.14 Water Review Review(50%) Dedication Stormwater Zoning 1043.00 CMP(50%) 797.15 TDM Impact 104.31 Sanitation x PM 3/15/2019 Review(50%) Energy Code REMP Pedestrian Env. Health Review 1766.25 Payment Amenity Parks CMP(50%) 797.15 GIS Housing Cash in Lieu 10,277.97 Landscape Parks Review City Use 3675.00 Water Tap Efficiency DAM G/4/19 Tax Approved County Use To Issue Utility Review 1125.00 Sanitation Tax Issuance ( CITY OF ASPEN January v2/l—'61 130 S. GALENA ST ASPEN, CO 81611 1001 East Cooper Ave, Unit 6 ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET THE CIFYOFASPE • FOR PLAN REVIEW QUESTIONS Name Dana Ellis Phone U •-. E-mail FOR INSPECTION QUESTIONS Name Jay Dewire Phone E-mail • • OWNER Name Phone Cell Phone V'• Mailing Address PO Box 1860 City p Aspen state CO ZIP 81612 E-mail Address richie@pearlstonegroup.com OWNER'S AUTHORIZED AGENT Alison A •le Name 9 Y Phone � Cell Phone Mailing 234 E. Hopkins Ave Aspen CO 81611 Address City State ZIP E-mail Address alison.agley@rowlandbroughton.com APPLICATION BEST CONTACT Name Alison Agley Phone Cell Phone ' ' Mailing 500 E Main St Aspen CO 81611 Address City State ZIP E-mail Address alison.agley@rowlandbroughton.com ARCHITECT OR DESIGNER OF RECORD Name Sarah Broughton Phone • Cell Phone Mailing 234 E. Hopkins Avenue Aspen CO 81611 Address City State ZIP E-mail Address sarah@rowlandbroughton.com CIVIL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER OF RECORD • Name Brett McElvain-KL&A Phone Cell Phone Mailing Address City State ZIP E-mail Address bmcelvain@klaa.com GENERAL CONTRACTOR Name Jay Dewire-Viking Construction Phone Cell Phone Mailing Address City State ZIP E-mail Address aspenviking@gmail.com INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. Contractor g ntreryJ Dewire Date 2/16/19au ng El Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/buiIddinga �av�t. (CITY USE ONLY) Owner builder approved by: Date: Affidavit on file Q2251,9 ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO/81611J BUILDING DEPARTMENT 1001 E Cooper Ave, Unit 6 ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT SCOPE OF WORK CHECKLIST THECnorASPL, LAND USE QUESTIONS If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your permit application. Does your permit involve any of the following? ElPart of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District ❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high non-unit space water mark ❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure ❑ Work involves exterior of structure Changes to elevator or stair configuration ElChanging the number of residential units Changes to the use of existing structure or space ❑ Changes to number or location of onsite parking replacing but count ADDITIONAL SCOPE OF WORK QUESTIONS stays the same Does your permit involve any of the following? ❑ Exterior lighting added or changed ❑ Work involves exterior wall penetrations ElWork involves roof penetrations ❑ Work involves digging or excavation Work adds, removes, or changes ❑ Work involves restaurant or food service plumbing fixtures ElDisturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys 12 months ❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines ❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries dripline of a tree • RECEIVE 1,9 ( CITY OF ASPEN _August130 S. GALENA ST I ASPEN, CO/81611j t l BUILDING DEPARTMENT PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC THEGr,,OrASPEN BUILDING CODE INFORMATION ❑ 2015 IRC ❑■ 2015 IBC 0 2015 IEBC 0 Other (Please Explain) Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted and Amended) Fire Sprinkler System I Existing? 0No I Required? ONeo, I Type 0 NFPA 13 ❑ NFPA 13 R 0 NFPA 13 D Type Of Construction ❑ VA ■❑ VB❑ IV 0 IIIA ❑ IIIB ❑ IIA 0 IIB 0 IA 0 IB Fire Alarms Installed ■❑ Yes No Required Special Inspections 0 High-Strength Bolting 0 Epoxy Anchors ❑ Structual Steel Welding ❑ Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other NA Energy Code Compliance I] Prescriptive Table 0 Other ❑ RESCheck UA Alternative 0 COMCheck UA Alternative Exterior Energy Use Total Approved On-Site Snowmelt° Spa° Pool ° (Existing + New) Building Type/ I 0 A 0 B ❑ F ❑ E ❑■ R 2 I ❑ One Family 0 Two Family Occupancy Group g ❑ B (A<50) ❑ H_ ❑M ❑ S_ R C ❑ I ❑ U C 0 Townhouse UNIT DESCRIPTION AS PROPOSED Gross Area of Building: ° Gross Area of Unit: 1445sgft ADU BUILDING DESCRIPTION Occupant Load: Is there an ADU? 0 Yes III No # Stories Above Grade 2 # Stories Below Grade ° # Living Rooms Attached Garage Detached Garage Carport # Kitchens Parking Spaces Parking Spaces Parking Spaces # Full Baths # Bedrooms 3 # Full Baths 1 Deck Area ° # 3/4 Baths # 1/2 Baths # 3/4 Baths 2 # 1/2 Baths ° # Bedrooms # Kitchens 1 #Wood Fireplaces ° #Other Rooms (List) # Gas Appliances 1 # Gas Logs 1 BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement Main Level (2)bedrooms,(2)baths,laundry,and closet 2nd Floor Kitchen,Living room,master bedroom,master bath,master closet 3rd Floor Additional Reviewed By: Date: ( CITY OF ASPEN January 2018 130 S. GALENA ST I ASPEN, CO�81611 J ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM THE O1YOFASPEN All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ADDRESS ` bO I • O 0?..c/ a UNIT# PARCEL ID# I, the property owner, certify as follows: (pick one) 0 This property is not subject to a homeowners association or other form of private covenant. This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. ® This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. see page 2 I understand the City of Aspe does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or hom owner association rules or bylaws. I understand that this document is a public document. Owner Signature Date l P / / Owner Printed Name •t -M i L--- efilizzgroa6 OR Owner's Attorney Signature Date Owner's Attorney Printed Name I a, i \/1 II ,li j CITY OF ASPENJanuary2018 130 S. GALENA ST I ASPEN, 81 ? ASHEN BUILDING DEPARTMENT ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT il 1100 HOMEOWNER ASSOCIATION COMPLIANCE FORM mECITYOFASPEN All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ADDRESS 10 0 -. Coot' r UNIT# Z PARCEL ID# 2 13-7 I )L?j L oci I,the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. / {. This property is subject to a homeowners association or private covenant and the improvements roposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature �at%ewite &e�a, Date 12/10/2018 Owner Printed Name Katherine Beckley HOA representative's signature for approval OR Owner's Attorney Signature Date Owner's Attorney Printed Name 19 ( CITY OF ASPEN January2018 130 S. GALENA ST I ASPEN, CU 81611j BUILDING DEPARTMEm ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFADAVIT THEC,,CTASPE AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application,the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that this document is a public document. Owner Signature: Date: Owner Printed Name: or, Authorized Agent Signature: Date:2019-02-15 Authorized Agent Printed Name: alison foto agley RECEIVE ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO/81611j t l BUILDING DEPARTMENT ADDRESS: 1001 E. Cooper Avenue- Unit 2 PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST THE CITY OF ASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks, or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST 1 Yes❑ No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel -examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑Yes❑ No Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel -examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. Owner Richie Pearlstone Phone # Applicant (print name) Dana Ellis Phone #970-429-8707 Applicant Signature ° ` Date 2/13/2019 pp g 1 � . Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you have�lqu stioris about asbestos, interpreting your test results, or other matters. CITY OF ASPEN August Zola 6 1 1 c 130 S. GALENA ST � ASPEN, CO 8,1611� PERMIT NUMBER: ADDRESS: 1001 g Coo pe,r 51 titt COMMUNITY DEVELOPMENT DEPARTMENT 14k ZONING COMPLIANCE VERIFICATION POLICY TuEcn„oFARE\ • 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: Y I (contractor name) b'2_,(-0 l r e understand this policy. I agree that this project will comply with the zoning itns affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: /� I c� Date: 2113/ I -1 i RED'E lVE ` n,,,c,?0,0, CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 81611J BUILDING DEPARTMENT