Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.201 Clubside Dr.0004.2019.ARBK
0004-2019-ARBK_BuildingComments_1 Response Comments 02.07.2019 (in Blue) 201 Clubside_Plans.pdf(8) Page:A102.2 SCALE: MIDDLE LEVEL FLOOR PLAN I i, There are 2 dryers in the laundry of „nr ii.i� h'i PROPOSED rY 71 �w~ l--m File Name: 201 Clubside_Plans.pdfinim room. Provide makeup air if the :I _ -1 Subject: Dryer Makeup air total exhausted airflow exceeds ' � 0 Author: nickt 200cfm. (2015 IMC 504.6) FIN�©�1,w Color: ■ ti See Sheet A102.2 with added notation. Make-up air requirement to be evaluated ® Design/Build by GC & Mechanical Subcontractor once Dryer specification is clarified and Ker ®°'°" selective demolition confirms the existing mechanical system and tie-in for make-up air. System to be confirmed with building inspector prior to proceeding with construction. Page:A102.2 SCALE: MIDDLE LEVEL FLOOR PLAN PROPOSED Indicate dryer vent duct length File Name: 201 Clubside_Plans.pdf and termination location. 2015 _ ® L IMC 504. Subject: PlanCheck I� wi Author: nickt ... Color: ■ �"-_!_����® ;i_i'®aw.�it, See Sheet A102.2 with added notation. Venting for new dryer to be addressed Design/Build l��' by GC & Mechanical Subcontractor once Dryer specification is clarified and selective "I"-07p41 - demolition confirms the existing dryer exhaust duct length. Final venting to be confirmed -> with building inspector prior to proceeding with construction. 112., Page:A102.2 SCALE: MIDDLE LEVEL FLOOR PLAN If the garage is not heated, the PROPOSED new wall between the 1'' File Name: 201 Clubside Plans.pdf new walland garage i_ t- - mudroom/laundry 9 9 Subject: PlanCheck �j becomes thermal envelope and %* Author: nickt mustcomply I with the insulation Color ■ !_ _ and air sealing provisions of "s s'� �' - © - 2015 IECC R402. 01 � See Sheet A102.2 for added wall system detail Erg �;---- WI-1/A501 that includes insulation. I Page:A103.2 UPPER LEVEL FLOOR PLAN PROPOSED O File Name: 201 Clubside_Plans.pdf Ordinance 40, 2016 amended f Subject: PlanCheck the 2015 IECC to require 0.28 U n<„° E -` factor for fenestration. Revise. emended the 2015 Author: nickt - F Color: ■ "c'° `";_°" " See Sheet A103.2 for updated notation for Ordinance 40 IECC requirements. Page:A201.1 EXTERIOR ELEVATIONS Ordinance 40, 2016 amended File Name: 201 Clubside_Plans.pdf .�s,�E. Subject: PlanCheck the 2015 IECC to require 0.28 U .E.- u— Author: nickt factor for fenestration. Revise. =owm°; Color: ■ :SIE ° °w= T :II.�/i See Sheet A201.1 and for updated notation for Ordinance 40 IECC requirements. -010 RECEIVED 02/12/2019 ASPEN BUILDING DEPARTMENT Page:A401 ENLARGED STAIR PLAN &SECTIONS Handrail ends must return to a File Name: 201 Clubside Plans.pdf Cg IN - .- - wall, guard, newel post, or floor'�_ Subject: handrail returns Fa - — Author: nickt surface. 2015 IRC R311.7.8.2. - .— Color: ■ °..—, o.."..1I HII See Sheet A401 for revised handrail returns. Page:A501 DETAILS File Name: 201 Clubside_Plans.pdf Indicate air sealing with notes. Subject: PlanCheck (Ordinance 40, 2016) wan - Author: nickt Color: ■ �_:® __ See revised detail 6/A501 for added air barrier. ER ;, I i.Z:', ilt raw- ;,; Page:A501 DETAILS File Name: 201 Clubside_Plans.pdf Glass guards must comply with Subject: PlanCheck one of the following: Have a top © cap supported by at least 3 E„a-,a —'Qv „E„a Author: nickt Color: •■ panes of glass; have a top cap y,EF?:ir s supported independent of the glass; or in the case of no top � EgPomIX_ FIill I� See Sheet A401 with revised glass panel elevations to cap, be at least two plies of ti Ilb comply with required rail support by at least three equal thickness glass laminated — Emile. panels of glass. As noted, small sections of guardrail together. Provide details at 7 & 9/A401 to be self supported at the wall and floor demonstrating compliance with once the existing finished are removed and the one of the above as well as existing structure is revealed. Connections will be method of attachment and designed by the structural engineer to comply with 200 losupport. Must supportPe a noteoint lb. design load. Supplemental structural details will be manyad of glass200 u. Please that g pp support issued to the building department with structural manufacturers require a top cap; stamps for approval prior to installation. Railing if you exceed their design you system selected to be C.R. Laurence CO GRS Railing will need a stamped engineered System per manufacturer information inserted below. design. (Ordinance 40, 2016) united metes _ C.R.LAURENCE CO. ® T ,-) ,__�lii� ji/L _a•,, CIIIARCHITECTURAL PRODUCTS 111� _ ALUMINUM i BUILDING GLASS RAILING SYSTEMS 5 �� SAFER STRONGER WITH BRILLIANT TRANSPARENCY 11 �� \ I-- �5TM �` �IbM M RILOALC RAIL CAP RAIL ,,E.I • 1/7 TEMPERED I/7'TEMPERED MONOLITHIC GIASS g /-MONOLUUICGI MS /�/ �\ g 373 CAP RAIL bt i /// 1 i 1_ IS/B"X 4-1a s 35 ///// g O{U CRL KWX50 FOR I T GLASS A i � /%//// %i EXPANDING WOOD N LINEOFMOUNRNG ^1/7'T ICAL BUITIC��T lCCC� y CRLBAS SUBSTRATE BETWEEN GLASS PANELS a q CRL BASE SHOE CR SSG. ROLL�.,nvL 5 Tr T t } // `r LINEOFMOUNRNG ; ;�T 1 '. T •.41 r.•. L•.• t1 iL" :: ) 1'. .11 EDGE OF SLAB - Hnsuotuc SUBSTRATE / '' ANCHOR SPACING WILL DEPEND • STANDARD ON MOUNTING SUBSTRATE AND 6'RECOMENDED EDGECA SOCKF,EAD CAP INSTALLATION LOCATION 111 GSTAHCELAG BOLTS INSTALL. COMp� Tw TYPICAL GLASS RAILING ELEVATION TYPICAL SECTION °OX s. �`��° L E D GRS FRAMELESS GLASS RAILING SYSTEM D DECK 3/16,LLE7 WELD TYPPIICDAL SURFACE MOUNT DE-ASP E N 'v'''"''= ([ ING DEPARTMENT