Loading...
HomeMy WebLinkAboutFile Documents.211 Cottonwood Ln.0062.2019 (65).ARBK Engineering_0062.2019.ARB K_1 530-003211 Cottonwood DrainLtr-10-19-18.pdf(5) Page: 3 Provide more detail for how rain Due to the proactive effort to reduce impervious areas,props condition. Since the Smuggler Trailer Park isinanunresol Author:jackd drain system is concerned,the City has required detention.'I barrels release water? from the FAA Procedure described in the Code.Due to the File Name: 530-003211CottonwoodDrainLtr-10-19-18.pdf historic condition,the detention vol •fired of f offset detention volume by providin- r the am of 110 gallons,or 14.7 cubic feet. the deter Because the site is small and deterueon would beimpmeeca A description of rain barrel release has been added to page 3 of the report. lieu"of providing on-site detention.The calculations are am Provide more detail A product specification sheet has been added to plan sheet C5. for how rain barrels --- release water? Mountain Cross Enuinee Cho end Environmental CaneuMi 828.Crand Nvenue,5558ww , 9)0.9a5.554a F:9)a.965.5558 www.m Page:4 Green roof maintenance needs :riodicatty fur , l Author:jackd to be included in the File Name: 530-003211CottonwoodDrainLtr-10-19-18.pdf quest inspection of the silt fence.Attached in the Appendix is maintenance section. used by the Owner. The maintenance for the Green Roof has been added to the maintenance section drainage design,WQCv was anticipated.The site grading was and included in the Maintenance Plan. WQCV. entire site byprov_d_ngpem4ble pavers and green roof These ens. 'Green roof maintenance needs to be included in the maintenance section. Mountain Cross Engineering Inc. get end eneaenm.nrr Cm W LLp*Season Page:4 The pervious paver volume can wn.,nm, Author:jackd File Name: 530-003211CottonwoodDrainLtr-10-19-18.pdf be used for detention. L'F,o°'" °' "" The report has been revised to provide detention volume in the permeable pavers. Page: 7 i Author:jackd Green roof is viewed as • �41i' n \ File Name: 530 003211CottonwoodDrainLtr 10 19 18.p pervious, and up to the same df amount of impervious areas draining toward green roof. Thegreen roof and thepermeable avers are considered as 50% impervious usi5a^wed P P ,tots emeamount and 50% pervious in the calculations per a previous conversation with of impervious areas ining toward City Staff. The impervious roof areas in the calculations are for roofs Pg n roof. on adjacent neighboring properties and the proposed solar panel roof. Page: 16 Author:jackd Include a more detailed MOUNTAIN CROSS File Name: 530-003211CottonwoodDrainLtr-10-19-18.pdf description of a properly ENGINEERING. INC. operating system. ��inewan a mom Maintenance Plan -'ofaprnpeoy Iptlon The Maintenance Plan has been revised to describe the system and a operating system. ecklist to aid the Property Owner of ongoing drainage system mainremzelar- sramm ga.nre ;ngnf dm�, section for permeable pavers, green roof, and rain barrels has been rnatm - r should be performed otter large rmgniNde rainfall aging o[thn seastoDamaged,credmd,or missing items should bet repaired added. tvered.This is not intandW to bemoll-inclusive list ,l drainage and grade any pondiag areas[o drain des from deposited sediment and debris RECEIVED 05/15/2019 ASPEN BUILDING DEPARTMENT Civil - 211 Cottonwood Lane.pdf(2) ,— ue, Page: C2 Show what sections of roof are Author:jackd �A green roof and show what is ` �b� r File Name: Civil-211 Cottonwood Lane.pdf i 1 -2 sections of roof drain to green '1 / ie roof. If there are sections that 4 ' sy Green Roof area is shown on sheet C2 g. i drain to reen roof, a level / with arrows showing flow direction. Solar ,�i panel roof area is shown on sheet C2 with Spreader is required. / Ilk4 \` Lot213 flow direction. No roof sections drain onto `�.NaNio- Troy Aflller the green roof so no level spreader is needed. Hyaer r Page: C2 o_ ��� Author:jackd -°°' Provide green roof detail. ..._ e File Name: Civil-211 Cottonwood Lane.pdf . Fi / ,....... 4,49t `9 Green Roof detail is provided on sheet C5. • 4 2 W Lot 213� 1 m ` Troy lidler Excavation Stabilization -211 Cottonwood Ln.pdf(1) N - a Page: Grade-2 of 6 Temporary Micropile Wall Location S Provide a legal agreement Author:jackd N1�.....*�_ . File Name: Excavation Stabilization-211 Cottonwood Ln.pdf showing the ability to excavate into the private roadway.Will this SS - \ excavation danger road users? Pmvlee a legal aadway,mowing `\ ,na ablLly W excavate L \\\�(}% roCewaywlll Mls eaege rose Baer:? `rS \ See letter from Smuggler Home Owners Association. RECEIVED 05/15/2019 ASPEN BUILDING DEPARTMENT