HomeMy WebLinkAboutFile Documents.905 Chatfield Rd.0085.2019 (25).ARBK 0085-2019-ARBK_BuildingCommentl
0_ARCH_CHANGE ORDER 1.2.pdf(1)
Subject: PlanCheck
Page Label:A-200_EXTERIOR ELEVATIONS All the elevations and sections
Author:justinh should be revised and included
File Name: 0_ARCH_CHANGE ORDER 1.2.pdf in this change order to show the
All the elevations and sections should be revised and Included, Color: • change in floor elevation and
yin Nis change oMerN s°w Me change in floor eleralion entl+
removal of exterior decks. The
dean even aiaerw"a"a sanb".a�uv.aaei are
floor elevation change would
affect every elevation and
section. Currently several are
missing from the change order
set.
17085-Building Permit Change Order 1 REMP Calc-041619.pdf(1)
Subject: PlanCheck
Page Label: 2 The PV worksheet is filled out
Author:justinh incorrectly. The original group is
File Name: 17085-Building Permit Change Order 1 REMP at 165 degrees from true south
•irOOO Calc 041619.pdf per the plan (roof slopes to the
=MI north)
nd the6 panel
Color: ■ new
group is at 180 degrees from
true south. Unless a new
-•--- inverter is being proposed the
inverter capacity should be
10kW per the originally
submitted spec. Please revise
the form to accurately depict the
solar system being proposed.
Please also confirm that the new
group of 6 panels will be using
the same 360W panels that the
original group had specified or
provide a new spec for the new
group.
7_SPA_R_17085-Building Permit Change Order 1.2.pdf(1)
Subject: PlanCheck
Page Label: PL1.0_PROJECT SITE PLAN &NOTES Please complete the attached
Author:justinh APSP-15 compliance
File Name: 7 SPA_R 17085-Building Permit Change Order information sheet to demonstrate
— Please tethe attached APSP-15 — — compliance with the 2015 IECC
compliancence information sheet to 1.2.pdf
demonstrate compliance with the 2015 Color: • energy code requirements for
IECC energy code requirements for