Loading...
HomeMy WebLinkAboutFile Documents.905 Chatfield Rd.0085.2019 (25).ARBK 0085-2019-ARBK_BuildingCommentl 0_ARCH_CHANGE ORDER 1.2.pdf(1) Subject: PlanCheck Page Label:A-200_EXTERIOR ELEVATIONS All the elevations and sections Author:justinh should be revised and included File Name: 0_ARCH_CHANGE ORDER 1.2.pdf in this change order to show the All the elevations and sections should be revised and Included, Color: • change in floor elevation and yin Nis change oMerN s°w Me change in floor eleralion entl+ removal of exterior decks. The dean even aiaerw"a"a sanb".a�uv.aaei are floor elevation change would affect every elevation and section. Currently several are missing from the change order set. 17085-Building Permit Change Order 1 REMP Calc-041619.pdf(1) Subject: PlanCheck Page Label: 2 The PV worksheet is filled out Author:justinh incorrectly. The original group is File Name: 17085-Building Permit Change Order 1 REMP at 165 degrees from true south •irOOO Calc 041619.pdf per the plan (roof slopes to the =MI north) nd the6 panel Color: ■ new group is at 180 degrees from true south. Unless a new -•--- inverter is being proposed the inverter capacity should be 10kW per the originally submitted spec. Please revise the form to accurately depict the solar system being proposed. Please also confirm that the new group of 6 panels will be using the same 360W panels that the original group had specified or provide a new spec for the new group. 7_SPA_R_17085-Building Permit Change Order 1.2.pdf(1) Subject: PlanCheck Page Label: PL1.0_PROJECT SITE PLAN &NOTES Please complete the attached Author:justinh APSP-15 compliance File Name: 7 SPA_R 17085-Building Permit Change Order information sheet to demonstrate — Please tethe attached APSP-15 — — compliance with the 2015 IECC compliancence information sheet to 1.2.pdf demonstrate compliance with the 2015 Color: • energy code requirements for IECC energy code requirements for residential pools and spas. residential pools and spas.