HomeMy WebLinkAboutFile Documents.520 E Hyman Ave.0149.2019 (4).ARBK 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
CITY OF ASPEN VERSION 11.3 UPDATED DECEMBER /3, 20/7
PROJECT ADDRESS: 520 E HYMAN AVE., UNIT 3A AND 3B
Parcel ID#: Permit Number: 0149.2019.3arbk
CONTACT INFORMATION : SALT PARKS WEST, LLC
Owner:
Name: City:
.3ULASI /1S1 SIKtiI
Address: State:
Email: Zip Code:
Phone: Cell Phone:
Owner's Representative:
Name: DON CARPENTER City: CARBONDALE
Address: 237 HOLLAND THOMPSON DR State: CO
Email: don@projectresourceco.com Zip Code: 81623
Phone: (970)948-9905 Cell Phone:
A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool,spa,and solar/GSHP information: M3.0
Do you have snowmelt or a spa that has been exempted by the buiding official? @ Yes(enter sqft below on the exempt row) 0 No
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing 1163.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
To be Demoed 1163.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New(non-exempt) 0.00 sqft 0.00 sqft 0.00 sqft 45.00 sqft
New(exempt) 1015.00 sqft 0.00 sqft 0.00 sqft
Total New 1015.00 sqft 0.00 sqft I 0.00 sqft 45.00 sqft J
Total on site 1015.00 sqft 0.00 sqft 0.00 sqft 45.00 sqft
Total Snowmelt on site 1015.00 sqft
Boiler Efficiency 85.0% I 100% 75.0% 100.0%
Mitigation Payment _ $0.00 - $ - $ 7,920.00
Total Payment for Mitigation: $ 7,920.00
B. ON-SITE RENEWABLE CREDITS
Supplemental System - REMP Credit
Use PV Worksheet Photovoltaic System $ -
Use Thermal Worksheet Hot Water Panels $ -
Use GSHP Cert Ground Source Heat Pump_ $ -
Other Approved System_ $ -
Total Mitigation Credits: $ -
Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 1.15
or How many square feet of SHW(solar hot water)would I need? 35.25
R-REMP Payment: $ 7,920.00
Amount Previously Paid on This Permit:
I TOTAL R-REMP PAYMENT: $ 7,920.00
Refund(includes minus$750): $ -
C. PREPARED BY: Date: 5/21/2019
Print Name: TAYLOR CRITCHLOW
Signature:
Phone&EMail: 970-748-8520-taylor@aec-vail.com
REVIEWED: TF Date: 7/17/2019 RECEIVED
Call for Bldg Dept inspection to document area of existing snowmelt 0 6/12/2 019
after piping is exposed
ASPEN
BUILDING DEPARTMENT