Loading...
HomeMy WebLinkAboutFile Documents.121 E Hyman Ave.0149.2018 (81).ARBK Sufficiency Checklist AOC THE CITY OF ASPEN CITY OF ASPEN ENGINEERING DEPARTMENT SUFFICIENCY REVIEW REQUIREMENTS If the project will increase impervious area(this includes enlarging a driveway, adding hard surface patios,increasing the footprint of the house,etc.),disturb>200SF of exterior area(this includes grading, even if a structure or hard surface isn't added), or add or repair snowmelt then an engineering review will be required as part of the Building Permit or Landscape and Grading Permit Application review process. All permit applications that must receive an engineering review are required to schedule and participate in a Pre-Application Meeting with the Development Engineer. The sufficiency checklist below and any necessary supporting documents should be completed prior to this meeting,as they will be reviewed during the meeting. The Development Engineer's signature on this checklist is required in order to submit a Building Permit Application. Project Address: 121 E. Hyman Ave. Aspen, Colorado 81611 Project Common Location/Common Name: Cayton Residence Remodel Parcel ID Number: 2735-12471-002 Owner and Phone Number: Andrea Cayton Trust Contact and Phone Number and e-mail address: Hans Brucker pinnacledesign@sopris.net 1. How much land will be disturbed? 0.0645 acres= 2800 sq.ft. If one acre or more is disturbed, a CDPHE Construction General Permit is required. Yes,Notice of Coverage has been included in the CMP. No, A statement that Notice of Coverage is not required has been included in the CMP. 2. How much impervious area will be disturbed? 2540 sq.ft. Added? 10 sq.ft. 3. What is the estimated total impervious area of the site(not just the addition)? 2550 sq.ft. 4. What type of permit is being sought(Building or Landscape/Grading)? Building 5. What sub-basin(see Secion 1.5 of TAMP)is the project located within? Aspen Mountain 6. What level of project is this—Minor or Major? Major In general,the project is considered"Minor"if 200— 1000 sq ft of disturbance/work and"Major" if > 1000 sq ft of disturbance/work. Revised 11-30-14 RECEIVED 5/23/2018 ASPEN BUILDING DEPARTMENT The following information is required for the engineer's review. Please indicate if these documents have been completed and are attached. If any of these documents are not applicable,please provide an explanation in the space provided. Included N/A 7. Minor Grading and Drainage Plan and Report 1 ❑✓ 8. Major Grading and Drainage Plan and Report LJ n 9. Compliant City of Aspen Survey ❑✓ 10. Soils Report L 11. Excavation Stabilization Plan 12. Construction Management Plan(CMP) ❑✓ 13. Public Improvement Requirements 14. Floodplain Development Requirements E1 15. Mudflow Analysis I hereby declare the engineering information submitted in this sufficiency review for this project is sufficient for City of Aspen Building Permit Application submittal. Applicant's Signature Date /Z0 g C' of Aspen Development E eer's Signature Date Revised 11-30-14 RECEIVEt 5/23/2018 ASPEN BUILDING DEPARTMENT