HomeMy WebLinkAboutFile Documents.520 E Hyman Ave.0149.2019 (5).ARBK aspen 500 w main st,aspen co 81611 + t 970 544 9006
denver 1830 blake st,denver co 80202 + t 303 308 1373
visit www.rowlandbroughton.com
rowland+broughton
architecture/urban design/interior design
TRANSMITTAL
Project: 0158.2018.ARBK— 520 E. Hyman 3 A/B
Subject: Change Order#1 Transmittal
Date: June 10, 2019
To: City of Aspen, do Lauren Litchet
Attachments: See below
Change Order 1 Submittal Narrative:
Approval Changes:
• HPC Certificate of No Negative Effect updated.
• Fireplace/Woodstove Registration Form updated (change to Montigo @ interior and Stellar Hearth
custom ventless @ exterior Level 3 patio).
• Updated REMP worksheet to reflect elimination of snowmelt from under mechanical equip on rooftop.
Drawing updates:
• Spa revisions and details
o This has altered the FAR of the deck; the planter and spa area has not changed. Result is a net
decrease in FAR.
• New skylights, details, and revisions to demo calcs (demo was not calculated accurately during permit).
• Plan revisions showing fire-rated details (details and revised assemblies have already been submitted to
the City previously).
• Updated fireplace specs and drawings.
• Updated stair drawings (Entry Stair 300 and Rear Stair 320) and details.
• Revisions to window/door schedules (new window 320, skylights, addition of fire-rated doors).
o Specifications for new skylights will be included to show energy compliance. Updated RESCheck
has already been submitted to the City previously.
List of Transmitted Documents:
• 0158.2018.ARBK_520 E Hyman 3AB_Building Permit Application_20190610.pdf
• 0158.2018.ARBK_520 E Hyman 3AB_Aspen-2015 IECC REMP CalcuationsVl l_20190523.pdf
• 0158.2018.ARBK_520 E Hyman 3AB_Fireplace Registration_20190610.pdf
• 0158.2018.ARBK_520 E Hyman 3AB_Change Order 1-ARCH_20190610.pdf
• 0158.2018.ARBK_520 E Hyman 3AB_Change Order 1-STRUCT_20190610.pdf
List of Transmitted Sheets-Architectural:
• A0.0 - revised RECEIVED
Page 1of1 06/12/2019
ASPEN
BUILDING DEPARTMENT
aspen 500 w main st,aspen co 81611 + t 970 544 9006
denver 1830 blake st,denver co 80202 + t 303 308 1373
visit www.rowlandbroughton.com
rowland+broughton
architecture/urban design/interior design
• A0.1 - revised
• A0.3
• A0.4
• A0.5
• A2.1
• A2.3
• A2.4
• A3.1
• A4.1
• A4.2
• A4.3
• A4.4
• A5.1
• A5.2
• A6.1
• A6.3
• A6.4
• A6.5 - new sheet
• A6.6
• A6.6.1
• A6.7
• A6.10 - revised
• A6.10.1 - new sheet
• A6.11 - revised
• A6.30 - new sheet
• A6.31
• A6.32
• A7.11 - renamed and revised
• A7.12 - new sheet
• A7.14 - new sheet
• A8.10 - revised
• A8.11 - revised
List of Transmitted Sheets- Structural:
• S2.3 - revised
• S2.4
• S5.2
• S6.1
• S6.2
Sheet A6.2 to be OMITTED from permit set.
Total:38 sheets (24 x 36) and 5 application documents.
Thank you and please be in touch with any questions or requests for more information.
Tim Owen, 970.544.9006 RECEIVED
Page 1of2 06/12/2019
ASPEN
BUILDING DEPARTMENT