HomeMy WebLinkAboutFile Documents.520 E Hyman Ave.0158.2018 (34).ARBK 520 E Hyman_BuildingComments_1
Architectural plans.pdf(6)
F E/Las SAFETY IFC2°'os Page:A0.0 COVER SHEET
"°°Ess'a"""' '°'""s' File Name: Architectural plans.pdf A special inspection is required
CRY OF ASPEN MA"'°"^"°DMIE8 for the structural steel welding
Author: bonniem
A special inspection is required Subject: PlanCheck and high strength bolting.
for the structural steel welding Please submit a special
and high strength bolting. Please Color: •
submit a special inspection inspection agreement with all of
agreement with all of the required the required signatures.
signatures.
R+B: Please see attached
special inspections report
III I I IJ U Page:A0.4 FIRE AREA AND SNOWMELT/RE
File Name: Architectural plans.pdf REMP worksheet provided does
% � Author: bonniem not match the summary on A0.4.
Subject: PlanCheck Revise the REMP worksheet
erm ;� Color: • and/or snowmelt plan so that
Ai they match.
-°- R+B: Please see attached
U ° revised REMP worksheet
' `_ . Page:A2.3 LEVEL 3 FLOOR
__ _ _ File Name: Architectural plans.pdf Wall W-5 is for an interior/interior
— �.° condition. Provide correct wall
Iia� �I -- L ° Author: bonniem
®� I''�� callout and detail.
wP ,� I , Subject: PlanCheck
2 lk
l� '' 1' Color: •
Ifl�l 01 i ® L R+B: Please see attached revised
— �� A2.3 LEVEL 3 FLOOR and A5.2
ir
6,, it
l ---i EZ,rngPL �1 BUILDING SECTIONS sheets. W-5
—'R� °°"e below window sill, W-1 above
i
window sill
o �., h .... Page:A3.3 LEVEL 3 REFLECTED CEILING PLAN
File Name: Architectural plans.pdf Revise reflected ceiling plan to
0 0 0' o Author: bonniem show smoke detector in Bed 2
G — q.Na Subject: PlanCheck and Bed 3. 907.2.11
/WI i'ir ii. Color: ■
� _ R+B: Please see attached
lirC„.. . ,. , 1 i
revised A3.3 LEVEL 3
I� ¢ REFLECTED CEILING
II , , ,
;a PLAN
1.,8 - v�,
I0E Page:A7.2 WALL ASSEMBL
"� ••<<waw"•• File Name:Architectural plans.pdf Include the listing for U465 in the
741 �� "`"�" b II
Author: bonniem detail pages the way you have
Subject: PlanCheck for the other listed assemblies.
Mal ,�„.,. •• Color: ■
® n== ® R+B: Please see attached
sheet A7.5 ASSEMBLY
==+ RATINGS
RECEIVED
12/27/2018
ASPEN
BUILDING DEPARTMENT
Page:A8.10 WINDOW SCHEDULE AND ELEVATIONS
File Name:Architectural plans.pdf Confirm with a plan note and/or
Author: bonniem cutsheet that skylights will be
Subject: PlanCheck laminated glass with a 30 mil
Color: ■ polyvinyl butyral interlayer.
1-1 2405.3
fl R+B: Please see attached revised sheet A8.10
WINDOW SCHEDULE AND ELEVATIONS, refer to
note '6' under the 'WINDOW SCHEDULE
GENERAL NOTES' at the bottom of the sheet
RECEIVED
12/27/2018
ASPEN
BUILDING DEPARTMENT