Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Master Permit.517 Park Cir.0161.2018.ARBK
11/27/24,2:14 PM 0161.2018.ARBK-Salesforce-Enterprise Edition • Close Window • Print This Page • Expand All I Collapse All 0161.2018.ARBK Number 0161.2018.ARBK Record Type Building- Imported Address 517 PARK CIR Owner Fernando Cruz Original Number 0161.2018.ARBK Status Closed- Final Type Building Reason for Cancel or Comp!.Review Fail Applicant MATT KORUS Aspen Internal? Account SHAW CONSTRUCTION LLC Required Bond Amount Project Total Available Bond Amount Land Use Planning Is This Associated w/a Application Building Permit? Permit Contractor SHAW CONSTRUCTION LLC Master Building Permit Valid Business Bluebeam Project Id 364-974-070 License on Account Imported HPC-ZON-EH-UTIL EH-Rcyl Rev, Review Required HPC-ZON-EH-UTIL Submissions Review-2 Documents Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Resubmitted Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Approved Covid-19 Parks-Prkng-San Parks Rev,Parks Fee,Water-LSE Plan Review Rev,Parking Rev,San Rev, Conditional Parks lnsp, Inspections Conditional Final Insp EH-Rcyl Final,Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parking Final,Parks Final,Water-LSE Final,San Final, Action Items Hold All Reviews Create Fees Hold Reason Create Fees 2 ,/ Utility Review Type Major Price Book EDEN Conditional Flat Fee FP, Applicant is a Formula Nonprofit? Conditional Tiered Fee Eligible for Small Formula Lodge Program? Conditional Tiered MAR, Discount All Fees(%) SqFt Fee Formula Fee Discount Reason CO/LOC? CO Status if Issued Applicable https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 1/26 11/27/24,2:14 PM 0161.2018.ARBK-Salesforce-Enterprise Edition Queue Score Queue Designation Milestone Current Days in Applicant Hand Queue Score 0 Milestone Current Days in City Hands Last Date Received Milestone-Total Days from Applicant in Applicant Hand Milestone-Total Days in City Hands Dates New Application Date 11/14/2019 TCO Issuance Date Application Complete 6/7/2018 Close/CO Issuance 12/3/2020 Date Date Application Accepted 6/7/2018 Expiration Date 2/6/2023 Date Issue Date 12/21/2018 Override Expiration Date Last Activity Date 8/10/2022 Basic Information Description Address: Census Code 105- Five or More Family Residences 517 Park Circle Applicant: Jamison Neyers Shaw Construction NEW 11 UNIT APARTMENT BUILDING: (4)2 BEDROOM (7) 1 BEDROOM UNITS/DRIVEWAY AND 11 PARKING SPACES/TRASH ENCLOSURE//KARLA//BB#364-974-070 Use of Building Multi-Family Interior Remodel Only Use Class Residential Class of Work New Permit Comments Job Location Address 517 PARK CIR,ASPEN : 273707401016 Lot 1 Site Address Display on Map Legal Description Subdivision:WAGAR/DETWEILER Lot: 1 Historic Property? No Eden Address 517 PARK CIR Historic District? No HPC -Planning -Zoning Details Zone District R-15 HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land Yes Use Approval? https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 2/26 11/27/24,2:14 PM 0161.2018.ARBK-Salesforce-Enterprise Edition Deed Restricted? Yes Located in a PD? No #of Dwellings Adds/Changes Floor Yes Area? Category of Zoning Residential Occupancy or Use Yes Fee Change? Zoning Work Level Major Zoning Fee Work Affects Exterior Yes of Building? Building Project Details Valuation $3,936,425.00 Lot Size Sq.Ft. 14,458 Reason for Valuation Soil Disturbance Sq Ft 14,458 Change Unit Sq.Ft. 9,145 Affected Area Sq Ft 14,458 Building Footprint Sq Existing Hardscape Ft Footprint Sq Ft Sq Ft of Building Work 9,145 Existing Hardscape% 0% Area of Lot Building Fire Area Sq 11,868 Con Mit Sq Ft Total 23,603 Ft Utility Review Sq. Ft. 9,145 Utility Review Sq Ft 14,458 Total %of Interior being 100% Altered New Sq. Ft. 9,145 Scope of Work Details Work Changes Building Yes Work Affects Yes Footprint? Tree/Drip Line? Work Changes Yes Located Within City No Fenestration/Thrml Mall Boundaries? Envelop? Requires Asbestos Yes Adjacent to City Open No Test? Space? Photovoltaic Installation No Impacts City No Trails/Parks? Work Yes Work Subject to Water Yes Adds/Removes/Changes Efficient L.O.? Plumbing Fixt? Restaurant/Food No Involves Impact on Yes Service Involved? Sewer? Change of Restaurant No Prevents Access to No Ownership? Sewer Main? Affects Yes Sewer Easements No Parking/Alleys/Loading? Affected? Building Description Code Editions 2015 IRC Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Occupancy Load Total Pool Sq Ft https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 3/26 11/27/24,2:14 PM 0161.2018.ARBK-Salesforce-Enterprise Edition Fire Sprinkler Amount of Onsite Existing? Renewable Generation? Fire Sprinkler Yes CO Description Required? Fire Sprinkler Type Basement Fire Alarms Installed? 1st Floor #Wood Fireplaces 2nd Floor #Gas Log Fireplaces 3rd Floor #Gas Appliances Additional Open Text Field For Comments Financials Total Fees $1,300.00 Total Payments $1,300.00 Fees Due at Current $1,300.00 Total Balance $0.00 Status System Information Number 0161.2018.ARBK Community Visibility I Created By Ruth Kinney, 7/27/2019 1:50 PM Contact IDs 0036A00000wkSe5QAE,0036A00000t2kkBQAQ IsTestData? Last Modified By Fernando Cruz, 11/27/2024 2:14 PM VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: CO Issuance Follow-up -0161.2018.ARBK Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/18/2020 Days in Applicant's Hands Comments To: mattk@beckbuilds.com CC: Rebecca.wallace@cityofaspen.com BCC: Attachment: 1-City Final Return_Use Tax.pdf, Notice_to_Contractor_517 PARK CIR- 0161.2018.ARBK.pdf, 1-County Use Tax Final Return Template(PDF).pdf Subject: CO Issuance Follow-up-0161.2018.ARBK Body: Good Morning, https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 4/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition To follow up on Stephens email,yesterday, issuing the Certificate of Occupancy for project 0161.2018.ARBK, I am sending the City Use tax letter and tax reconciliation forms. Please see the attached. If you have any questions please let us know. Kind regards, Lilly Culver Email: Permit Fees Due Type Billable Assigned To Steve Feder Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/17/2020 Days in Applicant's Hands To: mattk@beckbuilds.com CC: BCC: Attachment: --none-- Subject: Permit Fees Due Body: If you have not already paid the fees due on your permit 0161.2018.ARBK,at 517 PARK CIR,ASPEN : 273707401016, please log into the Aspen Permitting Portal to pay them. If you pay online, be aware that credit card transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: • Building and related permits: Community Development, 130 S Galena St.,3rd Floor •Construction parking permits: Parking Department,201 N Mill St., Garden Level • Pitkin County Water Permit(Landscape Efficiency): Utilities Dept., 500 Doolittle Dr. Comments • ROW and encroachments: 201 N Mill St., Suite 203 •Tree permits: Parks Dept., 130 S Galena St. • Utility Connection Permits: Utilities Dept., 500 Doolittle Dr. Current Amount Due: $1,300.00 Instructions to see detail of fees due: -Log in to the Portal here: https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible, click the"View All" link -To filter fees, click on the black funnel icon at the top right. (Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees" under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email: COVID-19 Safety Plan Approval Type Billable Assigned To Steve Feder Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/26/2020 https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 5/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Days in Applicant's Hands To:jimhamilton@shawconstruction.net CC: BCC: Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200426.pdf Subject: COVID-19 Safety Plan Approval Body: Comments Dear MATT KORUS, Thank you for submitting a COVID-19 Site Safety Plan for 0161.2018.ARBK at 517 PARK CIR. City staff has reviewed and approved the safety plan.Attached is the COVID-19 Approval Notice to re- commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan, as well as County requirements,will result in a site shut down.We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. Email: COVID-19 Safety Plan Approval Type Billable Assigned To Steve Feder Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/26/2020 Days in Applicant's Hands To: mattkorus@shawconstruction.net CC: BCC: Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200426.pdf Subject: COVID-19 Safety Plan Approval Body: Comments Dear MATT KORUS, Thank you for submitting a COVID-19 Site Safety Plan for 0161.2018.ARBK at 517 PARK CIR. City staff has reviewed and approved the safety plan.Attached is the COVID-19 Approval Notice to re- commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan, as well as County requirements,will result in a site shut down.We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. Email: Important! Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To Sophie Varga Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/26/2019 Days in Applicant's Hands Comments To: mattkorus@shawconstruction.net CC: BCC: Attachment: --none-- Subject: Important!Your City of Aspen permit has been moved to new permitting system Body: https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 6/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Dear MATT KORUS, As you may know,the City of Aspen has been transitioning to a new online-based permitting system, Salesforce.Thank you for your patience during this transition,which is now complete. Your permit is now operational in Salesforce.Your project located at 517 Park Circle will retain its original permit number, 0161.2018.ARBK and you will use this number to find your permit in Salesforce. If you have not already done so,you must register in Salesforce before you are able to access your permit information, upload new documents, request inspections, or otherwise track the status of your permit. Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system. Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/DocumentCenter/View/4254/Request-an-Inspection?bidld= If you have additional questions that are not addressed at the above links,you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. Sincerely, John Barker City of Aspen Sophie Varga Zoning Enforcement Officer Community Development 130 S. Galena St. Aspen, CO 81611 p: 970.429.2778 c: 970.274.7256 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable,the information and opinions contained in the email are based on current zoning,which is subject to change in the future, and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 8/27/2020 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 7/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/29/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/3/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/19/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/18/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 8/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/23/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/11/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 3/10/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/10/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.25 Total Cost $81.25 Fee Generated Date Start Date Completed Date 3/3/2020 Days in Applicant's Hands https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 9/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/3/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 2/25/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Justin Hahn Number of Hours 0.25 Total Cost $81.25 Fee Generated Date Start Date Completed Date 2/21/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 2/18/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 10/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 1/22/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 2/14/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 2/13/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 1/30/2020 Days in Applicant's Hands Comments Contacts Account SHAW CONSTRUCTION LLC Type Contractor Active Contractor License Count 2.00 Number 0012616 D BRIAN BEAZLEY Account DAVID JOHNSTON ARCHITECTS Type Architect https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 11/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Active Contractor License Count 0.00 Number 0032130 Account SHAW CONSTRUCTION LLC Type Applicant Active Contractor License Count 2.00 Number 0022391 DANIEL BICKES Account SHAW CONSTRUCTION LLC Type Contractor Active Contractor License Count 2.00 Number 0023678 Fees 0054541 Type Building Hourly Review Fee Total $1,300.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Closure Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time Files 1-County Use Tax Final Return Template (PDF) 1-City Final Return_Use Tax Last Modified 11/18/2020 11:19 AM Last Modified 11/18/2020 11:19 AM Created By Lilly Culver Created By Lilly Culver City_Use_Tax_to_Owner_0161.2018.ARBK—517 PARK Notice_to_Contractor_517 PARK CIR- CIR 0161.2018.ARBK Last Modified 11/18/2020 11:18 AM Last Modified 11/18/2020 11:17 AM Created By Lilly Culver Created By Lilly Culver 517 Park Circle -0161.2018.ARBK_LOC FINAL Email transmitting CO 11.17.20 Last Modified 11/18/2020 10:43 AM Last Modified 11/17/2020 3:58 PM Created By Lilly Culver Created By Rebecca Wallace IBC_CO_Letter_Template_20201117.docx UCP_Water_Final_20201005.docx Last Modified 11/17/2020 10:17 AM Last Modified 10/5/2020 11:26 AM Created By Stephen Kanipe Created By Steve Wilson Elevator Permit 517 Park Cir-0161.2018.ARBK APPROVAL_NOTICE_COVID- Last Modified 9/28/2020 6:23 AM 19_SITE_SAFETY_PLAN_20200426.pdf Created By Lilly Culver Last Modified 4/26/2020 12:19 PM Created By Steve Feder APPROVAL_NOTICE_COVID- 19_SITE_SAFETY_PLAN_20200426.pdf 0161.2018.ARBK inspections Last Modified 4/26/2020 12:11 PM Last Modified 11/21/2019 3:27 PM Created By Steve Feder Created By Rebecca Wallace 0161.2018.ARBK fees https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 12/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Last Modified 11/21/2019 3:27 PM Created By Rebecca Wallace Inspections INS-0005786-19 Status Failed/Rejected Type Building Subtype Drywall Requested Date 2/11/2020 10:00 AM Scheduled Start Date 2/11/2020 Completed Date 2/11/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0005790-19 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date Scheduled Start Date 1/22/2020 Completed Date 1/22/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0005794-19 Status Partial/Non-Complete Type Building Subtype Special Insp. Requested Date 2/25/2020 9:00 AM Scheduled Start Date 2/25/2020 Completed Date 2/25/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0005796-19 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date 5/19/2020 10:00 AM Scheduled Start Date 5/19/2020 Completed Date 5/19/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0005803-19 Status Failed/Rejected Type Zoning Subtype Requested Date https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 13/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Scheduled Start Date 10/14/2020 Completed Date 10/16/2020 Owner Last Name Pomeroy Permit Inspection Round Final Inspection Closed TRUE INS-0005807-19 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 2/28/2020 9:00 AM Scheduled Start Date 2/28/2020 Completed Date 2/28/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0005809-19 Status Pass/Accepted Type Building Subtype Special Building Inspection Requested Date 8/26/2020 3:49 PM Scheduled Start Date 8/26/2020 Completed Date 8/26/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0005810-19 Status Pass/Accepted Type Fire Subtype Requested Date Scheduled Start Date Completed Date 9/3/2020 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0001435-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 1/30/2020 6:43 AM Scheduled Start Date 1/30/2020 Completed Date 1/30/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0001954-20 Status Partial/Non-Complete Type Building https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 14/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Subtype Rough Framing Requested Date 2/12/2020 2:00 PM Scheduled Start Date 2/13/2020 Completed Date 2/13/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0003061-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 2/14/2020 9:00 AM Scheduled Start Date 2/14/2020 Completed Date 2/14/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0003084-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 2/17/2020 9:00 AM Scheduled Start Date 2/18/2020 Completed Date 2/18/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0003242-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 3/6/2020 2:00 PM Scheduled Start Date 3/6/2020 Completed Date 3/6/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0003303-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 2/21/2020 10:00 AM Scheduled Start Date 2/21/2020 Completed Date 2/21/2020 Owner Last Name Hahn Permit Inspection Round Re-Inspection Closed TRUE INS-0003428-20 https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 15/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 3/3/2020 6:35 AM Scheduled Start Date 3/3/2020 Completed Date 3/3/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0003832-20 Status Accepted as Noted Type Building Subtype Special Insp. Requested Date 7/29/2020 8:30 AM Scheduled Start Date 7/29/2020 Completed Date 7/29/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0003932-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 3/9/2020 2:00 PM Scheduled Start Date 3/10/2020 Completed Date 3/10/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0004024-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 3/10/2020 9:00 AM Scheduled Start Date 3/10/2020 Completed Date 3/10/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0004204-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 5/18/2020 2:00 PM Scheduled Start Date 5/18/2020 Completed Date 5/18/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 16/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition INS-0004358-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 5/19/2020 10:00 AM Scheduled Start Date 5/19/2020 Completed Date 5/19/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0004359-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 3/11/2020 10:00 AM Scheduled Start Date 3/11/2020 Completed Date 3/11/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0004437-20 Status Accepted as Noted Type Building Subtype Drywall Requested Date 3/23/2020 9:00 AM Scheduled Start Date 3/23/2020 Completed Date 3/23/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0006699-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 4/24/2020 2:42 PM Scheduled Start Date 4/26/2020 Completed Date 4/26/2020 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE INS-0007809-20 Status Closed -Not Needed Type APECC Subtype Insulation Requested Date 5/28/2020 8:42 AM Scheduled Start Date 5/29/2020 Completed Date 5/29/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 17/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Closed TRUE INS-0008270-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 5/29/2020 1:58 PM Scheduled Start Date 5/29/2020 Completed Date 5/29/2020 Owner Last Name Feder Permit Inspection Round Closed TRUE INS-0008271-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 6/3/2020 2:00 PM Scheduled Start Date 6/3/2020 Completed Date 6/3/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0011420-20 Status Pass/Accepted Type Recycling Subtype Requested Date 10/14/2020 2:00 PM Scheduled Start Date Completed Date 10/19/2020 Owner Last Name Tsevdos Permit Inspection Round Final Inspection Closed TRUE INS-0011421-20 Status Pass/Accepted Type Engineering Dev Subtype Requested Date 9/10/2020 9:30 AM Scheduled Start Date Completed Date 11/16/2020 Owner Last Name Murray Permit Inspection Round Final Inspection Closed TRUE INS-0011422-20 Status Accepted as Noted Type Engineering Erosion&Sediment Subtype Requested Date 11/9/2020 9:25 AM Scheduled Start Date Completed Date 11/16/2020 https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 18/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0011423-20 Status Pass/Accepted Type Engineering Water Subtype Requested Date 9/17/2020 10:30 AM Scheduled Start Date Completed Date 10/9/2020 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0011424-20 Status Pass/Accepted Type Parking Subtype Requested Date Scheduled Start Date Completed Date 10/9/2020 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0011425-20 Status Accepted as Noted Type Parks Subtype Requested Date Scheduled Start Date Completed Date 10/13/2020 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0011426-20 Status Pass/Accepted Type Water Efficient Landscaping Subtype Requested Date Scheduled Start Date Completed Date 10/20/2020 Owner Last Name Magill Permit Inspection Round Final Inspection Closed TRUE INS-0011427-20 Status Pass/Accepted Type Sanitation Subtype Requested Date 9/17/2020 10:30 AM https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 19/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Scheduled Start Date Completed Date 10/30/2020 Owner Last Name Strait Permit Inspection Round Final Inspection Closed TRUE INS-0014377-20 Status Pass/Accepted Type Water Efficient Landscaping Subtype Requested Date Scheduled Start Date Completed Date 10/14/2020 Owner Last Name Permit Inspection Round Closed TRUE INS-0014468-20 Status Pass/Accepted Type Zoning Subtype Requested Date Scheduled Start Date Completed Date 10/22/2020 Owner Last Name Pomeroy Permit Inspection Round Re-Inspection Closed TRUE INS-0016130-20 Status Pass/Accepted Type Building Subtype Final Building Requested Date 11/17/2020 9:00 AM Scheduled Start Date 11/17/2020 Completed Date 11/17/2020 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE MEP Permit Inspections INS-0005937-19 Type Plumbing Subtype Final Plumbing Status Accepted as Noted Permit 0045.2019.ASPL Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0005941-19 Type Plumbing Subtype Plumbing Waste&Vent Status Partial/Non-Complete Permit 0045.2019.ASPL https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 20/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006131-19 Type Electric Subtype Rough Electrical Status Partial/Non-Complete Permit 0068.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006132-19 Type Electric Subtype Permanent Service Status Re-Inspection Required Permit 0068.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006133-19 Type Electric Subtype Rough Electrical Status Partial/Non-Complete Permit 0068.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006134-19 Type Electric Subtype Special Electrical Status Partial/Non-Complete Permit 0068.2019.AELE Due Date Priority 2 Normal Owner Alias TParr Closed TRUE INS-0006135-19 Type Electric Subtype Underground Status Partial/Non-Complete Permit 0068.2019.AELE Due Date Priority 2 Normal Owner Alias TParr https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 21/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Closed TRUE INS-0006136-19 Type Electric Subtype Final Electrical Status Partial/Non-Complete Permit 0068.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006138-19 Type Fire Subtype Status Pass/Accepted Permit 0080.2019.afsr Due Date Priority 2 Normal Owner Alias jlage Closed TRUE INS-0004363-20 Type Mechanical Subtype Mechanical Ventilation Status Failed/Rejected Permit 0060-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004367-20 Type Mechanical Subtype Rough Mechanical Status Failed/Rejected Permit 0060-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0011241-20 Type Electric Subtype Final Electrical Status Re-Inspection Required Permit 0068.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0013563-20 https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 22/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0068.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE Milestones Review Round 1 -0161.2018.ARBK Status Approved Due Date Created Date 11/20/2019 Payments PY-007423 Related To 0161.2018.ARBK Amount $1,300.00 Created Date 11/17/2020 Payment Source R-0007094 Receipt-Amount Remaining R-0007094: $0 Permit History 11/27/2024 2:14 PM User Fernando Cruz Action Changed Owner from Lisa Guida to Fernando Cruz. Related Permits 0071.2019.AELE Type Electrical Address 517 PARK CIR Work Type New Status Closed -Final Applicant Ember Shannnon Sage Jones Issue Date 9/9/2019 Last Activity Date 12/3/2019 0068.2019.AELE Type Electrical Address 517 PARK CIR Work Type New Status Closed -Final Applicant Ember Shannnon Sage Jones Issue Date 9/9/2019 Last Activity Date 10/8/2020 0045.2019.ASPL Type Plumbing Address 517 PARK CIR Work Type New Status Closed -Final Applicant ED T ROBERTS Issue Date 5/10/2019 Last Activity Date 8/6/2020 https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 23/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition 0060-2020-MECH Type Mechanical Address 517 PARK CIR Work Type New Status Closed -Final Applicant MITCHELL HYRA Issue Date 3/11/2020 Last Activity Date 8/10/2020 0080.2019.afsr Type Fire Address 517 PARK CIR Work Type New Status Closed -Final Applicant DAKOTA SHAW Issue Date 8/12/2019 Last Activity Date 9/4/2020 0016-2019-FIRE Type Fire Address 517 PARK CIR Work Type New Status Closed -Final Applicant Alisa Sharff Issue Date 12/18/2019 Last Activity Date 0021-2020-RWRG Type Right of Way Address 517 PARK CIR Work Type New Status Closed -Final Applicant DANIEL BICKES Issue Date 5/20/2020 Last Activity Date 1/6/2023 Reviews REV-009067 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Parks Due Date Completed Date 11/20/2019 5:40 AM Owner Alias DRade On Hold Created Date 11/20/2019 REV-009068 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Parking Due Date Completed Date 11/20/2019 9:08 AM Owner Alias Parking -Review https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 24/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition On Hold Created Date 11/20/2019 REV-009069 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Water Efficient Landscaping Due Date Completed Date 11/20/2019 5:43 AM Owner Alias rmagi On Hold Created Date 11/20/2019 REV-009070 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Sanitation Due Date Completed Date 11/20/2019 5:38 AM Owner Alias PMohr On Hold Created Date 11/20/2019 REV-009072 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Engineering Water Due Date Completed Date 11/20/2019 5:37 AM Owner Alias SWilson On Hold Created Date 11/20/2019 REV-009073 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Engineering CMP Due Date Completed Date 11/21/2019 3:18 PM Owner Alias Engineering CMP-Review On Hold Created Date 11/20/2019 REV-009074 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Engineering Dev Due Date Completed Date 11/20/2019 5:30 AM Owner Alias JForm On Hold Created Date 11/20/2019 https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 25/26 11/27/24,2:14 PM 0161.2018.ARBK—Salesforce-Enterprise Edition REV-009075 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Engineering Erosion &Sediment Due Date Completed Date 11/21/2019 3:16 PM Owner Alias AReed On Hold Created Date 11/20/2019 REV-009076 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Fire Due Date Completed Date 11/20/2019 5:41 AM Owner Alias BMuhi On Hold Created Date 11/20/2019 REV-009077 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Zoning Due Date Completed Date 11/20/2019 5:27 AM Owner Alias JPome On Hold Created Date 11/20/2019 REV-009078 Milestone Review Round 1 -0161.2018.ARBK Status Approved Type Building Due Date Completed Date 11/20/2019 5:36 AM Owner Alias BMuhi On Hold Created Date 11/20/2019 Submissions COVID 19 Site Safety Plan Park CR.pdf Actions Submission Date 4/24/2020 2:44 PM Status Required Description Copyright©2000-2024 salesforce.com, inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000kZruNAAS/p 26/26