HomeMy WebLinkAboutFile Documents.517 Park Cir.0161.2018.ARBK 054.2017.AC B K_Zoning 1
Architectural.517 Park Circle.2018.06-SIGNED.pdf(11)
- Page: 1.1 FAR PLANS
T 1 L ; 0 , Checkmark: Unchecked
Author:jimp
_arob o bmya ,." File Name: Architectural.517 Park Circle.2018.06-SIGNED.pdf
.
o-.
__=- _ s Page: 1.1 FAR PLANS This chart will require a bit of reworking.
1 a o- - Checkmark: Unchecked The first column should be titled "Gross
1 't = Author:jimp
File Name:Architectural.517 Park Circle.2018.06-SIGNED.pdf Floor Area". For the second column, I will
require a bit more explanation of how the
ab b b See revised chart on 1.1. numbers are arrived at. Please take
�_- things apart and show me the math. It's
also important to not mix apple&oranges
-a feature needs to be either gross FA or
FA, and gross cannot be added to FA. If
a feature is getting split up and added to
units,then show that. Right now I am
having to guess at how you are arriving at
your totals.
Page: 1.1 FAR PLANS
Checkmark: Unchecked I'm not sure why there are areas of
Author:jimp features with different shadings.
isn to
,m a,�a°~~ File Name: Architectural.517 Park Circle.2018.06-SIGNED.pdf dhing eck,veryt torageteor rlexempther of Ig s it be
O , mQ.Q °M Q See revised legend on exterior, but not contained within 4 walls
j -0 a- --- 1.1, then it will be either deck or exempt
porch.
w�w T - „ V' Page: 1.1 FAR PLANS
°
1 toCheckmark: Unchecked I believe these are switched.
. K21M w.,,<.. n Author:jimp
ea.ow� File Name: Architectural.517 Park Circle.2018.06-SIGNED.pdf
°s�ww 1=—_I
See revised legend on 1.1.
-•-- r a_L. Page: 1.1 FAR PLANS
o- Checkmark: Unchecked Total Floor Area should be just that- FA
==° = a , after all exemptions have been deducted.
° Author:jimp
_ _A`::-`t'1 File Name:Architectural.517 Park Circle.2018.06-SIGNED.pdf it
should only show up in one column
See revised chart on 1.1.
Page: 1.1 FAR PLANS
Checkmark: Unchecked Please provide a legend to show what the
04T ° Author:jimp
_ I 0 - different shadings signify
irrEr_pm-- �,xm _
File Name: Architectural.517 Park Circle.2018.06-SIGNED.pdf
11 as _ I
-
See revised legend on 1.1.
�im1�_. .,ma
RECEIVED
07/27/18
ASPEN
BUILDING DEPARTMENT
®di-rimn A A A A A:t1 Page: 1.1 FAR PLANS This system is extremely hard to follow.
_ Checkmark: Unchecked Please number or letter the walls and
ftsd a Author:jimp then list them in order as one moves
d /du o- File Name:Architectura1.517 Park Circle.2018.06-SIGNED.pdf around the building.
Tip 11 ® See revised diagram on 1.1.
i
1 _0 Page: 1.1 FAR PLANS
_ Checkmark: Unchecked What is this?
1_ -� Author:jimp
a' __® File Name:Architectura1.517 Park Circle.2018.06-SIGNED.pdf
--0 Ir This is a front porch.
i-.-_ 10
I
ir" mow, Page: 2.3 SITE PLAN (ROOF)
4 � 1, Checkmark: Unchecked Please add additional height points where
(, Author:jimp shown on the roof plan drawing
w File Name:Architectura1.517 Park Circle.2018.06-SIGNED.pdf
Claude mentioned these height points are not required
.or -
since they are considered dormers at the same ridge height
as the main roof.
• 7= Page: 3.8 TRASH ENCLOSURE Per the approvals, please provide the
9 ram° 't Checkmark: Unchecked
Author:jimp square footage of the trash enclosure.
i[il iiii,1r4r_ l
File Name:Architectura1.517 Park Circle.2018.06-SIGNED.pdf
�����:� . See revised plan on 3.8.
.. , 0 0 4 ?is_ Page:4.2 ELEVATIONS Please show how this element meets the
Checkmark: Unchecked
III Author:jimp height requirements of the approvals.
ibl
iu'.II_ IIIII1I P-.-_•- File Name: Architectura1.517 Park Circle.2018.06-SIGNED.pdf Since it is closest to the east side of the
0 I n h\ l Claude mentioned these height points are not bpeuildCifiedpfor
lease the easthe height limit
required since they are considered dormers at
the same ridge height as the main roof.
Civil.517 Park Circle.2018.05.pdf(2)
, _ I' Page: [9] C8 DRAINAGE PLAN'1I- Checkmark: Unchecked It appears from this drawing that elements
—� Author:jimp of these patio areas are more than 6"
A' File Name: Civil.517 Park Circle.2018.05.pdf above the finished grade surrounding
,.1 1 them. If they are more than 6"above
se mv_ See revised deck calculation finished grade at any point,then the
"'�j r_ on 1.1. entire patio will need to be counted as
F!�• _._.. deck. Please either show that they will
not be taller than 6"above grade, or add
them to the deck total for the project.
Page: [9] C8 DRAINAGE PLAN
:' r-=- Checkmark: Unchecked It appears from this drawing that elements
�, of these patio areas are more than 6"
�, Author:jimp
N File Name: Civil.517 Park Circle.2018.05.pdf above the finished grade surrounding
N them. If they are more than 6"above
___ . .,._. ,;" See revised deck calculation finished grade at any point,then the
w w m='' f entire patio will need toF' VEDk�/ On 1'1' deck. Please either sh
not be taller than 6"above grade,or a d
them to the deck total for the efleft2. 7/18
ASPEN
BUILDING DEPARTMENT
Landscape Plans.517 Park Circle.2018.04.pdf(2)
Page: L.5.00 LIGHTING PLA
Checkmark: Unchecked Per 26.575.150.1, Prohibitions, Linear
Author:jimp lighting is not allowed in the City. Please
® File Name: Landscape Plans.517 Park Circle.2018.04.pdf amend your lighting plan to remove this
tape light.
mmm . : See revised lighting spec on
it L.5.00.
Page: L.5.00 LIGHTING PLA
— 57.71Y- :- Checkmark: Unchecked Is this sconce being used for all outdoor
Author:jimp lighting? Entries, decks, patios etc.?
111111 File Name: Landscape Plans.517 Park Circle.2018.04.pdf
Just the landscape lighting.
The deck and porch sconces
are the other sconce cutsheet
attached.
RECEIVED
07/27/18
ASPEN