Loading...
HomeMy WebLinkAboutFile Documents.517 Park Cir.0161.2018.ARBK 054.2017.AC B K_Zoning 1 Architectural.517 Park Circle.2018.06-SIGNED.pdf(11) - Page: 1.1 FAR PLANS T 1 L ; 0 , Checkmark: Unchecked Author:jimp _arob o bmya ,." File Name: Architectural.517 Park Circle.2018.06-SIGNED.pdf . o-. __=- _ s Page: 1.1 FAR PLANS This chart will require a bit of reworking. 1 a o- - Checkmark: Unchecked The first column should be titled "Gross 1 't = Author:jimp File Name:Architectural.517 Park Circle.2018.06-SIGNED.pdf Floor Area". For the second column, I will require a bit more explanation of how the ab b b See revised chart on 1.1. numbers are arrived at. Please take �_- things apart and show me the math. It's also important to not mix apple&oranges -a feature needs to be either gross FA or FA, and gross cannot be added to FA. If a feature is getting split up and added to units,then show that. Right now I am having to guess at how you are arriving at your totals. Page: 1.1 FAR PLANS Checkmark: Unchecked I'm not sure why there are areas of Author:jimp features with different shadings. isn to ,m a,�a°~~ File Name: Architectural.517 Park Circle.2018.06-SIGNED.pdf dhing eck,veryt torageteor rlexempther of Ig s it be O , mQ.Q °M Q See revised legend on exterior, but not contained within 4 walls j -0 a- --- 1.1, then it will be either deck or exempt porch. w�w T - „ V' Page: 1.1 FAR PLANS ° 1 toCheckmark: Unchecked I believe these are switched. . K21M w.,,<.. n Author:jimp ea.ow� File Name: Architectural.517 Park Circle.2018.06-SIGNED.pdf °s�ww 1=—_I See revised legend on 1.1. -•-- r a_L. Page: 1.1 FAR PLANS o- Checkmark: Unchecked Total Floor Area should be just that- FA ==° = a , after all exemptions have been deducted. ° Author:jimp _ _A`::-`t'1 File Name:Architectural.517 Park Circle.2018.06-SIGNED.pdf it should only show up in one column See revised chart on 1.1. Page: 1.1 FAR PLANS Checkmark: Unchecked Please provide a legend to show what the 04T ° Author:jimp _ I 0 - different shadings signify irrEr_pm-- �,xm _ File Name: Architectural.517 Park Circle.2018.06-SIGNED.pdf 11 as _ I - See revised legend on 1.1. �im1�_. .,ma RECEIVED 07/27/18 ASPEN BUILDING DEPARTMENT ®di-rimn A A A A A:t1 Page: 1.1 FAR PLANS This system is extremely hard to follow. _ Checkmark: Unchecked Please number or letter the walls and ftsd a Author:jimp then list them in order as one moves d /du o- File Name:Architectura1.517 Park Circle.2018.06-SIGNED.pdf around the building. Tip 11 ® See revised diagram on 1.1. i 1 _0 Page: 1.1 FAR PLANS _ Checkmark: Unchecked What is this? 1_ -� Author:jimp a' __® File Name:Architectura1.517 Park Circle.2018.06-SIGNED.pdf --0 Ir This is a front porch. i-.-_ 10 I ir" mow, Page: 2.3 SITE PLAN (ROOF) 4 � 1, Checkmark: Unchecked Please add additional height points where (, Author:jimp shown on the roof plan drawing w File Name:Architectura1.517 Park Circle.2018.06-SIGNED.pdf Claude mentioned these height points are not required .or - since they are considered dormers at the same ridge height as the main roof. • 7= Page: 3.8 TRASH ENCLOSURE Per the approvals, please provide the 9 ram° 't Checkmark: Unchecked Author:jimp square footage of the trash enclosure. i[il iiii,1r4r_ l File Name:Architectura1.517 Park Circle.2018.06-SIGNED.pdf �����:� . See revised plan on 3.8. .. , 0 0 4 ?is_ Page:4.2 ELEVATIONS Please show how this element meets the Checkmark: Unchecked III Author:jimp height requirements of the approvals. ibl iu'.II_ IIIII1I P-.-_•- File Name: Architectura1.517 Park Circle.2018.06-SIGNED.pdf Since it is closest to the east side of the 0 I n h\ l Claude mentioned these height points are not bpeuildCifiedpfor lease the easthe height limit required since they are considered dormers at the same ridge height as the main roof. Civil.517 Park Circle.2018.05.pdf(2) , _ I' Page: [9] C8 DRAINAGE PLAN'1I- Checkmark: Unchecked It appears from this drawing that elements —� Author:jimp of these patio areas are more than 6" A' File Name: Civil.517 Park Circle.2018.05.pdf above the finished grade surrounding ,.1 1 them. If they are more than 6"above se mv_ See revised deck calculation finished grade at any point,then the "'�j r_ on 1.1. entire patio will need to be counted as F!�• _._.. deck. Please either show that they will not be taller than 6"above grade, or add them to the deck total for the project. Page: [9] C8 DRAINAGE PLAN :' r-=- Checkmark: Unchecked It appears from this drawing that elements �, of these patio areas are more than 6" �, Author:jimp N File Name: Civil.517 Park Circle.2018.05.pdf above the finished grade surrounding N them. If they are more than 6"above ___ . .,._. ,;" See revised deck calculation finished grade at any point,then the w w m='' f entire patio will need toF' VEDk�/ On 1'1' deck. Please either sh not be taller than 6"above grade,or a d them to the deck total for the efleft2. 7/18 ASPEN BUILDING DEPARTMENT Landscape Plans.517 Park Circle.2018.04.pdf(2) Page: L.5.00 LIGHTING PLA Checkmark: Unchecked Per 26.575.150.1, Prohibitions, Linear Author:jimp lighting is not allowed in the City. Please ® File Name: Landscape Plans.517 Park Circle.2018.04.pdf amend your lighting plan to remove this tape light. mmm . : See revised lighting spec on it L.5.00. Page: L.5.00 LIGHTING PLA — 57.71Y- :- Checkmark: Unchecked Is this sconce being used for all outdoor Author:jimp lighting? Entries, decks, patios etc.? 111111 File Name: Landscape Plans.517 Park Circle.2018.04.pdf Just the landscape lighting. The deck and porch sconces are the other sconce cutsheet attached. RECEIVED 07/27/18 ASPEN BUILDING DEPARTMENT