Loading...
HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0098-2020-BCHO (3) FORUM PHI 11130 Black Birch - Change Order 2 Building Comment Responses Comment 1 The mechanical set shows this paver path as being snowmelted (108 sq.ft.)and that is not being included in your REMP totals on the architectural plans or the REMP worksheet. Revise to show snowmelt totals consistently. Response 1 Paver area will not be snow melted and has been removed from the Mechanical Set forumphi.com I p.970.279.4157 I f.866.770.5585 9 ED Aspen:715 W. Main St,#204 Aspen,CO 81611 Carbondale:36 N.4th Street Carbondale,CO 81623 021 ASPEN BUILDING DEPARTMENT