Loading...
HomeMy WebLinkAboutFile Documents.905 Chatfield Rd.0085.2019 (31).ARBK CHANGE ORDER 1 - NARRATIVE THIS CHANGE ORDER IS PRIMARILY WARRANTED BY THE ADDITION OF A SPA ALONG WITH A BASIC TERRACE LAYOUT MODIFICATION WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND LIGHTING IMPLICATIONS. SECONDARY REVISIONS INCLUDE, BUT ARE NOT LIMITED TO: • A REVISED EXT INSULATION SYSTEM • 2 REVISED WINDOWS • REVISED DECK AND ROOF ASSEMBLY • REVISED SNOWMELT PLEASE SEE THE FOLLOWING SCHEDULE FOR A COMPREHENSIVE LIST OF REVISED SHEETS AND A BRIEF DISCRIPTION OF THE REVISIONS THEY CONTAIN. EACH REVISION IS CLOUDED ON IT'S RESPECTIVE SHEET. REVISED SHEET # SHEET NAME REVISION DESCRIPTION ARCH 1 -COVER COVER SHEET BUILDING PERMIT CHANGE ORDER 1 COVER 2-COVER SHEET INDEX HIGHLIGHT REVISED SHEETS UNDER CHANGE ORDER 1 A-005 PROPOSED FAR REVISED DECK AREA CIVIL C1-00 SITE &UTILITY PLAN REVISED TERRACE LAYOUT C1-01 UTILITY PLAN UTILITIES TO REVISED TERRACE LAYOUT C1-10 DRIVEWAY PLAN AND PROFILE REVISED TERRACE LAYOUT C2-00 GRADING AND DRAINAGE PLAN GRADING AROUNDREVISED TERRACE LAYOUT-GRAVEL WASH TO RECEIVE RAIN CHAIN C2-10 STORM DRAINAGE PLAN AND PROFILES REVISED TERRACE LAYOUT C2-11 STORM DRAINAGE PLAN AND PROFILES REVISED TERRACE LAYOUT LANDSCAPE LCVR COVER/NOTES/INDEX MATERIAL/MOCKUP NOTES L0.01 LANDSCAPE ARCHITECTURE NOTES PLANT NOTES L1.00 LANDSCAPE DEVELOPMENT PLAN REVISED TERRACE LAYOUT PLANTING L3.00 MATERIALS PLAN (HARDSCAPE) REVISED TERRACE LAYOUT L5.00 PLANTING PLAN PLANT LIST L5.10 HYDROZONE DIAGRAM WATER EFFICIENT LANDSCAPE WORKSHEET L7.01 DETAILS ADDRESS WALL L7.02 DETAILS SEAT WALL/OMMITANCE OF LAWN FIRE FEATURE L8.10 IRRIGATION PLAN REVISED TERRACE AND IRRIGATION LAYOUT RECEIVED 06/10/2019 REVISED SHEETS I SILVERSTEIN RESIDENCE 03-15-2019 C C Y A R C H I T E C T SJIN BUILDING DEPARTMENT REVISED SHEET# SHEET NAME REVISION DESCRIPTION ARCH A-100 SITE PLAN - PRE-DEVELOPMENT& REVISED TERRACE LAYOUT PROPOSED GRADE A-100.1 SITE PLAN - EXISTING & PROPOSED GRADE REVISED TERRACE LAYOUT A-101 SNOWMELT PLAN REVISED SNOWMELT @ BACK TERRACE A-109 LOWER LEVEL CRAWL SPACE REVISED TERRACE FOUNDATION A-110 OVERALL LOWER LEVEL FLOOR PLAN REVISED TERRACE FOUNDATION A-112 OVERALL UPPER LEVEL FLOOR PLAN REMOVAL OF DECKS A-113 OVERALL ROOF PLAN REVISED SOLAR LAYOUT A-120 ENLARGED LOWER LEVEL FLOOR PLAN REVISED TERRACE FOUNDATION A-122 ENLARGED MAIN LEVEL FLOOR PLAN - B REVISED WALL TYPE-W6C-@ TWO TYP B SHEARWALLS A-123 ENLARGED UPPER LEVEL FLOOR PLAN REMOVAL OF DECKS A-204 EXTERIOR ELEVATIONS MECH VENTS @ SPA VAULT A-322 WALL SECTIONS REVISED ROOF DETAILS A-500 TYP. FLOOR/ROOF ASSEMBLIES REVISED R1 ROOF ASSEMBLY-USING BALLAST IN LIEU OF PAVERS A-501 TYP.WALL ASSEMBLIES REVISED WALL ASSEMBLIES-USE ZIP PANEL SYSTEM A-520 FLOOR DETAILS REVISED "FLOOR" DETAILS(NOW A ROOF INSTEAD OF BALCONY FLOOR) A-601 WINDOW SCHEDULE REVISED WINDOWS STRUCTURE S-120 FOUNDATION PLAN -A REVISED TERRACE FOUNDATION S-122 LOWER LEVEL FRAMING -A REVISED TERRACE FOUNDATION S-124 MAIN LEVEL FRAMING PLAN -A REVISED TERRACE FOUNDATION S-125 MAIN LEVEL FRAMING PLAN - B PLANTER WALL S-126 LOW ROOF FRAMING FRAMING S-127 UPPER LEVEL FRAMING PLAN ZIP PANEL OVER SHEAR WALL S-200 SECTIONS & DETAILS STEEL PLATE RETAINING WALL DETAIL S-301 SCHEDULES ZIP PANEL SCHEDULE MECH M001 MECHANICAL ZONING PLAN SNOWMELT ZONING M101 MECHANICAL SCHEDULES SNOWMELT SCHEDULE M201 LOWER LEVEL MECHANICAL PLAN VAULT EQUIPMENT M300 MECHANICAL SCHEMATICS REVISED CONTROLS M401 SEQUENCE OF OPERATION REVISED NOTES LIGHTING LIGHT 0.2a ARCHITECTURAL FIXTURE SCHEDULE REVISED FIXTURES LIGHT 1.0 SITE LIGHTING PLAN REVISED FIXTURES LIGHT 1.1 LOWER LEVEL LIGHTING PLAN REVISED LAYOUT LIGHT 1.2.2 MAIN LEVEL SOUTH PARTIAL LIGHTING REVISED LAYOUT PLAN POOL PL1.0 PROJECT SITEPLAN & NOTES NEW SHEET PL1.1 SPA PLAN NEW SHEET PL1.2 SPA DATA NEW SHEET PL2.1 spa plan NEW SHEET PL2.2 SPA DETAILS NEW SHEET �������� PL3.1 PIPING SCHEMATICS & EQUIPMENT PLAN NEW SHEET PL4.1 3D VIEWS NEW SHEET REVISED SHEETS 06/10/2019 SILVERSTEIN RESIDENCE I 03-15-2019 C C Y ARCHITECTSIFA BUILDING DEPARTMENT CHANGE ORDER 1 .2 - NARRATIVE THIS ADDENDUM CHANGE ORDER IS MANDATED UPON THE DISCOVERY THAT THE FRONT YARD WATERLINE LOCATION IS HIGHER THAN PREVIOUSLY CALCULATED. IN ORDER TO MAINTAIN THE THE PRESCRIBED 6' OF GROUND COVERAGE ABOVE THE WATERLINE AND MAINTAIN A COMPLIANT AND DESIRABLE DRIVEWAY SLOPE, THE CLIENT IS FORCED TO RAISE THE GARAGE PORTION OF THE HOUSE. PLEASE SEE THE FOLLOWING SCHEDULE FOR A LIST OF REVISED SHEETS AND A BRIEF DISCRIPTION OF THE REVISIONS THEY CONTAIN. EACH REVISION IS CLOUDED ON IT'S RESPECTIVE SHEET. REVISED SHEET# SHEET NAME REVISION DESCRIPTION ARCH A-007 HEIGHT LIMITS REVISED ROOF HEIGHTS AND ROOF SLOPE CIVIL C1-10 DRIVEWAY PLAN AND PROFILE REVISED GRADE& DRIVEWAY PROFILE LANDSCAPE LCVR COVER/NOTES/INDEX REVISION DESCRIPTION L1.00 LANDSCAPE DEVELOPMENT PLAN REVISED STEPS L3.00 MATERIALS PLAN (HARDSCAPE) REVISED TERRACE LAYOUT ARCH A-111 OVERALL MAIN LEVEL FLOOR PLAN RAISED FLOOR C GARAGE, STEPS ADDED A-113 OVERALL ROOF PLAN REVISED SOLAR LAYOUT A-123 ENLARGED UPPER LEVEL FLOOR REMOVAL OF DECKS PLAN A-201 EXTERIOR ELEVATION RAISED FLOOR AND ROOF HEIGHTS A-300 BUILDING SECTIONS RAISED FLOOR AND ROOF HEIGHTS, FLOOR OVER FRAMING A-302 BUILDING SECTIONS RAISED FLOOR AND ROOF HEIGHTS, FLOOR OVER FRAMING A-303 BUILDING SECTIONS RAISED FLOOR AND ROOF HEIGHTS A-304 BUILDING SECTIONS RAISED FLOOR AND ROOF HEIGHTS A-400 STAIRS ENLARGED PLANS& ADDED STAIRS AXONOMETRIC A-401 STAIR SECTIONS& ELEVATIONS ADDED STAIRS A-601 WINDOW SCHEDULE REVISED WINDOWS RECEIVED 06/10/2019 CHANGE ORDER 1 .2 I SILVERSTEIN RESIDENCE 05-13-2019 C C Y A R C H I T E C T SA BUILDING DEPARTMENT