Loading...
HomeMy WebLinkAboutFile Documents.735 Castle Creek Dr.0196.2018 (18).ARBK APPROVED DATE BY 735 Castle Creek Dr. Unit 1 Aspen, CO 81611 Construction Management Plan RECEIVED 07/25/2018 ASPEN BUILDING DEPARTMENT Table of Contents 2.0 Projection Location 2.1 Disturbance Area 2.2 Location 2.3 Description 3.0 Project Documentation 3.1 Permits/Other Documents 3.2 Public Notification 3.3 Project Sign 3.4 Contact Designation 4.0 Project Implementation 4.1 Dates of Construction 4.2 Hours of Construction 4.3 Sequence (Phasing of Construction) 4.4 Adjoining Properties 5.0 Site and Right of Way Management Plan 5.1 Right of Way Management Plan 5.2 Emergency Access/Ordinance 35 5.3 Construction Parking Details 5.4 Staging Areas 5.5 Construction Trailer, Material Storage, and Waste Management 6.0 Traffic Control 6.1 General Haul Routes 7.0 Emissions 7.1 General 8.0 Noise Suppression 8.1 General RECEIVED 07/25/2018 ASPEN BUILDING DEPARTMENT 2.0 PROJECT LOCATION 2.1 DISTURBANCE AREA The area of disturbance for the construction of this project is approximately 4,545 SF of interior space. There will be no soil disturbance. 2.2 LOCATION 735 Castle Creek Dr. Unit 1, Aspen, CO 81611 City of Aspen GIS �y 1 N Y n — f f T g ,' y it 1 -.•x ., 1; � -.414 +''• '� 'r •4j" l 5 \ f._Irt 7so 7 ''1 r i. • ..'%,jr , -' A t r -55 'it A i 44' ' ‘.:*:3/4-::04..*;44`;-__ — _:::,----es ..-;:i, - ; -�, } kt i ut t ___Alt A _,,. To -. i ', yy1 ' :„ 1.% . s', *, 1 .,ip'51.• : ".- . .:z. :, ..., .., �., ,, . ..„•, 11 - Y'- 4� 7 �� r 1 ',Z '�.� •:ram s�#�r s : �, •t• < it ' . s ,. x * to. ir i Alt ' ."',.,. ' '''. - A -)1— _!_ la', - 4.".. II 44. .,4-4111kr,,‘ A .--1. • •. ,, " --"-- , t ' I- ' % . .' * /-i A • ''.... • 1- ,. 4 -,-qt, Ti . .- I\ ..i .. , , , - - ., * ,....1,....s, , .. A. sr.Air ., , 9 � o�.a. • '{I �f. 1 '. -,dV 1715 1 .. 1 :.P in '�" June 7,2018 1:1 200 0 0.01 0.01 0.03 mi Structures Federal Lands USFS — Water Line Zoomed Out I 0 0.01 0.03 0.05 km Parcels Label:Unit Number BLM Addresses Label:Number — Water Line Zoomed In clyofAspenuls STATE OF CO p Water Polygons UOB Ciry of Asven GIS CeymAene.SI 2.3 DESCRIPTION Interior remodel to a duplex residence located off of Cemetery Lane in aspen. A proposed update to the basement, main, and upper level is associated with the remodel. Exterior updates are only to replace windows and doors. 3.0 PROJECT DOCUMENTATION 3.1 PERMITS/OTHER DOCUMENTS This construction management plan (CMP) is being submitted as required by the permitting process for the building permit. 3.2 PUBLIC NOTIFICATION A project update will be provided to the public and HOA on a basis no leRErEIVED 07/25/2018 ASPEN BUILDING DEPARTMENT than monthly, via website, newspaper, on-site notices, or other accepted means of notification (per request of the City of Aspen). The first public notification will occur no later than 10 days prior to construction. The update will include a description of the current project phase, list any traffic and/or pedestrian concerns and describe hauling/staging operations. Additionally, it will include information of the kinds of equipment, expected noise levels and durations of loud work. Communication with neighbors can prevent complaints from arising, and resolve concerns before there is a problem. Provide a phone number where the foreman can be reached prior to the start of the job. The above notification will specifically be distributed to neighbors located within 300 feet of the project property. 3.3 PROJECT SIGN To be provided by general contractor 3.4 CONTACT DESIGNATION Owner: 735 Castle Creek Drive LLC Contractor: Macky Morris - Cornerstone Site Supervisor: TBD Safety Officer: TBD Traffic Control Officer: TBD EMERGENCY Dial 911 Police Department: (970) 920-5400 Fire Department: (970) 925-8484 Aspen Community Development: (970) 920-5090 Aspen Water Department: (970) 925-5110 Aspen Consolidated Sanitation: (970) 925-3601 4.0 PROJECT IMPLEMENTATION 4.1 DATES OF CONSTRUCTION Construction will begin upon receiving the building permit and completed within a year. 4.2 HOURS OF CONSTRUCTION As required by City Ordinance, construction hours will be limited to 7:30am - RECRECEIVED 07/25/2018 ASPEN BUILDING DEPARTMENT 5:30pm, Monday through Friday, and 9:00am — 5:00pm on Saturdays. Construction activities will not be permitted on Sundays. In accordance with the Noise Suppression Plan, work activities generating noise levels in excess of 80 db. will be constrained to the hours of 9:00am — 5:00pm Monday through Friday only. The above notification will specifically be distributed to neighbors located within 300 feet of the project property. The following days are denoted as Non- Working days; • Sundays • 4th of July • Memorial Day Weekend, including Monday • Labor Day Weekend • Thanksgiving Day • Week of Christmas (Dec. 25-Jan. 1) 4.3 SEQUENCE (PHASING) OF CONSTRUCTION • Demolition of walls • Removal of fixtures • Removal & Replacement of windows • Framing & Drywall • Replace fixtures • Finish floors • Install Fireplaces 4.4 ADJOINING PROPERTIES The needs of adjoining properties and construction projects will not be compromised. 4.5 PROJECT FENCING All construction areas shall have a non-removable construction fence or other approved device securely placed around the areas to be protected. The fence shall be six feet (6') in height and constructed out of chain-link fence with mesh windscreens (visual barriers). The type and look of fencing will be approved by the engineering department. 4.6 PUBLIC HEALTH AND WELFARE All construction projects located within the City of Aspen shall uphold utmost respect to public health and welfare and be reflected in prepared Plan. 5.0 SITE AND RIGHT OF WAY MANAGEMENT 5.1 RIGHT OF WAY MANAGEMENT PLAN All construction access will be provided through the driveway. 5.2 EMERGENCY VEHICLE ACCESS Continuous emergency vehicle access, on and around site, will be maintained. 5.3 CONSTRUCTION PARKING DETAILS RECEIVED 07/25/2018 ASPEN BUILDING DEPARTMENT All construction access/parking will be provided through the driveway, and sit on site. 5.4 STAGING AREAS All construction staging will be facilitated in the space being remodeled. 5.5 CONSTRUCTION TRAILER, MATERIAL STORAGE, AND WASTE MANAGEMENT All construction materials and job site trailers will be kept inside the construction area. Waste will be removed as needed. 6.0 TRAFFIC CONTROL 6.1 GENERAL HAUL ROUTES Castle Creek Drive to Cemetery Lane to Hwy 82. 7.0 EMISSIONS 7.1 GENERAL All vehicles and equipment used on site will be properly maintained such that the engines will function within manufacture's standards or parameters. 8.0 NOISE SUPRESSION 8.1 GENERAL All construction equipment will be adequately muffled and maintained to minimize project noise. RECEIVED 07/25/2018 ASPEN BUILDING DEPARTMENT