Loading...
HomeMy WebLinkAboutFile Documents.926 Waters Ave.0176.2018 (7).ARBK ADDRESS: PERMIT NUMBER: - COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET i _ THE On OF ., / . FOR PLAN REVIEW QUESTIONS Name •Steve Novy Phone • • % ' • • • + ' E-mail • T �� • . s . FOR INSPECTION QUESTIONS Name Tom Sherladc Phonf , E-mail OWNER . - . • 0v, fr se ' • . • Phone Cell Phone Name �.._.._. Mailing Address City State ZIP E-mail Address --- —_ OWNER'S AUTHORIZED AGENT _ Name St' Novy Phone - • • - Cell Phone Mailing 65 N 4th St Ste. 5 Carbondale CO 81623 Address City State ZIP E-mail snovy@greenlinearchitects.com Address APPLICATION BEST CONTACT - -- - -- • Name Steve Novy - Phone ` • , . • . • Cell Phone Mailing 65 N 4th St Ste. 5 Carbondale scare CO ZIP 81623 Address - City E-mail Address Snovyggreenlinearchitects.corn --- ARCHITECT OR DESIGNER OF RECORD _ Novy, AlA Slovo � ' � • ' • • NamePhone Cell Phone A dlfeg 65 N 4th St Ste. 5 Carbondale CO City ZIP 81623 State • E-mail snovy@greenlinearchitects.com Address — - - -- CIVIL ENGINEER OF RECORD Name " Phone - Cell Phone Mailing Address City_ - - State ZIP E-mail Address - STRUCTIJAL ENGINEER OF RECORD Name Adolfo Gorra, MS, PF Phone . i . • ' . i Cell Phone Mailing 812 Pitkin Ave City Glenwood Springs State CO ZIP 81641 Address E-mail Address gSC SOpris.net GENERAL CONTRACTOR Name • HS Built- Tom Sherlock • Phone • - _ - II 9 _ Cell Phone Mailing 314 Suite B AABC City Aspen State CO ZIP 81611 Address _ E-mail tom@hsbuilt.com Address ---- INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provis • . of any other state r local law regulating construction or the performance of construction. It is my responsibility to review the ap-. ro plans n an c ents that are contained thereon and see that the structure and/or project is built in compliance with al -p di abl co Signature Contractor Thomas J. Sherlock - digital signature Date 06/27/2018 S gn [j Check if you are a tested owner builder (singl - - a Ily homes only . You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by: Date: Affidavit on file • ( CITY OF ASPENAugust2o17 130 S . GALENA ST ASPEN , CO 81611 ..l PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY ,„kc,nciAs.i. 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. -The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: I he Loving Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I HSBuiIt understand this policy. I agree that this project will (contractor name) g p 1 comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all ap .ca le z ni . limi 'o p<ri f:pr JL om 5Rwb4lClint NOWifisen off .us .. .o.�a�..awwa�oanw. To Br 8 ns 1-I .r . � , ,m �, G . ac-�. « Contractor Signature: � 1 `� .i : "° Date: 6/21 /18 [ CITY OF ASPEN August 2017 130 S . GALENA ST ASPEN , CO 81611)