HomeMy WebLinkAboutFile Documents.926 Waters Ave.0176.2018 (7).ARBK ADDRESS: PERMIT NUMBER:
-
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET i _
THE On OF .,
/ .
FOR PLAN REVIEW QUESTIONS
Name •Steve Novy Phone • • % ' • • • + ' E-mail • T �� • . s .
FOR INSPECTION QUESTIONS
Name Tom Sherladc Phonf , E-mail
OWNER
. - . • 0v, fr se ' • . •
Phone Cell Phone
Name �.._.._.
Mailing
Address City State ZIP
E-mail
Address --- —_
OWNER'S AUTHORIZED AGENT _
Name St' Novy Phone - • • - Cell Phone
Mailing 65 N 4th St Ste. 5 Carbondale CO 81623
Address City State ZIP
E-mail snovy@greenlinearchitects.com
Address
APPLICATION BEST CONTACT - -- - --
•
Name Steve Novy - Phone ` • , . • . • Cell Phone
Mailing 65 N 4th St Ste. 5 Carbondale scare CO ZIP 81623
Address - City
E-mail Address Snovyggreenlinearchitects.corn
---
ARCHITECT OR DESIGNER OF RECORD _
Novy, AlA
Slovo � ' � • ' • •
NamePhone Cell Phone
A dlfeg 65 N 4th St Ste. 5 Carbondale CO
City ZIP
81623
State
•
E-mail snovy@greenlinearchitects.com
Address — - - --
CIVIL ENGINEER OF RECORD
Name " Phone - Cell Phone
Mailing
Address City_ - - State ZIP
E-mail
Address -
STRUCTIJAL ENGINEER OF RECORD
Name Adolfo Gorra, MS, PF Phone . i . • ' . i Cell Phone
Mailing 812 Pitkin Ave City Glenwood Springs State CO ZIP 81641
Address
E-mail Address gSC SOpris.net
GENERAL CONTRACTOR
Name •
HS Built- Tom Sherlock •
Phone • - _ - II 9
_ Cell Phone
Mailing 314 Suite B AABC City Aspen State CO ZIP 81611
Address _
E-mail tom@hsbuilt.com
Address ----
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provis • . of any other state r local law regulating construction or the performance
of construction. It is my responsibility to review the ap-. ro plans n an c ents that are contained thereon and see that the
structure and/or project is built in compliance with al -p di abl co
Signature Contractor Thomas J. Sherlock - digital signature Date 06/27/2018
S
gn
[j Check if you are a tested owner builder (singl - - a Ily homes only . You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by: Date: Affidavit on file
•
( CITY OF ASPENAugust2o17 130 S . GALENA ST ASPEN , CO 81611
..l
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY ,„kc,nciAs.i.
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: I he Loving Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
I HSBuiIt understand this policy. I agree that this project will
(contractor name) g p 1
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all ap .ca le z ni . limi 'o
p<ri f:pr JL om 5Rwb4lClint NOWifisen
off .us .. .o.�a�..awwa�oanw.
To Br 8 ns 1-I .r . � , ,m �, G . ac-�. «
Contractor Signature: � 1 `� .i : "°
Date: 6/21 /18
[ CITY OF ASPEN August 2017 130 S . GALENA ST ASPEN , CO 81611)